<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".12" citation="COMAR 09.12.01.12" title_num="09" subtitle_num="12" chapter_num="01" heading="Heating Boiler — Existing Installation: Miscellaneous.">
  <paragraph num="A.">
    <text>Feedwater Connection.</text>
    <paragraph num="(1)">
      <text>Feedwater, make-up water, or water treatment:</text>
      <paragraph num="(a)">
        <text>Shall be introduced into a boiler through:</text>
        <paragraph num="(i)">
          <text>The return piping system, or</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>An independent feedwater connection that does not discharge against a part of the boiler exposed to direct radiant heat from the fire;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(b)">
        <text>May not be introduced through an opening or connection provided for:</text>
        <paragraph num="(i)">
          <text>Inspection or cleaning,</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Safety valve,</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>Safety relief valve,</text>
        </paragraph>
        <paragraph num="(iv)">
          <text>Surface blowoff,</text>
        </paragraph>
        <paragraph num="(v)">
          <text>Water column,</text>
        </paragraph>
        <paragraph num="(vi)">
          <text>Water gage glass,</text>
        </paragraph>
        <paragraph num="(vii)">
          <text>Pressure gage, or</text>
        </paragraph>
        <paragraph num="(viii)">
          <text>Temperature gage.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>Feedwater pipe shall have a:</text>
      <paragraph num="(a)">
        <text>Check valve near the boiler; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Stop valve or cock between the check valve and the boiler or return pipe system.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="B.">
    <text>Pressure or Altitude Gage.</text>
    <paragraph num="(1)">
      <text>A hot water boiler shall have a pressure or altitude gage connected to the boiler or its flow connection so that it cannot be shut off from the boiler except by a cock with a tee or lever handle:</text>
      <paragraph num="(a)">
        <text>Placed on the pipe near the gage; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>With the handle parallel to the pipe in which it is located, when the cock is open.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>The scale on the dial of a pressure or altitude gage shall be graduated to indicate pressures from 1-1/2 to 3 times the maximum allowable working pressure.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Piping or tubing for a pressure or altitude gage connection smaller than 1 inch pipe size shall be of nonferrous metal.</text>
    </paragraph>
  </paragraph>
  <paragraph num="C.">
    <text>Steam Gage.</text>
    <paragraph num="(1)">
      <text>A steam boiler shall have a steam gage connected to its steam space, water column, or steam connection by a siphon or equivalent device on the exterior of the boiler.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>A siphon shall be:</text>
      <paragraph num="(a)">
        <text>Of sufficient capacity to keep the gage tube filled with water; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Arranged so that the gage can be shut off from the boiler only by a cock with a tee or lever handle:</text>
        <paragraph num="(i)">
          <text>Placed in the pipe near the gage, and</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>With the handle parallel to the pipe in which it is located, when the cock is open.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>Scale.</text>
      <paragraph num="(a)">
        <text>The scale on the dial of a steam gage shall be graduated to at least 30 PSIG.</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The gage shall have effective stops for the indicating pointer at the:</text>
        <paragraph num="(i)">
          <text>Zero point; and</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Maximum pressure point.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(c)">
        <text>The travel of the pointer from zero to 30 PSIG shall be at least 3 inches.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="D.">
    <text>Stop Valve and Check Valve.</text>
    <paragraph num="(1)">
      <text>A boiler which can be closed off from the heating system by closing a steam stop valve shall have a check valve in the condensate return line between the boiler and the system.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Any part of a heating system that can be closed off from the remainder of the system by closing a steam stop valve shall have a check valve in the condensate return pipe from that part of the system.</text>
    </paragraph>
  </paragraph>
  <paragraph num="E.">
    <text>A hot water boiler shall have a thermometer located and connected so that:</text>
    <paragraph num="(1)">
      <text>A person observing the water pressure or altitude gage can read the thermometer easily; and</text>
    </paragraph>
    <paragraph num="(2)">
      <text>The thermometer at all times indicates the temperature, in degrees Fahrenheit, of the water in the boiler at or near the outlet.</text>
    </paragraph>
  </paragraph>
  <paragraph num="F.">
    <text>Water Gage Glass.</text>
    <paragraph num="(1)">
      <text>A steam boiler shall have at least one water gage glass attached to the water column or boiler by valved fittings.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>The lower fitting shall have a straightway drain valve with an opening at least 1/4 inch diameter to facilitate cleaning.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Gage glass replacement shall be possible while the boiler is under pressure.</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Transparent material other than glass may be used for a water gage if the material is suitable for the pressure, temperature, and corrosive conditions encountered in service.</text>
    </paragraph>
  </paragraph>
  <paragraph num="G.">
    <text>When practicable, a boiler equipped with a condensate return pump shall have a water level control that automatically maintains the water level in the boiler within the range of the gage glass.</text>
  </paragraph>
  <paragraph num="H.">
    <text>Repairs and replacements of fittings or appliances shall comply with the ASME Code for new construction, Section IV.</text>
  </paragraph>
  <paragraph num="I.">
    <text>The ASME Code, Section VI, Recommended Rules for the Care and Operation of Heating Boilers is recommended as a guide for proper and safe operating practices.</text>
  </paragraph>
  <paragraph num="J.">
    <text>It is recommended that a return water connection to a low-pressure steam heating boiler supplying a gravity return heating system be arranged to form a return pipe loop connection, so that water cannot be forced out of the boiler below the safe water level, as shown in Section IV, Figure HG-703.1 of the ASME Heating Boiler Code.</text>
  </paragraph>
</regulation>