<chapter num="01" heading="Board of Boiler Rules" title_num="09" subtitle_num="12">
  <regulation prefix="Regulation" num=".01" heading="Definitions.">
    <paragraph num="A.">
      <text>In these regulations, the following terms have the meanings indicated.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Terms Defined.</text>
      <paragraph num="(1)">
        <text>“ASME Code” means the “ASME Boiler and Pressure Vessel Code” of the American Society of Mechanical Engineers with revisions, amendments, and interpretations adopted by the Board of Boiler Rules.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>“Antique boiler” means a boiler that is:</text>
        <paragraph num="(a)">
          <text>Fabricated and stamped:</text>
          <paragraph num="(i)">
            <text>In accordance with the ASME Code or another nationally recognized boiler construction standard; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>More than 30 years before the date of the inspection;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Operated primarily for demonstration, exhibition, or instructional purposes and not for profit; or</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Constructed, inspected, and stamped in accordance with the ASME Code and registered with the National Board of Boiler and Pressure Vessels Inspectors to replace a historical boiler.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>“Approved” means approved by the Board of Boiler Rules.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>“Authorized Inspection Agency” means an entity that:</text>
        <paragraph num="(a)">
          <text>Is accredited in accordance with the National Board of Boiler and Pressure Vessel Inspectors NB-369, Qualifications and Duties for Authorized Inspection Agencies Performing Inservice Inspection Activities and Qualifications for Inspectors of Boilers and Pressure Vessels;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Is accredited in accordance with the National Board of Boiler and Pressure Vessel Inspectors NB-371, Accreditation of Owner-User Inspection Organizations (OUIO); or</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Meets the qualifications and definition of the National Board of Boiler and Pressure Vessel Inspectors NB-360, Criteria for Acceptance of Authorized Inspection Agencies for New Construction.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>“Authorized Insurer” means an authorized inspection agency licensed to insure boilers and pressure vessels in Maryland.</text>
      </paragraph>
      <paragraph num="(6)">
        <text>“Board” means the Board of Boiler Rules.</text>
      </paragraph>
      <paragraph num="(7)">
        <text>“Boiler external piping” means piping which:</text>
        <paragraph num="(a)">
          <text>Begins where the boiler proper terminates at the:</text>
          <paragraph num="(i)">
            <text>First circumferential joint for welded end connections;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Face of the first flange in bolted flanged connections; or</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>First threaded joint in threaded connections; and</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Extends up to and including the valve or valves required by Section I or Section IV of the ASME Code.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(8)">
        <text>“Certificate of Competency” means a certificate issued by the Chief Boiler Inspector indicating the suitability and fitness of an individual to inspect boilers and pressure vessels in Maryland.</text>
      </paragraph>
      <paragraph num="(9)">
        <text>“Certificate inspection” means an inspection the report of which is used by the Chief Boiler Inspector to determine whether to issue a certificate.</text>
      </paragraph>
      <paragraph num="(10)">
        <text>“Certificate of inspection for repair or alteration” means the certificate inspection performed after a repair or alteration to determine suitability of the object for return to service.</text>
      </paragraph>
      <paragraph num="(11)">
        <text>“Commissioner” means the Commissioner of Labor and Industry.</text>
      </paragraph>
      <paragraph num="(12)">
        <text>“Condemned boiler or pressure vessel” means a boiler or pressure vessel that has been inspected and declared unsafe or declared disqualified under legal requirements by an inspector who is authorized to take such action and who has applied a stamp or mark designating condemnation.</text>
      </paragraph>
      <paragraph num="(13)">
        <text>“Electric boiler” means a boiler in which the source of heat is electricity.</text>
      </paragraph>
      <paragraph num="(14)">
        <text>“Existing boiler or pressure vessel installation” means:</text>
        <paragraph num="(a)">
          <text>A boiler constructed, installed, placed in operation, or contracted for before July 1, 1969, excluding antique boilers, historical boilers or model steam boilers; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A pressure vessel constructed, installed, placed in operation, or contracted for before January 1, 1974, excluding antique boilers, historical boilers or model steam boilers.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(15)">
        <text>“External inspection” means an inspection made when a boiler or pressure vessel is in operation.</text>
      </paragraph>
      <paragraph num="(16)">
        <text>“Follow up inspection” means an inspection performed after a boiler or pressure vessel has been determined to be nonconforming with applicable laws and regulations.</text>
      </paragraph>
      <paragraph num="(17)">
        <text>Heating Boiler.</text>
        <paragraph num="(a)">
          <text>“Heating boiler” means:</text>
          <paragraph num="(i)">
            <text>A steam boiler that operates at pressures not exceeding 15 PSIG; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>A hot water boiler operated at pressures not exceeding 160PSIG or temperatures not exceeding 250°F at or near the boiler outlet.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>“Heating boiler” includes a vessel used in connection with it as an expansion tank.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(18)">
        <text>“High-pressure, high-temperature water boiler” means a water boiler that operates at pressures exceeding 160 PSIG or temperatures exceeding 250°F at or near the boiler outlet.</text>
      </paragraph>
      <paragraph num="(19)">
        <text>“Historical boiler” means a boiler that is:</text>
        <paragraph num="(a)">
          <text>Riveted and/or welded construction;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Not under the jurisdiction of the Federal Railroad Administration;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Not used for profit; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>An antique boiler, steam tractor, traction engine, hobby steam boiler, or portable steam boiler that is preserved, restored, and maintained for demonstration, viewing, or educational purposes.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(20)">
        <text>“Hobby steam boiler” means a model steam boiler.</text>
      </paragraph>
      <paragraph num="(21)">
        <text>“Hot water heating boiler” means a heating boiler furnishing hot water circulated to return to itself.</text>
      </paragraph>
      <paragraph num="(22)">
        <text>“Hot water supply boiler” means a heating boiler furnishing hot water for use external to itself.</text>
      </paragraph>
      <paragraph num="(23)">
        <text>“Individually fabricated” means constructed, inspected, and stamped in accordance with the ASME Code, or other standard accepted by the Chief Boiler Inspector.</text>
      </paragraph>
      <paragraph num="(24)">
        <text>“Inspector” means the chief boiler inspector, a deputy boiler inspector, or a special inspector.</text>
      </paragraph>
      <paragraph num="(25)">
        <text>"Installer” means an individual, firm, association, corporation, or other entity that installs or constructs boilers or pressure vessels.</text>
      </paragraph>
      <paragraph num="(26)">
        <text>“Internal inspection” means an examination as complete as possible of the internal and external surfaces of a boiler or pressure vessel conducted while it is not in operation, and with all manhole plates, hand hole plates, and other coverings of inspection openings removed.</text>
      </paragraph>
      <paragraph num="(27)">
        <text>“Kitchen” means an area used for the preparation or processing of food for human consumption.</text>
      </paragraph>
      <paragraph num="(28)">
        <text>“Kitchen equipment boiler” means a boiler located in a kitchen, and used for cooking or related purposes.</text>
      </paragraph>
      <paragraph num="(29)">
        <text>“Lap-seam crack” means a crack in a lap-seam of a boiler or pressure vessel parallel to a longitudinal joint, either between or adjacent to rivet holes.</text>
      </paragraph>
      <paragraph num="(30)">
        <text>“Maryland inspection report form” means the form submitted by an inspector and available on the Department’s website.</text>
      </paragraph>
      <paragraph num="(31)">
        <text>“Miniature boiler” means a boiler when none of the following limitations are exceeded:</text>
        <paragraph num="(a)">
          <text>16 inches inside diameter of shell;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>20 square feet heating surface, except for an electric boiler;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>5 cubic feet gross volume, exclusive of casing and insulation; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>100 psig maximum allowable working pressure.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(32)">
        <text>“Model steam boiler” means a boiler that is individually fabricated for non-commercial use and that is used primarily for demonstration, exhibition, or educational purposes, and not used for profit.</text>
      </paragraph>
      <paragraph num="(33)">
        <text>“Maximum allowable operating pressure” means the maximum pressure at which a boiler or pressure vessel is permitted to operate as determined by an inspector after an inspection and which is equal to or less than the maximum allowable working pressure.</text>
      </paragraph>
      <paragraph num="(34)">
        <text>“Maximum allowable working pressure” means the maximum pressure at which a boiler or pressure vessel is designed to operate as determined by the manufacturer in accordance with the construction code.</text>
      </paragraph>
      <paragraph num="(35)">
        <text>“Modular boiler system” means a series of boiler units specifically designed to be used singularly or together in sequential operation.</text>
      </paragraph>
      <paragraph num="(36)">
        <text>“National Board” means the National Board of Boiler and Pressure Vessel Inspectors.</text>
      </paragraph>
      <paragraph num="(37)">
        <text>“NBIC” means the National Board Inspection Code.</text>
      </paragraph>
      <paragraph num="(38)">
        <text>“New boiler or pressure vessel installation” means:</text>
        <paragraph num="(a)">
          <text>A boiler constructed, installed, placed in operation, or contracted for after July 1, 1969; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A pressure vessel constructed, installed, placed in operation, or contracted for after January 1, 1974.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(39)">
        <text>“Nonstandard boiler or pressure vessel” means a boiler or pressure vessel that does not bear the stamp of:</text>
        <paragraph num="(a)">
          <text>Maryland;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Another jurisdiction which has adopted a standard of construction equivalent to that required by the Board of Boiler Rules;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The ASME; or</text>
        </paragraph>
        <paragraph num="(d)">
          <text>The National Board.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(40)">
        <text>“Owner” means a person, firm, or corporation owning or operating a boiler or pressure vessel within Maryland.</text>
      </paragraph>
      <paragraph num="(41)">
        <text>“Owner-user inspection service” means an owner of a boiler or pressure vessel in Maryland, who maintains a regularly established inspection department whose inspection procedures meet the applicable requirements of the National Board of Boiler and Pressure Vessel Inspectors and are acceptable to the Board.</text>
      </paragraph>
      <paragraph num="(42)">
        <text>“Person” means an installer, owner, or operator of a boiler or pressure vessel, a repair organization, or a company licensed to insure or inspect boilers and pressure vessels in the State.</text>
      </paragraph>
      <paragraph num="(43)">
        <text>“Portable boiler or pressure vessel” means a boiler or pressure vessel that is not historical but meets the following requirements:</text>
        <paragraph num="(a)">
          <text>Is set on a frame, platform or trailer; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Is designed to be moved to different locations for use.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(44)">
        <text>“Portable steam boiler” means a historical boiler that is:</text>
        <paragraph num="(a)">
          <text>Not self-propelled;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Set on a frame, platform, or trailer; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Designed to be moved to different locations for use.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(45)">
        <text>“Power boiler” means a boiler in which steam or other vapor is generated at a pressure of more than 15 PSIG, and includes a high-pressure, high-temperature water boiler.</text>
      </paragraph>
      <paragraph num="(46)">
        <text>“PSIG” means pounds per square inch gauge.</text>
      </paragraph>
      <paragraph num="(47)">
        <text>“Standard boiler or pressure vessel” means a boiler or pressure vessel that:</text>
        <paragraph num="(a)">
          <text>Bears the stamp of Maryland;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Bears the stamp of another jurisdiction which has adopted a standard of construction equivalent to that required by the Board of Boiler Rules;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Bears the stamps of both ASME and the National Board; or</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Is of equivalent safe construction acceptable to the Board.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(48)">
        <text>“Used boiler or pressure vessel” means a boiler or pressure vessel which has been removed from its original setting and reinstalled at the same or different location.</text>
      </paragraph>
      <paragraph num="(49)">
        <text>“Water heater” means a closed vessel with openings through which water may flow and includes:</text>
        <paragraph num="(a)">
          <text>An apparatus by which heat is generated;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Controls necessary to prevent pressures greater than 160 psig and water temperatures greater than 210 degrees F; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Potable water that is withdrawn for external use.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(50)">
        <text>“Workday” means a day that is not a Saturday, a Sunday, or a State holiday.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".01-1" heading="Incorporation by Reference.">
    <paragraph num="A.">
      <text>The following documents are incorporated by reference to the extent that they are referenced in this chapter:</text>
      <paragraph num="(1)">
        <text>ASME 2019 Boiler and Pressure Vessel Code, an International Code; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>National Board Inspection Code — NBIC, 2019 Edition.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>The following documents are incorporated by reference in their entirety:</text>
      <paragraph num="(1)">
        <text>ASME B31.1 — 2018 Edition, Power Piping (American Society of Mechanical Engineers);</text>
      </paragraph>
      <paragraph num="(2)">
        <text>ASME B31.3 — 2018 Edition, Process Piping (American Society of Mechanical Engineers);</text>
      </paragraph>
      <paragraph num="(3)">
        <text>ASME CSD-1 — 2018 Edition, Controls and Safety Devices for Automatically Fired Boilers (American Society of Mechanical Engineers) as amended in §C of this regulation; and</text>
      </paragraph>
      <paragraph num="(4)">
        <text>NFPA 85, Boiler and Combustion Systems Hazards Code — 2019 Edition (National Fire Protection Association).</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Controls and Safety Devices for Automatically Fired Boilers (CSD-1) (American Society of Mechanical Engineers).</text>
      <paragraph num="(1)">
        <text>The requirements of ASME CSD-1 in effect at the time a boiler is installed apply to:</text>
        <paragraph num="(a)">
          <text>Power boilers regardless of fuel input;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Other boilers with a fuel input of greater than 2,500,000 Btu per hour and less than 12,500,000 Btu per hour; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Other boilers with a fuel input of 2,500,000 Btu per hour or less, except that Section CF of CSD-1 does not apply to these boilers.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>The following are exempt from the requirements of ASME CSD-1:</text>
        <paragraph num="(a)">
          <text>Water heaters stamped either “H” or “HLW” and used as potable water heaters, if the water temperature is less than 210°F and the water pressure is less than 160 PSIG;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Miniature boilers, except as required in Regulation .37 of this chapter;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Kitchen equipment boilers, except as required in Regulation .38 of this chapter; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Historical boilers.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".01-2" heading="Compliance.">
    <text>In the event of a conflict between a regulation in this chapter and a code section incorporated by reference, the provisions of this chapter control.</text>
  </regulation>
  <regulation prefix="Regulation" num=".02" heading="Access and Egress.">
    <paragraph num="A.">
      <text>Clearance.</text>
      <paragraph num="(1)">
        <text>Except for a water heater or a modular boiler system, a new or replacement boiler installed in a new or existing building shall be installed consistent with:</text>
        <paragraph num="(a)">
          <text>Or exceeding, the manufacturer's recommendations for clearance; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The space requirements of §A(6) of this regulation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>In the event manufacturer recommendations for clearance are not provided, a new or replacement boiler installed in a new or existing building, shall:</text>
        <paragraph num="(a)">
          <text>Have at least 3 feet between:</text>
          <paragraph num="(i)">
            <text>The top of the boiler and the ceiling, and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Each side of the boiler and the adjacent wall or other structure; and</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Comply with the conditions of §A(6) of this regulation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>The distance between or around a new or replacement boiler in a modular boiler system installed in a new or existing building shall be in accordance with the manufacturer's recommendations while ensuring:</text>
        <paragraph num="(a)">
          <text>There are 3 feet between each side of the perimeter of the boiler system and the adjacent wall or structure; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The conditions in §A(6) of this regulation are met.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>The distance between or around a water heater installed in a new or existing building shall be in accordance with the manufacturer's recommendations while ensuring the conditions of §A(6) of this regulation are met.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>A boiler or pressure vessel having a manhole shall have 5 feet clearance from the manhole opening to any wall, ceiling, or piping that prevents entrance through the manhole.</text>
      </paragraph>
      <paragraph num="(6)">
        <text>A boiler or pressure vessel shall be located to provide adequate space for:</text>
        <paragraph num="(a)">
          <text>Proper operation of the boiler or pressure vessel and its appurtenances;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Inspection of all surfaces, tubes, water-walls, economizers, piping, valves, and other equipment; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Required maintenance and the repair and replacement of tubes.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Ladders and Runways.</text>
      <paragraph num="(1)">
        <text>When necessary to afford safe access, a steel runway or platform of standard construction shall be installed across the tops of adjacent boilers or pressure vessels, or at another convenient level.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>When a valve or appurtenance requiring frequent manipulation cannot be reached or operated from the floor, a platform or other safe means of operation shall be provided.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>A platform or runway shall:</text>
        <paragraph num="(a)">
          <text>Be at least 24 inches wide;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Have standard handrails and toe boards; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Provide at least 7 feet, 6 inches overhead clearance.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>A runway shall:</text>
        <paragraph num="(a)">
          <text>Have at least two means of exit, located remotely from each other; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Be connected to floor level by:</text>
          <paragraph num="(i)">
            <text>A permanent stairway, or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>An inclined ladder.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Each elevation in a boiler room shall have at least two exits, located remotely from each other, if the room:</text>
      <paragraph num="(1)">
        <text>Exceeds 500 square feet floor area; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Contains one or more boilers having a fuel-burning capacity of 1,000,000 Btu per hour, or equivalent electrical heat input.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".03" heading="Air and Ventilation.">
    <paragraph num="A.">
      <text>A boiler room shall have a permanent source of outside air to:</text>
      <paragraph num="(1)">
        <text>Permit satisfactory combustion of fuel; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Provide proper ventilation of the boiler under normal operating conditions.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Louvered area.</text>
      <paragraph num="(1)">
