<section article="gpu" article_name="Public Utilities" number="4-210" title_number="4" title_name="Rate Regulation" subtitle_number="2" subtitle_name="Rate Setting Proceedings">
  <level label="a">
    <level label="1">
      <text>In this section the following words have the meanings indicated.</text>
    </level>
    <level label="2">
      <text>“Customer” means a retail natural gas customer.</text>
    </level>
    <level label="3">
      <text>“Eligible infrastructure replacement” means a replacement or an improvement in an existing infrastructure of a gas company that:</text>
      <level label="i">
        <text>is made on or after June 1, 2013;</text>
      </level>
      <level label="ii">
        <text>is designed to improve public safety or infrastructure reliability;</text>
      </level>
      <level label="iii">
        <text>does not increase the revenue of a gas company by connecting an improvement directly to new customers;</text>
      </level>
      <level label="iv">
        <text>reduces or has the potential to reduce greenhouse gas emissions through a reduction in natural gas system leaks; and</text>
      </level>
      <level label="v">
        <text>is not included in the current rate base of the gas company as determined in the gas company’s most recent base rate proceeding.</text>
      </level>
    </level>
    <level label="4">
      <text>“Plan” means a plan that a gas company files under subsection (e) of this section.</text>
    </level>
    <level label="5">
      <text>“Project” means an eligible infrastructure replacement project proposed by a gas company in a plan filed under this section.</text>
    </level>
  </level>
  <level label="b">
    <text>It is the intent of the General Assembly that the purpose of this section is to allow for the appropriate acceleration of gas infrastructure improvements in the State when:</text>
    <level label="1">
      <text>necessary to ensure safety and improve reliability; and</text>
    </level>
    <level label="2">
      <text>consistent with State policy.</text>
    </level>
  </level>
  <level label="c">
    <text>Nothing in this section may be construed to alter a gas company’s obligation under this division to make improvements to a gas system that are necessary to ensure the safety of the gas system.</text>
  </level>
  <level label="d">
    <text>This section does not apply to a gas cooperative.</text>
  </level>
  <level label="e">
    <level label="1">
      <text>A gas company may file with the Commission:</text>
      <level label="i">
        <text>a plan to invest in eligible infrastructure replacement projects; and</text>
      </level>
      <level label="ii">
        <text>in accordance with paragraph (5) of this subsection, a cost–recovery schedule associated with the plan that includes a fixed annual surcharge on customer bills to recover reasonable and prudent costs of proposed eligible infrastructure replacement projects.</text>
      </level>
    </level>
    <level label="2">
      <text>A plan under this subsection shall include:</text>
      <level label="i">
        <text>a description of each eligible infrastructure replacement project, including the project’s expected useful life;</text>
      </level>
      <level label="ii">
        <text>a time line for the completion of each eligible project;</text>
      </level>
      <level label="iii">
        <text>the estimated cost of each project;</text>
      </level>
      <level label="iv">
        <text>a description of customer benefits under the plan;</text>
      </level>
      <level label="v">
        <text>a demonstration that the gas company has selected and given priority to projects based on risk to the public and cost–effectiveness;</text>
      </level>
      <level label="vi">
        <text>an analysis that compares the costs of proposed replacement projects with alternatives to replacement, including leak detection and repair;</text>
      </level>
      <level label="vii">
        <text>a plan for notifying customers affected by proposed projects at least 6 months in advance of construction; and</text>
      </level>
      <level label="viii">
        <text>any other information the Commission considers necessary to evaluate the plan.</text>
      </level>
    </level>
    <level label="3">
      <text>A customer notification plan required under paragraph (2) of this subsection shall provide for:</text>
      <level label="i">
        <text>an initial notification of construction in a manner determined by the Commission;</text>
      </level>
      <level label="ii">
        <text>at least two subsequent notifications of construction in a manner determined by the Commission; and</text>
      </level>
      <level label="iii">
        <text>the communicating of:</text>
        <level label="1">
          <text>a complete and accurate description of project activities; and</text>
        </level>
