<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".07" citation="COMAR 10.15.01.07" title_num="10" subtitle_num="15" chapter_num="01" heading="Manufacturing Practices for Low-Acid Food and Acidified Food Canning.">
  <text>The person-in-charge shall ensure that:</text>
  <paragraph num="A.">
    <text>Low-acid foods are processed and labeled in accordance with 21 CFR 113;</text>
  </paragraph>
  <paragraph num="B.">
    <text>Acidified foods are processed and labeled in accordance with 21 CFR 114;</text>
  </paragraph>
  <paragraph num="C.">
    <text>When canning is taking place, a scheduled process is used that takes into account the critical factors and limits that are likely to influence the food’s safety, stability, or shelf life, such as:</text>
    <paragraph num="(1)">
      <text>Food characteristics;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Spoilage organisms;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Time and temperature of thermal process;</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Cooling parameters;</text>
    </paragraph>
    <paragraph num="(5)">
      <text>Acidification;</text>
    </paragraph>
    <paragraph num="(6)">
      <text>Storage conditions;</text>
    </paragraph>
    <paragraph num="(7)">
      <text>Design and performance of the processing equipment; and</text>
    </paragraph>
    <paragraph num="(8)">
      <text>Batch size and configuration;</text>
    </paragraph>
  </paragraph>
  <paragraph num="D.">
    <text>Before a food processing plant processes food in a closed vessel, such as a retort or steam cabinet, a process authority performs a thermal process validation study that includes:</text>
    <paragraph num="(1)">
      <text>Heat penetration tests;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Heat distribution tests;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Cooling parameters; and</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Any other measurements, observations, or calculations needed to ensure that the process is effective and reliable;</text>
    </paragraph>
  </paragraph>
  <paragraph num="E.">
    <text>The scheduled thermal process and validation study are re-established each time there is a change in the processing system; and</text>
  </paragraph>
  <paragraph num="F.">
    <text>All thermal processes and validation studies being used are available for inspection by the Department.</text>
  </paragraph>
</regulation>