        <text>The total requirements of all burners for all fired pressure vessels in a boiler room shall be used to determine the louver sizes, whether the pressure vessels are fired by coal, oil, or gas.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The minimum net free louvered area shall be at least 1 square foot.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The minimum dimension of air openings may not be less than 3 inches.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Ducts, when used, shall be of the same cross-sectional area as the free area of the openings to which they connect.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>The following configurations shall be used:</text>
        <paragraph num="(a)">
          <text>Two permanent openings:</text>
          <paragraph num="(i)">
            <text>One opening shall start within 12 inches of the ceiling, and one opening shall start within 12 inches of the floor;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>The openings shall connect directly, or by ducts, with the outdoors or with crawl or attic spaces that freely connect with the outdoors;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Where directly connecting with the outdoors or where connecting to the outdoors through vertical ducts, each opening shall have a minimum free area of 1 square inch per 4,000 Btu per hour of total input rating, or total relieving capacity, of all fired pressure vessels, whichever is greater; and</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Where connecting to the outdoors through horizontal ducts, each opening shall have a minimum free area of 1 square inch per 2,000 Btu per hour of total input rating, or total relieving capacity, of all fired pressure vessels, whichever is greater; or</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>One permanent opening:</text>
          <paragraph num="(i)">
            <text>The opening shall start within 12 inches of the ceiling;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>The opening shall directly connect with the outdoors, or shall connect through a vertical or horizontal duct to the outdoors or with crawl or attic spaces that freely connect to the outdoors; and</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>The opening shall have a free open area of 1 square inch per 3,000 Btu per hour of total input rating, or total relieving capacity, of all fired pressure vessels, whichever is greater.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(6)">
        <text>The following table shall be used to determine the net louvered area in square feet:</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Mechanical Combustion and Ventilation.</text>
      <paragraph num="(1)">
        <text>Mechanical ventilation may be used to supply combustion air or ventilation air, or both, to a boiler room.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>When mechanical ventilation is used:</text>
        <paragraph num="(a)">
          <text>The firing device shall be interlocked with the fan so that the firing device cannot operate without proven airflow;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The velocity of the air passing through the louvers cannot exceed 500 feet per minute; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The total air delivered shall be equal to or exceed 0.5 CFM per 1,000 Btu per hour of total input rating or total required relieving capacity, whichever is greater.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Water Heater Combustion Air Ventilation Requirements.</text>
      <paragraph num="(1)">
        <text>Hot water heaters in excess of 200,000 Btu per hour up to but not including 1,000,000 Btu per hour, that are located in their own equipment room, shall have at least:</text>
        <paragraph num="(a)">
          <text>1 permanent source of outside air; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>1 square foot of total net free louvered air space.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Hot water heaters of 1,000,000 Btu per hour or greater shall follow manufacturer's requirements.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Hot water heaters with inputs and required relieving capacities less than 200,000 Btu per hour are not covered by this regulation.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".04" heading="Equipment.">
    <paragraph num="A.">
      <text>Automatic Low Water Fuel Cutoff or Water Feeding Device.</text>
      <paragraph num="(1)">
        <text>An automatically fired steam or vapor system boiler shall have a low water fuel cutoff that automatically cuts off the fuel supply when the water surface falls to the lowest safe level. The following apply:</text>
        <paragraph num="(a)">
          <text>A water feeding device shall be:</text>
          <paragraph num="(i)">
            <text>Constructed so that the water inlet valve cannot feed water into the boiler through the float chamber, and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Located to supply the necessary feedwater;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>The lowest safe water line shall be not lower than the lowest visible part of the water glass.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>A fuel or feedwater control device may be attached:</text>
        <paragraph num="(a)">
          <text>Directly to a boiler; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>To the tapped openings provided to attach a water glass directly to a boiler, provided that for low-pressure boilers:</text>
          <paragraph num="(i)">
            <text>Connections from the boiler are made with nonferrous tees or Y's at least 1/2 inch pipe size between the boiler and the water glass, so that the water glass is attached directly and as close as possible to the boiler,</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Straightaway tapping of the Y or tee takes the water glass fittings, and</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>The side outlet of the Y or tee takes the fuel cutoff or water feeding device.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>The ends of all nipples shall be reamed to full-size diameter.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>A design using a float and float bowl shall have a vertical straightway valve drain pipe located at the lowest point in the water-equalizing pipe connections by which the bowl and equalizing pipe can be flushed and the device tested.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Blowoff Equipment.</text>
      <paragraph num="(1)">
        <text>Blowdown from a boiler that enters a sanitary sewer system, or blowdown that is a hazard to life or property, shall pass through blowoff equipment to ensure that the maximum:</text>
        <paragraph num="(a)">
          <text>Temperature of water leaving the equipment is 150°F; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Pressure of blowdown leaving the equipment is 5 PSIG.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Blowoff equipment shall:</text>
        <paragraph num="(a)">
          <text>Use piping and fittings between the boiler and the blowoff tank that comply with the ASME Code, Section I, paragraph PG-59;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Be fabricated of material that complies with the ASME Code, Section II;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Be fitted with openings that facilitate cleaning and inspection; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Conform to the rules for boiler blowoff equipment established by the National Board.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Discharge of safety valves, blowoff pipes, and other outlets shall be located to prevent injury to personnel.</text>
    </paragraph>
    <paragraph num="D.">
      <text>Boiler-Door Latches.</text>
      <paragraph num="(1)">
        <text>Firing Doors.</text>
        <paragraph num="(a)">
          <text>The firing doors on a watertube boiler shall:</text>
          <paragraph num="(i)">
            <text>Open inward;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Be equipped with effective fastening devices; or</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Be constructed to prevent the doors from being blown open by pressure on the furnace side.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Except for coal openings on a downdraft or similar furnace:</text>
          <paragraph num="(i)">
            <text>Door fastenings shall be positive self-locking; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Friction contacts, latches, or bolts actuated by springs may not be used.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>An explosion door, if used and located in a setting wall within 7 feet of a firing floor or operating platform, shall have substantial deflectors to divert a blast.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Except for an explosion door, a door not used during boiler firing may be equipped with bolts or fastenings.</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Pressure-Reducing Valve.</text>
      <paragraph num="(1)">
        <text>When a pressure-reducing valve is used:</text>
        <paragraph num="(a)">
          <text>If the piping or equipment on the low-pressure side of the reducing valve does not meet the requirements for full initial pressure, at least one relief or safety valve shall be installed on the low-pressure side of the reducing valve;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The relief or safety valves shall adjoin or be as close as possible to the reducing valve;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>When a relief or safety valve is vented to the atmosphere, proper protection shall be provided to prevent escaping fluid from causing injury or damage;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>The combined discharge capacity of relief or safety valves shall be such that the pressure rating of the lowest pressure piping or equipment cannot be exceeded if the reducing valve sticks open.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Bypass Around Reducing Valves.</text>
        <paragraph num="(a)">
          <text>A hand-controlled bypass around a reducing valve may be used.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>If a bypass is used around a reducing valve, the safety valve on the low-pressure side shall have sufficient relief capacity to prevent overpressuring the low-pressure side.</text>
        </paragraph>
        <aftertext>(3 ) A pressure gage shall be installed on the low-pressure side of a reducing valve.</aftertext>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>A boiler or pressure vessel shall have masonry or structural supports of sufficient strength and rigidity to:</text>
      <paragraph num="(1)">
        <text>Safely support the boiler or pressure vessel and its contents; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Prevent excessive vibration of the boiler, pressure vessel, or connecting piping.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".05" heading="Factor of Safety--Increase for Existing Installation.">
    <paragraph num="A.">
      <text>An inspector may increase the factor of safety of an existing installation if the condition of the boiler or pressure vessel warrants the increase.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Appeal Procedure.</text>
      <paragraph num="(1)">
        <text>An owner may appeal an increase in a factor of safety to the Board.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Upon appeal, the Board may request that the chief boiler inspector and a deputy boiler inspector or special inspector conduct a joint inspection.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Each inspector shall submit a report to the Board.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Based on the reports submitted, the Board shall make a final determination of the appropriate factor of safety.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".06" heading="Fired Jacketed Steam Kettle.">
    <paragraph num="A.">
      <text>A fired jacketed steam kettle may be installed if it is:</text>
      <paragraph num="(1)">
        <text>Constructed and stamped in accordance with the ASME Code, Section I, IV, or VIII, Division 1; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Registered with the National Board.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>A gas-fired jacketed steam kettle may be constructed in accordance with the ASME Code, Section VIII, Division 1, provided that:</text>
      <paragraph num="(1)">
        <text>Welded joints having contact with products of combustion are Type No. 1 of Table UW-12;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The minimum thickness of a part subject to pressure is, for:</text>
        <paragraph num="(a)">
          <text>Carbon steel, 1/4 inch, or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Stainless steel or nonferrous pressure parts, as specified in the ASME Code, Section VIII, Division 1, Subsection C;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>A part having contact with products of combustion is, for:</text>
        <paragraph num="(a)">
          <text>Carbon steel, pressure vessel quality, and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Austenitic stainless steel, either extra-low carbon or stabilized grade;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>Structural grade carbon steel is not used for any pressure part;</text>
      </paragraph>
      <paragraph num="(5)">
        <text>The operating pressure of the jacket does not exceed 50 PSI;</text>
      </paragraph>
      <paragraph num="(6)">
        <text>A vessel constructed in accordance with this regulation:</text>
        <paragraph num="(a)">
          <text>Is inspected by an authorized inspector, and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Is not marked with the UM symbol;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(7)">
        <text>Steam or water is not withdrawn from the jacket for use external to the vessel;</text>
      </paragraph>
      <paragraph num="(8)">
        <text>The capacity of the safety valve in pounds of steam per hour is at least equal to the BTU rating of the burner divided by 1,000; and</text>
      </paragraph>
      <paragraph num="(9)">
        <text>The jacket has:</text>
        <paragraph num="(a)">
          <text>A pressure gage,</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A water gage glass,</text>
        </paragraph>
        <paragraph num="(c)">
          <text>A separate connection, fitted with a check valve and stop valve, for adding water to the jacket while the vessel is not under pressure,</text>
        </paragraph>
        <paragraph num="(d)">
          <text>An automatic gas valve controlled by pressure or temperature to maintain the steam pressure in the jacket below the safety valve setting,</text>
        </paragraph>
        <paragraph num="(e)">
          <text>A low water cutoff to stop the flow of fuel to the burner if the water in the jacket drops below the lowest permissible water level as established by the manufacturer, and</text>
        </paragraph>
        <paragraph num="(f)">
          <text>A safety pilot control to stop the flow of fuel to both the main burner and the pilot burner in case of pilot flame failure.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".07" heading="Gas-Fired Installations.">
    <paragraph num="A.">
      <text>A burner in a gas-fired installation shall be tested and certified by the American Gas Association.</text>
    </paragraph>
    <paragraph num="B.">
      <text>A gas-fired boiler shall have a vent or flue that terminates at an acceptable location outside the building.</text>
    </paragraph>
    <paragraph num="C.">
      <text>The size of the vent or flue shall be:</text>
      <paragraph num="(1)">
        <text>That recommended by the boiler manufacturer;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>At least 4 inches in diameter or equivalent area; and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>If the horizontal run exceeds 10 feet, at least 6 inches in diameter or equivalent area.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".08" heading="Hazardous Condition.">
    <paragraph num="A.">
      <text>A special inspector who finds a hazardous condition affecting the safety of a boiler or pressure vessel shall notify the chief boiler inspector in accordance with Regulation .28 of this chapter.</text>
    </paragraph>
    <paragraph num="B.">
      <text>If a special inspector determines that a boiler or pressure vessel is unsafe for operation:</text>
      <paragraph num="(1)">
        <text>The inspector shall:</text>
        <paragraph num="(a)">
          <text>Notify the owner promptly;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Specify the repair or corrective measure required to achieve compliance with regulations; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>If the owner does not agree to take the required action promptly, notify the chief boiler inspector immediately;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Until the required repair or corrective measure is completed:</text>
        <paragraph num="(a)">
          <text>Use of the boiler or pressure vessel is prohibited; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The chief boiler inspector shall suspend the inspection certificate, if any.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>If, upon inspection, the chief boiler inspector or a deputy boiler inspector declares a boiler or pressure vessel unsafe:</text>
      <paragraph num="(1)">
        <text>The boiler or pressure vessel shall be condemned and stamped in accordance with Regulation .30 of this chapter; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Use or operation of the condemned boiler or pressure vessel shall subject the owner to the penalties provided by Public Safety Article, §12-915, Annotated Code of Maryland.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".09" heading="Hearings.">
    <paragraph num="A.">
      <text>A hearing shall be held in accordance with the requirements of the Administrative Procedure Act, Title 10, Subtitle 2, State Government Article, Annotated Code of Maryland.</text>
    </paragraph>
    <paragraph num="B.">
      <text>The Commissioner delegates the authority to issue a proposed decision on a citation or penalty to the Office of Administrative Hearings.</text>
    </paragraph>
    <paragraph num="C.">
      <text>A proposed decision of the Office of Administrative Hearings becomes a final order of the Commissioner 20 days after the date it is issued, unless:</text>
      <paragraph num="(1)">
        <text>The person found to have violated Public Safety Article, Title 12, Subtitle 9, Annotated Code of Maryland, or a regulation or order issued to carry out this law, requests a review; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The Commissioner orders review.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Review of Proceedings Before the Commissioner.</text>
      <paragraph num="(1)">
        <text>A request for review by a person found to have violated Public Safety Article, Title 12, Subtitle 9, Annotated Code of Maryland, or a regulation or order issued to carry out this law, shall:</text>
        <paragraph num="(a)">
          <text>Be in writing;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Contain a concise statement identifying each portion of the determination for which a review is requested;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Be filed with the Commissioner within 20 days after the date the determination is issued; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Be mailed by the requesting party to all other parties to the proceeding.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Affected parties have the opportunity to present argument to the Commissioner based on the record before the Office of Administrative Hearings.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Order of the Commissioner.</text>
        <paragraph num="(a)">
          <text>After review of the proceedings, with or without a hearing, the Commissioner shall:</text>
          <paragraph num="(i)">
            <text>Issue an order based on findings of fact; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Mail copies of the order to all affected parties.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>The Commissioner’s order shall affirm, modify, or vacate the citation or proposed penalty, or direct other appropriate relief.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Hearings Before the Board of Boiler Rules.</text>
      <paragraph num="(1)">
        <text>A hearing before the Board of Boiler Rules shall be held before at least four members of the Board.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A request for postponement of a hearing may not be considered unless the presiding officer receives a request:</text>
        <paragraph num="(a)">
          <text>In writing;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>At least 5 days before the scheduled hearing date; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Setting forth the reasons for the request.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Presiding Officer.</text>
        <paragraph num="(a)">
          <text>At a hearing before the Board, the chairman of the Board or, in the chairman’s absence, the chairman’s designee, shall be the presiding officer.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A presiding officer may:</text>
          <paragraph num="(i)">
            <text>Administer oaths and affirmations;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Rule on offers of proof and procedural matters;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Regulate the course of the hearing, including the conduct of parties and counsel;</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Receive relevant evidence;</text>
          </paragraph>
          <paragraph num="(v)">
            <text>Examine a witness; and</text>
          </paragraph>
          <paragraph num="(vi)">
            <text>Take other action authorized by statute or regulation.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>A hearing shall be recorded verbatim.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Hearing Procedure.</text>
        <paragraph num="(a)">
          <text>The presiding officer shall:</text>
          <paragraph num="(i)">
            <text>Call the title of the case;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Briefly explain the purpose and nature of the hearing;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Recite any charges, complaints, or other matters involved;</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Administer the oath to all persons who are to testify; and</text>
          </paragraph>
          <paragraph num="(v)">
            <text>Receive any stipulation entered into by the parties.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Counsel or a party may address any preliminary matter, exception, or motion.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The following exhibits shall be introduced:</text>
          <paragraph num="(i)">
            <text>A copy of the petition, complaint, or other matter involved in the hearing; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>A copy of the notice of hearing.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(d)">
