  <regulation prefix="Regulation" num=".01" heading="Authority.">
    <paragraph num="A.">
      <text>Authority. The Annotated Code of Maryland grants to the Administration certain regulatory authority, including the right to limit the width and location of existing access points, the requirement that a temporary or permanent entrance from any commercial or industrial property may not be made into any highway except in accordance with a permit issued by the Administration, and the requirement that permits must be acquired from the Administration before working within and across a State highway. An application for a permit to construct a commercial entrance street intersection shall be filed with plans, performance surety, and any other items which may be required by the responsible parties or their authorized representative.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Who Shall Apply for a Permit. The following is a descriptive listing of some of the parties required to apply for a permit. It is to be used only as a guide and may not be construed as all-inclusive. The words “commercial”, “industrial”, and “subdivision”, used singularly or collectively in the following text, shall include all entrances other than those for an individual residence:</text>
      <paragraph num="(1)">
        <text>Owners, or their duly authorized representatives (developers, contractors, tenants, lessees, etc.), of land newly being developed commercially, industrially, or as a subdivision, all desiring access to a State highway;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Parties desiring to establish a new public street intersection or modify an existing public street intersection;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Parties desiring to change existing entrances or create new entrances into existing commercial or industrial facilities, and subdivisions;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Parties desiring to modify, expand, or in any other manner make improvement to an existing facility, which will increase or change the type of vehicular generation or traffic pattern;</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Parties desiring to change use or occupancy of an existing facility;</text>
      </paragraph>
      <paragraph num="(6)">
        <text>Parties owning, occupying, leasing, or using a commercial or industrial facility (which was in existence before 1957) that is not fully channelized in accordance to permits issued by the Administration and which is now deemed hazardous from the viewpoint of access;</text>
      </paragraph>
      <paragraph num="(7)">
        <text>Parties desiring to do any work within or across the State highway right-of-way.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".02" heading="Procedure for Obtaining an Entrance Permit.">
    <paragraph num="A.">
      <text>An individual or corporation desiring to construct a commercial, industrial, or public street entrance connecting with a State highway shall make written application, transmitted by methods as determined acceptable by the Administration, to the appropriate office listed below. Applications shall be accompanied by performance surety, detailed plans, and a utility letter (see §I(2) of this regulation), if applicable.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Applications should be mailed to the appropriate Administration office as follows:</text>
    </paragraph>
    <paragraph num="C.">
      <text>Work may not be undertaken on the State right-of-way until the permittee has received his copy of the permit and a 48-hour advance notice has been given the maintenance engineer or inspector specified in it.</text>
    </paragraph>
    <paragraph num="D.">
      <text>When permit work involves erection of a new traffic signal or relocation or adjustments to a traffic signal, or both, it will be the additional responsibility of the permittee to notify the State Highway Administration, Traffic Engineering Division, Glen Burnie, Maryland (phone: (410) 787-5800) and Assistant District Engineer, Traffic, 10 days before beginning the work. This 10-day period is on the assumption the traffic signal plan has been reviewed and approved by the Traffic Division and financial arrangements, if any, have been made. The Assistant District Engineer, Traffic, for each of the seven districts can be contacted as follows:</text>
    </paragraph>
    <paragraph num="E.">
      <text>Application. Applications shall be submitted in duplicate on forms obtained from the Administration’s website found at www.marylandroads.com or by other methods as determined acceptable by the Administration.</text>
    </paragraph>
    <paragraph num="F.">
      <text>Plans.</text>
      <paragraph num="(1)">
        <text>All applicants shall submit detailed plans for review, indicating the true relationship between their planned improvements and the Administration’s existing right-of-way, including easements, drainage facilities, and pavement. Plans shall be prepared by a registered land surveyor or registered professional engineer. Plans shall show dimensions, existing and proposed contours, storm drain facilities, structures, parking, interior traffic patterns, typical section through the State Highway Administration right-of-way, proposed curbs, sidewalk ramps, proposed widenings, etc.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>When possible, the applicant's plans should be referenced to Administration surveys.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>A general location map shall accompany plan submission.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Preliminary plans should be prepared on an engineering scale of not less than 1 inch = 50 feet. Recommended scale is 1 inch = 20 feet. When acreage is of such a size that the plan must be to a smaller scale, it would be appropriate to make a separate plan for the entrance construction and any roadway improvement deemed necessary by the Administration.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Plan submission shall include a maintenance-of-traffic plan.</text>
