<?xml version='1.0' encoding='utf-8'?>
<section article="gpu" article_name="Public Utilities" number="5-406" title_number="5" title_name="Powers, Duties, and Prohibitions" subtitle_number="4" subtitle_name="Franchises and Condemnation">
  <level label="a">
    <level label="1">
      <text>A railroad company may change the location or grade of any portion of its road if the company finds the change is necessary for any reasonable cause, including to avoid:</text>
      <level label="i">
        <text>inconvenience to public travel;</text>
      </level>
      <level label="ii">
        <text>dangerous or difficult curves or grades; or</text>
      </level>
      <level label="iii">
        <text>unsafe or unsubstantial grounds or foundations.</text>
      </level>
    </level>
    <level label="2">
      <text>A change of location or grade under this section shall follow the general route of the existing road.</text>
    </level>
    <level label="3">
      <text>A railroad company may enter on and take land and make surveys necessary to make the change in location or grade in accordance with Title 12 of the Real Property Article.</text>
    </level>
  </level>
  <level label="b">
    <level label="1">
      <text>A railroad company is liable to the owner of the land on which the road was constructed for any damages caused by a change in location or grade of the road.</text>
    </level>
    <level label="2">
      <text>The amount of damages determined shall be paid to the owner or deposited into court.</text>
    </level>
    <level label="3">
      <text>An owner shall claim damages within:</text>
      <level label="i">
        <text>30 days after actual notice of the intended change has been given to the owner, if the owner resides on the premises; or</text>
      </level>
      <level label="ii">
        <text>60 days after publication of notice in a newspaper in general circulation in the county, if the owner is a nonresident.</text>
      </level>
    </level>
  </level>
  <level label="c">
    <text>If a railroad company condemns land under this section, the condemnation is binding on the company, unless the company chooses to abandon the location within 30 days after making the condemnation.</text>
  </level>
</section>
