<subtitle article="gpu" title_number="4" subtitle_number="2" title_name="Rate Regulation" subtitle_name="Rate Setting Proceedings">
  <section article="gpu" article_name="Public Utilities" number="4-201" title_number="4" title_name="Rate Regulation" subtitle_number="2" subtitle_name="Rate Setting Proceedings">
    <text>In accordance with the provisions of this article, a public service company shall charge just and reasonable rates for the regulated services that it renders.</text>
  </section>
  <section article="gpu" article_name="Public Utilities" number="4-202" title_number="4" title_name="Rate Regulation" subtitle_number="2" subtitle_name="Rate Setting Proceedings">
    <level label="a">
      <text>Except as provided in subsection (c)(1) of this section and subject to subsection (c)(2) of this section, a public service company shall file with the Commission a tariff schedule of its rates and charges for its regulated services and for standard offer service as provided in § 7–505(b)(8) of this article.</text>
    </level>
    <level label="b">
      <text>As ordered by the Commission, a public service company shall:</text>
      <level label="1">
        <text>plainly print the tariff schedule of its rates and charges for its regulated services;</text>
      </level>
      <level label="2">
        <text>make available the tariff schedules for public inspection; and</text>
      </level>
      <level label="3">
        <text>post the tariff schedules to make the tariff schedules readily accessible to and convenient for inspection by the public.</text>
      </level>
    </level>
    <level label="c">
      <level label="1">
        <level label="i">
          <text>A telephone company that is regulated using an alternative form of regulation under § 4–301 of this title for baskets of services is not required to file with the Commission a tariff schedule of its rates and charges for its regulated retail services that are included in Basket 4 “Discretionary Services” and Basket 5 “Competitive Services”.</text>
        </level>
        <level label="ii">
          <text>A telephone company that is not regulated using an alternative form of regulation under § 4–301 of this title for baskets of services is not required to file with the Commission a tariff schedule of its rates and charges for its regulated retail services that, as determined by the Commission, are similar to the services included in Basket 4 “Discretionary Services” and Basket 5 “Competitive Services”.</text>
        </level>
      </level>
      <level label="2">
        <text>Notwithstanding any other law, except as provided in paragraph (1) of this subsection, if the Commission finds after notice and hearing that it is in the public interest, the Commission may allow a telephone company that has 20,000 or fewer subscribers to provide a regulated service without requiring the telephone company to file a tariff schedule of its rates and charges for the regulated service.</text>
      </level>
      <level label="3">
        <text>The Commission may issue orders or adopt regulations that the Commission determines necessary to regulate a service in which a telephone company is not required to file a tariff schedule of its rates and charges under this subsection.</text>
      </level>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="4-203" title_number="4" title_name="Rate Regulation" subtitle_number="2" subtitle_name="Rate Setting Proceedings">
    <level label="a">
      <text>Unless otherwise ordered by the Commission, a public service company may not establish a new rate or change in rate unless the public service company:</text>
      <level label="1">
        <text>provides to the Commission notice of the new rate or change in rate at least 30 days before the new rate is established or current rate is changed; and</text>
      </level>
      <level label="2">
        <text>publishes the new rate or change in rate in accordance with § 4–202 of this subtitle during the entire 30 day notice period in new schedules or plainly indicated amendments to existing schedules.</text>
      </level>
    </level>
    <level label="b">
      <text>The public service company shall plainly set forth in the notice and publication:</text>
      <level label="1">
        <text>the changes that it proposes to the rate schedules currently in force; and</text>
      </level>
      <level label="2">
        <text>the effective date of the changes.</text>
      </level>
    </level>
    <level label="c">
      <level label="1">
        <text>The technical staff of the Commission may assist a water company or a sewage disposal company in establishing a proposed just and reasonable rate.</text>
      </level>
      <level label="2">
        <text>In assisting a water company or a sewage disposal company under this subsection, the technical staff may seek information from the water company or the sewage disposal company.</text>
      </level>
      <level label="3">
        <text>The Commission shall restrict the availability of staff–assisted rate cases authorized under this subsection to water companies or sewage disposal companies whose gross annual revenues, for the most recent calendar year for which data are available, are below an amount determined by the Commission, not to exceed $1,000,000.</text>
      </level>
      <level label="4">
        <text>The Commission shall adopt regulations to establish formal rules for staff–assisted rate cases authorized under this subsection.</text>
      </level>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="4-203.1" title_number="4" title_name="Rate Regulation" subtitle_number="2" subtitle_name="Rate Setting Proceedings">
    <level label="a">
      <level label="1">
        <text>This section applies only to a public service company that is an investor–owned electric company, a gas company, or a combination gas and electric company.</text>
      </level>
      <level label="2">
        <text>This section does not apply to a municipal electric utility or an electric cooperative.</text>
      </level>
    </level>
    <level label="b">
      <text>In addition to the requirements set forth in § 4–203 of this subtitle, when a public service company initiates a base rate proceeding or another proceeding that may lead to a distribution cost increase in excess of 3.0% for its customers served under a residential tariff, the public service company shall provide those customers, through links on physical or digital customer bills, links in separate e–mails, or links in any other form of communication determined acceptable by the Commission, with notification that:</text>
      <level label="1">
        <text>the public service company is initiating the proceeding; and</text>
      </level>
      <level label="2">
        <text>information about the proceeding is or will be available on the Commission’s website.</text>
      </level>
    </level>
    <level label="c">
      <text>A public service company shall include in each residential customer’s bill and automatic payment e–mail the following statement:</text>
      <text>“The Maryland General Assembly established the Public Service Commission to regulate public service companies doing business in Maryland, to ensure their activities are consistent with the public interest. For information on how to participate in or observe a proceeding before the Public Service Commission, please visit the Public Service Commission’s website.”.</text>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="4-204" title_number="4" title_name="Rate Regulation" subtitle_number="2" subtitle_name="Rate Setting Proceedings">
