<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".03" citation="COMAR 09.12.01.03" title_num="09" subtitle_num="12" chapter_num="01" heading="Air and Ventilation.">
  <paragraph num="A.">
    <text>A boiler room shall have a permanent source of outside air to:</text>
    <paragraph num="(1)">
      <text>Permit satisfactory combustion of fuel; and</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Provide proper ventilation of the boiler under normal operating conditions.</text>
    </paragraph>
  </paragraph>
  <paragraph num="B.">
    <text>Louvered area.</text>
    <paragraph num="(1)">
      <text>The total requirements of all burners for all fired pressure vessels in a boiler room shall be used to determine the louver sizes, whether the pressure vessels are fired by coal, oil, or gas.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>The minimum net free louvered area shall be at least 1 square foot.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>The minimum dimension of air openings may not be less than 3 inches.</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Ducts, when used, shall be of the same cross-sectional area as the free area of the openings to which they connect.</text>
    </paragraph>
    <paragraph num="(5)">
      <text>The following configurations shall be used:</text>
      <paragraph num="(a)">
        <text>Two permanent openings:</text>
        <paragraph num="(i)">
          <text>One opening shall start within 12 inches of the ceiling, and one opening shall start within 12 inches of the floor;</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>The openings shall connect directly, or by ducts, with the outdoors or with crawl or attic spaces that freely connect with the outdoors;</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>Where directly connecting with the outdoors or where connecting to the outdoors through vertical ducts, each opening shall have a minimum free area of 1 square inch per 4,000 Btu per hour of total input rating, or total relieving capacity, of all fired pressure vessels, whichever is greater; and</text>
        </paragraph>
        <paragraph num="(iv)">
          <text>Where connecting to the outdoors through horizontal ducts, each opening shall have a minimum free area of 1 square inch per 2,000 Btu per hour of total input rating, or total relieving capacity, of all fired pressure vessels, whichever is greater; or</text>
        </paragraph>
      </paragraph>
      <paragraph num="(b)">
        <text>One permanent opening:</text>
        <paragraph num="(i)">
          <text>The opening shall start within 12 inches of the ceiling;</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>The opening shall directly connect with the outdoors, or shall connect through a vertical or horizontal duct to the outdoors or with crawl or attic spaces that freely connect to the outdoors; and</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>The opening shall have a free open area of 1 square inch per 3,000 Btu per hour of total input rating, or total relieving capacity, of all fired pressure vessels, whichever is greater.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="(6)">
      <text>The following table shall be used to determine the net louvered area in square feet:</text>
    </paragraph>
  </paragraph>
  <paragraph num="C.">
    <text>Mechanical Combustion and Ventilation.</text>
    <paragraph num="(1)">
      <text>Mechanical ventilation may be used to supply combustion air or ventilation air, or both, to a boiler room.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>When mechanical ventilation is used:</text>
      <paragraph num="(a)">
        <text>The firing device shall be interlocked with the fan so that the firing device cannot operate without proven airflow;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The velocity of the air passing through the louvers cannot exceed 500 feet per minute; and</text>
      </paragraph>
      <paragraph num="(c)">
        <text>The total air delivered shall be equal to or exceed 0.5 CFM per 1,000 Btu per hour of total input rating or total required relieving capacity, whichever is greater.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="D.">
    <text>Water Heater Combustion Air Ventilation Requirements.</text>
    <paragraph num="(1)">
      <text>Hot water heaters in excess of 200,000 Btu per hour up to but not including 1,000,000 Btu per hour, that are located in their own equipment room, shall have at least:</text>
      <paragraph num="(a)">
        <text>1 permanent source of outside air; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>1 square foot of total net free louvered air space.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>Hot water heaters of 1,000,000 Btu per hour or greater shall follow manufacturer's requirements.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Hot water heaters with inputs and required relieving capacities less than 200,000 Btu per hour are not covered by this regulation.</text>
    </paragraph>
  </paragraph>
</regulation>