  <level label="a">
    <level label="1">
      <text>In this section the following words have the meanings indicated.</text>
    </level>
    <level label="2">
      <text>“Construction contractor” means a person that performs or is hired to perform road construction work.</text>
    </level>
    <level label="3">
      <text>“Road construction work” means the construction, repair, paving, repaving, or grading of a public roadway.</text>
    </level>
  </level>
  <level label="b">
    <text>Before beginning road construction work on a public roadway in the sanitary district in which a water, sewer, or stormwater management structure is installed, a construction contractor shall give notice to the Commission and the county of the proposed construction work.</text>
  </level>
  <level label="c">
    <text>The notice:</text>
    <level label="1">
      <text>shall include the proposed construction schedule and information about the location of construction to accomplish the purposes of this section;</text>
    </level>
    <level label="2">
      <text>except in emergency road repair situations, shall be given to the Commission and the county at least 7 days before road construction work begins; and</text>
    </level>
    <level label="3">
      <text>in an emergency road repair situation, shall be given to the Commission and the county as promptly as feasible under the emergency situation.</text>
    </level>
  </level>
  <level label="d">
    <text>Unless allowed by the Commission or the county, as appropriate, a person may not disturb, remove, pave over, or repave over a manhole, valve, fitting, or other Commission water or sewer structure or county stormwater management structure.</text>
  </level>