    <level label="a">
      <level label="1">
        <text>The Commission may suspend, effective immediately and without formal proceedings, any new rate or change in rate proposed by a public service company.</text>
      </level>
      <level label="2">
        <text>Unless suspended by the Commission, and subject to § 4-203 of this subtitle, a new rate or change in rate proposed by a public service company takes effect on the date specified in the rate application.</text>
      </level>
      <level label="3">
        <text>The Commission shall furnish to the public service company proposing a rate a written statement of the reasons for the suspension.</text>
      </level>
    </level>
    <level label="b">
      <level label="1">
        <text>The Commission promptly shall institute proceedings to consider whether the suspended rate is a just and reasonable rate.</text>
      </level>
      <level label="2">
        <text>The Commission may:</text>
        <level label="i">
          <text>suspend the rate initially for not more than 180 days after the proposed effective date; and</text>
        </level>
        <level label="ii">
          <text>extend the suspension for up to an additional 90 days if the filing is for an alternative form of ratemaking for a public service company.</text>
        </level>
      </level>
      <level label="3">
        <text>Subject to subsection (c) of this section, after the suspension or extension under paragraph (2) of this subsection expires, if the Commission has not entered a final order, the new rate or change in rate proposed by the public service company takes effect.</text>
      </level>
    </level>
    <level label="c">
      <level label="1">
        <text>If a proposed new rate or rate increase takes effect before the Commission enters a final order in the proceedings, if practicable, the Commission may order the public service company that proposes the rate to keep a detailed and accurate account of:</text>
        <level label="i">
          <text>all amounts received under the new rate or rate increase; and</text>
        </level>
        <level label="ii">
          <text>the persons on whose behalf the amounts are paid.</text>
        </level>
      </level>
      <level label="2">
        <text>After the proceedings conclude, the Commission may require the public service company to refund with interest, to each person listed under paragraph (1)(ii) of this subsection, the part of the new rate or rate increase that the Commission finds unjustified.</text>
      </level>
      <level label="3">
        <text>If a refund is not practicable, the public service company shall charge off and amortize the difference between the operating revenues under the rate charged and the operating revenues that would have been obtained from the same volume of business from the final set rate, through a temporary rate decrease for the period that the Commission sets.</text>
      </level>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="4-205" title_number="4" title_name="Rate Regulation" subtitle_number="2" subtitle_name="Rate Setting Proceedings">
    <level label="a">
      <text>The Commission may set a temporary rate for any public service company that is higher or lower than the rate previously in effect.</text>
    </level>
    <level label="b">
      <text>The Commission may set a temporary rate after hearing only if the Commission finds that:</text>
      <level label="1">
        <text>pending a final rate proceeding, the rate in force is not a just and reasonable rate; and</text>
      </level>
      <level label="2">
        <text>the temporary rate is necessary in the interest of justice in view of the length of time that must elapse before a final order may be entered.</text>
      </level>
    </level>
    <level label="c">
      <text>If the order involves a temporary rate increase, and refund to the consumer is practicable, the public service company shall post a bond, with security and in an amount that the Commission approves, payable to the State and conditioned to ensure prompt refund with interest to each consumer of each amount received by the public service company from the consumer above the final rates that the Commission sets.</text>
    </level>
    <level label="d">
      <text>Any temporary change in rate shall equal the amount found by the Commission to be higher or lower than a just and reasonable rate.</text>
    </level>
    <level label="e">
      <level label="1">
        <text>The temporary change in rate under subsection (d) of this section shall remain in effect for an initial period of not more than 9 months.</text>
      </level>
      <level label="2">
        <text>The Commission may order the temporary change to be extended by not more than 3 months.</text>
      </level>
    </level>
    <level label="f">
      <level label="1">
        <text>If the final rate set is higher than the rate set in the order for a temporary rate, the public service company may amortize and recover over a period that the Commission sets, through a temporary increase over the final rate set, the difference between the operating revenue obtained under the order for a temporary rate and the operating revenue that would have been obtained from the same volume of business from the final rate set.</text>
      </level>
      <level label="2">
        <text>If the rate in the order for a temporary rate is higher than the final rate set, the Commission shall order a refund, charge off, or amortization under § 4-204(c) of this subtitle.</text>
      </level>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="4-206" title_number="4" title_name="Rate Regulation" subtitle_number="2" subtitle_name="Rate Setting Proceedings">
    <level label="a">
      <text>At any time, the Commission may investigate and determine the fair value of the property of a public service company used and useful in providing service to the public.</text>
    </level>
    <level label="b">
      <level label="1">
        <text>The valuation:</text>
        <level label="i">
          <text>is not final until the Commission:</text>
          <level label="1">
            <text>serves on the public service company a copy of the order setting the proposed valuation and the method used to set the valuation; and</text>
          </level>
          <level label="2">
            <text>allows a reasonable time in which to file a protest; and</text>
          </level>
        </level>
        <level label="ii">
          <text>is final if a protest is not filed within the time specified in the order.</text>
        </level>
      </level>
      <level label="2">
        <text>If a timely protest is filed, the Commission shall enter a final valuation by order after hearing.</text>
      </level>
    </level>
    <level label="c">
      <text>All final valuations are prima facie evidence of value in proceedings under this division.</text>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="4-206.1" title_number="4" title_name="Rate Regulation" subtitle_number="2" subtitle_name="Rate Setting Proceedings">
    <level label="a">
      <text>This section applies only to a public service company that is an investor–owned gas company or investor–owned electric company.</text>
    </level>
    <level label="b">
      <text>In a base rate proceeding to set just and reasonable rates under this title, each public service company shall demonstrate to the Commission the reasonableness of the use of internal labor in comparison to contractual labor.</text>
