<subtitle article="gpu" title_number="7" subtitle_number="12" title_name="Gas, Electric, and Water Companies" subtitle_name="Energy Solicitation and Procurement">
  <section article="gpu" article_name="Public Utilities" number="7-1201" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="12" subtitle_name="Energy Solicitation and Procurement">
    <level label="a">
      <text>In this part the following words have the meanings indicated.</text>
    </level>
    <level label="b">
      <text>“Dispatchable energy generation” means a generating station or energy storage device with:</text>
      <level label="1">
        <text>an effective load carrying capability of at least 65%, as determined by PJM Interconnection’s most recent ELCC Class Ratings; and</text>
      </level>
      <level label="2">
        <text>a lower greenhouse gas emissions profile than coal or oil energy generating stations.</text>
      </level>
    </level>
    <level label="c">
      <text>“Effective load carrying capability” or “ELCC” means the expected capacity contribution of an energy resource during PJM Interconnection’s operating hours when there is high electricity demand and low resource output.</text>
    </level>
    <level label="d">
      <text>“Effective nameplate capacity” means the amount of energy an energy storage device can deliver continuously to the electric system over a period of at least 4 hours.</text>
    </level>
    <level label="e">
      <text>“Energy storage device” has the meaning stated in § 7–216 of this title.</text>
    </level>
    <level label="f">
      <text>“Generating station” has the meaning stated in § 7–207 of this title.</text>
    </level>
    <level label="g">
      <text>“Large capacity energy resource” means a generating station or energy storage device that has a capacity rating equal to or greater than 20 megawatts after accounting for the effective load carrying capability.</text>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="7-1202" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="12" subtitle_name="Energy Solicitation and Procurement">
    <level label="a">
      <text>An application for a proposed project under Parts III and IV of this subtitle is subject to a community benefit agreement.</text>
    </level>
    <level label="b">
      <text>A community benefit agreement shall:</text>
      <level label="1">
        <text>promote increased opportunities for local businesses and small, minority, women–owned, and veteran–owned businesses in the clean energy industry;</text>
      </level>
      <level label="2">
        <text>ensure the timely, safe, and efficient completion of the project by:</text>
        <level label="i">
          <text>facilitating a steady supply of highly skilled craft workers who shall be paid not less than the prevailing wage rate determined by the Commissioner of Labor and Industry under Title 17, Subtitle 2 of the State Finance and Procurement Article; and</text>
        </level>
        <level label="ii">
          <text>guaranteeing that the construction work performed in connection with the project will be subject to an agreement that:</text>
          <level label="1">
            <text>establishes the terms and conditions of employment at the construction site of the project or a portion of the project;</text>
          </level>
          <level label="2">
            <text>guarantees against strikes, lockouts, and similar disruptions;</text>
          </level>
          <level label="3">
            <text>ensures that all work on the project fully conforms to all relevant State and federal laws, rules, and regulations, including all required training for employees;</text>
          </level>
          <level label="4">
            <text>creates mutually binding procedures for resolving labor disputes arising during the term of the dispatchable energy generation project;</text>
          </level>
          <level label="5">
            <text>sets forth other mechanisms for labor–management cooperation on matters of mutual interest and concern, including productivity, quality of work, safety, and health; and</text>
          </level>
          <level label="6">
            <text>binds all contractors and subcontractors to the terms of the agreement through the inclusion of appropriate provisions in all relevant solicitation and contract documents;</text>
          </level>
        </level>
      </level>
      <level label="3">
        <text>promote safe completion of the project by ensuring that at least 80% of the craft workers on the project have completed a 10–hour Occupational Safety and Health Administration course;</text>
      </level>
      <level label="4">
        <text>promote career training opportunities in the manufacturing, maintenance, and construction industries for local residents, veterans, women, minorities, and formerly incarcerated individuals;</text>
      </level>
      <level label="5">
        <text>include provisions for local hiring and the hiring of historically disadvantaged groups;</text>
      </level>
      <level label="6">
        <text>use locally, sustainably, and domestically manufactured construction materials and components to the extent practicable;</text>
      </level>
      <level label="7">
        <text>require the use of skilled local labor, particularly with regard to the construction and manufacturing components of the project, using methods including outreach, hiring, and referral methods that are affiliated with registered apprenticeship programs under Title 11, Subtitle 4 of the Labor and Employment Article; and</text>
      </level>
      <level label="8">
        <text>authorize the Maryland Department of Labor and the Commission to consider, review, and enforce a storage developer or energy developer’s compliance with any community benefit agreement.</text>
      </level>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="7-1203" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="12" subtitle_name="Energy Solicitation and Procurement">
    <text>The Commission may contract for the services of independent consultants and experts to implement and execute any part of this subtitle.</text>
  </section>
  <section article="gpu" article_name="Public Utilities" number="7-1206" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="12" subtitle_name="Energy Solicitation and Procurement">
    <level label="a">
      <level label="1">
        <text>On or before October 1, 2025, and at other times as provided in subsection (b) of this section, the Commission shall issue one or more solicitations for proposals for the construction or expansion of:</text>
        <level label="i">
          <text>dispatchable energy generation; and</text>
        </level>
        <level label="ii">
          <text>large capacity energy resources.</text>
        </level>
      </level>
      <level label="2">
        <text>The Commission shall set the closing date for the solicitation period to be not sooner than 30 days after issuing the request for proposals under paragraph (1) of this subsection.</text>
      </level>
    </level>
    <level label="b">
      <text>The Commission may provide for an additional solicitation period if the capacity specified under § 7–1208(d)(1) of this subtitle has not been met during the initial solicitation period.</text>