          <text>In a hearing on an application for variance, the applicant shall proceed first and present evidence to demonstrate either that the subject regulation is unreasonable or that it imposes an undue burden on the applicant, and that equivalent safety can be maintained. The presenter of evidence shall then present information obtained as a result of the agency’s investigation of the application.</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Subject to statutes and rules governing the practice of law, a party or counsel representing a party may:</text>
          <paragraph num="(i)">
            <text>Call witnesses;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Offer evidence, including rebuttal evidence;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Cross-examine a witness called by another party or the agency; and</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Present argument and summation.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(f)">
          <text>Any member of the Board may examine a witness.</text>
        </paragraph>
        <paragraph num="(g)">
          <text>The Board may permit or require a party to file a written memorandum, which may include proposed findings of fact and conclusions of law.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>The Board shall:</text>
      <paragraph num="(1)">
        <text>Issue a written determination which includes findings of fact and conclusions of law, and an order disposing of the proceedings; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Promptly serve a copy of the determination on each party or the party's counsel of record.</text>
      </paragraph>
    </paragraph>
    <paragraph num="G.">
      <text>A party aggrieved by a final order issued pursuant to this regulation may obtain judicial review by filing a written petition with the appropriate circuit court within 30 days of issuance of the final order.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".10" heading="Heating Boiler — Existing Installation: Maximum Allowable Working Pressure">
    <paragraph num="A.">
      <text>The maximum allowable working pressure on a standard boiler may not exceed the pressure stamped or cast by the manufacturer on:</text>
      <paragraph num="(1)">
        <text>The boiler; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A plate secured to the boiler.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>The maximum allowable working pressure on:</text>
      <paragraph num="(1)">
        <text>The shell of a nonstandard riveted heating boiler shall be determined in accordance with Regulation .22 of this chapter, except that the maximum allowable working pressure on a:</text>
        <paragraph num="(a)">
          <text>Steam heating boiler may not exceed 15 PSIG; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Hot water boiler may not exceed:</text>
          <paragraph num="(i)">
            <text>160 PSIG, or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>250°F.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>A nonstandard steel or wrought iron heating boiler of welded construction:</text>
        <paragraph num="(a)">
          <text>May not exceed 15 PSIG for steam; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>For service other than steam, shall be calculated in accordance with the ASME Code, Section IV.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>A nonstandard boiler composed principally of cast iron, or having a cast iron shell or heads and steel or wrought iron tubes, may not exceed:</text>
        <paragraph num="(a)">
          <text>15 PSIG for steam service; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>30 PSIG for hot water service.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".11" heading="Heating Boiler — Existing Installation: Safety Valve.">
    <paragraph num="A.">
      <text>A steam boiler shall have at least one safety valve which is:</text>
      <paragraph num="(1)">
        <text>Officially rated;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Of the spring pop type; and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Adjusted and sealed to discharge at a pressure not greater than 15 PSI.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>A seal shall be attached in a manner to prevent the valve from being disassembled without breaking the seal.</text>
    </paragraph>
    <paragraph num="C.">
      <text>A safety valve shall be arranged so that it cannot be reset to relieve at a pressure higher than the maximum allowable working pressure of the boiler.</text>
    </paragraph>
    <paragraph num="D.">
      <text>Body Drain.</text>
      <paragraph num="(1)">
        <text>The manufacturer shall provide a body drain connection below seat level.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A body drain may not be plugged during or after field installation.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>If a valve exceeds 2 inch pipe size, the drain hole shall be tapped at least 3/8 inch pipe size.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>A valve less than 2 inches pipe size shall have a drain hole at least 1/4 inch in diameter.</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Valve Size.</text>
      <paragraph num="(1)">
        <text>A safety valve for a steam boiler shall be:</text>
        <paragraph num="(a)">
          <text>At least 3/4 inches, unless the boiler and radiating surfaces are a self-contained unit; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Not larger than 4 1/2 inches.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>An inlet opening shall have an inside diameter at least equal to the seat diameter.</text>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>The minimum relief capacity of a valve or valves is governed by the capacity marking on the boiler.</text>
    </paragraph>
    <paragraph num="G.">
      <text>Valve Capacity.</text>
      <paragraph num="(1)">
        <text>Subject to the requirements of §H, below, the minimum valve capacity in pounds per hour is the greater of the capacity determined:</text>
        <paragraph num="(a)">
          <text>By dividing the maximum BTU output at the boiler nozzle, obtained by firing any fuel for which the unit is installed, by 1,000; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>In accordance with the following table:</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>The minimum safety valve or safety relief valve relief capacity for an electric boiler shall be 3-1/2 pounds per hour per kilowatt input.</text>
      </paragraph>
    </paragraph>
    <paragraph num="H.">
      <text>The safety valve capacity for a steam boiler shall be sufficient to ensure that when fuel burning equipment is operated at maximum capacity, the pressure cannot exceed the maximum allowable working pressure by more than 5 PSI.</text>
    </paragraph>
    <paragraph num="I.">
      <text>When operating conditions change, or additional boiler heating surface is installed:</text>
      <paragraph num="(1)">
        <text>Valve capacity shall be increased, if necessary, to:</text>
        <paragraph num="(a)">
          <text>Meet the new conditions, and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Comply with the requirements of this regulation;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Provided there is no intervening valve, any additional valves required because of changed conditions may be installed on the outlet piping.</text>
      </paragraph>
    </paragraph>
    <paragraph num="J.">
      <text>If there is any doubt as to the capacity of a safety valve, an accumulation test shall be conducted in accordance with the ASME Code, Section VI, Recommended Rules for the Care and Operation of Heating Boilers.</text>
    </paragraph>
    <paragraph num="K.">
      <text>A valve of any type may not be placed:</text>
      <paragraph num="(1)">
        <text>Between a safety valve and a boiler; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>On a discharge pipe between a safety valve and the atmosphere.</text>
      </paragraph>
    </paragraph>
    <paragraph num="L.">
      <text>Discharge Pipe.</text>
      <paragraph num="(1)">
        <text>A discharge pipe shall be:</text>
        <paragraph num="(a)">
          <text>At least full-size; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Fitted with an open drain to prevent water from lodging in the upper part of a safety valve or in the discharge pipe.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>If a safety valve discharge pipe has an elbow, the:</text>
        <paragraph num="(a)">
          <text>Elbow shall be located near the safety valve outlet; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Discharge pipe shall be securely anchored and supported.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="M.">
      <text>Safety valve discharges shall be located or piped so as not to endanger workers.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".12" heading="Heating Boiler — Existing Installation: Miscellaneous.">
    <paragraph num="A.">
      <text>Feedwater Connection.</text>
      <paragraph num="(1)">
        <text>Feedwater, make-up water, or water treatment:</text>
        <paragraph num="(a)">
          <text>Shall be introduced into a boiler through:</text>
          <paragraph num="(i)">
            <text>The return piping system, or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>An independent feedwater connection that does not discharge against a part of the boiler exposed to direct radiant heat from the fire;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>May not be introduced through an opening or connection provided for:</text>
          <paragraph num="(i)">
            <text>Inspection or cleaning,</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Safety valve,</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Safety relief valve,</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Surface blowoff,</text>
          </paragraph>
          <paragraph num="(v)">
            <text>Water column,</text>
          </paragraph>
          <paragraph num="(vi)">
            <text>Water gage glass,</text>
          </paragraph>
          <paragraph num="(vii)">
            <text>Pressure gage, or</text>
          </paragraph>
          <paragraph num="(viii)">
            <text>Temperature gage.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Feedwater pipe shall have a:</text>
        <paragraph num="(a)">
          <text>Check valve near the boiler; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Stop valve or cock between the check valve and the boiler or return pipe system.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Pressure or Altitude Gage.</text>
      <paragraph num="(1)">
        <text>A hot water boiler shall have a pressure or altitude gage connected to the boiler or its flow connection so that it cannot be shut off from the boiler except by a cock with a tee or lever handle:</text>
        <paragraph num="(a)">
          <text>Placed on the pipe near the gage; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>With the handle parallel to the pipe in which it is located, when the cock is open.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>The scale on the dial of a pressure or altitude gage shall be graduated to indicate pressures from 1-1/2 to 3 times the maximum allowable working pressure.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Piping or tubing for a pressure or altitude gage connection smaller than 1 inch pipe size shall be of nonferrous metal.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Steam Gage.</text>
      <paragraph num="(1)">
        <text>A steam boiler shall have a steam gage connected to its steam space, water column, or steam connection by a siphon or equivalent device on the exterior of the boiler.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A siphon shall be:</text>
        <paragraph num="(a)">
          <text>Of sufficient capacity to keep the gage tube filled with water; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Arranged so that the gage can be shut off from the boiler only by a cock with a tee or lever handle:</text>
          <paragraph num="(i)">
            <text>Placed in the pipe near the gage, and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>With the handle parallel to the pipe in which it is located, when the cock is open.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Scale.</text>
        <paragraph num="(a)">
          <text>The scale on the dial of a steam gage shall be graduated to at least 30 PSIG.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The gage shall have effective stops for the indicating pointer at the:</text>
          <paragraph num="(i)">
            <text>Zero point; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Maximum pressure point.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(c)">
          <text>The travel of the pointer from zero to 30 PSIG shall be at least 3 inches.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Stop Valve and Check Valve.</text>
      <paragraph num="(1)">
        <text>A boiler which can be closed off from the heating system by closing a steam stop valve shall have a check valve in the condensate return line between the boiler and the system.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Any part of a heating system that can be closed off from the remainder of the system by closing a steam stop valve shall have a check valve in the condensate return pipe from that part of the system.</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>A hot water boiler shall have a thermometer located and connected so that:</text>
      <paragraph num="(1)">
        <text>A person observing the water pressure or altitude gage can read the thermometer easily; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The thermometer at all times indicates the temperature, in degrees Fahrenheit, of the water in the boiler at or near the outlet.</text>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>Water Gage Glass.</text>
      <paragraph num="(1)">
        <text>A steam boiler shall have at least one water gage glass attached to the water column or boiler by valved fittings.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The lower fitting shall have a straightway drain valve with an opening at least 1/4 inch diameter to facilitate cleaning.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Gage glass replacement shall be possible while the boiler is under pressure.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Transparent material other than glass may be used for a water gage if the material is suitable for the pressure, temperature, and corrosive conditions encountered in service.</text>
      </paragraph>
    </paragraph>
    <paragraph num="G.">
      <text>When practicable, a boiler equipped with a condensate return pump shall have a water level control that automatically maintains the water level in the boiler within the range of the gage glass.</text>
    </paragraph>
    <paragraph num="H.">
      <text>Repairs and replacements of fittings or appliances shall comply with the ASME Code for new construction, Section IV.</text>
    </paragraph>
    <paragraph num="I.">
      <text>The ASME Code, Section VI, Recommended Rules for the Care and Operation of Heating Boilers is recommended as a guide for proper and safe operating practices.</text>
    </paragraph>
    <paragraph num="J.">
      <text>It is recommended that a return water connection to a low-pressure steam heating boiler supplying a gravity return heating system be arranged to form a return pipe loop connection, so that water cannot be forced out of the boiler below the safe water level, as shown in Section IV, Figure HG-703.1 of the ASME Heating Boiler Code.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".13" heading="Hot Water Boiler—Existing Installation: Safety Relief Valve.">
    <paragraph num="A.">
      <text>Number of Valves.</text>
      <paragraph num="(1)">
        <text>A hot water heating boiler shall have at least one safety relief valve which is:</text>
        <paragraph num="(a)">
          <text>Officially rated; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Set to relieve at or below the maximum allowable working pressure of the boiler.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>A hot water supply boiler shall have at least one safety relief valve which is:</text>
        <paragraph num="(a)">
          <text>Officially rated;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Automatically reseating; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Set to relieve at or below the maximum allowable working pressure of the boiler.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>A safety relief valve with an officially rated capacity shall have pop action when tested by steam.</text>
    </paragraph>
    <paragraph num="C.">
      <text>When more than one safety relief valve is used on a hot water heating or hot water supply boiler, each additional valve shall be:</text>
      <paragraph num="(1)">
        <text>Officially rated; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Set at a maximum of:</text>
        <paragraph num="(a)">
          <text>6 PSI above the maximum allowable working pressure of the boiler, for a boiler having a maximum allowable working pressure of 60 PSI or less, or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>10 percent above the maximum allowable working pressure, for a boiler having a maximum allowable working pressure exceeding 60 PSI.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>A safety relief valve shall be:</text>
      <paragraph num="(1)">
        <text>Spring loaded; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Arranged so that it cannot be reset at a pressure higher than the maximum permitted by this regulation.</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>A material that can fail because of deterioration or vulcanization when subject to saturated steam temperature corresponding to capacity test pressure may not be used for any part.</text>
    </paragraph>
    <paragraph num="F.">
      <text>Size.</text>
      <paragraph num="(1)">
        <text>Except as otherwise provided by this regulation, the standard pipe size of a safety relief valve may not be:</text>
        <paragraph num="(a)">
          <text>Smaller than 3/4 inch; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Larger than 4-1/2 inches.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>A boiler having a heat input of 15,000 BTU per hour or less may have a rated safety relief valve of 1/2 inch standard pipe size.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>An inlet opening shall have an inside diameter approximately equal to, or greater than, the seat diameter.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>The minimum opening through any part of a valve shall be at least 1/2 inch in diameter or the equivalent area.</text>
      </paragraph>
    </paragraph>
    <paragraph num="G.">
      <text>Subject to the requirements of §I of this regulation, the minimum steam relief capacity of a pressure relief device on a boiler, in pounds per hour, shall be the greater of the capacity determined:</text>
      <paragraph num="(1)">
        <text>By dividing by 1,000 the maximum BTU output at the boiler nozzle, obtained by firing any fuel for which the unit is installed; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>In accordance with Table 09.12.01.11G.</text>
      </paragraph>
    </paragraph>
    <paragraph num="H.">
      <text>When operating conditions change or additional boiler heating surface is installed:</text>
      <paragraph num="(1)">
        <text>Valve capacity shall be increased, if necessary, to:</text>
        <paragraph num="(a)">
          <text>Meet the new conditions, and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Comply with this regulation; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>If there is no intervening valve, any additional valves required because of changed conditions may be installed on the outlet piping.</text>
      </paragraph>
    </paragraph>
    <paragraph num="I.">
      <text>The safety relief valve capacity for a boiler shall be sufficient to ensure that, with fuel burning equipment operated at maximum capacity, pressure cannot exceed:</text>
      <paragraph num="(1)">
        <text>6 PSI above the maximum allowable working pressure of the boiler, for a boiler having a maximum allowable working pressure of 60 PSI or less; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>10 percent above the maximum allowable working pressure, for a boiler having a maximum allowable working pressure greater than 60 PSI.</text>
      </paragraph>
    </paragraph>
    <paragraph num="J.">
      <text>If there is any doubt as to the capacity of a safety relief valve, an accumulation test shall be conducted in accordance with the ASME Code, Section VI, Recommended Rules for the Care and Operation of Heating Boilers.</text>
    </paragraph>
    <paragraph num="K.">
      <text>A valve of any type may not be placed:</text>
      <paragraph num="(1)">
        <text>Between a safety relief valve and a boiler; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>On a discharge pipe between a safety relief valve and the atmosphere.</text>
      </paragraph>
    </paragraph>
    <paragraph num="L.">
      <text>Discharge Pipe.</text>
      <paragraph num="(1)">
        <text>A discharge pipe shall be:</text>
        <paragraph num="(a)">
          <text>At least full-size; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Fitted with an open drain to prevent water from lodging in the upper part of a safety relief valve or in the discharge pipe.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>If a safety relief valve discharge pipe has an elbow, the:</text>
        <paragraph num="(a)">
          <text>Elbow shall be located near the safety relief valve outlet; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Discharge pipe shall be securely anchored and supported.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="M.">
      <text>Safety relief valve discharges shall be located or piped so as not to endanger workers.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".14" heading="Inspection Intervals.">
    <paragraph num="A.">
      <text>Boilers and pressure vessels subject to this regulation do not include power boilers, or high pressure or high temperature water boilers.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Except as provided in §C of this regulation, boilers and pressure vessels shall receive a certificate inspection biennially.</text>
    </paragraph>
    <paragraph num="C.">
      <text>A boiler or pressure vessel that is part of an amusement attraction, as defined by Business Regulation Article, §3-101(b), Annotated Code of Maryland, shall receive a certificate inspection annually.</text>
    </paragraph>
    <paragraph num="D.">
      <text>A historical boiler shall be inspected at intervals specified in Regulation .34 of this chapter.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".14-1" heading="Inspection.">
    <paragraph num="A.">
      <text>Internal Inspection.</text>
      <paragraph num="(1)">
        <text>Unless an internal inspection is required by law or by an inspector at the inspector's discretion, a:</text>
        <paragraph num="(a)">
