<?xml version='1.0' encoding='utf-8'?>
<section article="gpu" article_name="Public Utilities" number="7-207.1" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="2" subtitle_name="Electric Generation Facility Planning">
  <level label="a">
    <text>In this section, “generating station” does not include:</text>
    <level label="1">
      <text>a generating unit or facility that:</text>
      <level label="i">
        <text>is used for the production of electricity;</text>
      </level>
      <level label="ii">
        <text>has the capacity to produce not more than 2 megawatts of alternating current; and</text>
      </level>
      <level label="iii">
        <text>is installed with equipment that prevents the flow of electricity to the electric grid during time periods when the electric grid is out of service;</text>
      </level>
    </level>
    <level label="2">
      <text>a combination of two or more generating units or facilities that:</text>
      <level label="i">
        <text>are used for the production of electricity from a solar photovoltaic system or an eligible customer–generator that is subject to the provisions of § 7–306 of this title;</text>
      </level>
      <level label="ii">
        <text>are located on the same property or adjacent properties;</text>
      </level>
      <level label="iii">
        <text>have the capacity to produce, when calculated cumulatively for all generating units or facilities on the property or adjacent property, more than 2 megawatts but not more than 14 megawatts of alternating current; and</text>
      </level>
      <level label="iv">
        <text>for each individual generating unit or facility:</text>
        <level label="1">
          <text>has the capacity to produce not more than 2 megawatts of alternating current;</text>
        </level>
        <level label="2">
          <text>is separately metered by the electric company; and</text>
        </level>
        <level label="3">
          <text>does not export electricity for sale on the wholesale market under an agreement with PJM Interconnection, LLC;</text>
        </level>
      </level>
    </level>
    <level label="3">
      <text>a generating unit or facility that:</text>
      <level label="i">
        <text>is used for the production of electricity for the purpose of:</text>
        <level label="1">
          <text>onsite emergency backup at a facility when service from the electric company is interrupted due to electric distribution or transmission system failure or when there is equipment failure at a site where critical infrastructure is located; and</text>
        </level>
        <level label="2">
          <text>test and maintenance operations necessary to ensure functionality of the generating unit or facility in the event of a service interruption from the electric company due to electric distribution or transmission system failure or when there is equipment failure at a site where critical infrastructure is located;</text>
        </level>
      </level>
      <level label="ii">
        <text>is installed with equipment that prevents the flow of electricity to the electric grid;</text>
      </level>
      <level label="iii">
        <text>is subject to a permit to construct issued by the Department of the Environment; and</text>
      </level>
      <level label="iv">
        <text>is installed at a facility that is part of critical infrastructure if the facility complies with all applicable regulations regarding noise level and testing hours; or</text>
      </level>
    </level>
    <level label="4">
      <text>a combination of two or more generating units or facilities that satisfy item (3) of this subsection.</text>
    </level>
  </level>
  <level label="b">
    <text>This section applies to a person who:</text>
    <level label="1">
      <text>constructs a generating station:</text>
      <level label="i">
        <text>designed to provide on–site generated electricity if:</text>
        <level label="1">
          <text>the capacity of the generating station does not exceed 70 megawatts; and</text>
        </level>
        <level label="2">
          <text>the electricity that may be exported for sale from the generating station to the electric system is sold only on the wholesale market pursuant to an interconnection, operation, and maintenance agreement with the local electric company; or</text>
        </level>
      </level>
      <level label="ii">
        <text>that produces electricity from wind if:</text>
        <level label="1">
          <text>the generating station is land–based;</text>
        </level>
        <level label="2">
          <text>the capacity of the generating station does not exceed 70 megawatts;</text>
        </level>
        <level label="3">
          <text>the electricity that may be exported for sale from the generating station to the electric system is sold only on the wholesale market pursuant to an interconnection, operation, and maintenance agreement with the local electric company;</text>
        </level>
        <level label="4">
          <text>the Commission provides an opportunity for public comment at a public hearing as provided in subsection (g) of this section; and</text>
        </level>
        <level label="5">
          <text>the generating station’s wind turbines are not located within a distance from the Patuxent River Naval Air Station that is determined by regulations adopted by the Commission in coordination with the Commander, Naval Air Warfare Center Aircraft Division, provided that the distance requirement under the regulation is:</text>