    </level>
    <level label="c">
      <text>The Commission shall provide to the Power Plant Research Program a copy of each proposal received in response to the solicitation.</text>
    </level>
    <level label="d">
      <level label="1">
        <text>Except as provided in paragraph (2) of this subsection, the Commission may not approve or develop a financial commitment for the costs related to the construction or operation of a dispatchable energy generation project or large capacity energy resource project approved in accordance with this part.</text>
      </level>
      <level label="2">
        <text>A dispatchable energy generation project or large capacity energy resource project approved in accordance with this part may participate in other processes under which ratepayer funds are awarded to dispatchable energy generation or large capacity energy resources.</text>
      </level>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="7-1207" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="12" subtitle_name="Energy Solicitation and Procurement">
    <text>The Commission shall include specifications in a solicitation issued under § 7–1206 of this subtitle that require each proposal for a dispatchable energy generation project and large capacity energy resource project to:</text>
    <level label="1">
      <text>if the project is a natural gas energy generating station, ensure that the project can be converted to use only hydrogen or a zero–emissions biofuel as the energy source when the Commission determines that the conversion is feasible;</text>
    </level>
    <level label="2">
      <text>include a detailed description of the timeline for construction of the project, including:</text>
      <level label="i">
        <text>identifying the entity that has ownership or site control of the project site;</text>
      </level>
      <level label="ii">
        <text>queue position for PJM approval;</text>
      </level>
      <level label="iii">
        <text>the ability to procure materials, including turbines and other pipeline materials; and</text>
      </level>
      <level label="iv">
        <text>any information that demonstrates the applicant’s:</text>
        <level label="1">
          <text>readiness to apply for a certificate of public convenience and necessity under § 7–207 or § 7–207.4 of this title as soon as is reasonably feasible after receiving approval for the project, including the anticipated application date; and</text>
        </level>
        <level label="2">
          <text>ability to develop the project within the timeline presented;</text>
        </level>
      </level>
    </level>
    <level label="3">
      <text>include a description of the location of the project site, including:</text>
      <level label="i">
        <text>the proximity of the site to existing transmission lines and rights–of–way; and</text>
      </level>
      <level label="ii">
        <text>whether the project would be retrofitting a current or previous generating station site;</text>
      </level>
    </level>
    <level label="4">
      <text>if applicable, include a description of:</text>
      <level label="i">
        <text>the type and amount of co–located energy generation from Tier 1 renewable sources, as defined in § 7–701 of this title, that would be used with the project;</text>
      </level>
      <level label="ii">
        <text>the amount of co–located energy storage that would be used with the project;</text>
      </level>
      <level label="iii">
        <text>the use of carbon capture or sequestration technology to mitigate greenhouse gas emissions from the project; and</text>
      </level>
      <level label="iv">
        <text>the amount of hydrogen or zero–emissions biofuels that the project will mix with natural gas for energy generation; and</text>
      </level>
    </level>
    <level label="5">
      <text>state the emissions intensity of the generation output over the life of the project.</text>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="7-1208" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="12" subtitle_name="Energy Solicitation and Procurement">
    <level label="a">
      <level label="1">
        <text>Within 45 days after the closing date for the solicitation period set in accordance with § 7–1206 of this subtitle or sooner as determined by the Commission, the Power Plant Research Program shall recommend to the Commission proposals to be authorized to utilize the expedited certificate of public convenience and necessity process under § 7–207.4 of this title.</text>
      </level>
      <level label="2">
        <text>The Power Plant Research Program shall base its recommendations on the information in the proposals received and the specifications listed in §§ 7–1207 and 7–1209 of this subtitle.</text>
      </level>
    </level>
    <level label="b">
      <text>Subject to subsection (c) of this section and after considering the recommendations of the Power Plant Research Program made under subsection (a) of this section, unless the Commission grants a request for an extension for good cause, not later than 60 days after the close of the solicitation period the Commission shall approve, conditionally approve, or deny a proposal submitted in response to a solicitation issued under § 7–1206 of this subtitle.</text>
    </level>
    <level label="c">
      <text>In addition to the criteria specified in § 7–1207 of this subtitle, the Commission shall determine which proposals to approve based on the factors and requirements specified in § 7–1209 of this subtitle.</text>
    </level>
    <level label="d">
      <level label="1">
        <text>Subject to paragraph (2) of this subsection, the combined total capacity of dispatchable energy generation projects and large capacity energy resource projects approved under this section shall be greater than the combined summer peak capacity profile of coal and oil energy generating stations in the State as outlined under Table 9 of the Commission’s Ten–Year Plan (2024–2033) of Electric Companies in Maryland.</text>
      </level>
      <level label="2">
        <text>The combined total capacity of natural gas dispatchable energy generation projects and large capacity energy resource projects approved under this section may not exceed the combined summer peak capacity profile of coal and oil energy generating stations in the State as outlined under Table 9 of the Commission’s Ten–Year Plan (2024–2033) of Electric Companies in Maryland.</text>
      </level>
    </level>
    <level label="e">
      <text>Every 5 years after the date that a natural gas dispatchable energy generation project or large capacity energy resource project becomes operational under a certificate of public convenience and necessity issued under § 7–207.4 of this title, the owner or operator of the natural gas dispatchable energy generation or large capacity energy resource shall submit to the Commission a report regarding the feasibility of converting the natural gas dispatchable energy generation or large capacity energy resource to the use of only hydrogen or zero–emissions biofuel.</text>
    </level>
    <level label="f">