      </paragraph>
      <paragraph num="(6)">
        <text>For access permits where work is required in a travelled lane or where work disrupts the normal traffic pattern, an appropriate traffic control plan shall be developed by professional representatives of the permittee and approved by the SHA Assistant District Engineer, Traffic.</text>
      </paragraph>
    </paragraph>
    <paragraph num="G.">
      <text>Performance Surety. In order to ensure complete and satisfactory compliance with the terms and specifications of the entrance permit, the permittee shall be required to submit a performance bond, letter of credit, or certified check, in a form acceptable to the Administration. The amount of the bond, check, or letter of credit shall be the next highest even thousand dollar above 150 percent of the cost estimate for the construction. This estimate must be acceptable to the SHA. If a bond is submitted, the SHA shall be designated as the obligee and the permittee as principal. In instances when a certified check is submitted, the check shall be made payable to the State Highway Administration and include the permittee’s federal identification number.</text>
    </paragraph>
    <paragraph num="H.">
      <text>Utility Adjustment.</text>
      <paragraph num="(1)">
        <text>The relocation or adjustment of any public or private utility shall be the responsibility of the permittee and completed with entrance construction and roadway improvement. This includes traffic signals, fire hydrants, water mains, sewers, storm drains, telephone facilities, electric facilities, cable facilities, etc.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Before the issuance of a permit, the permittee shall be required to submit letters from the permittee or utility companies acknowledging and agreeing to the financial responsibility regarding the relocation or adjustment of utilities along with a schedule for relocation and adjustments to utility facilities.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>It is the permittee's responsibility to relocate or have relocated all utilities which are within the paving and in front of the curbs or within the limit of work to be constructed under the permit. This relocation shall be accomplished before initiation of work stated in the permit or accomplished simultaneously with the work. The entrance and paving may not be open to traffic until relocation has been completed.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>The permittee or the permittee's representative shall notify “Miss Utility” (1-800-257-7777), 48 hours in advance of any construction to have underground utilities staked and marked in the field.</text>
      </paragraph>
    </paragraph>
    <paragraph num="I.">
      <text>Inspection Cost. At the discretion of the Administration, a State highway construction inspector may be assigned full-time to inspect the work stipulated in the permit. All projects shall be inspected by the Administration. The Administration may require construction inspection reimbursement for any permit with over $50,000 in estimated neat construction costs. This reimbursement shall be calculated on the base pay of the assigned employee, plus overhead, and all administrative and general expenses.</text>
    </paragraph>
    <paragraph num="J.">
      <text>Maintenance Responsibility. The owner shall be responsible for maintaining all areas from the flowline front face of a curb to the State highway right-of-way line both during and following construction.</text>
    </paragraph>
    <paragraph num="K.">
      <text>Traffic Impact Study. At the discretion of the State's engineer, applicants for a major development or a development that may have a significant impact upon the State's highway system, or both, shall submit a traffic impact study to determine the type of access and scope of required highway improvements required to accommodate the proposed development.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".03" heading="Entrance Standards and Specifications.">
    <paragraph num="A.">
      <text>All work and materials shall conform to Administration specifications, standards, and addenda current at the time of the permit grant.</text>
    </paragraph>
    <paragraph num="B.">
      <text>All work is subject to Administration periodic inspection and final approval.</text>
    </paragraph>
    <paragraph num="C.">
      <text>Entrance Location.</text>
      <paragraph num="(1)">
        <text>The number and location of entrances which may be granted shall be based on usage, interior and exterior traffic patterns, and current design policy of the Administration.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A maximum of two entrances may be allowed in the first 200 feet of frontage. For each additional 100 feet of frontage, a maximum of one entrance may be permitted, subject to the final determination of the Administration in order to promote highway safety. Regardless of frontage, a development may be restricted to a single entrance and exit location.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Entrances shall adhere to the safety criteria for acceptable intersection or stopping sight distance conditions, or both, in accordance with current Administration standards and engineering practices.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Entrance Width.</text>
      <paragraph num="(1)">
