<section article="gpu" article_name="Public Utilities" number="7-217" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="2" subtitle_name="Electric Generation Facility Planning">
  <level label="a">
    <level label="1">
      <text>In this section the following words have the meanings indicated.</text>
    </level>
    <level label="2">
      <text>“Electric school bus” means a school bus that is powered exclusively by an electric motor that draws its current from rechargeable storage batteries that are recharged with electricity from an electric vehicle charging station.</text>
    </level>
    <level label="3">
      <text>“Electric school bus pilot program” means a pilot program conducted by an investor–owned electric company under this section.</text>
    </level>
    <level label="4">
      <text>“Incremental administrative and operating costs” means the amount by which the cost of administering and operating an electric school bus program exceeds the cost of administering and operating a diesel school bus program.</text>
    </level>
    <level label="5">
      <text>“Incremental costs of purchasing and deploying electric school buses” means the amount by which the costs of purchasing and deploying electric school buses exceed the costs of purchasing and deploying diesel school buses.</text>
    </level>
    <level label="6">
      <text>“Interconnection equipment” means a group of components or an integrated system that connects an electric vehicle charging station with the distribution system of an investor–owned electric company.</text>
    </level>
    <level label="7">
      <text>“Interconnection facilities” means facilities required by an investor–owned electric company to accommodate the interconnection of an electric vehicle charging station.</text>
    </level>
    <level label="8">
      <text>“Participating school system” means a school system located within an investor–owned electric company’s service territory that:</text>
      <level label="i">
        <text>participates in an electric school bus pilot program under an agreement between its school board and an investor–owned electric company; and</text>
      </level>
      <level label="ii">
        <text>owns its school buses or contracts with another entity for school bus services.</text>
      </level>
    </level>
    <level label="9">
      <text>“Program costs” means:</text>
      <level label="i">
        <text>any costs to deploy appropriate electric school bus charging infrastructure that are incurred by an investor–owned electric company in implementing an electric school bus pilot program; and</text>
      </level>
      <level label="ii">
        <text>rebates paid to a participating school system.</text>
      </level>
    </level>
    <level label="10">
      <text>“Rebate” means an incentive provided by an investor–owned electric company to a participating school system that is equal to:</text>
      <level label="i">
        <text>the demonstrable incremental costs of purchasing and deploying electric school buses to participating school systems; and</text>
      </level>
      <level label="ii">
        <text>the incremental administrative and operating costs incurred by a participating school system in implementing its electric school bus pilot program.</text>
      </level>
    </level>
  </level>
  <level label="b">
    <level label="1">
      <text>There is an electric school bus pilot program.</text>
    </level>
    <level label="2">
      <text>The electric school bus pilot program shall be implemented and administered by the Commission and shall operate as provided in this section.</text>
    </level>
  </level>
  <level label="c">
    <text>An investor–owned electric company may apply to the Commission to implement an electric school bus pilot program if the pilot program is structured to:</text>
    <level label="1">
      <text>commence on or before October 1, 2024;</text>
    </level>
    <level label="2">
      <text>provide for the deployment of not fewer than 25 electric school buses;</text>
    </level>
    <level label="3">
      <text>provide for electric school bus rebates to participating school systems;</text>
    </level>
    <level label="4">
      <text>limit total rebates to $50,000,000;</text>
    </level>
    <level label="5">
      <text>allow the investor–owned electric company to use the storage batteries of the electric school buses to access the stored electricity through vehicle–to–grid technology:</text>
      <level label="i">
        <text>except as provided in item (6) of this subsection, without additional compensation to the school system for the electricity; and</text>
      </level>
      <level label="ii">
        <text>at times when the participating school system determines that the school buses are not needed to transport students;</text>
      </level>
    </level>
    <level label="6">
      <text>ensure that if the investor–owned utility uses electricity that a participating school system provides to charge an electric school bus battery, the investor–owned utility replaces that electricity at no cost to the participating school system;</text>
    </level>
    <level label="7">
      <text>provide for the selection of school systems that apply to participate in the pilot program on the basis of appropriate factors determined by the investor–owned electric company with the approval of the Commission, including the locational benefits that the storage batteries of school buses may bring to the investor–owned electric company;</text>
    </level>
    <level label="8">
      <text>consider, in determining the appropriate factors under item (7) of this subsection, the health and economic effects on low–income and minority communities;</text>
    </level>
    <level label="9">
      <text>provide and install the interconnection equipment and interconnection facilities for electric vehicle charging stations;</text>
    </level>
    <level label="10">
      <text>ensure each electric school bus is equipped with lap and shoulder belts in accordance with recommendations from the National Transportation Safety Board; and</text>
    </level>
    <level label="11">
      <text>ensure the school board is provided with adequate training and expertise to operate ably electric school buses, electric vehicle charging stations, and associated infrastructure.</text>
    </level>
  </level>
  <level label="d">
    <text>A participating school system shall:</text>
    <level label="1">
      <text>when deploying electric school buses, consider criteria that benefit students who are eligible for free and reduced price meals; and</text>
    </level>
    <level label="2">
      <text>before the delivery of electric school buses, develop a plan for training and retaining any school system employee affected by the electric school bus pilot program.</text>
    </level>
  </level>
  <level label="e">
    <text>Subject to the Commission’s approval, an investor–owned electric company may recover all reasonable and prudent program costs incurred under an electric school bus pilot program through a mechanism that is reviewed and approved by the Commission.</text>
  </level>
  <level label="f">
    <text>Subject to the Commission’s approval, an investor–owned electric company may establish a pilot tariff or rate to provide service to an electric school bus.</text>
  </level>
  <level label="g">
    <text>An investor–owned electric company that applies to implement an electric school bus pilot program shall provide to the Commission any information, data, and analysis that the Commission requires.</text>
  </level>
  <level label="h">
    <text>The Commission shall approve, deny, or approve with modifications an investor–owned electric company’s application to implement an electric school bus pilot program.</text>
  </level>
  <level label="i">
    <level label="1">
      <text>An investor–owned electric company that establishes an electric school bus pilot program authorized by this section shall, in consultation with each participating school system, by February 1, 2025, and each year thereafter for the duration of the pilot program, report on the status of the pilot program to the Governor, the Commission, and, in accordance with § 2–1257 of the State Government Article, the House Economic Matters Committee and the Senate Finance Committee.</text>
    </level>
    <level label="2">
      <text>The report required under paragraph (1) of this subsection shall include:</text>
      <level label="i">
        <text>an evaluation of the environmental and health benefits of the pilot program; and</text>
      </level>
      <level label="ii">
        <text>the financial costs and benefits of implementing the pilot program to the participating school system and the investor–owned utility, including:</text>
        <level label="1">
          <text>the deployment, operation, and maintenance of the electric school buses; and</text>
        </level>
        <level label="2">
          <text>the use of vehicle–to–grid technology.</text>
        </level>
      </level>
    </level>
  </level>
  <level label="j">
    <text>The initial duration of an electric school bus pilot program shall be at least 3 years and may not exceed 5 years.</text>
  </level>
  <level label="k">
    <text>On the request of an investor–owned electric company, the Commission may authorize an expansion of the scope, deployment, program costs, and duration of the electric school bus pilot program.</text>
  </level>