      <text>An approval or conditional approval of a project under this section does not guarantee that the project will be issued a certificate of public convenience and necessity under § 7–207 or § 7–207.4 of this title.</text>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="7-1209" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="12" subtitle_name="Energy Solicitation and Procurement">
    <level label="a">
      <level label="1">
        <text>Except as provided in paragraph (2) of this subsection and subject to paragraph (3) of this subsection, the Commission may approve up to 10 proposals to be eligible to undergo the expedited certificate of public convenience and necessity process under § 7–207.4 of this title.</text>
      </level>
      <level label="2">
        <text>The Commission may approve more than 10 proposals to be eligible to undergo the expedited certificate of public convenience and necessity process under § 7–207.4 of this title only if the Commission determines that:</text>
        <level label="i">
          <text>the Commission has sufficient resources to complete that number of expedited reviews of applications for a certificate of public convenience and necessity under § 7–207.4 of this title; and</text>
        </level>
        <level label="ii">
          <text>the number of expedited reviews of applications for a certificate of public convenience and necessity under § 7–207.4 of this title is in the public interest.</text>
        </level>
      </level>
      <level label="3">
        <text>If not more than 10 projects respond to a solicitation issued under § 7–1206 of this subtitle, the Commission shall approve, subject to § 7–1208(d)(2) of this subtitle, all projects that apply for the solicitation.</text>
      </level>
    </level>
    <level label="b">
      <level label="1">
        <text>For the purpose of this subsection, a transmission energy storage device shall be considered a non–emissions–emitting project.</text>
      </level>
      <level label="2">
        <text>Subject to paragraph (3) of this subsection, the Commission shall approve 4 non–emissions–emitting projects to every 1 emissions–emitting project.</text>
      </level>
      <level label="3">
        <text>The Commission may waive the requirement under paragraph (2) of this subsection if a sufficient number of applications for projects that meet the requirement are not received.</text>
      </level>
    </level>
    <level label="c">
      <level label="1">
        <text>In determining which proposals to approve, the Commission shall prioritize dispatchable energy generation projects over large capacity energy resources.</text>
      </level>
      <level label="2">
        <text>In addition to the prioritization in paragraph (1) of this subsection, if the Commission receives more than 10 proposals or determines that more than 10 proposals may be approved under § 7–1208 of this subtitle, the Commission shall base the approvals on:</text>
        <level label="i">
          <text>which projects will provide the highest capacity value to the State;</text>
        </level>
        <level label="ii">
          <text>the timeliness of a project to begin construction;</text>
        </level>
        <level label="iii">
          <text>the timeliness of a project to begin operation; and</text>
        </level>
        <level label="iv">
          <text>which projects have the lowest emissions intensity.</text>
        </level>
      </level>
    </level>
    <level label="d">
      <text>The Commission shall determine when the proceedings for a certificate of public convenience and necessity under § 7–207.4 of this title will begin for a proposal approved under this part.</text>
    </level>
    <level label="e">
      <text>The Commission may contract for the services of independent consultants and experts in evaluating and comparing whether a proposal shall be approved to be eligible to undergo an expedited certificate of public convenience and necessity process under § 7–207.4 of this title.</text>
    </level>
    <level label="f">
      <text>A proposal that is not approved to be eligible to undergo an expedited certificate of public convenience and necessity process under § 7–207.4 of this title may apply for a certificate of public convenience and necessity under § 7–207 of this title.</text>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="7-1212" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="12" subtitle_name="Energy Solicitation and Procurement">
    <level label="a">
      <level label="1">
        <text>After the effective date of Commission regulations implementing this part, a person may submit an application to the Commission for approval of a proposed nuclear energy generation project, including an application to upgrade the generation capabilities of an existing nuclear energy generating station.</text>
      </level>
      <level label="2">
        <text>For an application submitted in accordance with paragraph (1) of this subsection, the long–term pricing schedule shall be based only on any new generation proposed in the application, including new generation at an existing nuclear energy generating station.</text>
      </level>
    </level>
    <level label="b">
      <level label="1">
        <text>On receipt of an application for approval of a proposed nuclear energy generation project, the Commission shall:</text>
        <level label="i">
          <text>open an application period during which other interested persons may submit applications for approval of a proposed nuclear energy generation project; and</text>
        </level>
        <level label="ii">
          <text>provide notice that the Commission is accepting applications for approval of proposed nuclear energy generation projects.</text>
        </level>
      </level>
      <level label="2">
        <text>The Commission shall set the closing date for the application period to be not sooner than 90 days after the notice provided under paragraph (1) of this subsection.</text>
      </level>
    </level>
    <level label="c">
      <text>The Commission shall provide at least two additional application periods before January 1, 2031.</text>
    </level>
    <level label="d">
      <text>The Commission may provide additional application periods that meet the requirements of this section.</text>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="7-1213" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="12" subtitle_name="Energy Solicitation and Procurement">
    <level label="a">
      <text>Subject to subsection (b) of this section, the Commission shall approve, conditionally approve, or deny an application submitted under § 7–1212 of this subtitle within 1 year after the close of the application period.</text>
    </level>
    <level label="b">
      <text>The Commission may extend the time to approve, conditionally approve, or deny an application under subsection (a) of this section for good cause.</text>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="7-1214" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="12" subtitle_name="Energy Solicitation and Procurement">
    <text>An application submitted for a nuclear energy generation project under § 7–1212 of this subtitle shall include:</text>