          <text>Hot water boiler requires only an external inspection for certificate purposes; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Pressure vessel requires only an external inspection for certificate purposes.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>At least 7 days before an internal inspection, the inspector shall notify the owner of the inspection date.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>The owner of a boiler shall prepare the boiler for internal inspection and hydrostatic test, if necessary, by:</text>
      <paragraph num="(1)">
        <text>Drawing off water and washing the boiler thoroughly;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Removing manhole and handhole plates, washout plugs, and inspection plugs in water column connections;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Cooling and thoroughly cleaning furnace and combustion chambers;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Removing all grates of internally fired boilers;</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Removing the pressure gage for testing;</text>
      </paragraph>
      <paragraph num="(6)">
        <text>Disconnecting the pipe or valve at the most convenient point to prevent leakage of steam or hot water into the boiler;</text>
      </paragraph>
      <paragraph num="(7)">
        <text>Performing the following procedures before opening a manhole or handhole cover and entering any part of a steam-generating unit connected to a common header with other boilers:</text>
        <paragraph num="(a)">
          <text>Close, tag, and preferably padlock:</text>
          <paragraph num="(i)">
            <text>Non return and steam stop valves; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Feed and check valves;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Open drain valves or cocks between:</text>
          <paragraph num="(i)">
            <text>Non return and steam stop valves; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Feed and check valves; and</text>
          </paragraph>
        </paragraph>
        <paragraph num="(c)">
          <text>After draining the boiler:</text>
          <paragraph num="(i)">
            <text>Close and padlock the blowoff valves;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Where practicable, disconnect blowoff lines at a point between pressure parts and valves; and</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Open all drains and vent lines.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>The owner of a pressure vessel shall prepare the pressure vessel for inspection to the extent required by the inspector, using the applicable procedures set out in §B of this regulation.</text>
    </paragraph>
    <paragraph num="D.">
      <text>Removal of Covering During Inspection.</text>
      <paragraph num="(1)">
        <text>At each annual inspection, brickwork shall be removed, as required by the inspector, to determine the condition of the boiler, headers, furnace, supports, or other parts.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Unless the information can be obtained by other means, if boiler or pressure vessel jacketing conceals the longitudinal seams of a shell, drum, or dome, sufficient jacketing, setting wall, or other casing or housing shall be removed to permit:</text>
        <paragraph num="(a)">
          <text>Reasonable inspection of the seams; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Determination of:</text>
          <paragraph num="(i)">
            <text>The size and pitch of the rivets; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Other data necessary to ascertain the safety of the boiler or pressure vessel.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>When an external inspection discloses evidence of a leak or crack:</text>
        <paragraph num="(a)">
          <text>Sufficient covering shall be removed from the boiler or pressure vessel to permit the inspector to make a safety determination; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>If the covering cannot be removed during the inspection, the inspector may order use of the boiler or pressure vessel discontinued until:</text>
          <paragraph num="(i)">
            <text>The covering can be removed; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Proper inspection can be made.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Hydrostatic Pressure Test.</text>
      <paragraph num="(1)">
        <text>A hydrostatic pressure test of a boiler or pressure vessel may not exceed:</text>
        <paragraph num="(a)">
          <text>1-1/2 times the maximum allowable working pressure; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The required test pressure by more than 2 percent.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>During a hydrostatic test:</text>
        <paragraph num="(a)">
          <text>Each safety valve shall be removed; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Each valve disk shall be held to its seat by a testing clamp, and not by tightening the compression screw on the spring.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Water used to apply a hydrostatic test shall have a:</text>
        <paragraph num="(a)">
          <text>Recommended minimum temperature of 70°F; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Maximum temperature of 140°F.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>When a hydrostatic test is applied to an existing installation to determine:</text>
        <paragraph num="(a)">
          <text>Tightness, test pressure shall equal the release pressure of the safety valve having the lowest release setting; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Safety, test pressure shall equal 1-1/2 times the maximum allowable working pressure.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>If a boiler or pressure vessel is not properly prepared for internal inspection, or if the owner fails to comply with the requirements for a hydrostatic test as set out in this regulation:</text>
      <paragraph num="(1)">
        <text>The inspector may refuse to conduct the inspection or test; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>If the inspector refuses, the chief boiler inspector shall withhold the inspection certificate until the owner complies with the requirements.</text>
      </paragraph>
    </paragraph>
    <paragraph num="G.">
      <text>An inspector is authorized to:</text>
      <paragraph num="(1)">
        <text>Conduct inspections in accordance with Public Safety Article, §12-909, Annotated Code of Maryland; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Review and verify records required by Public Safety Article, Title 12, Subtitle 9, Annotated Code of Maryland, and by Codes referenced in Regulation .01-1 of this chapter.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".15" heading="Inspection Certificate.">
    <paragraph num="A.">
      <text>Revocation or Suspension.</text>
      <paragraph num="(1)">
        <text>Emergency Action.</text>
        <paragraph num="(a)">
          <text>The chief boiler inspector or an authorized representative may order an inspection certificate suspended summarily if, in his opinion, public safety imperatively requires emergency action.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>If an inspection certificate is summarily suspended, the chief boiler inspector shall promptly give the owner of the boiler or pressure vessel for which the inspection certificate was issued:</text>
          <paragraph num="(i)">
            <text>Written notice of the suspension, including the reason and facts that warrant the suspension; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>An opportunity to be heard.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>General.</text>
        <paragraph num="(a)">
          <text>The chief boiler inspector shall suspend an inspection certificate if:</text>
          <paragraph num="(i)">
            <text>An inspector determines that the condition of the boiler or pressure vessel makes continued operation unsafe;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>A special inspector notifies the chief boiler inspector that an owner refuses to make promptly the repairs necessary to bring an unsafe boiler or pressure vessel into compliance with these regulations;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>The owner refuses to permit inspection of a boiler or pressure vessel; or</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>The owner refuses to pay a fee required by the Boiler and Pressure Vessel Safety Act.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>The chief boiler inspector or an authorized representative may suspend or revoke an inspection certificate if the boiler or pressure vessel for which it was issued:</text>
          <paragraph num="(i)">
            <text>Cannot be operated consistent with public safety; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Does not comply with applicable law or regulations.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(c)">
          <text>Except as otherwise provided by this regulation, before suspending or revoking an inspection certificate, the chief boiler inspector shall give the owner of the boiler or pressure vessel:</text>
          <paragraph num="(i)">
            <text>Written notice of the suspension or revocation which states the reasons and facts warranting the suspension or revocation; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>An opportunity to be heard.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>An inspection certificate becomes invalid:</text>
      <paragraph num="(1)">
        <text>On its expiration date; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>When the boiler or pressure vessel for which it was issued ceases to be:</text>
        <paragraph num="(a)">
          <text>Insured by an authorized insurer; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Owned by an owner-user inspection service.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".16" heading="Inspector.">
    <paragraph num="A.">
      <text>An inspector:</text>
      <paragraph num="(1)">
        <text>May not engage in the sale of boilers, pressure vessels, or any related item; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Shall be employed regularly in inspection work.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>To be eligible to take the examination for a Certificate of Competency as an inspector, an applicant shall have:</text>
      <paragraph num="(1)">
        <text>A degree in mechanical engineering plus 1 year of experience in the design, construction, operation, or inspection of high pressure vessels;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A degree in another branch of engineering, plus 2 years of experience in the design, construction, operation, or inspection of high pressure boilers and pressure vessels; or</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The equivalent of a high school education plus 3 years of experience:</text>
        <paragraph num="(a)">
          <text>In high pressure boiler and pressure vessel construction or repair;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>As an operating engineer in charge of a high pressure boiler operation; or</text>
        </paragraph>
        <paragraph num="(c)">
          <text>As an inspector of high pressure boilers and pressure vessels.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Application Procedure for Certificate of Competency.</text>
      <paragraph num="(1)">
        <text>An applicant shall apply to take an examination:</text>
        <paragraph num="(a)">
          <text>On the form furnished by the Chief Boiler Inspector; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>At least 30 days before the examination date.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>The applicant shall provide:</text>
        <paragraph num="(a)">
          <text>A description of the applicant's education;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A list of the applicant's past and present employers;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The dates of the applicant's employment with each employer;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>The position the applicant held with each employer; and</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Upon approval of the application by the Chief Boiler Inspector, a $50 examination fee, payable to the Division of Labor and Industry.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>An individual applying for a Certificate of Competency as a special inspector on the basis of a commission issued by the National Board of Boiler and Pressure Vessel Inspectors shall submit an application:</text>
        <paragraph num="(a)">
          <text>On the form furnished by the Chief Boiler Inspector; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Accompanied by a copy of the commission and valid identification card issued by the National Board.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>An application containing false information shall be rejected.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>The examination for Certificate of Competency shall:</text>
      <paragraph num="(1)">
        <text>Be written;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Cover the construction, installation, operation, maintenance, and repair of boilers and pressure vessels and their appurtenances;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Be offered:</text>
        <paragraph num="(a)">
          <text>At the office of the Board of Boiler Rules, or any other location that the Board selects; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>On the first Wednesday of March, June, September, and December.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>The chief boiler inspector shall issue a Certificate of Competency to an applicant who:</text>
      <paragraph num="(1)">
        <text>Passes the examination or a subsequent re-examination; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Is a full-time employee of an authorized inspection agency.</text>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>Special Inspector Commission Application Procedure.</text>
      <paragraph num="(1)">
        <text>An authorized inspection agency or an owner-user inspection service employing an individual applying for a special inspector commission shall:</text>
        <paragraph num="(a)">
          <text>Submit a completed application form to the chief boiler inspector, setting forth the following:</text>
          <paragraph num="(i)">
            <text>The applicant's name;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>A description of the applicant's education;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>A list of the applicant's past and present employers;</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>The dates of the applicant’s employment with each employer; and</text>
          </paragraph>
          <paragraph num="(v)">
            <text>The position the applicant held with each employer.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Submit with the application for an individual who holds a commission or certificate of competency from a state with an equivalent examination or a commission issued by the National Board, a copy of:</text>
          <paragraph num="(i)">
            <text>The commission or certificate; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Any valid identification card issued by a state or the National Board.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>An application containing false information shall be rejected.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Upon approval of the special inspector commission by the chief boiler inspector, the authorized inspection agency or owner-user inspection service shall pay a $50 special inspector commission fee, payable to the Division of Labor and Industry.</text>
      </paragraph>
    </paragraph>
    <paragraph num="G.">
      <text>Unless the authorized inspection agency or owner-user inspection service complies with the renewal provisions of §H of this regulation, a special inspector commission expires:</text>
      <paragraph num="(1)">
        <text>On the second March 1 after June 1, 2001, for special inspector commissions that were issued before June 1, 2001;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>On March 1 of the next odd number year after the initial issuance of the special inspector commission; or</text>
      </paragraph>
      <paragraph num="(3)">
        <text>On March 1 of the next odd number year after renewal of the special inspector commission.</text>
      </paragraph>
    </paragraph>
    <paragraph num="H.">
      <text>To renew a special inspector commission, the authorized inspection agency or the owner-user inspection service employing the special inspector shall, at least 30 days before the special inspector commission is scheduled to expire, provide documentation that:</text>
      <paragraph num="(1)">
        <text>The special inspector continues to be certified as a special inspector by the National Board;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The special inspector has maintained sufficient proficiency during the past year by experience and training to qualify for renewal of the commission; and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The special inspector remains in the employ of the authorized inspection agency or the owner-user inspection service.</text>
      </paragraph>
    </paragraph>
    <paragraph num="I.">
      <text>Suspension of Special Inspector Commission.</text>
      <paragraph num="(1)">
        <text>After due investigation and recommendation by the Board of Boiler Rules, the Commissioner may suspend a special inspector commission for:</text>
        <paragraph num="(a)">
          <text>Incompetence;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Untrustworthiness; or</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Willful falsification of information provided:</text>
          <paragraph num="(i)">
            <text>On the application; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>In an inspection report.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>The Commissioner shall give the inspector and the inspector's employer written notice within 10 days of the suspension.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>An inspector whose special inspector commission is suspended may:</text>
        <paragraph num="(a)">
          <text>Appeal the suspension to the Board of Boiler Rules; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Be present or be represented by counsel at any hearing of the appeal.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="J.">
      <text>An applicant who fails an examination may take another examination:</text>
      <paragraph num="(1)">
        <text>After 90 days; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>At the next regularly scheduled examination date.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".16-1" heading="Authorized Inspection Agency Insurance Requirements.">
    <paragraph num="A.">
      <text>An authorized inspection agency shall have general liability insurance and professional liability insurance to cover its inspection activities.</text>
    </paragraph>
    <paragraph num="B.">
      <text>An insurance policy required by this section shall be issued by an insurance company authorized to do business in Maryland.</text>
    </paragraph>
    <paragraph num="C.">
      <text>The insurance policy shall be in the amount of at least $500,000 for injury or death for any number of individuals in any single occurrence, and $100,000 for property damage in any single occurrence.</text>
    </paragraph>
    <paragraph num="D.">
      <text>The authorized inspection agency shall notify the Commissioner of any alterations or cancellations within 5 business days.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".17" heading="Installation.">
    <paragraph num="A.">
      <text>A new or used boiler, pressure vessel, or piping installation or reinstallation shall be installed in accordance with this chapter.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Notice of Installation.</text>
      <paragraph num="(1)">
        <text>At least 30 days before installing or reinstalling a boiler or pressure vessel, the installer shall file with the chief boiler inspector written notice of the installation.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The notice of installation shall contain the following information for each boiler or pressure vessel to be installed:</text>
        <paragraph num="(a)">
          <text>Installer’s name, company name, contact person, address, telephone number, fax number, and email address;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Owner’s name, company name, contact person, street address, telephone numbers, fax number, and email address;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>User’s name, company name, contact person, street address, telephone numbers, fax number, and email address;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Name of the location where the boiler or pressure vessel is installed, company name, contact person, street address, telephone numbers, fax number, and email address;</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Type and use of boiler or pressure vessel;</text>
        </paragraph>
        <paragraph num="(f)">
          <text>If a boiler, the type of fuel;</text>
        </paragraph>
        <paragraph num="(g)">
          <text>If a pressure vessel, the pressurized fluid;</text>
        </paragraph>
        <paragraph num="(h)">
          <text>The minimum required safety valve capacity;</text>
        </paragraph>
        <paragraph num="(i)">
          <text>If the boiler or pressure vessel is greater than 30 boiler horsepower input or 1,000,000 Btu/hr minimum required safety valve capacity, and operates at greater than 15 psig, the name and Maryland license number of the stationary engineer responsible for the boiler or pressure vessel;</text>
        </paragraph>
        <paragraph num="(j)">
          <text>Manufacturer, date of manufacture, National Board number, and manufacturer’s serial number;</text>
        </paragraph>
        <paragraph num="(k)">
          <text>Construction code and section and stamp;</text>
        </paragraph>
        <paragraph num="(l)">
          <text>Name and contact information of the authorized inspection agency for the installation;</text>
        </paragraph>
        <paragraph num="(m)">
          <text>Planned date of installation, and planned date of startup; and</text>
        </paragraph>
        <paragraph num="(n)">
          <text>Whether a waiver of the 30 day notice requirement under §C of this regulation is requested, with a detailed explanation.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Waiver of 30-day Notice Requirement.</text>
      <paragraph num="(1)">
        <text>If emergency or unusual circumstances are established by the installer, the chief boiler inspector shall waive the 30-day notice requirement.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>To obtain a waiver, the installer shall file a written waiver request with the Chief Boiler Inspector as soon as the emergency or unusual circumstances arise; and give a detailed explanation of the emergency or unusual circumstances.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>If the Chief Boiler Inspector grants a waiver under this section, the Chief Boiler Inspector shall also advise the installer of when the notice is due.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Except for an existing boiler or pressure vessel being reinstalled, or as otherwise provided by this regulation, a boiler or pressure vessel may not be installed unless:</text>