    </level>
    <level label="c">
      <text>To demonstrate reasonableness of the use of labor as required under subsection (b) of this section, a public service company shall provide to the Commission, at a minimum:</text>
      <level label="1">
        <text>a comparison of the costs of internal labor and contractual labor;</text>
      </level>
      <level label="2">
        <text>a demonstration of the reasonableness of the decision to use contractual labor;</text>
      </level>
      <level label="3">
        <text>a justification for the use of contractual labor when used instead of internal labor, including a cost–based rationale; and</text>
      </level>
      <level label="4">
        <text>any other information that the Commission requires.</text>
      </level>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="4-207" title_number="4" title_name="Rate Regulation" subtitle_number="2" subtitle_name="Rate Setting Proceedings">
    <level label="a">
      <text>This section applies only to:</text>
      <level label="1">
        <text>an electric cooperative; and</text>
      </level>
      <level label="2">
        <text>a gas company, electric company, telephone company, water company, or sewage disposal company whose gross annual revenues, for the most recent calendar year for which data are available, are less than 3% of the total gross annual revenues of all public service companies in the State during the same calendar year.</text>
      </level>
    </level>
    <level label="b">
      <level label="1">
        <text>When the Commission suspends a proposed new rate for an electric cooperative or a company subject to this section that is based on the existing authorized fair rate of return or, for an electric cooperative, the existing debt service coverage ratio, the Commission promptly shall institute proceedings to determine if additional revenues are required to allow the electric cooperative or the company to earn the existing debt service coverage ratio or the existing fair rate of return authorized in the previous base rate proceeding.</text>
      </level>
      <level label="2">
        <text>The Commission shall:</text>
        <level label="i">
          <text>serve each of the parties to the previous base rate proceeding of that electric cooperative or that company with a copy of the suspension order;</text>
        </level>
        <level label="ii">
          <text>order the electric cooperative or the company to publish a display advertisement about the proposal in newspapers of general circulation in its service area; and</text>
        </level>
        <level label="iii">
          <text>order the electric cooperative to conduct a public hearing in accordance with the requirements of § 3–104 of this article.</text>
        </level>
      </level>
      <level label="3">
        <text>Proceedings under this section shall:</text>
        <level label="i">
          <text>account for revenues, expenses, and rate base in the same manner that the Commission employed in determining a just and reasonable rate in the previous base rate proceeding; and</text>
        </level>
        <level label="ii">
          <text>exclude consideration of any increase in the rate of return, or, for an electric cooperative, the debt service coverage ratio, any change in rate structure, or any change in an accounting approach to any item pertaining to revenues, expenses, or rate base inconsistent with that used by the Commission in determining a just and reasonable rate in the previous base rate proceeding for the electric cooperative or the company.</text>
        </level>
      </level>
      <level label="4">
        <text>In proceedings under this section, the Commission may use a more recent past test period than that used in the previous base rate proceeding for the electric cooperative or the company.</text>
      </level>
      <level label="5">
        <text>The Commission shall enter a final order as to the revenue requirement determined under this section within 90 days after the proposed new rate is filed.</text>
      </level>
      <level label="6">
        <text>The final order shall:</text>
        <level label="i">
          <text>authorize a new rate distributing any change in the revenue requirement proportionally among the ratepayers without change in the rate structure; and</text>
        </level>
        <level label="ii">
          <text>state whether further proceedings shall be held.</text>
        </level>
      </level>
      <level label="7">
        <text>If, in the final order, the Commission decides to conduct further proceedings under subsection (c) of this section, the final order may provide for refund, consistent with the provisions of § 4–204(c) of this subtitle, of any difference between the new rate authorized under this subsection and the rate the Commission sets under subsection (c) of this section.</text>
      </level>
    </level>
    <level label="c">
      <level label="1">
        <text>If the Commission decides to conduct further proceedings under subsection (b) of this section, the Commission, after a hearing, may:</text>
        <level label="i">
          <text>modify the rate structure;</text>
        </level>
        <level label="ii">
          <text>lower the authorized fair rate of return or, for an electric cooperative, lower the debt service coverage ratio; or</text>
        </level>
        <level label="iii">
          <text>modify the accounting approach to an item that pertains to revenues, expenses, or rate base.</text>
        </level>
      </level>
      <level label="2">
        <text>The Commission shall take any action under this subsection within 120 days after entry of a final order under subsection (b) of this section.</text>
      </level>
    </level>
    <level label="d">
      <level label="1">
        <text>This section does not apply to a proposed new rate that is filed:</text>
        <level label="i">
          <text>less than 1 year after a previously proposed new rate under this section is filed; or</text>
        </level>
        <level label="ii">
          <text>with a request for temporary rates under § 4–205 of this subtitle.</text>
        </level>
      </level>
      <level label="2">
        <level label="i">
          <text>An electric cooperative or a company may not file a proposed new rate under this subtitle if any proposed new rate filed by the electric cooperative or the company under this section is pending, or a new rate filed by the electric cooperative or the company under this section has been in effect fewer than 90 days.</text>
        </level>
        <level label="ii">
          <text>This paragraph does not preclude an electric cooperative or a company from filing a proposed new rate for a new service if the proposal does not affect the authorized rate of return or, for an electric cooperative, the debt service coverage ratio.</text>
        </level>
      </level>
      <level label="3">
        <text>Unless the Commission provides otherwise, this section does not apply to a proposed new rate that is filed more than 3 years after the Commission enters a final order authorizing the existing fair rate of return or, for an electric cooperative, the existing debt service coverage ratio in the previous base rate proceeding.</text>
      </level>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="4-208" title_number="4" title_name="Rate Regulation" subtitle_number="2" subtitle_name="Rate Setting Proceedings">
