<?xml version='1.0' encoding='utf-8'?>
<subtitle num="39" heading="Interagency Commission on School Construction" title_num="14" title_heading="Independent Agencies">
  <chapter num="01" heading="Terminology">
    <regulation prefix="Regulation" num=".01" heading="Definitions.">
      <paragraph num="A.">
        <text>In this subtitle, the following terms have the meanings indicated.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Terms Defined.</text>
        <paragraph num="(1)">
          <text>“Alternative education” means a public elementary or secondary school or program that addresses the needs of students that typically cannot be met in a regular school program and is designed to meet the needs of students with academic difficulties and/or discipline problems, and temporarily provide students with specialized instructional and/or behavioral supports for a specified time period before returning to their home school.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>“Best value” means the expected outcome of a procurement that provides the greatest overall benefit in response to the requirement with consideration given to the quantities involved, the time required for delivery, the purpose for which required, the competency and responsibility of the bidder, the ability of the bidder to perform satisfactory service, the plan for utilization of minority contractors, and the price offered by the bidder.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>“Bid” means a statement of price, terms of sale, schedule, and description of the supplies, services, construction, or construction-related services offered by a bidder in response to an invitation for bids.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>“Capital maintenance” means projects that involve the major repair, alteration, and replacement of building systems, equipment, finishes, and components, including their removal and disposal, and are sometimes referred to as “systemic renovation” projects.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Competitive Negotiation.</text>
          <paragraph num="(a)">
            <text>“Competitive negotiation” means a method of source selection that permits offerors to:</text>
            <paragraph num="(i)">
              <text>Demonstrate creativity, experience, and knowledge; and</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Submit proposals that vary widely in scope, cost, and other factors.</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>“Competitive negotiation” allows negotiating between the LEA and the qualified offerors with the objective that the final proposal should be the most advantageous to the LEA.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(6)">
          <text>“Competitive sealed bidding” means a process of procurement in which bidders provide fixed prices in response to a scope of work established by the LEA that is defined in advance.</text>
        </paragraph>
        <paragraph num="(7)">
          <text>Construction.</text>
          <paragraph num="(a)">
            <text>“Construction” means the process of building, altering, repairing, improving, or demolishing any structure, building, or other improvement to real property.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>“Construction” includes any major work necessary to repair, replace, prevent damage to, or sustain existing components of an improvement to real property.</text>
          </paragraph>
          <paragraph num="(c)">
            <text>“Construction” does not include:</text>
            <paragraph num="(i)">
              <text>The maintenance or routine operation of an existing improvement to real property; or</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Activities related to an energy performance contract.</text>
            </paragraph>
          </paragraph>
        </paragraph>
        <paragraph num="(8)">
          <text>“Construction management agency (CMA)” means a project delivery method in which the LEA:</text>
          <paragraph num="(a)">
            <text>Directly contracts with trade contractors; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Performs one of the following:</text>
            <paragraph num="(i)">
              <text>Engages a construction manager as its agent to manage the project; or</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Acts as the construction manager.</text>
            </paragraph>
          </paragraph>
        </paragraph>
        <paragraph num="(9)">
          <text>“Construction management at-risk (CMR)” means a project delivery method in which the LEA engages a construction manager to contract directly with trade contractors and provide a guaranteed maximum price for project procurement and construction.</text>
        </paragraph>
        <paragraph num="(10)">
          <text>“Constructor” means the builder of a facility.</text>
        </paragraph>
        <paragraph num="(11)">
          <text>“Cooperative-use space” means areas in a school that serve as shared or co-located spaces in which both the LEA and non-LEA organizations deliver programs and/or services.</text>
        </paragraph>
        <paragraph num="(12)">
          <text>“County” includes Baltimore City.</text>
        </paragraph>
        <paragraph num="(13)">
          <text>“Day” means calendar day unless otherwise designated.</text>
        </paragraph>
        <paragraph num="(14)">
          <text>Design-Build.</text>
          <paragraph num="(a)">
            <text>“Design-build” means a project delivery method in which a single entity is contractually responsible for both design and construction of a project.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>“Design-build” may include finance-design-build and other contracts that include services in addition to design and construction.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(15)">
          <text>“Donation” means a contribution of cash or gift in kind from a private entity to a public school system or a local government, with no consideration required of the recipient.</text>
        </paragraph>
        <paragraph num="(16)">
          <text>“eMaryland Marketplace” means the State electronic procurement system.</text>
        </paragraph>
        <paragraph num="(17)">
          <text>“Forward-funded project” means a school construction project that the State has approved for planning and for which the LEA has paid some portion of the State share with local funds.</text>
        </paragraph>
        <paragraph num="(18)">
          <text>“Free and reduced-price meal percentage” means the number of students eligible in the previous year for free and reduced-price meals, divided by the full-time equivalent enrollment from the previous year.</text>
        </paragraph>
        <paragraph num="(19)">
