<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".09" citation="COMAR 09.12.38.09" title_num="09" subtitle_num="12" chapter_num="38" heading="Prooftesting of Platform and Rigging.">
  <paragraph num="A.">
    <text>An employer may not hoist employees on a personnel platform until the following prooftesting requirements are satisfied.</text>
  </paragraph>
  <paragraph num="B.">
    <text>The platform and rigging shall be prooftested to 125 percent of the platform's rated capacity.</text>
  </paragraph>
  <paragraph num="C.">
    <text>Prooftesting shall be performed by holding the platform in a suspended position for 5 minutes with the test load evenly distributed on the platform.</text>
  </paragraph>
  <paragraph num="D.">
    <text>After prooftesting:</text>
    <paragraph num="(1)">
      <text>A competent designated person shall inspect the platform and rigging; and</text>
    </paragraph>
    <paragraph num="(2)">
      <text>If any deficiency is found, then before employees are hoisted:</text>
      <paragraph num="(a)">
        <text>It shall be corrected, and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Another prooftest shall be conducted.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="E.">
    <text>The platform and rigging shall be prooftested:</text>
    <paragraph num="(1)">
      <text>Before the first use to lift personnel;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Annually after that; and</text>
    </paragraph>
    <paragraph num="(3)">
      <text>After any repair or modification.</text>
    </paragraph>
  </paragraph>
  <paragraph num="F.">
    <text>The prooftesting may be performed concurrently with any trial lift conducted at a time set forth in Regulation .08A, B, or C of this chapter.</text>
  </paragraph>
</regulation>