        </level>
        <level label="A">
          <text>not greater than is necessary to encompass an area in which utility scale wind turbines could create Doppler radar interference for missions at the Patuxent River Naval Air Station;</text>
        </level>
        <level label="B">
          <text>not greater than 46 miles, measured from location 38.29667N, 76.37668W; and</text>
        </level>
        <level label="C">
          <text>subject to modification if necessary to reflect changes in missions or technology at the Patuxent River Naval Air Station or changes in wind energy technology; or</text>
        </level>
      </level>
    </level>
    <level label="2">
      <text>constructs a generating station if:</text>
      <level label="i">
        <text>the capacity of the generating station does not exceed 25 megawatts;</text>
      </level>
      <level label="ii">
        <text>the electricity that may be exported for sale from the generating station to the electric system is sold only on the wholesale market pursuant to an interconnection, operation, and maintenance agreement with the local electric company; and</text>
      </level>
      <level label="iii">
        <text>at least 10% of the electricity generated at the generating station each year is consumed on–site.</text>
      </level>
    </level>
  </level>
  <level label="c">
    <level label="1">
      <text>The Commission shall require a person that is exempted from the requirement to obtain a certificate of public convenience and necessity under § 7–207(b)(1)(ii)1 of this subtitle to obtain approval from the Commission under this section before the person may construct a generating station described in subsection (b) of this section.</text>
    </level>
    <level label="2">
      <text>An application for approval under this section shall:</text>
      <level label="i">
        <text>be made to the Commission in writing on a form adopted by the Commission;</text>
      </level>
      <level label="ii">
        <text>be verified by oath or affirmation; and</text>
      </level>
      <level label="iii">
        <text>contain information that the Commission requires, including:</text>
        <level label="1">
          <text>proof of compliance with all applicable requirements of the independent system operator; and</text>
        </level>
        <level label="2">
          <text>a copy of an interconnection, operation, and maintenance agreement between the generating station and the local electric company.</text>
        </level>
      </level>
    </level>
  </level>
  <level label="d">
    <text>On receipt of an application for approval under this section, the Commission shall provide notice immediately or require the applicant to provide notice immediately of the application to:</text>
    <level label="1">
      <text>the governing body of each county or municipal corporation in which any portion of the generating station is proposed to be constructed;</text>
    </level>
    <level label="2">
      <text>the governing body of each county or municipal corporation within 1 mile of the proposed location of the generating station;</text>
    </level>
    <level label="3">
      <text>each member of the General Assembly representing any part of a county in which any portion of the generating station is proposed to be constructed; and</text>
    </level>
    <level label="4">
      <text>each member of the General Assembly representing any part of each county within 1 mile of the proposed location of the generating station.</text>
    </level>
  </level>
  <level label="e">
    <text>When reviewing an application for approval under this section, the Commission shall:</text>
    <level label="1">
      <text>ensure the safety and reliability of the electric system;</text>
    </level>
    <level label="2">
      <text>require the person constructing the generating station to notify the Commission 2 weeks before the first export of electricity from a generating station approved under this section; and</text>
    </level>
    <level label="3">
      <text>conduct its review and approval in an expeditious manner.</text>
    </level>
  </level>
  <level label="f">
    <text>Except for the notice required under subsection (d) of this section, the Commission may waive an element of the approval process under this section if the Commission determines that the waiver is in the public interest.</text>
  </level>
  <level label="g">
    <level label="1">
      <text>The Commission shall provide an opportunity for public comment and hold a public hearing as provided under this subsection on an application for approval made under subsection (b)(1)(ii) of this section in each county and municipal corporation in which any portion of the construction of a generating station is proposed to be located.</text>
    </level>
    <level label="2">
      <text>Upon the request of the governing body of a county or municipal corporation in which any portion of the construction of a generating station is proposed to be located, the Commission shall hold the public hearing jointly with the governing body.</text>
    </level>
    <level label="3">
      <text>Once in each of 2 successive weeks immediately before the hearing date, the Commission, at the expense of the applicant, shall provide weekly notice of the public hearing and opportunity for public comment by advertisement in a newspaper of general circulation in the county or municipal corporation affected by the application.</text>
    </level>
  </level>
</section>