    <level label="1">
      <text>a detailed description and financial analysis of the project;</text>
    </level>
    <level label="2">
      <text>the proposed method of financing the project, including documentation demonstrating that the applicant has applied for all current eligible State and federal grants, rebates, tax credits, loan guarantees, and other programs available to offset the cost of the project or provide tax advantages;</text>
    </level>
    <level label="3">
      <text>a commitment that the applicant will use best efforts to apply for all eligible State and federal grants, rebates, tax credits, loan guarantees, or other similar benefits as those benefits become available;</text>
    </level>
    <level label="4">
      <text>a cost–benefit analysis that shall include, at a minimum:</text>
      <level label="i">
        <text>a detailed input–output analysis of the impact of the project on income, employment, wages, and taxes in the State;</text>
      </level>
      <level label="ii">
        <text>detailed information concerning assumed employment impacts in the State, including the expected duration of employment opportunities, the salary of each position, and other supporting evidence of employment impacts;</text>
      </level>
      <level label="iii">
        <text>an analysis of any impact on residential, commercial, and industrial ratepayers over the life of the project;</text>
      </level>
      <level label="iv">
        <text>an analysis of any long–term effect on energy and capacity markets as a result of the project;</text>
      </level>
      <level label="v">
        <text>an analysis of any impact the project would have on businesses in the State;</text>
      </level>
      <level label="vi">
        <text>an analysis of the anticipated environmental benefits, health benefits, and economic impacts of the project to the citizens of the State; and</text>
      </level>
      <level label="vii">
        <text>an analysis of other benefits resulting from the project, including increased in–State construction, operation and maintenance needs, and equipment purchases;</text>
      </level>
    </level>
    <level label="5">
      <text>a proposed long–term pricing schedule for the project that shall specify a price for the generation attributes, including the energy, capacity, ancillary services, and environmental attributes;</text>
    </level>
    <level label="6">
      <text>a decommissioning and waste storage plan for the project, including provisions for decommissioning or waste storage as required by the U.S. Nuclear Regulatory Commission;</text>
    </level>
    <level label="7">
      <text>a commitment to abide by the requirements set forth in § 7–1202 of this subtitle;</text>
    </level>
    <level label="8">
      <text>a description of the applicant’s plan for engaging small businesses, as defined in § 14–501 of the State Finance and Procurement Article;</text>
    </level>
    <level label="9">
      <text>if applicable, the statement specified in § 7–1215(b)(2) of this subtitle; and</text>
    </level>
    <level label="10">
      <text>any other information the Commission requires.</text>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="7-1215" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="12" subtitle_name="Energy Solicitation and Procurement">
    <level label="a">
      <text>The Commission shall use the following criteria to evaluate and compare applications for nuclear energy generation projects submitted during an application period under  § 7–1212 of this subtitle:</text>
      <level label="1">
        <text>the lowest cost impact on ratepayers of the price set under a proposed long–term pricing schedule;</text>
      </level>
      <level label="2">
        <text>potential reductions in transmission congestion prices within the State;</text>
      </level>
      <level label="3">
        <text>potential changes in capacity prices within the State;</text>
      </level>
      <level label="4">
        <text>potential reductions in locational marginal pricing;</text>
      </level>
      <level label="5">
        <text>potential long–term changes in capacity prices within the State from the project as it compares to conventional energy sources;</text>
      </level>
      <level label="6">
        <text>the extent to which the cost–benefit analysis submitted under  § 7–1214 of this subtitle demonstrates positive net economic, environmental, and health benefits to the State;</text>
      </level>
      <level label="7">
        <text>the extent to which an applicant’s plan for engaging small businesses meets the goals specified in Title 14, Subtitle 5 of the State Finance and Procurement Article;</text>
      </level>
      <level label="8">
        <text>the extent to which an applicant’s plan provides for the use of skilled labor, particularly with regard to the construction and manufacturing components of the project, through outreach, hiring, or referral systems that are affiliated with registered apprenticeship programs under Title 11, Subtitle 4 of the Labor and Employment Article;</text>
      </level>
      <level label="9">
        <text>the extent to which an applicant’s plan provides for the use of an agreement designed to ensure the use of skilled labor and to promote the prompt, efficient, and safe completion of the project, particularly with regard to the construction, manufacturing, and maintenance of the project;</text>
      </level>
      <level label="10">
        <text>the extent to which an applicant’s plan provides for compensation to its employees and subcontractors consistent with wages outlined under Title 17, Subtitle 2 of the State Finance and Procurement Article;</text>
      </level>
      <level label="11">
        <text>siting and project feasibility;</text>
      </level>
      <level label="12">
        <text>the extent to which the project would require transmission or distribution infrastructure improvements in the State; and</text>
      </level>
      <level label="13">
        <text>any other criteria that the Commission determines are appropriate.</text>
      </level>
    </level>
    <level label="b">
      <level label="1">
        <text>In this paragraph, “minority” means an individual who is a member of any of the groups listed in § 14–301(k)(1)(i) of the State Finance and Procurement Article.</text>
      </level>
      <level label="2">
        <text>If an applicant is seeking investors in a proposed nuclear energy generation project, the applicant shall take the following steps before the Commission may approve the proposed project:</text>
        <level label="i">
          <text>make serious, good–faith efforts to solicit and interview a reasonable number of minority investors;</text>
        </level>
        <level label="ii">
          <text>as part of the application, submit a statement to the Commission that lists the names and addresses of all minority investors interviewed and whether or not any of those investors have purchased an equity share in the entity submitting the application;</text>
        </level>
        <level label="iii">