      <paragraph num="(1)">
        <text>The boiler or pressure vessel has been constructed, inspected and stamped in accordance with the ASME Code and registered with the National Board;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The boiler or pressure vessel has been:</text>
        <paragraph num="(a)">
          <text>Constructed, inspected and stamped in accordance with the ASME Code;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Inspected and the inspector recommends acceptance; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The Chief Boiler Inspector accepts the inspector’s recommendation; or</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>The boiler or pressure vessel has been constructed equal to or greater than Maryland standards and:</text>
        <paragraph num="(a)">
          <text>The person intending to construct or install the boiler or pressure vessel:</text>
          <paragraph num="(i)">
            <text>Applies to the Chief Boiler Inspector for approval prior to installation; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Together with the application files the manufacturer’s data report covering construction of the boiler or pressure vessel;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>An inspector inspects the boiler or pressure vessel during construction and approves the design, materials, fabrication, welding, welding specification, welder’s qualifications, processes and workmanship; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The Chief Boiler Inspector approves the boiler or pressure vessel and its installation.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Reinstallation.</text>
      <paragraph num="(1)">
        <text>A used boiler or pressure vessel not moved to another state for use, or repair, or alteration may be reinstalled if the:</text>
        <paragraph num="(a)">
          <text>Owner applies to the Chief Boiler Inspector for permission;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Owner submits documents required by the Chief Boiler Inspector; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Chief Boiler Inspector approves the reinstallation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>A used standard boiler or pressure vessel, if moved outside the state for use, repair, or alteration, may be reinstalled if the:</text>
        <paragraph num="(a)">
          <text>Owner applies to the Chief Boiler Inspector for permission;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Owner submits documents required by the Chief Boiler Inspector; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Chief Boiler Inspector approves the reinstallation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>A used nonstandard boiler or pressure vessel, if moved outside the State for use, repair or alteration, may be reinstalled in Maryland if the:</text>
        <paragraph num="(a)">
          <text>Owner applies to the Chief Boiler Inspector and the Board for permission;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Owner submits documents required by the Chief Boiler Inspector and the Board; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The Board of Boiler Rules approves the reinstallation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>Fittings and appliances of a stationary boiler or pressure vessel which is moved and reinstalled shall comply with the requirements for new installations.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".18" heading="Lap-Seam Crack.">
    <paragraph num="A.">
      <text>If a boiler or pressure vessel has a lap-seam crack along a longitudinal riveted joint, use of the shell or drum shall be discontinued immediately.</text>
    </paragraph>
    <paragraph num="B.">
      <text>If the boiler is not more than 15 years old, a complete new course of the original thickness may be installed upon:</text>
      <paragraph num="(1)">
        <text>Recommendation by the inspector; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Approval of the chief boiler inspector.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Patching a lap seam crack is prohibited.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".19" heading="Portable Boilers and Pressure Vessels.">
    <paragraph num="A.">
      <text>The installer and owner of a portable boiler or pressure vessel shall comply with all requirements of this chapter.</text>
    </paragraph>
    <paragraph num="B.">
      <text>While a portable boiler or pressure vessel is being moved, it shall not be operated.</text>
    </paragraph>
    <paragraph num="C.">
      <text>A portable boiler or pressure vessel shall receive an internal and external certificate inspection:</text>
      <paragraph num="(1)">
        <text>Annually; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>After it has been moved to a different location and installed before use.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".20" heading="Power Boiler — Existing Installation: Age Limit.">
    <paragraph num="A.">
      <text>Nonstandard Construction.</text>
      <paragraph num="(1)">
        <text>Except as otherwise provided in this regulation, the age limit of a boiler of nonstandard construction installed before the Act became effective shall be 30 years.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A boiler of nonstandard construction installed before the Act became effective, not having a lap-riveted longitudinal joint, may continue to operate for more than 30 years without reduction in working pressure after a:</text>
        <paragraph num="(a)">
          <text>Thorough internal and external inspection; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Hydrostatic pressure test at 1-1/2 times the allowable working pressure, held for a period of at least 30 minutes, during which no distress or leakage develops.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>A boiler having a lap-riveted longitudinal joint, which operates at a pressure greater than 50 PSI, has an age limit of 20 years.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>The chief boiler inspector may authorize a reasonable time for replacement, not to exceed 1 year.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Standard Construction.</text>
      <paragraph num="(1)">
        <text>The age limit of a boiler of standard construction installed before July 1, 1969 shall be determined by a:</text>
        <paragraph num="(a)">
          <text>Thorough internal and external inspection; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Hydrostatic pressure test conducted at 1-1/2 times the maximum allowable working pressure, with water temperature between 70°F and 140°F and not less than the nil ductility temperature of the material.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>A boiler that exhibits no distress or leakage under test conditions may continue in operation at the same working pressure.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>The shell or drum of a boiler having a lap-seam crack along a longitudinal riveted joint in either a butt seam or a lap joint may not be used under steam pressure.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".21" heading="Power Boiler — Existing Installation: Boiler Feed System.">
    <paragraph num="A.">
      <text>A boiler shall have a feed supply which permits it to be fed at any time while under pressure.</text>
    </paragraph>
    <paragraph num="B.">
      <text>A boiler having more than 500 square feet of water-heating surface shall have at least two means of feeding, as follows:</text>
      <paragraph num="(1)">
        <text>One means shall be an approved feed pump, injector, or inspirator;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The other source may be directly from a water main, at a pressure 6 percent greater than the set pressure of the safety valve having the highest setting.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>A boiler conforming to the ASME Code, PG-61.1, and fired by gaseous, liquid, or solid fuel in suspension may have a single feed supply provided that means are furnished for the immediate shutoff of heat input if the water feed is interrupted.</text>
    </paragraph>
    <paragraph num="D.">
      <text>Feedwater shall be fed into a boiler so that it will not be introduced:</text>
      <paragraph num="(1)">
        <text>Near a riveted joint of a shell or furnace sheet; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Directly against a surface exposed to:</text>
        <paragraph num="(a)">
          <text>A product of combustion, or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Direct radiation from the fire.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Feed Pipe.</text>
      <paragraph num="(1)">
        <text>Feed pipe shall have a:</text>
        <paragraph num="(a)">
          <text>Check valve near the boiler; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Valve or cock between the check valve and the boiler.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>When two or more boilers are fed from a common source, the branch to each boiler shall have a valve between the check valve and source of supply.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The inlet of a globe valve on a feed pipe shall be under the disc of the valve.</text>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>Returns.</text>
      <paragraph num="(1)">
        <text>When a return is fed back to a boiler by gravity, each return line shall have, as close as practicable to the boiler, a:</text>
        <paragraph num="(a)">
          <text>Check valve; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Stop valve placed between the boiler and the check valve.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>It is recommended that no stop valve be placed in the supply and return pipe connection of a single boiler installation.</text>
      </paragraph>
    </paragraph>
    <paragraph num="G.">
      <text>Deaerating Heater. When a deaerating heater is:</text>
      <paragraph num="(1)">
        <text>Not used, the recommended minimum temperature for feedwater is 120°F to avoid creating localized stress.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Used, the recommended minimum feedwater temperature is 215°F, so that dissolved gases can be released completely.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".22" heading="Power Boiler — Existing Installation: Maximum Allowable Working Pressure.">
    <paragraph num="A.">
      <text>The maximum allowable working pressure on a standard boiler shall be determined in accordance with the ASME Code under which it was constructed and stamped.</text>
    </paragraph>
    <paragraph num="B.">
      <text>The maximum allowable working pressure on the shell of a nonstandard boiler shall be determined by the strength of the weakest section of the structure computed by multiplying TS by t and E and dividing the product by R multiplied by FS:</text>
      <paragraph num="(1)">
        <text>TS = ultimate tensile strength of the shell plate, PSI, which, if unknown, shall be:</text>
        <paragraph num="(a)">
          <text>55,000 PSI for steel; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>45,000 PSI for wrought iron;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>t = minimum thickness of the shell plate of the weakest course, in inches;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>E = efficiency of the longitudinal joint, which is, for:</text>
        <paragraph num="(a)">
          <text>Tube ligaments and riveted construction, established by Section I of the ASME Code for power boilers; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Seamless construction, 100 percent;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>R = inside radius of the weakest course of the shell, in inches;</text>
      </paragraph>
      <paragraph num="(5)">
        <text>FS = factor of safety required by this regulation;</text>
      </paragraph>
      <paragraph num="(6)">
        <text>The resistance to crushing of mild steel is assumed to be 95,000 PSI of cross-sectional area;</text>
      </paragraph>
      <paragraph num="(7)">
        <text>When computing the ultimate strength of rivets in shear, the following values, in pounds per square inch, of the cross-sectional area of the rivet shank shall be used:</text>
        <paragraph num="(a)">
          <text>Iron rivets in single shear 38,000 PSI;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Iron rivets in double shear 76,000 PSI;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Steel rivets in single shear 44,000 PSI; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Steel rivets in double shear 88,000 PSI;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(8)">
        <text>When the diameter of a rivet hole in a longitudinal joint of a boiler is not known, the diameter and cross-sectional area of the rivet, after driving, shall be:</text>
        <paragraph num="(a)">
          <text>Ascertained by cutting out one rivet in the body of the joint; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>As indicated in the following table:</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>The maximum allowable working pressure on a:</text>
      <paragraph num="(1)">
        <text>Water-tube boiler having tubes secured to cast iron or malleable-iron headers, or having cast-iron mud drums, shall be 160 PSIG;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Cast-iron boiler, except a hot-water boiler, shall be 15 PSIG;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Boiler having lap-riveted longitudinal joints, operated at a pressure greater than 50 PSI, when removed from an existing setting and reinstalled, shall be 15 PSIG; and</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Reinstalled horizontal-return tubular boiler having a continuous longitudinal lap seam more than 12 feet long, shall be 15 PSIG.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Except as otherwise provided by this regulation, the lowest factor of safety shall be, for:</text>
      <paragraph num="(1)">
        <text>An existing installation: 4.5;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A horizontal-return tubular boiler having continuous longitudinal lap seams more than 12 feet long: 8;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>A reinstalled or secondhand boiler having longitudinal seams of lap-riveted construction: 6; and</text>
      </paragraph>
      <paragraph num="(4)">
        <text>A reinstalled or secondhand boiler with longitudinal seams of butt and double-strap construction: 5.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".23" heading="Power Boiler — Existing Installation: Other Equipment.">
    <paragraph num="A.">
      <text>Blowoff Connection.</text>
      <paragraph num="(1)">
        <text>A boiler shall have a blowoff pipe, fitted with a valve or cock, connected directly to the lowest water space. The following apply:</text>
        <paragraph num="(a)">
          <text>A cock shall be of the gland or guard type, suitable for the pressure allowed;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A globe valve may not be used.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Settings.</text>
        <paragraph num="(a)">
          <text>The setting around a blowoff pipe shall permit free expansion and contraction.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>To the maximum extent practicable, setting openings shall be sealed without restricting the movement of the blowoff piping.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Blowoff piping exposed to furnace heat shall be:</text>
        <paragraph num="(a)">
          <text>Protected by firebrick or other heat-resisting material; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Constructed so that the piping can be inspected readily.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>When the maximum allowable working pressure exceeds 100 PSIG:</text>
        <paragraph num="(a)">
          <text>A blowoff pipe shall have two valves or a valve and cock of at least extra-heavy type;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Blowoff piping shall:</text>
          <paragraph num="(i)">
            <text>Be at least extra-heavy non-galvanized steel, and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Run full size without reducers or bushings.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>A fitting between the boiler and a blowoff valve shall be steel.</text>
      </paragraph>
      <paragraph num="(6)">
        <text>A replacement blowoff pipe or fitting shall be installed in accordance with the ASME Code requirements for new installations.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Steam Gage.</text>
      <paragraph num="(1)">
        <text>A steam boiler shall have a steam gage which:</text>
        <paragraph num="(a)">
          <text>Has a dial range of at least 1-1/2 times the maximum allowable working pressure;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Is connected to:</text>
          <paragraph num="(i)">
            <text>The steam space or steam connection to the water column, and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>A siphon or equivalent device of sufficient capacity to keep the gage tube filled with water;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(c)">
          <text>Is arranged so that the gage can be shut off from the boiler only by a cock with a tee or lever handle:</text>
          <paragraph num="(i)">
            <text>Placed near the gage, and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>With the handle parallel to the pipe in which it is located, when the cock is open.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>When a steam gage connection longer than 8 feet is necessary, a shutoff valve near the boiler may be used if the:</text>
        <paragraph num="(a)">
          <text>Valve is:</text>
          <paragraph num="(i)">
            <text>The outside-screw-and-yolk type, and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Locked open; and</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Line is:</text>
          <paragraph num="(i)">
            <text>Of ample size, and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Permits free blowing.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>A boiler shall have a 1/4 inch nipple and globe valve:</text>
        <paragraph num="(a)">
          <text>Connected to the steam space; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Used only to attach a test gage while the boiler is in operation, to measure the accuracy of the boiler steam gage.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Stop Valves.</text>
      <paragraph num="(1)">
        <text>Except for safety valve and water column connections, each steam outlet from a boiler shall have a stop valve as near as practicable to the boiler.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Drainage.</text>
        <paragraph num="(a)">
          <text>When a stop valve is located so water can accumulate, ample drains shall be provided.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Drainage shall be piped to a safe location and may not be discharged on the top of the boiler or its setting.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Common Steam Mains.</text>
        <paragraph num="(a)">
          <text>When boilers having manholes are connected to a common steam main, the steam connection from each boiler shall be fitted with two stop valves having an ample free blow drain between them.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The discharge of the drain shall be:</text>
          <paragraph num="(i)">
            <text>Visible to the operator while manipulating the valves; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Piped clear of the boiler setting.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(c)">
          <text>A stop valve arrangement having one automatic non-return valve beside the boiler, and a second valve of the outside-screw-and-yoke-type, is recommended.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Water Level Indicator.</text>
      <paragraph num="(1)">
        <text>Except for a damper regulator, feedwater regulator, low-water fuel cutout, drain, steam gage, or other apparatus that does not permit the escape of an appreciable amount of steam or water, no outlet connection shall be placed on piping that connects a water column to a boiler.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A water column shall have a valved drain of at least 3/4 inch pipe size.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The drain shall be piped to a safe location.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Gage Cocks.</text>
        <paragraph num="(a)">
          <text>Except as otherwise provided by this regulation, a boiler shall have at least three gage cocks within the visible length of the water glass.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A boiler shall have at least two gage cocks if the boiler:</text>
          <paragraph num="(i)">
            <text>Has two water glasses on the same horizontal line; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Is 36 inches or less in diameter, and has a heating surface of 100 square feet or less.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>When a water gage glass is more than 30 feet above the boiler operating floor, remote water-level indicating or recording gages installed above the operating floor at eye level are recommended.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".24" heading="Power Boiler — Existing Installation: Safety Valve.">
    <paragraph num="A.">
      <text>A weighted-lever safety valve or a safety valve having a cast iron seat or disc:</text>
      <paragraph num="(1)">
        <text>May not be used after October 15, 1975; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Shall be replaced by a direct, spring-loaded, pop-type valve that complies with the requirements of the ASME Code, Section I.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>A boiler shall have at least one safety valve.</text>
    </paragraph>
    <paragraph num="C.">
      <text>A boiler shall have at least two safety valves if the boiler has:</text>
      <paragraph num="(1)">
        <text>More than 500 square feet of water-heating surface; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>An electric power input of more than 500 kw.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>A safety valve shall be:</text>
      <paragraph num="(1)">
        <text>Connected to the boiler, independent of any other steam connection;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Attached:</text>
        <paragraph num="(a)">
          <text>As close as possible to the boiler, without unnecessary intervening pipe or fittings; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>With no valve of any type between the safety valve and the boiler; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Installed in a manner that protects walkways and platforms from discharges.</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>If an escape pipe is used:</text>
      <paragraph num="(1)">
        <text>There may not be a valve of any type between a safety valve and the atmosphere;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>It shall be:</text>
        <paragraph num="(a)">