        <text>The maximum width for a two-way access at 90 degrees shall be 35 feet, except where traffic, type of access, or type or size of using vehicles justify a variation of the 35-foot maximum. The minimum width of a two-way access is 25 feet.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>One-way access at 45 degrees to 90 degrees shall have a maximum width of 20 feet. The minimum width should also be 20 feet. Exceptions based on existing conditions and current adopted design criteria may be made by the State Highway Administration.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Entrance width shall be measured perpendicular to the center line of the entrance.</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Channelization.</text>
      <paragraph num="(1)">
        <text>Unless other channelization is acceptable to the Chief, Engineering Access Permits Division, all entrances permitted under these regulations shall be channelized, for their entire frontage, as follows:</text>
        <paragraph num="(a)">
          <text>Projects funded in the Consolidated Transportation Program for construction within 6 years, whether or not advertised—temporary bituminous curb may be used;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Highways with safety grading—type C concrete curb, or concrete curb and gutter;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>All other situations—type A concrete curb, or curb and gutter;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>On existing curbed State highways, developers shall generally be required to replace existing curbs in kind; and</text>
        </paragraph>
        <paragraph num="(e)">
          <text>All improvements shall provide for increased safety and access for pedestrian and bicycle traffic in a manner acceptable to the Administration.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>The front curb shall be constructed on a line 14 feet to 17 feet from and parallel to the existing edge of the road as determined by the Administration. The rear edge of the back curb shall be constructed on the existing right-of-way line where existing right-of-way is sufficient for ultimate roadway design. Where the existing right-of-way is not sufficient to contain the ultimate improvements, the curb should be placed on the alignment of the proposed right-of-way line. The area between the curbs shall be properly graded and paved, sodded or seeded. Signs, structures, etc. may not be placed in this area or elsewhere within the highway right-of-way.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>In rural areas where a drainage ditch of sufficient depth to act as a barrier will remain paralleling the highway, or the height and grade of slope of the property abutting the State highway is greater than 3 feet and 2:1, respectively, the back curb (on the right-of-way line) may be eliminated at the discretion of the State Highway Administration. However, the front curb shall be constructed. If the topography of the area is changed by the owner so that the side ditches or cut slopes are eliminated, a curb or a curb and gutter along the right-of-way will be required.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Ultimate Section.</text>
        <paragraph num="(a)">
          <text>Rural Section—four lane divided highway, 50 foot—76 foot median	Minimum 150 foot right-of-way*</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Urban Section—four lane divided highway—20 foot—34 foot median	Minimum 120 foot right-of-way*</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Street Section—undivided 36 foot—60 foot street	Minimum 80 foot right-of-way*</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>Curb Length.</text>
      <paragraph num="(1)">
        <text>The minimum curb length between entrances is 40 feet, consisting of a 10-foot radius—20-foot tangent—10-foot radius.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The minimum tangent curb length between the radius point of the entrance and the property line is 10 feet.</text>
      </paragraph>
    </paragraph>
    <paragraph num="G.">
      <text>Intersection Radius.</text>
      <paragraph num="(1)">
        <text>At the intersection of a State highway with a minor road (county, municipal, etc.), the minimum radius shall be a 30-foot or equivalent three-centered compound curve and provide for increased safety and access for pedestrian and other intended traffic in a manner acceptable to SHA.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>At the intersection of a State highway with a State highway or other major arterial highway, the minimum radius shall be a 50-foot or equivalent three-centered compound curve and provide for increased safety and access for pedestrian and other intended traffic in a manner acceptable to SHA.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>At intersections with channelization providing for free right turns, the above-mentioned dimensions will be increased as directed by the State Highway Administration in accordance with accepted engineering practices.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>There shall be a minimum 20-foot tangent distance between the intersection radius and the first permitted entrance.</text>
      </paragraph>
    </paragraph>
    <paragraph num="H.">
      <text>Paving. Paving within the State Highway Administration right-of-way, including storage lanes, bypass lanes, speed change lanes, crossovers, entrances proper, etc., shall be in accordance with current State Highway Administration paving specifications or as stipulated in the permit, or both.</text>
    </paragraph>
    <paragraph num="I.">
      <text>Median Openings. The granting of a permit for access onto a dual type facility may not be construed to mean that an opening in the median will be permitted.</text>
    </paragraph>
    <paragraph num="J.">