        <level label="2">
          <text>any other information the Commission considers necessary to evaluate the plan.</text>
        </level>
      </level>
    </level>
    <level label="4">
      <level label="i">
        <text>When calculating the estimated cost of a project under paragraph (2) of this subsection, a gas company shall include:</text>
        <level label="1">
          <text>the pretax rate of return on the gas company’s investment in the project;</text>
        </level>
        <level label="2">
          <text>depreciation associated with the project, based on new assets less retired plant; and</text>
        </level>
        <level label="3">
          <text>property taxes associated with the project, based on new assets less retired plant.</text>
        </level>
      </level>
      <level label="ii">
        <text>The estimated project costs described in subparagraph (i) of this paragraph are collectible at the same time the eligible infrastructure replacement is made.</text>
      </level>
      <level label="iii">
        <text>The pretax rate of return under subparagraph (i)1 of this paragraph shall:</text>
        <level label="1">
          <text>be calculated using the gas company’s capital structure and weighted average cost of capital as the Commission approved in the gas company’s most recent base rate proceeding; and</text>
        </level>
        <level label="2">
          <text>include an adjustment for bad debt expenses as the Commission approved in the gas company’s most recent base rate proceeding.</text>
        </level>
      </level>
    </level>
    <level label="5">
      <text>For a plan filed under this section:</text>
      <level label="i">
        <text>the cost–recovery schedule shall include a fixed annual surcharge that:</text>
        <level label="1">
          <text>may not exceed $2 each month on each residential customer account; and</text>
        </level>
        <level label="2">
          <text>for each nonresidential customer account, may not be less than the fixed annual surcharge applicable to a residential customer account, but shall be capped under item (ii) of this paragraph; and</text>
        </level>
      </level>
      <level label="ii">
        <text>to create a surcharge cap for all customer classes, costs shall be allocated to nonresidential and residential customers consistent with the proportions of total distribution revenues that those classes bear in accordance with the most recent base rate proceeding for the gas company.</text>
      </level>
    </level>
    <level label="6">
      <text>For a gas company to recover costs associated with eligible infrastructure replacement projects, a plan shall demonstrate:</text>
      <level label="i">
        <text>customer benefits; and</text>
      </level>
      <level label="ii">
        <text>that the gas company has:</text>
        <level label="1">
          <text>analyzed available cost–effective options to defer, reduce, or remove the need to replace, construct, or upgrade components of the gas company’s distribution infrastructure, including leak detection and repair; and</text>
        </level>
        <level label="2">
          <text>met any other requirements established by the Commission when setting rates under this title.</text>
        </level>
      </level>
    </level>
    <level label="7">
      <text>A plan under this subsection shall be filed separately from a base rate proceeding.</text>
    </level>
    <level label="8">
      <text>In a base rate proceeding after approval of a plan, the Commission shall, in establishing a gas company’s revenue requirements, take into account any benefits the gas company realized as a result of a surcharge approved under the plan.</text>
    </level>
    <level label="9">
      <text>Any adjustment for return on equity based on an approved plan only shall be considered and determined in a subsequently filed base rate case.</text>
    </level>
  </level>
  <level label="f">
    <level label="1">
      <text>Within 180 days after a gas company files a plan, the Commission:</text>
      <level label="i">
        <text>may hold a public hearing on the plan; and</text>
      </level>
      <level label="ii">
        <text>shall take a final action to approve or deny the plan.</text>
      </level>
    </level>
    <level label="2">
      <text>Within 150 days after a gas company files an amendment to an approved plan, the Commission shall take final action to approve or deny the amendment.</text>
    </level>
    <level label="3">
      <text>The Commission may approve a plan if it finds that the investments and estimated costs of eligible infrastructure replacement projects are:</text>
      <level label="i">
        <text>reasonable and prudent;</text>
      </level>
      <level label="ii">
        <text>designed to improve public safety or infrastructure reliability over the short term and long term; and</text>