    <level label="a">
      <text>This section applies to a public service company that:</text>
      <level label="1">
        <text>provides gas or electric services;</text>
      </level>
      <level label="2">
        <text>is subject to a cost allocation manual approved by the Commission;</text>
      </level>
      <level label="3">
        <level label="i">
          <text>engages in an unregulated business activity; or</text>
        </level>
        <level label="ii">
          <text>has a subsidiary that engages in an unregulated business activity; and</text>
        </level>
      </level>
      <level label="4">
        <text>does not meet the standards for rate proceedings provided for under § 4-207 of this subtitle.</text>
      </level>
    </level>
    <level label="b">
      <level label="1">
        <text>A public service company subject to this section shall file an independent audit opinion prepared by an entity approved by the Commission on the earliest of:</text>
        <level label="i">
          <text>once every 2 years; or</text>
        </level>
        <level label="ii">
          <text>when the public service company:</text>
          <level label="1">
            <text>files a request for a change in its base rate under this subtitle; or</text>
          </level>
          <level label="2">
            <text>has a major change in its corporate organization or structure as determined by the Commission.</text>
          </level>
        </level>
      </level>
      <level label="2">
        <text>The independent auditor shall:</text>
        <level label="i">
          <text>examine:</text>
          <level label="1">
            <text>compliance by the public service company with policies and procedures of the public service company’s cost allocation manual;</text>
          </level>
          <level label="2">
            <text>proper allocation of costs to an affiliate of the public service company in accordance with the manual; and</text>
          </level>
          <level label="3">
            <text>appropriate charging of costs and transactions relative to the manual to the public service company and its affiliates; and</text>
          </level>
        </level>
        <level label="ii">
          <text>identify adjustments that should be made:</text>
          <level label="1">
            <text>to the manual consistent with prior Commission rulings; and</text>
          </level>
          <level label="2">
            <text>to the public service company or to an affiliate of the public service company relative to the examination of the allocation of costs and charging of costs and transactions.</text>
          </level>
        </level>
      </level>
    </level>
    <level label="c">
      <text>The cost of the independent audit opinion filed under subsection (b) of this section shall be borne by the stockholders of the public service company.</text>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="4-209" title_number="4" title_name="Rate Regulation" subtitle_number="2" subtitle_name="Rate Setting Proceedings">
    <level label="a">
      <text>With respect to the net capital costs associated with the relocation underground of utility lines and facilities in connection with projects required by § 8–401 of the Land Use Article, the Commission shall:</text>
      <level label="1">
        <text>set the amount of the monthly surcharge required to support the costs and determine which customers of the applicable utility are subject to the surcharge;</text>
      </level>
      <level label="2">
        <text>include in the rate base the related net capital costs; or</text>
      </level>
      <level label="3">
        <text>adopt another method to apportion the costs appropriately.</text>
      </level>
    </level>
    <level label="b">
      <text>A utility may not be required to pay more than 50% of the net capital costs of a relocation project.</text>
    </level>
    <level label="c">
      <text>A county or municipal corporation may appropriate money for a relocation project from appropriate federal, State, and local funds it receives for this purpose.</text>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="4-210" title_number="4" title_name="Rate Regulation" subtitle_number="2" subtitle_name="Rate Setting Proceedings">
    <level label="a">
      <level label="1">
        <text>In this section the following words have the meanings indicated.</text>
      </level>
      <level label="2">
        <text>“Customer” means a retail natural gas customer.</text>
      </level>
      <level label="3">
        <text>“Eligible infrastructure replacement” means a replacement or an improvement in an existing infrastructure of a gas company that:</text>
        <level label="i">
          <text>is made on or after June 1, 2013;</text>
        </level>
        <level label="ii">
          <text>is designed to improve public safety or infrastructure reliability;</text>
        </level>
        <level label="iii">
          <text>does not increase the revenue of a gas company by connecting an improvement directly to new customers;</text>
        </level>
        <level label="iv">
          <text>reduces or has the potential to reduce greenhouse gas emissions through a reduction in natural gas system leaks; and</text>
        </level>
        <level label="v">
          <text>is not included in the current rate base of the gas company as determined in the gas company’s most recent base rate proceeding.</text>
        </level>
      </level>
      <level label="4">
        <text>“Plan” means a plan that a gas company files under subsection (e) of this section.</text>
      </level>
      <level label="5">
        <text>“Project” means an eligible infrastructure replacement project proposed by a gas company in a plan filed under this section.</text>
      </level>
    </level>
    <level label="b">
      <text>It is the intent of the General Assembly that the purpose of this section is to allow for the appropriate acceleration of gas infrastructure improvements in the State when:</text>
      <level label="1">
        <text>necessary to ensure safety and improve reliability; and</text>
      </level>
      <level label="2">
        <text>consistent with State policy.</text>
      </level>
    </level>
    <level label="c">
      <text>Nothing in this section may be construed to alter a gas company’s obligation under this division to make improvements to a gas system that are necessary to ensure the safety of the gas system.</text>
    </level>
    <level label="d">
      <text>This section does not apply to a gas cooperative.</text>
    </level>
    <level label="e">
      <level label="1">
        <text>A gas company may file with the Commission:</text>
        <level label="i">
          <text>a plan to invest in eligible infrastructure replacement projects; and</text>
        </level>
        <level label="ii">
          <text>in accordance with paragraph (5) of this subsection, a cost–recovery schedule associated with the plan that includes a fixed annual surcharge on customer bills to recover reasonable and prudent costs of proposed eligible infrastructure replacement projects.</text>
        </level>
      </level>
      <level label="2">
        <text>A plan under this subsection shall include:</text>
        <level label="i">
          <text>a description of each eligible infrastructure replacement project, including the project’s expected useful life;</text>
        </level>
        <level label="ii">