          <text>sign a memorandum of understanding with the Commission that requires the applicant to again make serious, good–faith efforts to solicit and interview a reasonable number of minority investors in any future attempts to raise venture capital or attract new investors to the project;</text>
        </level>
        <level label="iv">
          <text>sign a memorandum of understanding with the Commission that requires the applicant to use best efforts and effective outreach to obtain, as a goal, contractors and subcontractors for the project that are minority business enterprises, to the extent practicable, as supported by a disparity study; and</text>
        </level>
        <level label="v">
          <text>sign a memorandum of understanding with the Commission and skilled labor organizations that requires the applicant to follow the portions of the applicant’s plan that relate to the criteria set forth in subsection (a)(8) and (9) of this section.</text>
        </level>
      </level>
      <level label="3">
        <text>The Governor’s Office of Small, Minority, and Women Business Affairs, in consultation with the Office of the Attorney General, shall provide assistance to all potential applicants and potential minority investors to satisfy the requirements under paragraph (2)(i) and (iii) of this subsection.</text>
      </level>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="7-1216" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="12" subtitle_name="Energy Solicitation and Procurement">
    <level label="a">
      <text>The Commission may not approve an application for a nuclear energy generation project submitted under § 7–1212 of this subtitle unless:</text>
      <level label="1">
        <text>the project is connected to the electric system serving the State;</text>
      </level>
      <level label="2">
        <text>over the duration of the proposed long–term pricing schedule, the projected net rate impact for an average residential customer, based on annual consumption of 12,000 kilowatt–hours and combined with the projected net rate impact of other nuclear energy generation projects, does not exceed an amount determined by the Commission;</text>
      </level>
      <level label="3">
        <text>over the duration of the proposed long–term pricing schedule, the projected net rate impact for all nonresidential customers, considered as a blended average and combined with the projected net rate impact of other nuclear energy generation projects, does not exceed a percentage determined by the Commission of nonresidential customers’ total annual electric bills; and</text>
      </level>
      <level label="4">
        <text>the price specified in the proposed long–term pricing schedule does not exceed an amount determined by the Commission.</text>
      </level>
    </level>
    <level label="b">
      <text>When calculating the projected net average rate impacts for nuclear energy generation projects under this section, the Commission shall consider the net long–term cost per megawatt–hour applied to residential and nonresidential customers.</text>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="7-1217" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="12" subtitle_name="Energy Solicitation and Procurement">
    <level label="a">
      <text>An order the Commission issues approving an application for a nuclear energy generation project submitted under § 7–1212 of this subtitle shall:</text>
      <level label="1">
        <text>specify the long–term pricing schedule;</text>
      </level>
      <level label="2">
        <text>specify the duration of the long–term pricing schedule, not to exceed 30 years;</text>
      </level>
      <level label="3">
        <text>provide that:</text>
        <level label="i">
          <text>a payment may not be made under a long–term pricing schedule until electricity supply is generated by the project; and</text>
        </level>
        <level label="ii">
          <text>ratepayers and the State shall be held harmless for any cost overruns associated with the project; and</text>
        </level>
      </level>
      <level label="4">
        <text>require that any debt instrument issued in connection with the project include language specifying that the debt instrument does not establish a debt, an obligation, or a liability of the State.</text>
      </level>
    </level>
    <level label="b">
      <text>An order approving a nuclear energy generation project vests the owner of the project with the right to receive payments according to the terms in the order.</text>
    </level>
    <level label="c">
      <text>On or before March 1 each year, the Commission shall report to the Governor and, in accordance with § 2–1257 of the State Government Article, the Senate Committee on Education, Energy, and the Environment and the House Economic Matters Committee on:</text>
      <level label="1">
        <text>applicant compliance with the minority business enterprise participation goals under § 7–1215(b) of this subtitle; and</text>
      </level>
      <level label="2">
        <text>with respect to the community benefit agreement under § 7–1202 of this subtitle:</text>
        <level label="i">
          <text>the availability and use of opportunities for local businesses and small, minority, women–owned, and veteran–owned businesses;</text>
        </level>
        <level label="ii">
          <text>the success of efforts to promote career training opportunities in the manufacturing, maintenance, and construction industries for local residents, veterans, women, and minorities; and</text>
        </level>
        <level label="iii">
          <text>compliance with the minority workforce goal under § 7–1202 of this subtitle.</text>
        </level>
      </level>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="7-1218" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="12" subtitle_name="Energy Solicitation and Procurement">
    <level label="a">
      <text>If the Commission approves an application that demonstrates, based on the criteria specified in § 7–1214 of this subtitle, positive net economic impacts and environmental and health benefits to the State, the Commission shall issue an order in compliance with § 7–1217 of this subtitle.</text>
    </level>
    <level label="b">
      <text>The Commission may not issue an order to facilitate the financing of a nuclear energy generation project unless the project is subject to a community benefit agreement under § 7–1202 of this subtitle.</text>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="7-1219" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="12" subtitle_name="Energy Solicitation and Procurement">
    <level label="a">
      <text>The findings and evidence relied on by the General Assembly for the continuation of the Minority Business Enterprise Program under Title 14, Subtitle 3 of the State Finance and Procurement Article are incorporated in this section.</text>
    </level>
    <level label="b">
      <text>To the extent practicable and authorized by the United States Constitution, an applicant approved for a nuclear energy generation project under § 7–1213 of this subtitle shall comply with the State’s Minority Business Enterprise Program.</text>
    </level>
    <level label="c">
      <level label="1">