      </level>
      <level label="iii">
        <text>required to improve the safety of the gas system after consideration of alternatives to replacement.</text>
      </level>
    </level>
    <level label="4">
      <level label="i">
        <text>The Commission shall approve the cost–recovery schedule associated with the plan at the same time that it approves the plan.</text>
      </level>
      <level label="ii">
        <text>Costs recovered under the schedule approved in subparagraph (i) of this paragraph may relate only to the projects within the plan approved by the Commission.</text>
      </level>
    </level>
    <level label="5">
      <text>The Commission may not consider a revenue requirement or rate–making issue that is not related to the plan when reviewing a plan for approval or denial unless the plan is filed in conjunction with a base rate case.</text>
    </level>
  </level>
  <level label="g">
    <level label="1">
      <text>Subject to paragraph (2) of this subsection, if the Commission does not take final action on a plan within the time period required under subsection (f) of this section, the gas company may implement the plan.</text>
    </level>
    <level label="2">
      <text>If a gas company implements a plan that the Commission has not approved, the gas company shall refund to customers any amount of the surcharge that the Commission later determines is not reasonable or prudent, including interest.</text>
    </level>
  </level>
  <level label="h">
    <text>The Commission may authorize a gas company to use a mechanism to promptly recover reasonable and prudent costs of investments for eligible infrastructure replacement projects that:</text>
    <level label="1">
      <text>are part of a plan approved under this section or implemented under subsection (g) of this section; and</text>
    </level>
    <level label="2">
      <text>accelerate gas infrastructure improvements in the State.</text>
    </level>
  </level>
  <level label="i">
    <level label="1">
      <level label="i">
        <text>A surcharge under this section shall be in effect for 5 years from the date of initial implementation of an approved plan.</text>
      </level>
      <level label="ii">
        <level label="1">
          <text>Before the end of the 5–year period, the gas company shall file a base rate case application.</text>
        </level>
        <level label="2">
          <text>In a base rate proceeding filed under subsubparagraph 1 of this subparagraph, if a plan approved by the Commission remains in effect:</text>
        </level>
        <level label="A">
          <text>eligible infrastructure project costs included in base rates in accordance with a final Commission order on the base rate case shall be removed from a surcharge; and</text>
        </level>
        <level label="B">
          <text>the surcharge mechanism shall continue for eligible future infrastructure project costs that are not included in the base rate case.</text>
        </level>
      </level>
    </level>
    <level label="2">
      <level label="i">
        <text>If the actual cost of a plan is less than the amount collected under a surcharge, the gas company shall refund to customers the difference on customer bills, including interest.</text>
      </level>
      <level label="ii">
        <text>If the actual cost of a plan is more than the amount collected under the surcharge and the Commission determines that the higher costs were reasonably and prudently incurred, the Commission shall authorize the gas company to increase the surcharge to recover the difference, subject to the rate limit under subsection (e)(5) of this section.</text>
      </level>
    </level>
  </level>
  <level label="j">
    <text>Each year a gas company shall file with the Commission a reconciliation to adjust the amount of a surcharge to account for any difference between the actual cost of a plan and the actual amount recovered under the surcharge.</text>
  </level>
  <level label="k">
    <text>If, after approving a surcharge in a plan, the Commission establishes new base rates for the gas company that include costs on which the surcharge is based, the gas company shall file a revised rate schedule with the Commission that subtracts those costs from the surcharge.</text>
  </level>
  <level label="l">
    <level label="1">
      <text>The Commission may review a previously approved plan.</text>
    </level>
    <level label="2">
      <text>If the Commission determines that an investment of a project or cost of a project no longer meets the requirements of subsection (f)(3) of this section, the Commission may:</text>
      <level label="i">
        <text>reduce future base rates or surcharges; or</text>
      </level>
      <level label="ii">
        <text>alter or rescind approval of that part of the plan.</text>
      </level>
    </level>
  </level>
</section>