          <text>a time line for the completion of each eligible project;</text>
        </level>
        <level label="iii">
          <text>the estimated cost of each project;</text>
        </level>
        <level label="iv">
          <text>a description of customer benefits under the plan;</text>
        </level>
        <level label="v">
          <text>a demonstration that the gas company has selected and given priority to projects based on risk to the public and cost–effectiveness;</text>
        </level>
        <level label="vi">
          <text>an analysis that compares the costs of proposed replacement projects with alternatives to replacement, including leak detection and repair;</text>
        </level>
        <level label="vii">
          <text>a plan for notifying customers affected by proposed projects at least 6 months in advance of construction; and</text>
        </level>
        <level label="viii">
          <text>any other information the Commission considers necessary to evaluate the plan.</text>
        </level>
      </level>
      <level label="3">
        <text>A customer notification plan required under paragraph (2) of this subsection shall provide for:</text>
        <level label="i">
          <text>an initial notification of construction in a manner determined by the Commission;</text>
        </level>
        <level label="ii">
          <text>at least two subsequent notifications of construction in a manner determined by the Commission; and</text>
        </level>
        <level label="iii">
          <text>the communicating of:</text>
          <level label="1">
            <text>a complete and accurate description of project activities; and</text>
          </level>
          <level label="2">
            <text>any other information the Commission considers necessary to evaluate the plan.</text>
          </level>
        </level>
      </level>
      <level label="4">
        <level label="i">
          <text>When calculating the estimated cost of a project under paragraph (2) of this subsection, a gas company shall include:</text>
          <level label="1">
            <text>the pretax rate of return on the gas company’s investment in the project;</text>
          </level>
          <level label="2">
            <text>depreciation associated with the project, based on new assets less retired plant; and</text>
          </level>
          <level label="3">
            <text>property taxes associated with the project, based on new assets less retired plant.</text>
          </level>
        </level>
        <level label="ii">
          <text>The estimated project costs described in subparagraph (i) of this paragraph are collectible at the same time the eligible infrastructure replacement is made.</text>
        </level>
        <level label="iii">
          <text>The pretax rate of return under subparagraph (i)1 of this paragraph shall:</text>
          <level label="1">
            <text>be calculated using the gas company’s capital structure and weighted average cost of capital as the Commission approved in the gas company’s most recent base rate proceeding; and</text>
          </level>
          <level label="2">
            <text>include an adjustment for bad debt expenses as the Commission approved in the gas company’s most recent base rate proceeding.</text>
          </level>
        </level>
      </level>
      <level label="5">
        <text>For a plan filed under this section:</text>
        <level label="i">
          <text>the cost–recovery schedule shall include a fixed annual surcharge that:</text>
          <level label="1">
            <text>may not exceed $2 each month on each residential customer account; and</text>
          </level>
          <level label="2">
            <text>for each nonresidential customer account, may not be less than the fixed annual surcharge applicable to a residential customer account, but shall be capped under item (ii) of this paragraph; and</text>
          </level>
        </level>
        <level label="ii">
          <text>to create a surcharge cap for all customer classes, costs shall be allocated to nonresidential and residential customers consistent with the proportions of total distribution revenues that those classes bear in accordance with the most recent base rate proceeding for the gas company.</text>
        </level>
      </level>
      <level label="6">
        <text>For a gas company to recover costs associated with eligible infrastructure replacement projects, a plan shall demonstrate:</text>
        <level label="i">
          <text>customer benefits; and</text>
        </level>
        <level label="ii">
          <text>that the gas company has:</text>
          <level label="1">
            <text>analyzed available cost–effective options to defer, reduce, or remove the need to replace, construct, or upgrade components of the gas company’s distribution infrastructure, including leak detection and repair; and</text>
          </level>
          <level label="2">
            <text>met any other requirements established by the Commission when setting rates under this title.</text>
          </level>
        </level>
      </level>
      <level label="7">
        <text>A plan under this subsection shall be filed separately from a base rate proceeding.</text>
      </level>
      <level label="8">
        <text>In a base rate proceeding after approval of a plan, the Commission shall, in establishing a gas company’s revenue requirements, take into account any benefits the gas company realized as a result of a surcharge approved under the plan.</text>
      </level>
      <level label="9">
        <text>Any adjustment for return on equity based on an approved plan only shall be considered and determined in a subsequently filed base rate case.</text>
      </level>
    </level>
    <level label="f">
      <level label="1">
        <text>Within 180 days after a gas company files a plan, the Commission:</text>
        <level label="i">
          <text>may hold a public hearing on the plan; and</text>
        </level>
        <level label="ii">
          <text>shall take a final action to approve or deny the plan.</text>
        </level>
      </level>
      <level label="2">
        <text>Within 150 days after a gas company files an amendment to an approved plan, the Commission shall take final action to approve or deny the amendment.</text>
      </level>
      <level label="3">
        <text>The Commission may approve a plan if it finds that the investments and estimated costs of eligible infrastructure replacement projects are:</text>
        <level label="i">
          <text>reasonable and prudent;</text>
        </level>
        <level label="ii">
          <text>designed to improve public safety or infrastructure reliability over the short term and long term; and</text>
        </level>
        <level label="iii">
          <text>required to improve the safety of the gas system after consideration of alternatives to replacement.</text>
        </level>
      </level>
      <level label="4">
        <level label="i">
          <text>The Commission shall approve the cost–recovery schedule associated with the plan at the same time that it approves the plan.</text>
        </level>
        <level label="ii">
          <text>Costs recovered under the schedule approved in subparagraph (i) of this paragraph may relate only to the projects within the plan approved by the Commission.</text>
        </level>
      </level>
      <level label="5">