      <text>Pump Island Location. In order that the entrances operate at maximum efficiency, it is recommended that the roadside face of the pump island of filling stations be set a minimum of 12 feet, preferably 15 feet, from the property line. Pump setback lines are subject to the regulations of the pertinent local subdivision.</text>
    </paragraph>
    <paragraph num="K.">
      <text>Building Setback. In order that the entrances operate at maximum efficiency, it is recommended that the minimum desirable building setback line be 30 feet. Building setback lines are subject to the regulations of the pertinent local subdivision and appropriate design criteria.</text>
    </paragraph>
    <paragraph num="L.">
      <text>Angular Entrances. Angular entrances may not extend beyond the property line when paving a driveway to highway, or beyond access control limits. The point of control shall be the extension of the property line from its intersection at the existing State Highway Administration right-of-way line normal or radial to the edge of the pavement. One-way angular entrances shall be at 45 degrees.</text>
    </paragraph>
    <paragraph num="M.">
      <text>Ditch Cross Sections. Ditch cross sections shall be in accordance with current adopted State Highway Administration criteria.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".04" heading="Subdivisions, Street Location, and Alignment Requirements.">
    <paragraph num="A.">
      <text>Definitions.</text>
      <paragraph num="(1)">
        <text>Roads or streets leading through a subdivision or development and making connection with a State or principal highway will be known under these regulations as “nonpreference roads”.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>State highways or principal roads will be known as “preference roads”.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Nonpreference roads leading into or intersecting preference roads are limited to a distance of 750 feet between center lines.</text>
    </paragraph>
    <paragraph num="C.">
      <text>The angle of intersection with preference roads shall be not less than 70 degrees or greater than 110 degrees.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".05" heading="Grade Requirements.">
    <paragraph num="A.">
      <text>The gradients of intersecting streets should be as flat as possible on those sections that are to be used for storage space for stopped vehicles. Grades in excess of 2 percent may not be allowed on the landing grade (first 50 feet) of intersecting streets, unless otherwise approved by the Administration. This allows for a normal maximum grade break of 5 percent between the normal 2 percent preference road cross slope and the profile grade of the nonpreference road. Grades beyond the landing grade shall be in accordance with currently accepted engineering practices, but may not exceed 6 percent. In all cases, appropriate cross slopes provide a maximum 2 percent cross slope for pedestrian mobility in a manner acceptable to the Administration.</text>
    </paragraph>
    <paragraph num="B.">
      <text>The profile grade lines and cross sections on the nonpreference intersecting streets shall be designed to provide a smooth junction and proper drainage. Normally, the grade line of the major highway should be carried through the intersection, and that of the intersecting street should be adjusted to it.</text>
    </paragraph>
    <paragraph num="C.">
      <text>Commercial entrances shall be guided by the criteria in §§A and B, above. A minimum 40-foot landing grade may not exceed 3 percent. For sites smaller than 1/2 acre and low traffic generators, grades up to 6 percent are allowed. An approved grade may not exceed 6 percent, with a maximum grade break of 8 percent allowed between the State highway and the entrance profile grade.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".06" heading="General Information.">
    <paragraph num="A.">
      <text>Plans for commercial sites should be submitted to the Administration for review after the developer takes an option or acquires title to the property. The Administration will review the tentative plans and inform the prospective developer whether or not the plans as submitted comply with the duly promulgated regulations of the State Highway Administration.</text>
    </paragraph>
    <paragraph num="B.">
      <text>The permittee or owner is responsible for carrying storm water to an outfall in a manner acceptable to the State Highway Administration. Acceptable outfalls, and their associated contributing drainage facilities, shall meet the design criteria set forth by the Administration. Storm water management plans shall address, treat, and manage both on-site improvements and roadway improvements within State right of way to the Administration's satisfaction. In cases where the proposed site storm drainage facilities:</text>
      <paragraph num="(1)">
        <text>Are not tied into existing highway drainage facilities, storm water management plans should be reviewed and approved by a county, a soil conservation district, or the State Water Resources Administration, or all of these. The discharge rate after development may not exceed the rate before development for the 2-, 10-, and, in some instances, the 100-year storm events. The State Highway Administration will institute legal proceedings upon being damaged by increased storm water runoff to recover any costs and to avoid recurrence.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Connect to existing State facilities, the proposed storm water management plans shall be reviewed by the State Highway Administration following their approval by a county, a soil conservation district, or the State Water Resources Administration, or all of these. The State will review the proposed facilities based on the design-year storm of the existing State facilities. For example, State highway cross culvert outfalls will be analyzed using the functional classification storm, State side ditch outfalls on the 10-year storm, State longitudinal storm drain outfalls on the 25-year storm, etc.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>All work occurring within a critical area shall require a review and approval by the Critical Area Commission (CAC), and such approval shall be provided to the Administration before the work begins.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Information which is required to determine properly the effect of proposed drainage facilities on existing highway drainage facilities is as follows:</text>