          <text>At least the full size of the safety valve discharge; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Fitted with an open drain to prevent water from lodging in the upper part of a safety valve or escape pipe;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>If a safety valve escape pipe has an elbow, the:</text>
        <paragraph num="(a)">
          <text>Elbow shall be located near the safety valve outlet; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Escape pipe shall be anchored and supported securely.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>A boiler shall have sufficient safety valve capacity to discharge all steam the boiler can generate without allowing pressure to rise more than:</text>
      <paragraph num="(1)">
        <text>6 percent above the highest pressure to which any valve is set; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>6 percent above the maximum allowable working pressure.</text>
      </paragraph>
    </paragraph>
    <paragraph num="G.">
      <text>Settings.</text>
      <paragraph num="(1)">
        <text>At least one safety valve on a boiler shall be set at or below the maximum allowable working pressure.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Additional valves shall be set not more than 3 percent above the maximum allowable working pressure.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The range of settings of all safety valves on a boiler may not exceed 10 percent of the highest pressure to which any valve is set.</text>
      </paragraph>
    </paragraph>
    <paragraph num="H.">
      <text>When two or more boilers, operating at different pressures and safety valve settings, are interconnected, the lower pressure boilers or interconnected piping shall have safety valves of sufficient capacity to prevent over-pressure, considering the maximum generating capacity of all boilers.</text>
    </paragraph>
    <paragraph num="I.">
      <text>A boiler supplied with feedwater directly from a water main without the use of feeding apparatus other than a return trap, may not have a safety valve set at a pressure greater than 94 percent of the lowest pressure obtained in the supply main feeding the boiler.</text>
    </paragraph>
    <paragraph num="J.">
      <text>Relief Capacity.</text>
      <paragraph num="(1)">
        <text>The relief capacity of a safety valve shall be tested by one of the following:</text>
        <paragraph num="(a)">
          <text>An accumulation test (unless the valve is located on a boiler having a superheater or reheater), performed by shutting off all other steam-discharge outlets from the boiler and forcing fires to the maximum. The safety valve relief capacity shall be sufficient to prevent increased pressure in excess of 6 percent of the maximum allowable working pressure.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Measuring the maximum amount of fuel that can be burned, and computing the corresponding evaporative capacity on the basis of the heating value of the fuel, as outlined in the appendix of the ASME Code, Section I.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Measuring the maximum amount of feedwater that can be evaporated.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>When either method in §J(1)(b) or (c) is used, the sum of the safety valve capacities shall equal or exceed the maximum evaporative capacity of the boiler.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>If relief capacity is insufficient, additional valves shall be provided.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".25" heading="Power Boiler — Existing Installation: Miscellaneous.">
    <paragraph num="A.">
      <text>Repair or replacement of a fitting or appliance shall comply with the ASME Code.</text>
    </paragraph>
    <paragraph num="B.">
      <text>The ASME Code, Section VII, Recommended Guidelines for the Care of Power Boilers, is recommended as a guide for safe operating practices.</text>
    </paragraph>
    <paragraph num="C.">
      <text>A condition not specifically covered by this regulation:</text>
      <paragraph num="(1)">
        <text>Shall be treated as a new installation; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>May be referred to the chief boiler inspector for information about the requirements.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".26" heading="Pressure Vessel — Existing Installation.">
    <paragraph num="A.">
      <text>The maximum allowable working pressure for a standard pressure vessel:</text>
      <paragraph num="(1)">
        <text>Shall be determined in accordance with the ASME Code under which it was constructed and stamped; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>May not exceed the pressure shown on the manufacturer's name plate stamp and data report.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Nonstandard Pressure Vessel—Maximum Allowable Working Pressure.</text>
      <paragraph num="(1)">
        <text>The maximum allowable working pressure on the shell of a nonstandard pressure vessel shall be determined by the strength of the weakest course computed by multiplying TS by t and E and dividing the product by R multiplied by FS:</text>
        <paragraph num="(a)">
          <text>TS = ultimate tensile strength of the shell plate, PSI, which, if unknown, shall be 55,000 PSI for steel, for temperatures not exceeding 700°F;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>t = minimum thickness of the shell plate of the weakest course, in inches;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>E = efficiency of the longitudinal joint, which is, for:</text>
          <paragraph num="(i)">
            <text>Riveted joints, the calculated riveted efficiency, and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Fusion-welded and brazed joints:</text>
          </paragraph>
        </paragraph>
        <paragraph num="(d)">
          <text>R = radius of the weakest course of the shell, in inches, using the:</text>
          <paragraph num="(i)">
            <text>Inside radius, if the thickness is 10 percent or less of the radius, and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Outside radius, if the thickness is greater than 10 percent of the radius;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(e)">
          <text>FS = factor of safety required by this regulation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>The maximum allowable working pressure for a cylindrical nonstandard pressure vessel subjected to external or collapsing pressure shall be determined by the ASME Code, Section VIII, paragraphs UG-28 and UG-29.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Factor of Safety.</text>
        <paragraph num="(a)">
          <text>For an existing installation, the minimum factor of safety shall be at least four.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>When necessary to ensure safe operation, the inspector may increase the factor of safety based on the:</text>
          <paragraph num="(i)">
            <text>Condition of the vessel; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Specific service to which it is subject.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>The maximum allowable working pressure for formed heads under pressure shall be determined by the:</text>
        <paragraph num="(a)">
          <text>Appropriate formulas from the ASME Code, Section VIII, Division 1, Paragraphs UG-32, UG-33, and UG-35; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Tensile strength and factors of safety set out in this regulation.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>If the inspector determines, because of conditions disclosed during an inspection, that the interior or exterior lining, covering, or brickwork should be removed to expose parts of the vessel not normally visible, the owner shall remove the material to permit:</text>
      <paragraph num="(1)">
        <text>Proper inspection; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Drilling any part of the vessel where necessary to ascertain thickness.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Safety Appliances.</text>
      <paragraph num="(1)">
        <text>To ensure safe operation, a pressure vessel shall have:</text>
        <paragraph num="(a)">
          <text>Safety and relief valves; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Indicating and controlling devices.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Safety appliances shall be constructed, located, and installed so that they cannot readily be rendered inoperative.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The relief capacity of a safety valve shall be sufficient to prevent pressure in the vessel from rising more than 10 percent above the maximum allowable working pressure, with static head pressure factored into the calculation.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Safety valve discharge shall be carried to a safe place.</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Repairs and replacements of fittings and appliances shall comply with the requirements for new installations.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".27" heading="Repair.">
    <paragraph num="A.">
      <text>All repairs and alterations of boilers and pressure vessels shall conform to the requirements of the NBIC.</text>
    </paragraph>
    <paragraph num="B.">
      <text>The person performing repairs and alterations on a boiler or pressure vessel shall provide the chief boiler inspector with reports related to the repair as required by Regulation .28 of this chapter.</text>
    </paragraph>
    <paragraph num="C.">
      <text>The person certifying that the repair or alteration is complete and in accordance with the NBIC shall be a special inspector, deputy boiler, or Chief Boiler Inspector.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".28" heading="Reporting Requirements.">
    <paragraph num="A.">
      <text>Accident or Explosion Report.</text>
      <paragraph num="(1)">
        <text>After an accident or explosion the owner or operator shall notify the chief boiler inspector within 24 hours by email and by telephone.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Notification under §A(1) of this regulation shall contain the following information regarding the accident or explosion:</text>
        <paragraph num="(a)">
          <text>Name, address, telephone number, and other contact information of the individual reporting the incident;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Location and address of the incident;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Date and time of the incident;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Description of the incident;</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Maryland registration number and National Board registration number;</text>
        </paragraph>
        <paragraph num="(f)">
          <text>Manufacturer, year of manufacture, and serial number;</text>
        </paragraph>
        <paragraph num="(g)">
          <text>Type of boiler or pressure vessel and maximum allowable working pressure;</text>
        </paragraph>
        <paragraph num="(h)">
          <text>Injuries including fatalities; and</text>
        </paragraph>
        <paragraph num="(i)">
          <text>Property damage.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>A special inspector, immediately upon receiving a report of an accident or explosion, shall notify the chief boiler inspector.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Unless necessary to save human life, the owner or operator, or both, shall ensure that the boiler, pressure vessel, or any part of the boiler or pressure vessel is not removed or disturbed before the inspector conducts an inspection.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>An inspector shall file a report of a hazardous condition that affects the safe operation of a boiler or pressure vessel with the Chief Boiler Inspector within 24 hours by email.</text>
    </paragraph>
    <paragraph num="C.">
      <text>An authorized insurer shall file a report with the Chief Boiler Inspector by email within 24 hours if the insurance policy is cancelled, not renewed, or suspended due to an unsafe condition.</text>
    </paragraph>
    <paragraph num="D.">
      <text>An authorized insurer shall file a report with the Chief Boiler Inspector by email within 24 hours where the insurance coverage is denied as a result of an inspector’s first inspection.</text>
    </paragraph>
    <paragraph num="E.">
      <text>Inspection Report.</text>
      <paragraph num="(1)">
        <text>Within 30 days of the inspection date, an authorized inspection agency shall submit to the Chief Boiler Inspector:</text>
        <paragraph num="(a)">
          <text>A report of each certificate inspection; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A report of each inspection of a boiler or pressure vessel that did not have a valid certificate at the time of the inspection.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>The inspection report shall include at least the following information:</text>
        <paragraph num="(a)">
          <text>Date of the inspection;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Maryland registration number;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Owner’s identification number;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Manufacturer, year of manufacture, National Board registration number, manufacturer’s serial number;</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Year of installation;</text>
        </paragraph>
        <paragraph num="(f)">
          <text>Location and address of the boiler or pressure vessel;</text>
        </paragraph>
        <paragraph num="(g)">
          <text>Name and address of the owner of the boiler or pressure vessel;</text>
        </paragraph>
        <paragraph num="(h)">
          <text>Name and address of the primary contact of the boiler or pressure vessel;</text>
        </paragraph>
        <paragraph num="(i)">
          <text>Name and address of the person to whom a certificate should be sent;</text>
        </paragraph>
        <paragraph num="(j)">
          <text>Name and address of the person to whom an invoice should be sent;</text>
        </paragraph>
        <paragraph num="(k)">
          <text>Specific location in the plant;</text>
        </paragraph>
        <paragraph num="(l)">
          <text>Type and use of the boiler or pressure vessel;</text>
        </paragraph>
        <paragraph num="(m)">
          <text>Whether a variance has been granted and if so, the terms of the variance;</text>
        </paragraph>
        <paragraph num="(n)">
          <text>ASME symbol stamped on the boiler or pressure vessel;</text>
        </paragraph>
        <paragraph num="(o)">
          <text>If a boiler, the fuel, the fuel train code, and the firing method;</text>
        </paragraph>
        <paragraph num="(p)">
          <text>If a pressure vessel, the pressurized fluid;</text>
        </paragraph>
        <paragraph num="(q)">
          <text>The stamped maximum allowable working pressure and the maximum allowable operating pressure and the set pressure of the pressure relief device;</text>
        </paragraph>
        <paragraph num="(r)">
          <text>The minimum required capacity of the pressure relief device, and the total installed pressure relief capacity;</text>
        </paragraph>
        <paragraph num="(s)">
          <text>The status of the boiler or pressure vessel;</text>
        </paragraph>
        <paragraph num="(t)">
          <text>The inspection type;</text>
        </paragraph>
        <paragraph num="(u)">
          <text>Whether a certificate is posted;</text>
        </paragraph>
        <paragraph num="(v)">
          <text>Whether the pressure gage was tested;</text>
        </paragraph>
        <paragraph num="(w)">
          <text>Whether the inspector recommends that a certificate be issued;</text>
        </paragraph>
        <paragraph num="(x)">
          <text>Whether a hydrostatic pressure test was performed, and if so, at what pressure;</text>
        </paragraph>
        <paragraph num="(y)">
          <text>Complete nameplate information or a photograph or rubbing of the nameplate;</text>
        </paragraph>
        <paragraph num="(z)">
          <text>A statement of the condition of the boiler or pressure vessel, in general and specifically as needed, including violations;</text>
        </paragraph>
        <paragraph num="(aa)">
          <text>If violations were noted, the recommended corrective action to take;</text>
        </paragraph>
        <paragraph num="(bb)">
          <text>The name of the owner or owner’s representative to whom the report was explained, with contact information;</text>
        </paragraph>
        <paragraph num="(cc)">
          <text>The name of the authorized inspection agency; and</text>
        </paragraph>
        <paragraph num="(dd)">
          <text>The name of the inspector, the inspector’s National Board commission number, and the inspector’s Maryland commission number.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>An inspection of a historical boiler shall be reported on:</text>
        <paragraph num="(a)">
          <text>National Board Form C-1; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A Maryland inspection report form.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>Method of Filing an Inspection Report.</text>
        <paragraph num="(a)">
          <text>A report shall be submitted electronically in the format required by the Chief Boiler Inspector, unless to do so would create an undue burden.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>If a report is not submitted electronically in the format required by the Chief Boiler Inspector it shall be:</text>
          <paragraph num="(i)">
            <text>Submitted on the Maryland inspection report form; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Subject to a filing fee, payable by the authorized inspection agency.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>An authorized insurer shall file a report of insurance change with the Chief Boiler Inspector within 30 days after an insurance policy is issued, cancelled, not renewed, or suspended for any reason.</text>
    </paragraph>
    <paragraph num="G.">
      <text>A manufacturer shall file a manufacturer’s data report with the Chief Boiler Inspector through the National Board for each of its boilers and pressure vessels to be operated in Maryland.</text>
    </paragraph>
    <paragraph num="H.">
      <text>Repair and Alteration Reports.</text>
      <paragraph num="(1)">
        <text>A person performing repairs or alterations on a boiler or pressure vessel shall provide the Chief Boiler Inspector and the owner with a written report of each repair or alteration within 30 days of the completion of the repair or alteration.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The repair or alteration report shall include at least the following:</text>
        <paragraph num="(a)">
          <text>Name and address of the company performing the repair or alteration;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Owner and location, including the address of the boiler or pressure vessel;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Maryland registration number and National Board registration number;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Manufacturer and serial number;</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Description of the repair or alteration; and</text>
        </paragraph>
        <paragraph num="(f)">
          <text>Completion of certificate of compliance and certificate inspection.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="I.">
      <text>Inventory Report.</text>
      <paragraph num="(1)">
        <text>Within 3 days of the first day of each month, each authorized insurer shall submit to the Chief Boiler Inspector an inventory report of each boiler and pressure vessel that it insures.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Within 3 days of the first day of each month, each owner-user inspection service shall submit to the Chief Boiler Inspector an inventory report of each boiler and pressure vessel it owns.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The inventory report shall contain at least the following information about each boiler and pressure vessel:</text>
        <paragraph num="(a)">
          <text>Maryland registration number;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Name of the manufacturer, year of manufacture, and National Board number;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Manufacturer’s serial number;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Owner’s identifying number;</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Type of boiler or pressure vessel;</text>
        </paragraph>
        <paragraph num="(f)">
          <text>Location and address of the boiler or pressure vessel; and</text>
        </paragraph>
        <paragraph num="(g)">
          <text>Name and address of the owner of the boiler or pressure vessel.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>Method of Filing an Inventory Report.</text>
        <paragraph num="(a)">
          <text>An inventory report shall be submitted electronically in the format required by the Chief Boiler Inspector, unless to do so would create an undue burden.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>If an inventory report is not submitted electronically in the format required by the Chief Boiler Inspector it shall be subject to a filing fee, payable by the authorized inspection agency.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".28-1" heading="Record Keeping.">
    <text>An owner or user of a boiler or pressure vessel shall maintain a legible copy of inspection, maintenance, repair, and alteration records.</text>
    <paragraph num="A.">
      <text>At a readily accessible central location in the building where the boiler or pressure vessel is located; and</text>
    </paragraph>
    <paragraph num="B.">
      <text>For the life of the boiler or pressure vessel.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".28-2" heading="Database Report of Boilers and Pressure Vessels.">
    <paragraph num="A.">
      <text>An authorized insurer shall develop a database report of boilers and pressure vessels that it insures.</text>
    </paragraph>
    <paragraph num="B.">
      <text>An owner-user inspection service shall develop a database report of the boilers and pressure vessels it owns.</text>
    </paragraph>
    <paragraph num="C.">
      <text>The database report required by §§A and B of this regulation shall contain the following information about each boiler and pressure vessel:</text>
      <paragraph num="(1)">
        <text>Maryland registration number and National Board registration number;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Name and address of the owner of the boiler or pressure vessel;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Location and address of the boiler or pressure vessel;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Type of boiler or pressure vessel;</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Name of the manufacturer and serial number;</text>
      </paragraph>
      <paragraph num="(6)">
        <text>Date or dates the certificate inspection was completed;</text>
      </paragraph>
      <paragraph num="(7)">