        <text>The Commission may not consider a revenue requirement or rate–making issue that is not related to the plan when reviewing a plan for approval or denial unless the plan is filed in conjunction with a base rate case.</text>
      </level>
    </level>
    <level label="g">
      <level label="1">
        <text>Subject to paragraph (2) of this subsection, if the Commission does not take final action on a plan within the time period required under subsection (f) of this section, the gas company may implement the plan.</text>
      </level>
      <level label="2">
        <text>If a gas company implements a plan that the Commission has not approved, the gas company shall refund to customers any amount of the surcharge that the Commission later determines is not reasonable or prudent, including interest.</text>
      </level>
    </level>
    <level label="h">
      <text>The Commission may authorize a gas company to use a mechanism to promptly recover reasonable and prudent costs of investments for eligible infrastructure replacement projects that:</text>
      <level label="1">
        <text>are part of a plan approved under this section or implemented under subsection (g) of this section; and</text>
      </level>
      <level label="2">
        <text>accelerate gas infrastructure improvements in the State.</text>
      </level>
    </level>
    <level label="i">
      <level label="1">
        <level label="i">
          <text>A surcharge under this section shall be in effect for 5 years from the date of initial implementation of an approved plan.</text>
        </level>
        <level label="ii">
          <level label="1">
            <text>Before the end of the 5–year period, the gas company shall file a base rate case application.</text>
          </level>
          <level label="2">
            <text>In a base rate proceeding filed under subsubparagraph 1 of this subparagraph, if a plan approved by the Commission remains in effect:</text>
          </level>
          <level label="A">
            <text>eligible infrastructure project costs included in base rates in accordance with a final Commission order on the base rate case shall be removed from a surcharge; and</text>
          </level>
          <level label="B">
            <text>the surcharge mechanism shall continue for eligible future infrastructure project costs that are not included in the base rate case.</text>
          </level>
        </level>
      </level>
      <level label="2">
        <level label="i">
          <text>If the actual cost of a plan is less than the amount collected under a surcharge, the gas company shall refund to customers the difference on customer bills, including interest.</text>
        </level>
        <level label="ii">
          <text>If the actual cost of a plan is more than the amount collected under the surcharge and the Commission determines that the higher costs were reasonably and prudently incurred, the Commission shall authorize the gas company to increase the surcharge to recover the difference, subject to the rate limit under subsection (e)(5) of this section.</text>
        </level>
      </level>
    </level>
    <level label="j">
      <text>Each year a gas company shall file with the Commission a reconciliation to adjust the amount of a surcharge to account for any difference between the actual cost of a plan and the actual amount recovered under the surcharge.</text>
    </level>
    <level label="k">
      <text>If, after approving a surcharge in a plan, the Commission establishes new base rates for the gas company that include costs on which the surcharge is based, the gas company shall file a revised rate schedule with the Commission that subtracts those costs from the surcharge.</text>
    </level>
    <level label="l">
      <level label="1">
        <text>The Commission may review a previously approved plan.</text>
      </level>
      <level label="2">
        <text>If the Commission determines that an investment of a project or cost of a project no longer meets the requirements of subsection (f)(3) of this section, the Commission may:</text>
        <level label="i">
          <text>reduce future base rates or surcharges; or</text>
        </level>
        <level label="ii">
          <text>alter or rescind approval of that part of the plan.</text>
        </level>
      </level>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="4-211" title_number="4" title_name="Rate Regulation" subtitle_number="2" subtitle_name="Rate Setting Proceedings">
    <level label="a">
      <level label="1">
        <text>Except as provided in paragraph (3) of this subsection, when determining necessary and proper expenses while setting a just and reasonable rate for a gas company, the Commission may include all costs reasonably incurred by the gas company for performing environmental remediation of real property in response to a State or federal law, regulation, or order if:</text>
        <level label="i">
          <text>the remediation relates to the contamination of the real property; and</text>
        </level>
        <level label="ii">
          <text>the real property is or was used to provide manufactured or natural gas service directly or indirectly to the gas company’s customers or the gas company’s predecessors.</text>
        </level>
      </level>
      <level label="2">
        <text>Environmental remediation costs incurred by a gas company may be included in the gas company’s necessary and proper expenses regardless of whether:</text>
        <level label="i">
          <text>the real property is currently used and useful in providing gas service; or</text>
        </level>
        <level label="ii">
          <text>the gas company owns the real property when the rate is set.</text>
        </level>
      </level>
      <level label="3">
        <text>Environmental remediation costs incurred by a gas company may not be included in the gas company’s necessary and proper expenses if a court of competent jurisdiction determines that the proximate cause of the environmental contamination is a result of the gas company’s failure to comply with a State or federal law, regulation, or order in effect when the contamination occurred.</text>
      </level>
    </level>
    <level label="b">
      <text>The Commission shall balance the interests of a gas company with those of the gas company’s customers when setting the recovery schedule for the environmental remediation costs incurred by the gas company.</text>
    </level>
    <level label="c">
      <level label="1">
        <text>In this subsection, “financial benefit” includes any monetary gain on the conveyance of real property, or any portion of real property that was subject to environmental remediation, to a third party and any other financial benefit of the property or portion of the property that subsequently inures to the gas company, including income from rentals and tax credits, deductions, or other financial benefits, less any environmental remediation costs relating to the property that the gas company was not allowed to recover from the gas company’s customers.</text>
      </level>
      <level label="2">
        <text>If a gas company is allowed to recover environmental remediation costs under this section, any financial benefit accruing to the gas company as a result of the remediation of real property shall be credited to the gas company’s customers in a manner determined by the Commission.</text>
      </level>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="4-212" title_number="4" title_name="Rate Regulation" subtitle_number="2" subtitle_name="Rate Setting Proceedings">