        <text>Within 6 months after the issuance of an order that approves a nuclear energy generation project and includes a long–term pricing component, the Governor’s Office of Small, Minority, and Women Business Affairs, in consultation with the Office of the Attorney General and the approved applicant, shall establish a clear plan for setting reasonable and appropriate minority business enterprise participation goals and procedures for each phase of the nuclear energy generation project.</text>
      </level>
      <level label="2">
        <text>To the extent practicable, the goals and procedures set in accordance with paragraph (1) of this subsection shall be based on the requirements of Title 14, Subtitle 3 of the State Finance and Procurement Article and the regulations implementing that subtitle.</text>
      </level>
      <level label="3">
        <text>Every 6 months following the issuance of an order that approves a nuclear energy generation project and includes a long–term pricing component, the approved applicant shall submit a report on the progress made to establish and implement minority business enterprise goals and procedures to the Commission.</text>
      </level>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="7-1220" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="12" subtitle_name="Energy Solicitation and Procurement">
    <level label="a">
      <text>In this section, “zero–emission credit” means a credit equal to the environmental attributes of 1 megawatt–hour of electricity that is derived from a nuclear energy generating station approved by the Commission under § 7–1217 of this subtitle.</text>
    </level>
    <level label="b">
      <text>The Commission shall adopt regulations that:</text>
      <level label="1">
        <text>establish the nuclear energy long–term pricing purchase obligation sufficiently in advance to allow an electric company to reflect nuclear energy long–term pricing costs as a nonbypassable surcharge that is added to the electric company’s base distribution rate on customer bills;</text>
      </level>
      <level label="2">
        <text>define rules that facilitate and ensure the secure and transparent transfer of revenues and long–term pricing payments among parties;</text>
      </level>
      <level label="3">
        <text>define the terms and procedures of the nuclear energy long–term pricing schedule obligations, including:</text>
        <level label="i">
          <text>establishing a formula and process to adjust the value of the long–term pricing schedule every 2 years based on projected wholesale market prices adjusted by the locational value and earning potential in the PJM region of the nuclear energy generating station; and</text>
        </level>
        <level label="ii">
          <text>establishing a per megawatt hour cap on any long–term pricing schedule specified in an order issued under § 7–1217 of this subtitle;</text>
        </level>
      </level>
      <level label="4">
        <text>require the Commission to establish an escrow account; and</text>
      </level>
      <level label="5">
        <text>to meet the total statewide long–term pricing purchase obligation for all applications approved in an order issued under § 7–1217 of this subtitle, require the Commission to annually establish each electric company’s zero–emission credit purchase obligation based on the most recent final electricity sales data as reported by PJM Interconnection and measured at the customer’s meter in proportion to the electric company’s share of statewide load.</text>
      </level>
    </level>
    <level label="c">
      <level label="1">
        <text>Each electric company shall procure from the escrow account established by regulation under this section a quantity of zero–emission credits equal to the electric company’s respective percentage of retail electric sales each year.</text>
      </level>
      <level label="2">
        <text>Subject to any escrow account reserve requirement the Commission establishes, if there are insufficient zero–emission credits available to satisfy the electric companies’ zero–emission credit purchase obligations, the overpayment shall be distributed to electric companies to be refunded or credited to each distribution customer based on the customer’s consumption of electricity supply that is subject to the renewable energy portfolio standard.</text>
      </level>
    </level>
    <level label="d">
      <text>A debt, an obligation, or a liability of a nuclear energy generation project or of an owner or operator of a nuclear energy generation project may not be considered a debt, an obligation, or a liability of the State.</text>
    </level>
    <level label="e">
      <level label="1">
        <text>Subject to paragraph (2) of this subsection, and before the nuclear energy generation project begins commercial operation, the Commission may approve an increase of the total cost of a nuclear energy generation project under a long–term pricing purchase obligation.</text>
      </level>
      <level label="2">
        <text>The total cost of a nuclear energy generation project that may be recovered under a long–term pricing purchase obligation may not be increased by more than 15% of the original total project cost.</text>
      </level>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="7-1221" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="12" subtitle_name="Energy Solicitation and Procurement">
    <text>On or before July 1, 2027, the Commission shall adopt regulations to carry out this part.</text>
  </section>
  <section article="gpu" article_name="Public Utilities" number="7-1224" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="12" subtitle_name="Energy Solicitation and Procurement">
    <level label="a">
      <text>The Commission shall, by regulation or order, establish a competitive process for the procurement of projects for the construction and deployment of front–of–the–meter transmission energy storage devices in the State.</text>
    </level>
    <level label="b">
      <level label="1">
        <level label="i">
          <text>On or before January 1, 2026, the Commission shall issue a procurement solicitation for applications for projects for the construction and deployment of front–of–the–meter transmission energy storage devices.</text>
        </level>
        <level label="ii">
          <text>Except as provided in subparagraph (iii) of this paragraph, the procurement solicitation shall be for 800 megawatts of cumulative energy storage capacity, as measured in effective nameplate capacity.</text>
        </level>
        <level label="iii">
          <text>The procurement solicitation may exceed 800 megawatts of cumulative energy storage capacity, as measured in effective nameplate capacity, if the Commission determines that the proposals are cost–effective and adequately support the goals established under this subtitle, including the goal of securing affordable, reliable electrical service for Maryland residents.</text>
        </level>
      </level>
      <level label="2">
        <text>On or before October 1, 2026, the Commission shall issue a decision on whether to approve one or more proposals in accordance with § 7–1226(c) of this subtitle.</text>
      </level>
      <level label="3">