        <text>Name of the special inspector conducting the inspection; and</text>
      </paragraph>
      <paragraph num="(8)">
        <text>Last inspection date.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Submission of Database Report.</text>
      <paragraph num="(1)">
        <text>A copy of the database report required by §§A and B of this regulation shall be submitted to the chief boiler inspector by September 1, 2001.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>After September 1, 2001, the database report and annual updates to the database report shall be submitted to the chief boiler inspector by January 15 of each year.</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Database reports submitted by an authorized insurer pursuant to §D of this regulation shall reflect all boilers and pressure vessels that the company insures including:</text>
      <paragraph num="(1)">
        <text>Each certificate inspection; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Each time that the authorized insurer adds or drops a boiler or pressure vessel from coverage.</text>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>Filing Reports.</text>
      <paragraph num="(1)">
        <text>Database reports shall be filed by an authorized insurer or owner-user inspection service in an electronic format that is acceptable to the chief boiler inspector.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The chief boiler inspector shall notify authorized insurers and owner-user inspection services of the acceptable electronic formats.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Database reports not submitted electronically by an authorized insurer or owner-user inspection service shall be submitted on the form provided by the chief boiler inspector.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Database reports not submitted electronically by an authorized insurer are subject to the filing fee provisions of Public Safety Article, §12-910(a)(3), Annotated Code of Maryland.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".28-3" heading="Quality Assurance Program.">
    <text>Each authorized inspection agency shall make available for review by the Chief Boiler Inspector, the quality assurance program documents that were submitted to the National Board for accreditation as an authorized inspection agency.</text>
  </regulation>
  <regulation prefix="Regulation" num=".29" heading="Safety Appliance Removal.">
    <paragraph num="A.">
      <text>When a boiler or pressure vessel is operating, a person may not remove, modify, alter, or repair a safety appliance required by these regulations.</text>
    </paragraph>
    <paragraph num="B.">
      <text>When a boiler or pressure vessel is not operating and a safety appliance is removed for modification, alteration, or repair the appliance shall be reinstalled in proper working order before the boiler or pressure vessel resumes operation.</text>
    </paragraph>
    <paragraph num="C.">
      <text>A safety valve may not be loaded to maintain a working pressure greater than the maximum allowable operating pressure.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".30" heading="Stamping.">
    <paragraph num="A.">
      <text>At the first post-installation internal or certificate inspection, the inspector shall assign to a boiler or pressure vessel a Maryland serial number that is:</text>
      <paragraph num="(1)">
        <text>At least 5/16 of an inch in height;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Configured as follows:</text>
        <paragraph num="(a)">
          <text>For power boilers	&lt;MD&gt;	MD 0000;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>For heating boilers	&lt;MD&gt;	MD 0000H;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>For pressure vessels	&lt;MD&gt;	MD 0000V;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>For nuclear vessels	&lt;MD&gt;	MD 0000N; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Stamped on:</text>
        <paragraph num="(a)">
          <text>The boiler or pressure vessel, or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A metal tag at least 1 inch in height, securely attached to the front of:</text>
          <paragraph num="(i)">
            <text>A low pressure heating boiler constructed of cast iron, or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>A pressure vessel constructed of cast iron or other material of a thickness that should not be stamped.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Unless a record is kept showing the location of stamping so that the stamping can be uncovered readily, stamping:</text>
      <paragraph num="(1)">
        <text>May not be concealed by lagging or paint; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Shall be exposed at all times.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>When a boiler or pressure vessel stamp is indistinct:</text>
      <paragraph num="(1)">
        <text>An inspector shall direct the owner to have the boiler or pressure vessel restamped;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The owner shall:</text>
        <paragraph num="(a)">
          <text>Request from the chief boiler inspector permission to restamp, and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Submit with the request, proof of the original stamp; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>If the chief boiler inspector authorizes restamping, an inspector shall:</text>
        <paragraph num="(a)">
          <text>Observe the restamping, and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>File with the chief boiler inspector notice of the restamping, and a facsimile of the stamp applied.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>A condemned boiler or pressure vessel shall be stamped with:</text>
      <paragraph num="(1)">
        <text>Letters 5/16 of an inch in height; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The configuration XXX MD XXX.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".31" heading="Variance from Regulation.">
    <paragraph num="A.">
      <text>A person who believes that a regulation is unreasonable or imposes an undue burden on an owner may request the Board of Boiler Rules to grant a variance from that regulation.</text>
    </paragraph>
    <paragraph num="B.">
      <text>An application for variance shall:</text>
      <paragraph num="(1)">
        <text>Be in writing;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Specify the:</text>
        <paragraph num="(a)">
          <text>Name and address of the applicant,</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Regulation from which the applicant seeks a variance,</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Location, equipment, and practices involved;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>State:</text>
        <paragraph num="(a)">
          <text>In detail, the reasons why the applicant requests the variance, and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The steps the applicant has taken and will take, with specific dates when appropriate, to protect employees and the public against the hazard covered by the regulation;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>Certify that the applicant has given appropriate notice of the application to:</text>
        <paragraph num="(a)">
          <text>The applicant's employees affected by the variance,</text>
        </paragraph>
        <paragraph num="(b)">
          <text>All authorized representatives of the affected employees, and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Other persons affected by the condition for which a variance is sought;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>Include a:</text>
        <paragraph num="(a)">
          <text>Copy or description of the required notice, and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>List of the names and addresses of persons entitled to notice.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Order of Variance.</text>
      <paragraph num="(1)">
        <text>After an investigation and such hearing as it may direct, the Board of Boiler Rules may grant a variance from a regulation.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>An order of variance may impose special conditions necessary to ensure equivalent safety.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>When there is reason to believe, or when a complaint is received, that a variance does not provide safety equivalent to the regulation, the Board of Boiler Rules may continue, suspend, revoke, or modify the conditions specified in a variance order after:</text>
      <paragraph num="(1)">
        <text>Notice to the owner and to the complainant, if any; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Such investigation and hearing as the Board of Boiler Rules may direct.</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>A declaration, act, or omission of the Board of Boiler Rules, the chief boiler inspector, a deputy boiler inspector, or a special inspector, other than a written order authorizing a variance in accordance with this regulation, may not exempt an owner from full compliance with this chapter.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".32" heading="Vacant" />
  <regulation prefix="Regulation" num=".33" heading="Model Steam Boilers.">
    <paragraph num="A.">
      <text>Model steam boilers are subject to the requirements of Regulations .01, .01-1, .05, .08, .09, .14—.16, .19, and .27—.31 of this chapter.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Repealed.</text>
    </paragraph>
    <paragraph num="C.">
      <text>A model steam boiler may not be operated in Maryland unless it has a valid:</text>
      <paragraph num="(1)">
        <text>Maryland inspection certificate; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Inspection or operating certificate issued by another state having standards equivalent to the requirements of this regulation.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Inspection Certificate.</text>
      <paragraph num="(1)">
        <text>Unless sooner suspended or revoked, an inspection certificate expires 1 year from date of issuance.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>An inspection certificate shall specify the maximum operating pressure of the model steam boiler, determined in accordance with this regulation.</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Initial Test.</text>
      <paragraph num="(1)">
        <text>Before an initial test of a model steam boiler:</text>
        <paragraph num="(a)">
          <text>An owner shall provide the inspector with:</text>
          <paragraph num="(i)">
            <text>Construction drawings,</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Material specifications,</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Welding and brazing information,</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Stress calculations, in accordance with §H of this regulation,</text>
          </paragraph>
          <paragraph num="(v)">
            <text>The calculated factor of safety,</text>
          </paragraph>
          <paragraph num="(vi)">
            <text>Requested maximum operating pressure,</text>
          </paragraph>
          <paragraph num="(vii)">
            <text>The name and qualifications of the manufacturer and assembler, and</text>
          </paragraph>
          <paragraph num="(viii)">
            <text>The name and qualifications of the designer, if available; and</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>An inspector shall verify that the design of the model steam boiler is in accordance with the documents provided.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Before being put into operation, a new model steam boiler shall be tested hydrostatically to a pressure of at least two times the maximum operating pressure.</text>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>Inspection.</text>
      <paragraph num="(1)">
        <text>A model steam boiler shall be tested:</text>
        <paragraph num="(a)">
          <text>Annually; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>After repair or modification.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>An owner requesting an inspection of a model steam boiler shall supply test equipment, including:</text>
        <paragraph num="(a)">
          <text>Water source, pump, pressure lines, and master test gage; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Plugs, gags, or caps to replace safety valves or other appurtenances, if needed to prevent damage by the required test pressure.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>An inspector:</text>
        <paragraph num="(a)">
          <text>Shall conduct an external inspection and, to the extent possible, an internal inspection, to ascertain the physical condition of the model steam boiler before the hydrostatic test is conducted;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Shall witness the hydrostatic test;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>May require that:</text>
          <paragraph num="(i)">
            <text>A model steam boiler be placed in operation so the inspector can make further observations and check safety valve operation, and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>An accumulation test be conducted in accordance with Regulation .24J(1)(a) of this chapter; and</text>
          </paragraph>
        </paragraph>
        <paragraph num="(d)">
          <text>If the test is completed successfully, shall sign the test report and file it with the chief boiler inspector.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>A hydrostatic test:</text>
        <paragraph num="(a)">
          <text>Except as otherwise provided by this regulation, shall be applied at 1-1/2 times the maximum operating pressure;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>May be conducted using a model steam boiler's feed pump and pressure gage, if the:</text>
          <paragraph num="(i)">
            <text>Range of the gage is sufficient, and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Gage has been calibrated in accordance with this regulation; and</text>
          </paragraph>
        </paragraph>
        <paragraph num="(c)">
          <text>May not be approved if the model steam boiler:</text>
          <paragraph num="(i)">
            <text>Shows leakage, bulging or displacement of a sheet, firebox, barrel, or other surface exposed to pressure, or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>While pressure is being increased or is at the maximum level, experiences a serious leak, unusual sound, or sudden drop in pressure.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="G.">
      <text>Equipment.</text>
      <paragraph num="(1)">
        <text>Safety Valve.</text>
        <paragraph num="(a)">
          <text>A model steam boiler shall have two or more safety valves.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Each safety valve shall be set at or below the maximum operating pressure.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>A model steam boiler shall:</text>
          <paragraph num="(i)">
            <text>Have sufficient safety valve capacity to discharge all steam the model steam boiler can generate, without allowing pressure to rise more than 6 percent above the maximum operating pressure; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Comply with the requirements of the ASME Code, Section I, Paragraph PG-70.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Steam Gage. If a steam gage:</text>
        <paragraph num="(a)">
          <text>Has sufficient range:</text>
          <paragraph num="(i)">
            <text>It may be left in place during a test,</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>A record shall be made of its readings and compared with the master test gage, and</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>If test readings conflict, the steam gage shall be recalibrated or replaced;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Does not have sufficient range for test pressure:</text>
          <paragraph num="(i)">
            <text>The steam gage shall be removed and calibrated with the test gage or with a dead weight tester, and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>A test gage shall be used to conduct the test.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="H.">
      <text>Maximum operating pressure, as designated on the inspection certificate:</text>
      <paragraph num="(1)">
        <text>For a model steam boiler on a locomotive, shall be that necessary to move the locomotive, considering cylinder dimension and weight on driving wheels;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>For other model steam boilers, shall be that necessary for optimum operation of the engine; and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>May not exceed the maximum allowable working pressure.</text>
      </paragraph>
    </paragraph>
    <paragraph num="I.">
      <text>Maximum Allowable Working Pressure.</text>
      <paragraph num="(1)">
        <text>Maximum allowable working pressure on:</text>
        <paragraph num="(a)">
          <text>The shell of a model steam boiler shall be computed by the formula: (s X t X c)/r = maximum allowable working pressure, PSIG, where:</text>
          <paragraph num="(i)">
            <text>s = maximum allowable material stress, PSI,</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>t = minimum thickness of the shell wall, in inches,</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>c = constant, which for a seamless shell shall be 1.0, and for a welded shell shall be 0.8, and</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>r = outside radius of the shell, in inches;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>A stayed surface shall be computed by the formula: (t squared X s X c)/p squared = Maximum allowable working pressure, PSIG, where:</text>
          <paragraph num="(i)">
            <text>c = constant, which for welded or silver soldered stay bolts without heads shall be 2.1, and for welded or silver soldered stay bolts with heads shall be 2.8,</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>p = stay bolt pitch, in inches, using the largest dimension if the spacing is not square,</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>s = maximum allowable material stress, PSI, and</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>t = minimum thickness of the wall, in inches;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(c)">
          <text>A stay bolt shall be computed by the formula: (a X s)/(h X v) = maximum allowable working pressure, PSIG, where:</text>
          <paragraph num="(i)">
            <text>a = cross sectional area of stay bolt, root of thread, if threaded, in square inches,</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>h = stay bolt horizontal spacing, in inches,</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>s = maximum allowable material stress, PSI, and</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>v = stay bolt vertical spacing, in inches.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>The calculated factor of safety shall be computed by the formula: ((maximum allowable ASME Code calculated working pressure, PSIG)/(maximum operation pressure, PSIG)) X (ASME Code factor of safety) = calculated factor of safety</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The maximum allowable material stress shall be, for:</text>
        <paragraph num="(a)">
          <text>Carbon steel:</text>
          <paragraph num="(i)">
            <text>Ultimate tensile strength: 50,000 PSI;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>ASME Code factor of safety: 4;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Allowable working stress: 12,500 PSI; and</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>A temperature allowance is not required for pressures up to 250 PSI. Allowable stress values for pressures above 250 PSI shall comply with the requirements of the ASME Code, Section I, Part PG-23.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Copper:</text>
          <paragraph num="(i)">
            <text>Ultimate tensile strength: 30,000 PSI;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>ASME Code factor of safety: 5; and</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Allowable working stress, with temperature allowance:</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".34" heading="Historic Boilers.">
    <paragraph num="A.">
      <text>Except as provided for in this regulation, a historical boiler shall be installed, inspected, operated, repaired, or altered in accordance with the NBIC.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Inspection.</text>
      <paragraph num="(1)">
        <text>An initial inspection shall be conducted:</text>
        <paragraph num="(a)">
          <text>To determine baseline criteria needed for the operating life of the boiler;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>In accordance with the requirements outlined in the NBIC;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>On any boiler not previously inspected in Maryland; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>On any boiler which has not received a certificate inspection in Maryland in the previous 2 years.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Except as provided in this subsection, a historical boiler shall be inspected at the inspection intervals of the NBIC:</text>
        <paragraph num="(a)">
          <text>An internal inspection shall be conducted annually;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>An external inspection shall be conducted annually;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>After a repair or alteration, a historical boiler shall be inspected before operation; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>If an inspection detects a condition warranting further investigation, an inspector may require further investigation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Before an inspection, an owner shall, upon request, provide the inspector with:</text>
        <paragraph num="(a)">
          <text>Stress calculations in accordance with this regulation;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The calculated factor of safety;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Requested maximum allowable operating pressure;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>The two most recent ultrasonic thickness examination maps; and</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Any other documentation required by the NBIC.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>During an inspection, an inspector may:</text>
        <paragraph num="(a)">
          <text>Examine all documents pertaining to the qualifications of the operator; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Assess an operator’s demonstrated understanding of the operational requirements of the historical boiler.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Hydrostatic Pressure Test.</text>
      <paragraph num="(1)">
        <text>A historical boiler shall be hydrostatically tested to a pressure of not less than the maximum allowable operating pressure but no more than 1-1/4 times the maximum allowable operating pressure.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>After a repair or alteration, a historical boiler shall be tested hydrostatically to a pressure of not less than 1¼ times the maximum allowable operating pressure but no more than 1½ times the maximum allowable operating pressure.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>An owner shall supply the necessary test equipment required by the inspector for the hydrostatic test including:</text>