    <level label="a">
      <level label="1">
        <text>In this section the following words have the meanings indicated.</text>
      </level>
      <level label="2">
        <text>“Contract capacity” means the amount of monthly peak load requirements:</text>
        <level label="i">
          <text>that is mutually agreed to by an electric company and a large load customer for each month remaining in a contract term after the load ramp period has ended; and</text>
        </level>
        <level label="ii">
          <text>for which:</text>
          <level label="1">
            <text>the electric company agrees to provide all of the components of retail electric service subject to the terms and conditions in its tariffs; and</text>
          </level>
          <level label="2">
            <text>the large load customer agrees to purchase service at that load level for the stated term of the contract and under the same terms and conditions as those stated in the contract.</text>
          </level>
        </level>
      </level>
      <level label="3">
        <text>“Large load customer” has the meaning stated in § 7–232 of this article.</text>
      </level>
      <level label="4">
        <text>“Load ramp period” means the period of time from commencement of service until a large load customer’s billing calculation is based on the full contract capacity.</text>
      </level>
    </level>
    <level label="b">
      <text>It is the intent of the General Assembly that residential retail electric customers in the State should not bear the financial risks associated with large load customers interconnecting to the electric system serving the State.</text>
    </level>
    <level label="c">
      <level label="1">
        <level label="i">
          <text>On or before September 1, 2026, each investor–owned electric company and each electric cooperative shall submit to the Commission for approval a specific rate schedule for large load customers that accomplishes the intent of subsection (b) of this section.</text>
        </level>
        <level label="ii">
          <text>Each municipal electric utility that receives an application for retail electric service from a large load customer shall submit to the Commission for approval a specific rate schedule for large load customers.</text>
        </level>
      </level>
      <level label="2">
        <level label="i">
          <text>Service under a specific rate schedule shall be available to large load customers that will use, within the initial contract term:</text>
          <level label="1">
            <text>a monthly maximum demand of more than 25 megawatts at a single location; or</text>
          </level>
          <level label="2">
            <text>an aggregated contract capacity in the electric company’s service territory of more than 25 megawatts.</text>
          </level>
        </level>
        <level label="ii">
          <text>Except as provided in subparagraph (iii) of this paragraph, large load customers that qualify for a specific rate schedule after the effective date of that schedule:</text>
          <level label="1">
            <text>shall take service under the specific rate schedule; and</text>
          </level>
          <level label="2">
            <text>may not be allowed to take service under any other existing schedule.</text>
          </level>
        </level>
        <level label="iii">
          <text>A specific rate schedule does not apply to the facility of an existing large load customer that has signed a service agreement before the effective date of the schedule if:</text>
          <level label="1">
            <text>the large load customer’s existing load does not expand by more than 25 megawatts at that facility under the existing service agreement; or</text>
          </level>
          <level label="2">
            <text>the large load customer does not sign a new service agreement to expand the facility’s load by more than 25 megawatts above the contract capacity of the existing service agreement.</text>
          </level>
        </level>
      </level>
    </level>
    <level label="d">
      <text>In making a determination on whether to approve a specific rate schedule submitted under subsection (c) of this section, the Commission shall consider whether the rate schedule:</text>
      <level label="1">
        <text>requires a large load customer to cover the just and reasonable costs associated with any electric transmission or distribution system buildout required to:</text>
        <level label="i">
          <text>interconnect the large load customer to the electric system serving the State; or</text>
        </level>
        <level label="ii">
          <text>serve the large load customer;</text>
        </level>
      </level>
      <level label="2">
        <text>protects residential retail electric customers from the financial risks associated with large load customers through the use of:</text>
        <level label="i">
          <text>load ramp periods;</text>
        </level>
        <level label="ii">
          <text>minimum billing demand for electric distribution and transmission service that is a high percentage of a large load customer’s contract capacity;</text>
        </level>
        <level label="iii">
          <text>long–term contractual commitments and exit fees;</text>
        </level>
        <level label="iv">
          <text>guarantee or collateral requirements; and</text>
        </level>
        <level label="v">
          <text>penalties and reimbursement requirements for the large load customer if the large load customer delays or cancels a project after the electric company has begun buildout to accommodate the large load customer;</text>
        </level>
      </level>
      <level label="3">
        <text>allocates to the large load customer:</text>
        <level label="i">
          <text>any increased or avoided costs that the Commission determines have been caused by the large load customer, including any increased or avoided wholesale costs such as:</text>
          <level label="1">
            <text>transmission costs; and</text>
          </level>
          <level label="2">
            <text>capacity costs; and</text>
          </level>
        </level>
        <level label="ii">
          <text>notwithstanding § 4–503(b) of this title and as authorized under federal law, any direct or indirect costs, fees, and obligations that are normally applied to retail electric customers in the service territory in which the large load customer is located or interconnected if the Commission determines that the direct or indirect costs, fees, and obligations should be attributable to the large load customer; and</text>
        </level>
      </level>
      <level label="4">
        <text>sufficiently ensures that the allocation of costs to large load customers under the schedule does not result in customers that are not large load customers unreasonably subsidizing the costs of large load customers under the schedule.</text>
      </level>
    </level>
    <level label="e">
      <text>It is the intent of the General Assembly that the costs allocated to a large load customer in accordance with subsection (d)(3) of this section include costs that are incurred by a large load customer that is not providing 100% of its electricity needs and are associated with:</text>
      <level label="1">
        <text>capacity procurement, including backstop reliability procurement; and</text>
