<chapter num="11" heading="Coast Smart Council" title_num="08" subtitle_num="01">
  <regulation prefix="Regulation" num=".01" heading="Scope.">
    <paragraph num="A.">
      <text>This chapter applies to all units of State and local government that construct projects subject to the Coast Smart Construction Program.</text>
    </paragraph>
    <paragraph num="B.">
      <text>This chapter does not apply to the reconstruction of a highway facility.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".02" heading="Definitions.">
    <paragraph num="A.">
      <text>In this chapter, the following terms have the meanings indicated.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Terms Defined.</text>
      <paragraph num="(1)">
        <text>The following terms have the meaning stated in Natural Resources Article, §3-1001, Annotated Code of Maryland:</text>
        <paragraph num="(a)">
          <text>“Coast Smart”;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>“Coast Smart Council”;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>“Design criteria”;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>“Siting criteria”;</text>
        </paragraph>
        <paragraph num="(e)">
          <text>“Structure”; and</text>
        </paragraph>
        <paragraph num="(f)">
          <text>“Substantial damage”.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>“Categorical Exemption” means an exemption from the strict application of the Coast Smart siting or design criteria for a class of projects, provided the project has been designed to include adaptation and resiliency features to prevent or mitigate damage to the maximum extent practicable.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>“Coast Smart Map” means the map adopted by the Coast Smart Council delineating the boundary within which the Coast Smart Construction Program applies.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Coast Smart Construction Program.</text>
        <paragraph num="(a)">
          <text>“Coast Smart Construction Program” means the program that establishes Coast Smart siting and design criteria for the construction of new or reconstructed structures and new highway facilities within the boundary established by the Coast Smart Map.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>“Coast Smart Construction Program” includes the Coast Smart Map and the Coast Smart Construction Program Document, adopted by the Coast Smart Council</text>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>Critical or Essential Facilities.</text>
        <paragraph num="(a)">
          <text>“Critical or essential facilities” means buildings and other structures that are intended to remain operational in the event of extreme environmental impacts from flood, wind, snow, or earthquakes.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>“Critical and essential facilities” include hospitals, fire stations, police stations, storage of critical records, facilities that handle or store hazardous materials, drinking water and sewage treatment facilities, airports, transit and highway access and other essential transportation, and similar facilities.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(6)">
        <text>“Emergency” has the meaning stated in Public Safety Article, §14-101, Annotated Code of Maryland.</text>
      </paragraph>
      <paragraph num="(7)">
        <text>“Historic structure” means a structure that is located in the State and:</text>
        <paragraph num="(a)">
          <text>Is listed in the National Register of Historic Places;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Is designated as a historic property under local law and determined by the Director of the Maryland Historical Trust to be eligible for listing on the National Register of Historic Places; or</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Is:</text>
          <paragraph num="(i)">
            <text>Located in a historic district listed on the National Register of Historic Places or in a local historic district that the Director of the Maryland Historical Trust determines is eligible for listing on the National Register of Historic Places; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Certified by the Director of the Maryland Historical Trust as contributing to the significance of the district.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(8)">
        <text>“Passive public access project” means a project that:</text>
        <paragraph num="(a)">
          <text>Provides either recreational or scenic access to water bodies or shoreline areas; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Requires location within a flood zone for its purpose.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(9)">
        <text>“Qualifying agency” means a unit of state or local government that funds, plans, designs, constructs, or oversees capital projects subject to the Coast Smart Construction Program.</text>
      </paragraph>
      <paragraph num="(10)">
        <text>“Temporary structure” means a structure intended to be in place for less than 180 consecutive days in any given calendar year.</text>
      </paragraph>
      <paragraph num="(11)">
        <text>“Water-dependent project” means a project that by reason of its intrinsic nature or operation is:</text>
        <paragraph num="(a)">
          <text>Dependent on the water;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Requires location at or near the water; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Requires continued direct access to the water as an integral part of its use.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".03" heading="Applicability.">
    <paragraph num="A.">
      <text>A project shall comply with the Coast Smart Construction Program if it meets the criteria in §B of this regulation.</text>
    </paragraph>
    <paragraph num="B.">
      <text>The applicable Coast Smart Construction Program criteria are:</text>
