<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".07" citation="COMAR 09.15.02.07" title_num="09" subtitle_num="15" chapter_num="02" heading="Training for HVACR Journeyman.">
  <paragraph num="A.">
    <text>Before an HVACR apprentice may be examined for a license as an HVACR journeyman, the apprentice shall complete at least 6,000 hours of training in providing heating, ventilation, air-conditioning, and refrigeration services under the direction and control of a licensed HVACR contractor. The training shall be over a period of at least 4 years, while licensed as a Maryland HVACR apprentice.</text>
  </paragraph>
  <paragraph num="B.">
    <text>It is recommended that the study, instruction, training, and experience include the following areas:</text>
    <paragraph num="(1)">
      <text>Installation of HVACR equipment including:</text>
      <paragraph num="(a)">
        <text>Determining location of exterior and interior equipment including condensers, thermostat, humidistat, exhaust piping, and duct work;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Preparing equipment foundation/base to install anchors, equipment, and vibration isolator pads;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Determining type and mounting system required for equipment, layout, and routing of condensate drain;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Installing air, water and evaporative cooled condensers, evaporative cooler, air-handling units, gas and oil furnaces, heat pumps, and baseboard heat;</text>
      </paragraph>
      <paragraph num="(e)">
        <text>Installing humidifiers, electronic air cleaners, thermostats, and humidistats; and</text>
      </paragraph>
      <paragraph num="(f)">
        <text>Installing and filling a hydronic system including a circulator pump, three-way diverter valve, automatic feeder, expansion tank, zone valves, air vent, pressure relief valve, booster fan, condensate pump, water pump, gas valve, and primary safety control;</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>Duct systems including:</text>
      <paragraph num="(a)">
        <text>Being able to provide basic design of a duct system and determine adequacy of the existing or designed duct system;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Installing with accessories round metal duct, rectangular metal duct, rigid fiberglass duct, plenum, duct liner, and duct wrap;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Installing manual air-flow damper, register, grill, fire damper, barometric damper, powered damper with actuator, factory-fabricated filter box, and vent damper;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Being able to modify an existing plenum and existing duct; and</text>
      </paragraph>
      <paragraph num="(e)">
        <text>Being able to fabricate a rectangular trunk line duct, plenum, transition, elbow, offset, sled with turning vanes, floor pan, and filter sled;</text>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>Diagnostic procedures including troubleshooting:</text>
      <paragraph num="(a)">
        <text>Air-conditioning system, AC system with electric heat, heat pump system, heat pump with fossil fuel heat;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Gas pack, gas furnace, electric furnace, oil furnace, and hydronic system; and</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Cooling-tower system, chilled-water system, and evaporative cooler;</text>
      </paragraph>
    </paragraph>
    <paragraph num="(4)">
      <text>Adjustment of components including gas pressure, pilot flame, pilot igniter, direct spark igniter, burner oil system, burner air on gas furnaces, and burner primary air on oil furnaces;</text>
    </paragraph>
    <paragraph num="(5)">
      <text>Installation of piping and tubing including:</text>
      <paragraph num="(a)">
        <text>Determination of layout and size of refrigerant tubing;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Determination of the type and location of fittings and in-line components;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Connection of pipe using a threaded joint and a cemented joint;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Connection of tubing using a compression fitting, flare fitting, soft solder, and brazing;</text>
      </paragraph>
      <paragraph num="(e)">
        <text>Pipe and tubing insulation and covering, refrigeration line solenoid valve, in-line or angle hand valve, suction line accumulator, suction/liquid line heat exchanger, liquid receiver, fixed restriction/thermostatic expansion metering device, liquid/suction line filter-dryer, sight glass, pressure-regulator valve, head pressure control valve, check valve, and access valve; and</text>
      </paragraph>
      <paragraph num="(f)">
        <text>Vibration isolator in refrigerant line, precharged factory line set, tubing and pipe clamps and supports, and evaporator condensate drain line;</text>
      </paragraph>
    </paragraph>
    <paragraph num="(6)">
      <text>Placement of HVACR systems in operation including:</text>
      <paragraph num="(a)">
        <text>Leak test system, set belt tension if applicable, adjust condenser water-flow controls, test for gas leaks;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Measuring air flow at register, measuring relative humidity, adjusting humidistat, calibrating thermostat, and setting heat anticipator;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Adjusting fan speed for correct CFM output, adjusting fresh air intake, adjusting bypass damper, and adjusting relief damper;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Checking safety drain in attic installation, checking humidifier water feed and drain, checking aquastat for proper setting and operation, and checking static pressure at fan discharge;</text>
      </paragraph>
    </paragraph>
    <paragraph num="(7)">
      <text>Maintenance and repair of systems including replacing an HVAC timer delay relay, control switch, gas valve, pilot safety switch, glow coil assembly, thermocouple or thermopile, and flame sensing electronic sensing device.</text>
    </paragraph>
  </paragraph>
  <paragraph num="C.">
    <text>The Journey examination will include questions based upon basic knowledge in the areas listed in §C of this regulation.</text>
  </paragraph>
</regulation>