        <level label="i">
          <text>Except as provided in subparagraph (ii) of this paragraph, the transmission energy storage devices procured in accordance with this subsection shall be operational within 24 months after a project is selected by the Commission.</text>
        </level>
        <level label="ii">
          <text>The Commission may extend the operating deadline under subparagraph (i) of this paragraph for good cause shown.</text>
        </level>
      </level>
    </level>
    <level label="c">
      <level label="1">
        <text>On or before January 1, 2027, the Commission shall issue a second procurement solicitation for the procurement of projects for the construction and deployment of front–of–the–meter transmission energy storage devices.</text>
      </level>
      <level label="2">
        <level label="i">
          <text>Except as provided in subparagraph (ii) of this paragraph, the procurement solicitation shall be for 800 megawatts of cumulative energy storage capacity, as measured in effective nameplate capacity.</text>
        </level>
        <level label="ii">
          <text>The procurement solicitation may exceed 800 megawatts of cumulative energy storage capacity, as measured in effective nameplate capacity, if the Commission determines that the proposals are cost–effective and adequately support the goals established under this subtitle, including the goal of securing affordable, reliable electrical service for Maryland residents.</text>
        </level>
      </level>
      <level label="3">
        <text>On or before October 1, 2027, the Commission shall issue a decision on whether to approve one or more proposals in accordance with § 7–1226(c) of this subtitle.</text>
      </level>
      <level label="4">
        <level label="i">
          <text>Except as provided in subparagraph (ii) of this paragraph, the transmission energy storage devices procured in accordance with this subsection shall be operational within 24 months after a project is selected by the Commission.</text>
        </level>
        <level label="ii">
          <text>The Commission may extend the operating deadline under subparagraph (i) of this paragraph for good cause shown.</text>
        </level>
      </level>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="7-1225" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="12" subtitle_name="Energy Solicitation and Procurement">
    <level label="a">
      <text>The Commission shall include specifications in a procurement solicitation issued under § 7–1224 of this subtitle that require each proposal to:</text>
      <level label="1">
        <text>include a proposed pricing schedule for the transmission energy storage project that:</text>
        <level label="i">
          <text>is for at least 15 years; and</text>
        </level>
        <level label="ii">
          <text>represents the anticipated monthly wholesale value of capacity per megawatt and other benefits identified in a cost–benefit analysis, but not including any anticipated wholesale energy and ancillary services revenue;</text>
        </level>
      </level>
      <level label="2">
        <text>include a cost–benefit analysis of the project and proposed pricing schedule comparison on a dollar–per–megawatt–hour basis, including an analysis of:</text>
        <level label="i">
          <text>the locational value and time to deployment of the energy storage devices;</text>
        </level>
        <level label="ii">
          <text>the value of long–duration storage, including its capacity accreditation value for resource adequacy as measured in PJM Interconnection’s effective load carrying capability class ratings;</text>
        </level>
        <level label="iii">
          <text>avoided or delayed transmission, generation, and distribution costs;</text>
        </level>
        <level label="iv">
          <text>avoided emissions in the short term and projected avoided emissions in the long term, measured using the social cost of carbon, as determined by the U.S. Environmental Protection Agency as of January 1, 2025;</text>
        </level>
        <level label="v">
          <text>the value of the rapid deployment of energy storage devices;</text>
        </level>
        <level label="vi">
          <text>the value of reliability during periods of electric system stress, including the ability to deliver capacity during periods of extreme weather, fuel scarcity, and large unplanned resource outages; and</text>
        </level>
        <level label="vii">
          <text>any other avoided costs;</text>
        </level>
      </level>
      <level label="3">
        <text>ensure that the owner or operator of the project has the capability to export electricity for sale on the wholesale market and bid into the PJM capacity market under an agreement with PJM Interconnection;</text>
      </level>
      <level label="4">
        <text>ensure that the energy storage devices can deliver their effective nameplate capacity;</text>
      </level>
      <level label="5">
        <text>incorporate a community benefit agreement;</text>
      </level>
      <level label="6">
        <text>attest in writing that all contractors and subcontractors working on the project have been in compliance with federal and State wage and hour laws for the immediately preceding 3 years or the duration of the contractor’s or subcontractor’s business operation, whichever is longer; and</text>
      </level>
      <level label="7">
        <text>ensure a competitive bidding process, including by redacting proprietary information provided to the Commission.</text>
      </level>
    </level>
    <level label="b">
      <text>An energy storage device shall be considered capable of delivering its effective nameplate capacity under this section if:</text>
      <level label="1">
        <text>the energy storage device will have the capacity interconnection rights with PJM Interconnection equal to its effective nameplate capacity; or</text>
      </level>
      <level label="2">
        <level label="i">
          <text>the energy storage device will have surplus interconnection service with PJM Interconnection; and</text>
        </level>
        <level label="ii">
          <text>the ability of the energy storage device to deliver its effective nameplate capacity will be limited only by the generation of another nonenergy storage generation resource with which the energy storage device shares a point of interconnection to the electric transmission system.</text>
        </level>
      </level>
    </level>
    <level label="c">
      <text>Projects that include any of the following devices may be included in a proposal in response to a procurement solicitation under § 7–1224 of this subtitle:</text>
      <level label="1">
        <text>front–of–the–meter transmission energy storage devices paired with Tier 1 or Tier 2 renewable sources, as defined under § 7–701 of this title; and</text>
      </level>
      <level label="2">
        <text>front–of–the–meter energy storage devices:</text>
        <level label="i">
          <text>interconnected to a facility within the State; and</text>
        </level>
        <level label="ii">