      <paragraph num="(1)">
        <text>The project is a capital project;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The project is located within the Coast Smart boundary, as indicated on the Coast Smart Map;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The project includes:</text>
        <paragraph num="(a)">
          <text>The construction of a new structure;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The reconstruction of a structure with substantial damage; or</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The construction of a new highway facility;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>At least 50 percent of the total project costs are funded with state funds; and</text>
      </paragraph>
      <paragraph num="(5)">
        <text>The total project cost is $500,000 or more.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".04" heading="Coast Smart Construction Program.">
    <paragraph num="A.">
      <text>Projects subject to the Coast Smart Construction Program shall satisfy the Coast Smart siting and design criteria specified in the Coast Smart Construction Program Document published on the Department’s website.</text>
    </paragraph>
    <paragraph num="B.">
      <text>For all projects subject to the Coast Smart Construction Program, the Qualifying Agency shall complete the Coast Smart Project Screening Form within the Coast Smart Construction Program Document.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".05" heading="Categorical Exemptions.">
    <paragraph num="A.">
      <text>The following categories of projects may be exempt from the strict application of the Coast Smart siting and design criteria:</text>
      <paragraph num="(1)">
        <text>Water-dependent projects;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Passive public access projects;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Historic structures;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Temporary structures; and</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Emergency projects.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>A qualifying agency may determine that a project qualifies for a categorical exemption, provided that the qualifying agency demonstrates that the project has been designed to include adaptation and resiliency features to prevent or mitigate damage to the maximum extent practicable.</text>
    </paragraph>
    <paragraph num="C.">
      <text>For all projects eligible for a categorical exemption, the qualifying agency must complete the Coast Smart Project Screening Form within the Coast Smart Construction Program Document and indicate the project category for which the exemption applies.</text>
    </paragraph>
    <paragraph num="D.">
      <text>The qualifying agency may request input from the Coast Smart Council regarding the project’s eligibility for and the qualifying agency’s determination of an exemption.</text>
    </paragraph>
    <paragraph num="E.">
      <text>The qualifying agency shall make the final determination as to whether a project qualifies for an exemption.</text>
    </paragraph>
    <paragraph num="F.">
      <text>The qualifying agency shall provide the completed Coast Smart Project Screening Form to the Coast Smart Council upon request.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".06" heading="Waivers.">
    <paragraph num="A.">
      <text>A qualifying agency may request a waiver from one or more of the Coast Smart siting or design criteria.</text>
    </paragraph>
    <paragraph num="B.">
      <text>The Governor's Sustainable Growth Subcabinet, established under State Government Article, § 9-1403, Annotated Code of Maryland, shall review and decide waiver requests.</text>
    </paragraph>
    <paragraph num="C.">
      <text>The qualifying agency shall submit to the Governor's Sustainable Growth Subcabinet:</text>
      <paragraph num="(1)">
        <text>The Coast Smart Criteria Waiver Form within the Coast Smart Construction Program Document;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>All necessary supporting documents including the Coast Smart Project Screening Form; and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>A letter:</text>
        <paragraph num="(a)">
          <text>Identifying the specific siting or design criteria from which a waiver is requested;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Justification for why the project is unable to meet the Coast Smart siting or design criteria; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Factors upon which the waiver request is based, as provided in the Coast Smart Construction Program Document.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".07" heading="Reporting.">
    <paragraph num="A.">
      <text>Upon request, a qualifying agency shall submit project information to the Coast Smart Council.</text>
    </paragraph>
    <paragraph num="B.">
      <text>The information shall include the following list of projects:</text>
      <paragraph num="(1)">
        <text>Projects that were located within the Coast Smart boundary, as indicated on the Coast Smart Map;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Projects for which the qualifying agency made a categorical exemption determination; and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Projects that received waiver determinations from the Governor's Sustainable Growth Subcabinet.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>The qualifying agency shall maintain all project information, including the Coast Smart Screening Form, in accordance with the agency's document retention schedule.</text>
    </paragraph>
  </regulation>
  <annotations>
    <annotation type="Authority">Natural Resources Article, §§3-1001, 3-1006, and 3-1009, Annotated Code of Maryland</annotation>
    <annotation type="History" subtype="Administrative History">Effective date: December 11, 2025 (52:24 Md. R. 1197)</annotation>
  </annotations>
</chapter>