<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".06" citation="COMAR 09.12.64.06" title_num="09" subtitle_num="12" chapter_num="64" heading="Daily Inspections.">
  <paragraph num="A.">
    <text>The owner shall ensure that a go-kart operation is inspected each day before the start of operation.</text>
  </paragraph>
  <paragraph num="B.">
    <text>The inspection and test shall be made:</text>
    <paragraph num="(1)">
      <text>By an owner or operator experienced and instructed in the proper assembly and operation of the amusement ride or attraction; and</text>
    </paragraph>
    <paragraph num="(2)">
      <text>In accordance with the specifications included in the manual.</text>
    </paragraph>
  </paragraph>
  <paragraph num="C.">
    <text>The owner shall inspect the go-kart operation to determine that the karts, tracks, and facility:</text>
    <paragraph num="(1)">
      <text>Are in safe operating condition; and</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Conform to the requirements in this chapter and COMAR 09.12.62.</text>
    </paragraph>
  </paragraph>
  <paragraph num="D.">
    <text>The inspection of each kart shall:</text>
    <paragraph num="(1)">
      <text>Include the operation of:</text>
      <paragraph num="(a)">
        <text>Speed-limiting devices,</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The brake system, and</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Control devices;</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>Ensure that a part is not damaged, missing, or worn in a manner that is or may become unsafe.</text>
    </paragraph>
  </paragraph>
  <paragraph num="E.">
    <text>A record of each inspection shall be:</text>
    <paragraph num="(1)">
      <text>Made at once upon completion of the test;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Kept at a central location at the site of operation;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Maintained for 30 days; and</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Made available to the Commissioner upon request.</text>
    </paragraph>
  </paragraph>
</regulation>