<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".02" citation="COMAR 09.20.02.02" title_num="09" subtitle_num="20" chapter_num="02" heading="Required Training for Apprentice Plumbers.">
  <paragraph num="A.">
    <text>Before an apprentice plumber may be examined for a license as a journey plumber, the apprentice plumber shall:</text>
    <paragraph num="(1)">
      <text>Receive at least 7,500 working hours of instruction and experience in the installation and repair of plumbing material and systems, under the direction and control of a master plumber; and</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Be registered with the Board for the duration of the apprenticeship training.</text>
    </paragraph>
  </paragraph>
  <paragraph num="B.">
    <text>To avoid undue hardship, the Board may give credit for hours worked in the installation and repair of plumbing material and systems by an unregistered apprentice plumber.</text>
  </paragraph>
  <paragraph num="C.">
    <text>It is recommended that the instruction and experience include:</text>
    <paragraph num="(1)">
      <text>Installation of piping for waste, soil, sewerage, vent and rain leader lines in copper,</text>
      <paragraph num="(a)">
        <text>Name and size of sewer fittings, wyes, tees, bend, packing, pouring, caulking joints;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Use of proper fittings in making connections;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Proper pitch in sewer lines;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Regulations on cesspools and septic tanks;</text>
      </paragraph>
      <paragraph num="(e)">
        <text>Local codes governing plumbing.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>Installation of piping for hot and cold water for domestic purposes:	1,400 hrs.</text>
      <paragraph num="(a)">
        <text>Rough-in water and gas piping for fixtures;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Cut holes in floors and joist;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Measure up piping;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Run pipe in copper, steel, or plastic;</text>
      </paragraph>
      <paragraph num="(e)">
        <text>Installation of domestic water boilers and hot water heaters;</text>
      </paragraph>
      <paragraph num="(f)">
        <text>Install tankless or tank-type copper coil heaters in boilers;</text>
      </paragraph>
      <paragraph num="(g)">
        <text>Automatic gas water heaters with vent to chimney;</text>
      </paragraph>
      <paragraph num="(h)">
        <text>Measure up piping and connect to hot and cold water lines;</text>
      </paragraph>
      <paragraph num="(i)">
        <text>Use of pipe cutters and reamers;</text>
      </paragraph>
      <paragraph num="(j)">
        <text>Cut threads with stocks and dies, or with pipe threading machines;</text>
      </paragraph>
      <paragraph num="(k)">
        <text>Use of joint compound on threads and screw up fittings on pipe with pipe wrenches;</text>
      </paragraph>
      <paragraph num="(l)">
        <text>Local codes governing plumbing.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>Installation of lead pipe, tin pipe, sheet lead, and solder work: 	180 hrs.</text>
      <paragraph num="(a)">
        <text>Proper use of tools;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Kinds of materials and fluxes;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Correct heating temperatures.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(4)">
      <text>Assembly in position and connection of fixtures and appliances used in the plumbing</text>
      <paragraph num="(a)">
        <text>Rough-in waste, soil, and vent lines for fixtures;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Pack, pour, and caulk fittings and pipe;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Make up fittings, run piping, and hook up main sewer;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Lay out water lines, hot and cold;</text>
      </paragraph>
      <paragraph num="(e)">
        <text>Place and connect various plumbing fixtures;</text>
      </paragraph>
      <paragraph num="(f)">
        <text>Local codes governing plumbing.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(5)">
      <text>Service work—maintenance and repair of plumbing:	480 hrs.</text>
      <paragraph num="(a)">
        <text>Leaks;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Renewals;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Stoppage of lines;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Alterations;</text>
      </paragraph>
      <paragraph num="(e)">
        <text>Trouble shooting plumbing systems.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(6)">
      <text>Operation, care, safety, and use of all tools and materials connected with the trade:	 850 hrs.</text>
      <paragraph num="(a)">
        <text>Pipe and fittings, tees, ells, 45-degree ells and nipples;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Black, galvanized, wrought iron, wrought steel, copper, and plastic pipe;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Use and care of tools;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Pipe cutters, reamers, stocks and dies, size of wrenches, caulking irons, lead pots,</text>
      </paragraph>
      <paragraph num="(e)">
        <text>Types of tubs—corner or recess, left or right;</text>
      </paragraph>
      <paragraph num="(f)">
        <text>Lavatories—cast iron, vitreous china, and stainless steel;</text>
      </paragraph>
      <paragraph num="(g)">
        <text>Closet combinations—vitreous china, closed couples, siphon action, flushometer types.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(7)">
      <text>Gas installation: 	750 hrs.</text>
      <paragraph num="(a)">
        <text>Types of gas installations—natural and LPG;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Venting gas systems;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Gas appliances and controls;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Local codes governing gas fitting.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(8)">
      <text>Special purpose installations: 	180 hrs.</text>
      <paragraph num="(a)">
        <text>Swimming pools;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Fountains and planters;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Lawn sprinkling and vacuum systems;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Local codes governing plumbing.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(9)">
      <text>Plan reading:	 375 hrs.</text>
      <paragraph num="(a)">
        <text>Sketching;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Sleeve drawing and deck layout;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Drawing coordination.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(10)">
      <text>Builders level transit: 	275 hrs.</text>
      <paragraph num="(a)">
        <text>Layout of sewer and water lines;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Shoot grades and elevations.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(11)">
      <text>Welding connected with the trade: 	480 hrs.</text>
      <paragraph num="(a)">
        <text>Gas, metallic arc, and heliarc welding;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Use of torch;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Proper flame, fluxes, and solder;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Pipe welding;</text>
      </paragraph>
      <paragraph num="(e)">
        <text>Proper welding procedures and techniques;</text>
      </paragraph>
      <paragraph num="(f)">
        <text>Identification of welding rods and materials;</text>
      </paragraph>
      <paragraph num="(g)">
        <text>Flame cutting;</text>
      </paragraph>
      <paragraph num="(h)">
        <text>Brazing.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(12)">
      <text>Rigging: 	375 hrs.</text>
      <paragraph num="(a)">
        <text>Materials;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Equipment.</text>
      </paragraph>
    </paragraph>
  </paragraph>
</regulation>