      <paragraph num="(1)">
        <text>A map showing the drainage areas contributing to the proposed drainage facilities and the drainage areas contributing to the existing highway drainage facilities which are affected. When photogrammetry coverage is available, these maps are the most desirable for presenting this information. When there is no photogrammetry available, U.S. Geological Survey Quadrangle Maps, if possible enlarged to at least a scale of 1 inch = 500 feet, are the next choice.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Current zoning information, preferably presented in map form, covering the entire drainage areas involved.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Grading plans, if the project is part of a residential or commercial development.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Plans of the proposed drainage construction, identifying each pipe or other structure involved.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>A profile of the proposed drainage construction, extending sufficiently into the Administration right-of-way so that differences in survey data between Administration construction plans and the proposed improvement can be clearly established. When the existing drainage facilities are of considerable age, the profile should be extended to cover all affected facilities within the State Highway Administration right-of-way. Profiles of proposed storm drain systems should include inlet grate elevations and manhole cover elevations, in addition to invert elevations.</text>
      </paragraph>
      <paragraph num="(6)">
        <text>Hydraulic calculations in accordance with currently accepted engineering practices.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>If traffic conditions demand the modification of existing signals or other traffic control devices or the erection of new signals or other traffic control devices at private (commercial) access points, erection and maintenance are the responsibility of the permittee or other responsible parties. The State Highway Administration assumes no obligation, financial or otherwise, for erection or maintenance.</text>
    </paragraph>
    <paragraph num="E.">
      <text>Entrance Approval. Administration approval of entrances should be obtained before finalizing the development plans and making application to the local authorities for a building permit.</text>
    </paragraph>
    <paragraph num="F.">
      <text>Entrances onto highways can only function to the degree of efficiency that the interior traffic pattern permits. Therefore, in developing the site plan, every effort should be made to employ accepted traffic engineering principles in designating the interior traffic pattern.</text>
    </paragraph>
  </regulation>
  <annotations>
    <annotation type="Authority">Transportation Article, §§2-103(b)(2), 8-202(b)(2)(i), 8-203(a), 8-204(b), (c), and,(i) 8-625, 8-626, 8-629, 8-630, and 8-646, Annotated Code of Maryland</annotation>
    <annotation type="History" subtype="Administrative History">Effective date: May 14, 1975 (2:10 Md. R. 757)</annotation>
    <annotation type="History" subtype="Administrative History">Chapter recodified from COMAR 11.04.10 to 11.04.05</annotation>
    <annotation type="History" subtype="Administrative History">Regulations .01—.04 amended effective September 3, 1990 (17:17 Md. R. 2082)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01A amended effective February 8, 2010 (37:3 Md. R. 176); February 1, 2016 (43:2 Md. R. 128); November 19, 2018 (45:23 Md. R. 1070)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .02 amended effective February 8, 2010 (37:3 Md. R. 176); November 19, 2018 (45:23 Md. R. 1070)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .02A, B, D amended effective December 18, 1995 (22:25 Md. R. 1962)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .02A, G amended effective February 1, 2016 (43:2 Md. R. 128)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .03 amended effective February 8, 2010 (37:3 Md. R. 176)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .03E amended effective November 30, 1979 (6:24 Md. R. 1920); December 18, 1995 (22:25 Md. R. 1962)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .05 repealed, new Regulation .05 adopted effective September 3, 1990 (17:17 Md. R. 2082)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .05A amended effective February 8, 2010 (37:3 Md. R. 176)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .06 amended effective September 3, 1990 (17:17 Md. R. 2082); December 18, 1995 (22:25 Md. R. 1962); November 19, 2018 (45:23 Md. R. 1070)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .06C amended effective February 8, 2010 (37:3 Md. R. 176)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .07D amended effective November 30, 1979 (6:24 Md. R. 1920)</annotation>
    <annotation type="History" subtype="Administrative History">Regulations .07 and .08 repealed effective September 3, 1990 (17:17 Md. R. 2082)</annotation>
  </annotations>