          <text>that have been assigned a project identifier in the PJM Interconnection process in response to a request for new service.</text>
        </level>
      </level>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="7-1226" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="12" subtitle_name="Energy Solicitation and Procurement">
    <level label="a">
      <text>In selecting a proposal for a front–of–the–meter transmission energy storage device project, the Commission:</text>
      <level label="1">
        <text>shall specify:</text>
        <level label="i">
          <text>a 15–year pricing schedule that uses a monthly fixed price for each megawatt that represents the anticipated wholesale value of capacity for the front–of–the–meter transmission energy storage device and the benefits identified in § 7–1225(a)(2) of this subtitle;</text>
        </level>
        <level label="ii">
          <text>that each electricity supplier shall be responsible for purchasing storage capacity credits at the monthly fixed price schedule proportional to the electricity supplier’s capacity obligation;</text>
        </level>
        <level label="iii">
          <text>that all PJM capacity market revenue earned by the energy storage project be transmitted to the Commission to be held in escrow for distribution to electric companies to be refunded or credited to each distribution customer proportional to the electricity supplier’s monthly capacity purchase obligation;</text>
        </level>
        <level label="iv">
          <text>that the energy storage project shall retain any energy and ancillary services revenue earned;</text>
        </level>
        <level label="v">
          <text>that electric companies must jointly select an escrow administrator, in consultation with the Commission; and</text>
        </level>
        <level label="vi">
          <text>for any cost recovery by an electric company, that the recovery shall be done through a nonbypassable surcharge established by the electric company that is added to the electric company’s base distribution rate or supply rate on customer bills;</text>
        </level>
      </level>
      <level label="2">
        <text>shall specify that for continued receipt of payment under item (1) of this subsection, an applicant shall demonstrate, to the satisfaction of the Commission, that the applicant’s energy storage device is available;</text>
      </level>
      <level label="3">
        <text>shall incorporate penalties for nonperformance and underperformance in the contract, including withholding of payment that reflects the degree of underperformance, for energy storage devices that fail to meet availability metrics;</text>
      </level>
      <level label="4">
        <text>may terminate energy storage devices from the program if device performance does not improve after appropriate notice and opportunity to cure;</text>
      </level>
      <level label="5">
        <text>shall consider other nonprice factors to ensure project deliverability within 24 months after the award date, such as:</text>
        <level label="i">
          <text>project maturity dates;</text>
        </level>
        <level label="ii">
          <text>interconnection queue status;</text>
        </level>
        <level label="iii">
          <text>site control;</text>
        </level>
        <level label="iv">
          <text>developer experience, including procuring, constructing, and operating front–of–the–meter transmission energy storage devices;</text>
        </level>
        <level label="v">
          <text>any evidence of key development milestones to substantiate project deliverability within 24 months after the award date;</text>
        </level>
        <level label="vi">
          <text>safety plans; and</text>
        </level>
        <level label="vii">
          <text>any other relevant nonprice factors as determined by the Commission; and</text>
        </level>
      </level>
      <level label="6">
        <text>shall require, at a minimum, all energy storage devices that utilize lithium–ion batteries to comply with the most up–to–date revision of the National Fire Protection Association 855: Standard for the Installation of Stationary Energy Storage Systems in effect at the project’s final permit application date.</text>
      </level>
    </level>
    <level label="b">
      <level label="1">
        <text>Each energy storage project shall include a proposed decommissioning plan.</text>
      </level>
      <level label="2">
        <text>The proposed decommissioning plan shall include a plan to maximize the recycling or reuse of all qualifying components of each energy storage device.</text>
      </level>
      <level label="3">
        <text>The owner or operator of an energy storage device may submit a revised recycling and reuse plan that incorporates emerging recycling and reuse opportunities up to 1 year before executing the decommissioning plan.</text>
      </level>
    </level>
    <level label="c">
      <text>The Commission shall:</text>
      <level label="1">
        <text>after giving public notice, hold one or more public hearings to receive public comment and evaluate the proposals; and</text>
      </level>
      <level label="2">
        <text>subject to subsection (d) of this section, issue one or more orders to select a proposal or proposals for development.</text>
      </level>
    </level>
    <level label="d">
      <text>The Commission may end the solicitation process without selecting a proposal if the Commission finds that none of the proposals adequately support the goals established under this subtitle, including the goal of securing affordable, reliable electrical service for Maryland residents.</text>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="7-1227" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="12" subtitle_name="Energy Solicitation and Procurement">
    <level label="a">
      <text>For any proposal selected under this part, the Commission may adopt conditions for the construction and operation of facilities included in the proposal.</text>
    </level>
    <level label="b">
      <text>An order selecting a proposal under § 7–1226 of this subtitle bestows the same rights to the selected proposal that a generating system would otherwise be granted through a certificate of public convenience and necessity under § 7–207 of this title if the selected proposal is reviewed under an alternative process as determined by the Commission.</text>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="7-1228" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="12" subtitle_name="Energy Solicitation and Procurement">
    <text>Any transmission energy storage device built in accordance with this subtitle shall count toward the energy storage device deployment goals under § 7–216.1 of this title.</text>
  </section>
  <section article="gpu" article_name="Public Utilities" number="7-1229" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="12" subtitle_name="Energy Solicitation and Procurement">
    <text>On or before December 31, 2026, the Commission shall report, in accordance with § 2–1257 of the State Government Article, to the General Assembly on the effectiveness of the procurement process established under this part.</text>
  </section>