<?xml version='1.0' encoding='utf-8'?>
<section article="gpu" article_name="Public Utilities" number="7-523" title_number="7" title_name="Gas, Electric, and Water Companies" subtitle_number="5" subtitle_name="Electric Industry Restructuring">
  <level label="a">
    <text>The Commission may require that a deferral of expenses under a rate stabilization plan be either voluntary or mandatory if the Commission finds that the required type of deferral is in the public interest.</text>
  </level>
  <level label="b">
    <text>The rate stabilization plan may provide that a deferral shall be secured through the issuance of rate stabilization bonds authorized by a qualified rate order under this part.</text>
  </level>
</section>