      </level>
      <level label="2">
        <text>costs associated with the interconnection process, including transmission costs.</text>
      </level>
    </level>
    <level label="f">
      <text>Before signing a contract for service under a specific rate schedule submitted under subsection (c) of this section, a large load customer under the schedule is required to:</text>
      <level label="1">
        <text>submit a request for a load study to determine the necessary contract capacity for the large load customer and pay any applicable fees associated with the study;</text>
      </level>
      <level label="2">
        <text>designate a specific site where the large load customer’s project will be constructed and served by the electric company;</text>
      </level>
      <level label="3">
        <text>own or have the exclusive right to use the land designated in item (2) of this subsection for the project; and</text>
      </level>
      <level label="4">
        <text>meet any other requirements specified under the rate schedule.</text>
      </level>
    </level>
    <level label="g">
      <level label="1">
        <text>On or before June 1, 2026, the Commission shall adopt regulations to carry out this section.</text>
      </level>
      <level label="2">
        <text>The regulations shall:</text>
        <level label="i">
          <text>establish minimum notice requirements and deadlines related to load study requests and contract terminations and adjustments;</text>
        </level>
        <level label="ii">
          <text>if considered necessary by the Commission, specify common forms of acceptable collateral to satisfy the requirements of this section; and</text>
        </level>
        <level label="iii">
          <text>establish deadlines related to completion of load studies and payment of fees.</text>
        </level>
      </level>
    </level>
    <level label="h">
      <level label="1">
        <text>By order or regulation, the Commission shall:</text>
        <level label="i">
          <text>prohibit behind–the–meter energy storage facilities from being studied by an electric company as an additional load under a load study conducted under this section;</text>
        </level>
        <level label="ii">
          <text>establish requirements and limitations for charging and discharging behind–the–meter energy storage facilities during peak demand; and</text>
        </level>
        <level label="iii">
          <text>subject to paragraph (2) of this subsection, establish a voluntary large–load interruptible interconnection process for an electric company to provide voluntary large–load interruptible interconnection service.</text>
        </level>
      </level>
      <level label="2">
        <level label="i">
          <text>The voluntary large–load interruptible interconnection process established under paragraph (1)(iii) of this subsection shall include:</text>
          <level label="1">
            <text>a load study that reflects the terms of the voluntary interruptible interconnection service; and</text>
          </level>
          <level label="2">
            <text>methods to ensure compliance with the voluntary large–load interruptible interconnection service.</text>
          </level>
        </level>
        <level label="ii">
          <text>The compliance methods required under subparagraph (i)2 of this paragraph may include the imposition of civil penalties for failure to comply with the voluntary large–load interruptible interconnection service.</text>
        </level>
      </level>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="4-213" title_number="4" title_name="Rate Regulation" subtitle_number="2" subtitle_name="Rate Setting Proceedings">
    <level label="a">
      <text>This section applies only to a public service company that is an electric company, a gas company, or a combination gas and electric company.</text>
    </level>
    <level label="b">
      <text>Unless otherwise authorized by law, the Commission may approve the use of a multiyear rate plan for distribution base rates only if the plan:</text>
      <level label="1">
        <text>demonstrates the customer benefits of the investment; and</text>
      </level>
      <level label="2">
        <text>does not allow for:</text>
        <level label="i">
          <text>the public service company to file for reconciliation of cost or revenue variances of the approved revenue component used by the Commission to establish just and reasonable rates if the reconciliation would result in additional charges to customers; or</text>
        </level>
        <level label="ii">
          <text>the use of cost–sharing mechanisms that would result in additional charges to customers above the approved revenue component used by the Commission to establish just and reasonable rates.</text>
        </level>
      </level>
    </level>
    <level label="c">
      <text>A public service company that files or has filed an application for a multiyear rate plan may not subsequently file for reconciliation of cost or revenue variances that would result in additional charges to customers due to the public service company spending more than the approved revenue component used by the Commission to establish the multiyear rates unless the filing for reconciliation was made on or before January 1, 2025.</text>
    </level>
    <level label="d">
      <text>For multiyear rate plans approved after January 1, 2026, the Commission may require a public service company to include a reconciliation procedure in its multiyear rate plan to refund customers the difference between:</text>
      <level label="1">
        <text>the public service company’s approved revenue requirement; and</text>
      </level>
      <level label="2">
        <text>the public service company’s actual revenue requirement during the term of the multiyear rate plan.</text>
      </level>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="4-214" title_number="4" title_name="Rate Regulation" subtitle_number="2" subtitle_name="Rate Setting Proceedings">
    <level label="a">
      <text>In this section, “nonpipeline alternative” means an investment or activity that defers, reduces, or eliminates the need to construct a new gas pipeline.</text>
    </level>
    <level label="b">
      <text>Nothing in this section may be construed to restrict an investor–owned gas company’s ability to make improvements to its gas system to ensure the safe and reliable operation of the system.</text>
    </level>
    <level label="c">
      <text>An investor–owned gas company may recover reasonable and prudent costs associated with a planned gas infrastructure investment if the investor–owned gas company demonstrates at a rate setting proceeding:</text>
      <level label="1">
        <text>the customer benefits of the investment;</text>
      </level>
      <level label="2">
        <text>that the investor–owned gas company analyzed cost–effective options available to defer, reduce, or eliminate the need to replace, upgrade, or construct new components, including an analysis of:</text>
        <level label="i">
          <text>for new investments unrelated to safety, nonpipeline alternatives; and</text>
        </level>
        <level label="ii">
          <text>leak detection and repair; and</text>
        </level>
      </level>
      <level label="3">
        <text>the estimated risk reduction associated with a safety–related investment, if applicable.</text>
      </level>
    </level>
  </section>