<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".12" citation="COMAR 11.13.10.12" title_num="11" subtitle_num="13" chapter_num="10" heading="Facility Requirements.">
  <paragraph num="A.">
    <text>Facilities, which may include mobile or satellite units, where interlock devices are installed, serviced, monitored, or removed shall:</text>
    <paragraph num="(1)">
      <text>Be in an area where customers are not allowed to watch the installation, calibration, or removal of a device;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Be open during normal business hours with after hours service capability;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Be established to service the geographical location and volume of individuals who qualify for and are admitted into the program;</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Have records maintained for 5 years; and</text>
    </paragraph>
    <paragraph num="(5)">
      <text>Have and use the required tools, test equipment, and manuals needed to screen vehicles for acceptable mechanical and electrical conditions to install devices.</text>
    </paragraph>
  </paragraph>
  <paragraph num="B.">
    <text>The tools, test equipment, and manuals required under §A(5) of this regulation include, but are not limited to, the following:</text>
    <paragraph num="(1)">
      <text>Tools necessary to ensure electrical connections are made in a workmanlike manner in accordance with accepted trade standards (for example, properly soldered or mechanically crimped with high quality connectors);</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Heat gun if heat shrink tubing or heat set labels are used;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Volt/ohmmeter;</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Test light;</text>
    </paragraph>
    <paragraph num="(5)">
      <text>Battery testing equipment and servicing tools (for example, load tester, terminal cleaning tools, battery filler, etc.); and</text>
    </paragraph>
    <paragraph num="(6)">
      <text>Electrical wiring diagrams or reference guide, or both, for electrical systems on import and domestic vehicles, 20 years old or less, necessary for the installation and operation of the device.</text>
    </paragraph>
  </paragraph>
</regulation>