<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".05" citation="COMAR 09.12.01.05" title_num="09" subtitle_num="12" chapter_num="01" heading="Factor of Safety--Increase for Existing Installation.">
  <paragraph num="A.">
    <text>An inspector may increase the factor of safety of an existing installation if the condition of the boiler or pressure vessel warrants the increase.</text>
  </paragraph>
  <paragraph num="B.">
    <text>Appeal Procedure.</text>
    <paragraph num="(1)">
      <text>An owner may appeal an increase in a factor of safety to the Board.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Upon appeal, the Board may request that the chief boiler inspector and a deputy boiler inspector or special inspector conduct a joint inspection.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Each inspector shall submit a report to the Board.</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Based on the reports submitted, the Board shall make a final determination of the appropriate factor of safety.</text>
    </paragraph>
  </paragraph>
</regulation>