        <paragraph num="(a)">
          <text>Water source, pump, pressure lines, and calibrated test gauge; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Plugs, gags, or caps to replace safety valves or other appurtenances if needed to prevent damage from the required test pressure.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Maximum Allowable Operating Pressure.</text>
      <paragraph num="(1)">
        <text>The maximum allowable operating pressure shall be determined by the inspector in accordance with the NBIC and ASME Code.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The maximum allowable operating pressure for objects containing wrought iron will be determined by considering the following:</text>
        <paragraph num="(a)">
          <text>For pressures up to 250 psi a temperature allowance is not required; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>For pressures above 250 psi the allowable stress values shall comply with the requirements of the ASME Code, Section I, Part PG-23.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>The maximum allowable operating pressure for objects containing materials other than carbon steel or wrought iron shall be determined in accordance with the ASME Code.</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Training.</text>
      <paragraph num="(1)">
        <text>A person who operates a historical boiler shall retain a written record of their training.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Upon request, a person who operates a historical boiler shall provide the Chief Boiler Inspector with a copy of their training record.</text>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>Historical boilers with a certificate of inspection issued by another jurisdiction may operate in Maryland under the following circumstances:</text>
      <paragraph num="(1)">
        <text>An owner of a historical boiler may request that the Chief Boiler Inspector recognize a certificate of inspection issued by another jurisdiction;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>In evaluating a request for recognition of a certification of inspection by the other jurisdiction, the Chief Boiler Inspector may conduct an inspection of a historical boiler to verify:</text>
        <paragraph num="(a)">
          <text>Compliance with the NBIC; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Satisfaction of safety requirements that are equal to or greater than Maryland’s requirements;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>If the Chief Boiler Inspector conducts an inspection to evaluate a historical boiler with a certificate of inspection from the other jurisdiction, the Chief Boiler Inspector shall examine the following:</text>
        <paragraph num="(a)">
          <text>Verification and validation of the certificate of inspection from the other jurisdiction;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Examination of all documents required by this regulation and by the NBIC;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Examination of all documents pertaining to the qualifications of the operator;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Demonstrated understanding of the operational requirements by the operator of the historical boiler; and</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Other tests at the discretion of the inspector including but not limited to:</text>
          <paragraph num="(i)">
            <text>An external inspection;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>A determination of the maximum allowable operating pressure in Maryland; and</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Operation at the maximum allowable operating pressure in Maryland; and</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>If the Chief Boiler Inspector determines that a historical boiler with a certificate of inspection issued by another jurisdiction is in compliance with safety requirements that are equal to or greater than Maryland, the Chief Boiler Inspector shall issue a certificate of inspection.</text>
      </paragraph>
    </paragraph>
    <paragraph num="G.">
      <text>A historical portable steam boiler shall not be operated at a pressure greater than:</text>
      <paragraph num="(1)">
        <text>15 psig when being moved at a speed of 5 miles per hour or less; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Zero psig when being moved at a speed greater than 5 miles per hour.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".35" heading="Citations.">
    <paragraph num="A.">
      <text>If, after an inspection or investigation, the Commissioner finds that, within the immediately preceding 6 months, a person has violated Public Safety Article, Title 12, Subtitle 9, Annotated Code of Maryland, or a regulation or order issued to carry out this law, the Commissioner shall issue a citation to the person.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Each citation shall:</text>
      <paragraph num="(1)">
        <text>Be in writing;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Describe, in detail, the nature of the alleged violation;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Cite the provision or provisions of Public Safety Article, Title 12, Subtitle 9, Annotated Code of Maryland, regulation, or order that the person is alleged to have violated;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Set a reasonable time for correction of the alleged violation;</text>
      </paragraph>
      <paragraph num="(5)">
        <text>State the proposed civil penalty, if any, that the Commissioner intends to impose; and</text>
      </paragraph>
      <paragraph num="(6)">
        <text>Inform the person of the right to a hearing under §E of this regulation.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>The Commissioner shall serve the citation on each named person by:</text>
      <paragraph num="(1)">
        <text>Certified mail, return receipt requested; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Personal delivery, if the person serving the document certifies to the manner and date of service.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>A person who receives a citation shall:</text>
      <paragraph num="(1)">
        <text>Upon receipt of the citation, post the citation, or an unedited copy, conspicuously at or near each place where the citation alleges that a violation occurred;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Post the citation, or an unedited copy, conspicuously at its place of business where:</text>
        <paragraph num="(a)">
          <text>Notices to employees are usually posted; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Notices to the public are usually posted;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Ensure that the posted citation is not:</text>
        <paragraph num="(a)">
          <text>Removed;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Altered;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Defaced; or</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Covered; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>Ensure that the citation remains posted for the later of:</text>
        <paragraph num="(a)">
          <text>The time the violation described in the citation is corrected; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>3 workdays.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Within 15 workdays after a person receives notice of a citation under §C of this regulation, the person may submit to the Commissioner a written request for a hearing on the citation or proposed civil penalty.</text>
    </paragraph>
    <paragraph num="F.">
      <text>Unless a person requests a hearing as provided in §E of this regulation, a citation, including a notice of a proposed civil penalty, is considered a final order.</text>
    </paragraph>
    <paragraph num="G.">
      <text>The Commissioner, or the Commissioner’s designee, shall give notice of a hearing and hold the hearing under §E of this regulation in accordance with State Government Article, Title 10, Subtitle 2, Annotated Code of Maryland, as supplemented by Regulation .09 of this chapter.</text>
    </paragraph>
    <paragraph num="H.">
      <text>A person shall correct each violation for which the Commissioner issues a citation within the time set for correction in the citation or a final order under this chapter.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".36" heading="Penalties.">
    <paragraph num="A.">
      <text>The Commissioner may impose a civil penalty, not exceeding $1,000 for each violation, against a person who violates Public Safety Article, Title 12, Subtitle 9, Annotated Code of Maryland, or a regulation or order issued to carry out this law, if:</text>
      <paragraph num="(1)">
        <text>The violation involves recordkeeping, notice, filing, access, or posting requirements;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>An inspection is not conducted on time; or</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The Commissioner finds that the violation is less than serious.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>The Commissioner may impose a civil penalty, not exceeding $2,500 for each violation, against a person who violates Public Safety Article, Title 12, Subtitle 9, Annotated Code of Maryland, or a regulation or order issued to carry out this law, if a substantial probability of death, serious physical injury, or serious damage to property exists because of the violation, unless the person did not know and with reasonable diligence could not have known of the violation.</text>
    </paragraph>
    <paragraph num="C.">
      <text>The Commissioner may impose a civil penalty, not exceeding $5,000 for each violation, against a person who:</text>
      <paragraph num="(1)">
        <text>Operates a boiler or pressure vessel without a certificate of inspection from the Commissioner;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Operates a boiler or pressure vessel that has been prohibited from use; or</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Willfully or repeatedly violates Public Safety Article, Title 12, Subtitle 9, Annotated Code of Maryland, or a regulation or order issued to carry out this law.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Before the Commissioner imposes a civil penalty, the Commissioner shall consider the appropriateness of the penalty in relation to:</text>
      <paragraph num="(1)">
        <text>The size of the business of the person against whom the penalty is to be imposed;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The nature or gravity of the violation for which the penalty is to be imposed;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The good faith of the person; and</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Any previous violations by the person.</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>The Commissioner may impose a civil penalty, not exceeding $1,000 for each day a violation continues, against a person who fails to correct the violation in the time set for its correction.</text>
    </paragraph>
    <paragraph num="F.">
      <text>Each civil penalty shall be paid into the General Fund of the State.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".37" heading="Miniature Boilers.">
    <paragraph num="A.">
      <text>Miniature boilers are exempt from the requirements of CSD-1, except that they shall have:</text>
      <paragraph num="(1)">
        <text>An emergency shut-off switch located outside of the main point of access and egress to the boiler room, unless the installer can establish that this location would allow access by the general public that could be detrimental to the operation of the boiler; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A lockable service disconnect.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Control and safety devices for miniature boilers shall comply with:</text>
      <paragraph num="(1)">
        <text>The code under which they were constructed and stamped; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The recommendations and requirements in the manufacturer's installation manual.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>If a conflict between §B(1) and (2) of this regulation occurs, the code under which they were constructed and stamped shall be followed.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".38" heading="Kitchen Equipment Boilers.">
    <paragraph num="A.">
      <text>Kitchen equipment boilers are exempt from the requirements of CSD-1, except that they shall have:</text>
      <paragraph num="(1)">
        <text>An emergency shut-off switch located outside of the main point of access and egress to the kitchen, unless the installer can establish that this location would allow access by the general public that could be detrimental to the operation of the boiler; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A lockable service disconnect.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Control and safety devices for kitchen equipment boilers shall comply with:</text>
      <paragraph num="(1)">
        <text>The code under which they were constructed and stamped; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The recommendations and requirements in the manufacturer's installation manual.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>If a conflict between §B(1) and (2) of this regulation occurs, the code under which they were constructed and stamped shall be followed.</text>
    </paragraph>
  </regulation>
  <annotations>
    <annotation type="Authority">Public Safety Article, Title 12, Annotated Code of MarylandCh. 351, Acts of 2004</annotation>
    <annotation type="History" subtype="Administrative History">Effective date: October 15, 1975 (2:23 Md. R. 1414)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .02CC amended and .02DD repealed effective June 1, 1982 (9:8 Md. R. 821)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .02PP amended effective November 4, 1985 (12:22 Md. R. 2103)</annotation>
    <annotation type="History" subtype="Administrative History">Regulations .07—.08 adopted effective November 4, 1985 (12:22 Md. R. 2103)</annotation>
    <annotation type="History" subtype="Administrative History">Regulations .01—.08 repealed and new Regulations .01—.32 adopted effective June 1, 1989 (16:10 Md. R. 1106)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01B amended effective September 1, 1989 (16:16 Md. R. 1749); April 16, 1990 (17:7 Md. R. 848); October 7, 1996 (23:20 Md. R. 1422); June 30, 1997 (24:13 Md. R. 930)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01B amended as an emergency provision effective July 14, 1999 (26:16 Md. R. 1237); amended permanently effective October 4, 1999 (26:20 Md. R. 1545)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01B amended effective July 10, 2000 (27:13 Md. R. 1211)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01-1 amended effective January 31, 1994 (21:2 Md. R. 98); July 18, 1994 (12:14 Md. R. 1228); November 20, 1994 (21:25 Md. R. 1933); July 3, 1995 (22:13 Md. R. 966); January 15, 1996 (23:1 Md. R. 23); April 22, 1996 (23:8 Md. R. 604); August 12, 1996 (23:16 Md. R. 1175); June 30, 1997 (24:13 Md. R. 930); November 3, 1997 (24:22 Md. R. 1551); July 10, 2000 (27:13 Md. R. 1211); February 19, 2001 (28:3 Md. R. 205)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01-1A(1) amended as an emergency provision effective July 14, 1999 (26:16 Md. R. 1236); amended permanently effective October 4, 1999 (26:20 Md. R. 1545)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01-2 adopted effective October 11, 1993 (20:20 Md. R. 1569)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01-2 amended effective June 30, 1997 (24:13 Md. R. 930)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .02A amended effective October 7, 1996 (23:20 Md. R. 1422); July 10, 2000 (27:13 Md. R. 1211); February 19, 2001 (28:3 Md. R. 205)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .03B amended effective July 3, 1995 (22:13 Md. R. 966)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .09 amended effective March 5, 1990 (17:4 Md. R. 496)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .14G adopted effective October 11, 1993 (20:20 Md. R. 1569)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .15 amended effective September 3, 1990 (17:17 Md. R. 2078)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .17A amended effective October 11, 1993 (20:20 Md. R. 1569)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .17A amended as an emergency provision effective July 14. 1999 (26:16 Md. R. 1237); amended permanently effective October 4, 1999 (26:20 Md. R. 1545)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .17E amended effective September 1, 1989 (16:16 Md. R. 1749)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .22B amended effective July 3, 1995 (22:13 Md. R. 966)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .25B amended as an emergency provision effective July 14, 1999 (26:16 Md. R. 1237); amended permanently effective October 4, 1999 (26:20 Md. R. 1545)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .26B amended effective July 3, 1995 (22:13 Md. R. 966)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .27 amended as an emergency provision effective July 14, 1999 (26:16 Md. R. 1237); amended permanently effective October 4, 1999 (26:20 Md. R. 1545)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .27B amended effective August 5, 1991 (18:15 Md. R. 1725); November 20, 1994 (21:23 Md. R. 1933)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .27C adopted effective August 5, 1991 (18:15 Md. R. 1725)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .27C amended effective October 11, 1993 (20:20 Md. R. 1569)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .28A amended effective June 30, 1997 (24:13 Md. R. 930)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .31D amended effective November 20, 1994 (21:23 Md. R. 1933)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .32 amended and recodified to Regulation .01-1 effective October 11, 1993 (20:20 Md. R. 1569)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .32A amended effective April 16, 1990 (17:7 Md. R. 848)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .33 adopted effective September 1, 1989 (16:16 Md. R. 1749)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .33A amended, B repealed effective June 30, 1997 (24:13 Md. R. 930)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .34 adopted effective June 30, 1997 (24:13 Md. R. 930)</annotation>
    <annotation type="History" subtype="Administrative History">Chapter revised as an emergency provision effective August 10, 2001 (28:17 Md. R. 1551); revised permanently effective November 12, 2001 (28:22 Md. R. 1936)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01B amended effective December 12, 2002 (29:24 Md. R. 1919); April 23, 2018 (45:8 Md. R. 419)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01-1 amended effective April 19, 2021 (48:8 Md. R. 308)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01-1A amended effective September 29, 2003 (30:19 Md. R. 1331); March 17, 2014 (41:5 Md. R. 342)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01-1A, B amended effective September 2, 2002 (29:17 Md. R. 1380)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01-1A, C amended effective April 23, 2018 (45:8 Md. R. 419)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01-1B, C amended effective December 12, 2002 (29:24 Md. R. 1919)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01-2 amended effective December 12, 2002 (29:24 Md. R. 1919); April 23, 2018 (45:8 Md. R. 419)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .03B, C amended and D adopted effective September 30, 2002 (29:19 Md. R. 1523)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .08 amended effective April 23, 2018 (45:8 Md. R. 419)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .09 amended effective April 23, 2018 (45:8 Md. R. 419)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .14 recodified to Regulation .14-1 and new Regulation .14 adopted as an emergency provision effective July 9, 2004 (31:18 Md. R. 1348); adopted permanently effective September 27, 2004 (31:19 Md. R. 1431)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .14C amended effective April 23, 2018 (45:8 Md. R. 419)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .14D adopted effective April 23, 2018 (45:8 Md. R. 419)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .14-1G amended effective April 23, 2018 (45:8 Md. R. 419)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .15B amended effective April 23, 2018 (45:8 Md. R. 419)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .16 amended as an emergency provision effective December 22, 2008 (36:2 Md. R. 96); emergency status extended at 36:17 Md. R. 1310; emergency status expired November 19, 2009</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .16 amended effective April 23, 2018 (45:8 Md. R. 419)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .16-1 adopted as an emergency provision effective December 22, 2008 (36:2 Md. R. 96); emergency status extended at 36:17 Md. R. 1310; emergency status expired November 19, 2009</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .16-1 adopted effective December 26, 2011 (38:26 Md. R. 1696)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .16-1 amended effective April 23, 2018 (45:8 Md. R. 419)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .17 amended effective April 23, 2018 (45:8 Md. R. 419)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .17C amended effective December 12, 2002 (29:24 Md. R. 1919)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .19 repealed and new Regulation .19 adopted effective April 23, 2018 (45:8 Md. R. 419)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .27A amended effective September 29, 2003 (30:19 Md. R. 1331); April 23, 2018 (45:8 Md. R. 419)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .27C adopted effective April 23, 2018 (45:8 Md. R. 419)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .28 amended effective April 23, 2018 (45:8 Md. R. 419)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .28G amended effective July 16, 2020 (47:14 Md. R. 675)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .28-1 amended effective April 23, 2018 (45:8 Md. R. 419)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .28-2B, F amended effective April 23, 2018 (45:8 Md. R. 419)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .28-3 amended effective April 23, 2018 (45:8 Md. R. 419)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .29 amended effective April 23, 2018 (45:8 Md. R. 419)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .34 amended effective April 23, 2018 (45:8 Md. R. 419)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .35 amended effective April 23, 2018 (45:8 Md. R. 419)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .37 adopted effective December 12, 2002 (29:24 Md. R. 1919)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .38 adopted effective December 12, 2002 (29:24 Md. R. 1919)</annotation>
  </annotations>
</chapter>