  <paragraph num="A.">
    <text>Mobile Cranes.</text>
    <paragraph num="(1)">
      <text>A trial lift with the unoccupied personnel platform loaded at least to the weight of the maximum intended load shall be:</text>
      <paragraph num="(a)">
        <text>Made from ground level, or any other location where employees will enter the platform, to each location to which the personnel platform will be hoisted and positioned; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Performed immediately before placing employees on the platform.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>A trial lift may be performed at one time for all locations that are to be reached from a single set up position.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>When the crane or derrick is moved and set up in a new location or returned to a previously used location, a trial lift shall be repeated before hoisting employees.</text>
    </paragraph>
  </paragraph>
  <paragraph num="B.">
    <text>Fixed-Track Mounted Cranes.</text>
    <paragraph num="(1)">
      <text>A trial lift with the unoccupied personnel platform loaded at least to the weight of the maximum intended load shall be:</text>
      <paragraph num="(a)">
        <text>Made from ground level or any other location where employees will enter the platform, to the location at which the personnel platform will be hoisted and positioned once along the route of the track; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Performed during each shift when employees will be lifted, immediately before the first lift.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>A trial lift may be performed at one time for all locations that are to be reached from a single set up position.</text>
    </paragraph>
  </paragraph>
  <paragraph num="C.">
    <text>Fixed Cranes and Hoists. A trial lift with the unoccupied personnel platform loaded at least to the weight of the maximum intended load shall be:</text>
    <paragraph num="(1)">
      <text>Made from ground level at each location at which the personnel platform is to be hoisted and positioned; and</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Performed during each shift, immediately before the first lift.</text>
    </paragraph>
  </paragraph>
  <paragraph num="D.">
    <text>Operator Requirements. For each trial lift performed under §§A, B, and C of this regulation, the employer shall ensure that the operator determines that:</text>
    <paragraph num="(1)">
      <text>All systems, controls, and safety devices are activated and functioning properly;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>No interferences exist; and</text>
    </paragraph>
    <paragraph num="(3)">
      <text>All configurations necessary to reach each work location will allow the operator to remain under the 50 percent limit of the rated capacity of the crane or hoist, as provided in Regulation .04F of this chapter.</text>
    </paragraph>
  </paragraph>
  <paragraph num="E.">
    <text>Materials and tools to be used during the actual lift may be loaded in the platform as provided, in Regulation .06D(5) of this chapter, for the trial lift.</text>
  </paragraph>
  <paragraph num="F.">
    <text>Inspections.</text>
    <paragraph num="(1)">
      <text>Before each personnel lift, the platform, with maximum intended load, shall be hoisted a few inches and inspected to ensure that it is secure and properly balanced.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Before an employee is hoisted, the employer shall ensure that:</text>
      <paragraph num="(a)">
        <text>Hoist ropes shall be free of kinks;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Multiple part lines may not be twisted around each other;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>The primary attachment shall be centered over the platform; and</text>
      </paragraph>
      <paragraph num="(d)">
        <text>If the load rope is slack, the hoisting system is inspected to ensure all ropes are properly seated on drums and in sheaves.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>Visual Inspection.</text>
      <paragraph num="(a)">
        <text>Immediately after the trial lift, a visual inspection of the crane, hoist, rigging, personnel platform, and the base support or ground shall be conducted by a competent designated person to determine whether the testing has exposed any defect or produced any adverse effect upon any component or structure.</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The inspection shall include, but not be limited to, all wire rope, hooks, brakes, the boom, safety devices, and other mechanical, structural, and rigging equipment.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(4)">
      <text>Any defect found during the trial lift or inspection which creates a safety hazard shall be corrected before hoisting personnel.</text>
    </paragraph>
  </paragraph>