          <text>“Funding approval” means pending the availability of funds, the State commits to fund, in the next fiscal year, the entire or a portion of the State share of eligible costs for a school construction project.</text>
        </paragraph>
        <paragraph num="(20)">
          <text>“Furniture, Fixtures, and Equipment (FF&amp;E)” means a category of items such as chairs, desks, movable equipment, and fixed components that are required for the delivery of education within a school facility and are normally not included in the construction contract.</text>
        </paragraph>
        <paragraph num="(21)">
          <text>“Gift in kind” means a contribution of materials, labor, services, equipment, or land from a private entity to a public school system or a local government, with no consideration required of the recipient.</text>
        </paragraph>
        <paragraph num="(22)">
          <text>“Guaranteed maximum price (GMP)” means an arrangement between the LEA and the construction manager at risk in which the total amount payable to the construction manager at risk for the project is restricted to a preagreed maximum and includes the cost of construction and construction management services that is generally determined before the design and construction documents are complete.</text>
        </paragraph>
        <paragraph num="(23)">
          <text>“High performance school” means a school building that satisfies the definition of a high performance building under State Finance and Procurement Article, §3-602.1, Annotated Code of Maryland, and is:</text>
          <paragraph num="(a)">
            <text>A school building that meets or exceeds the current version of the U.S. Green Building Council's Leadership in Energy and Environmental Design (LEED) for schools green building rating system silver rating;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>A school building that achieves at least a comparable numeric rating according to a nationally recognized, accepted, and appropriate numeric sustainable development rating system, guideline, or standard approved by the Secretary of Budget and Management and the Secretary of General Services; or</text>
          </paragraph>
          <paragraph num="(c)">
            <text>A school building that complies with a nationally recognized and accepted green building code, guideline, or standard reviewed and recommended by the Maryland Green Building Council and approved by the Secretary of Budget and Management and the Secretary of General Services.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(24)">
          <text>“IAC” means the Interagency Commission on School Construction.</text>
        </paragraph>
        <paragraph num="(25)">
          <text>“IAC” or its designee means a member of the IAC or a staff member, respectively, of the Maryland State Department of Education, the Department of General Services, or the Maryland Department of Planning who has been specifically designated to act in the place of the IAC member, or the Executive Director of the Public School Construction Program.</text>
        </paragraph>
        <paragraph num="(26)">
          <text>“Invitation for bids (IFB)” means the document used for soliciting bids under procurement by competitive sealed bidding.</text>
        </paragraph>
        <paragraph num="(27)">
          <text>“Job order contracting (JOC)” means a project delivery method in which the LEA selects a contractor through a competitive procurement process based on a multiplier or coefficient that:</text>
          <paragraph num="(a)">
            <text>Reflects the bidder's determination of the actual cost to perform the work plus overhead and profit; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Is applied to a fixed-price list of construction items and activities.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(28)">
          <text>“LEA” means the local education agency or its designee.</text>
        </paragraph>
        <paragraph num="(29)">
          <text>“Local board” means the board of education of a county and includes the Baltimore City Board of School Commissioners</text>
        </paragraph>
        <paragraph num="(30)">
          <text>“Locally funded project” means a school construction project that has been designed, built, or occupied prior to the State approval of planning.</text>
        </paragraph>
        <paragraph num="(31)">
          <text>“Maintenance” means routine, preventative, or corrective activities that are performed to a facility to:</text>
          <paragraph num="(a)">
            <text>Continue operations or upkeep;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Prevent deterioration; or</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Correct a deficiency.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(32)">
          <text>Minority Business Enterprise (MBE).</text>
          <paragraph num="(a)">
            <text>“Minority business enterprise” means a legal entity, other than a joint venture, organized to engage in commercial transactions, that is:</text>
            <paragraph num="(i)">
              <text>At least 51 percent owned and controlled by one or more individuals who are socially and economically disadvantaged;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Managed by, and whose daily business operations are controlled by, one or more of the socially and economically disadvantaged individuals who own it; and</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Certified as a Minority Business Enterprise by the Maryland Department of Transportation.</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>“Minority business enterprise (MBE)” includes a not-for-profit entity organized to promote the interests of physically or mentally disabled individuals.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(33)">
          <text>“Multistep sealed bidding” means a multiphase process in which bidders submit a technical offer (statement of qualifications) and a second phase in which those bidders who are determined qualified during the first phase may have price bids considered.</text>
        </paragraph>
        <paragraph num="(34)">
          <text>“Offeror” means an entity that responds to a request for proposals.</text>
        </paragraph>
        <paragraph num="(35)">
          <text>“Planning approval” means, pending the availability of funds, the State commits to fund the State share of eligible costs for a school construction project in some future fiscal years.</text>
        </paragraph>
        <paragraph num="(36)">
          <text>“Prevailing wage rate” means the hourly rate of wages paid in the locality as determined by the State Commissioner of Labor and Industry under State Finance and Procurement Article, §17-208, Annotated Code of Maryland.</text>
        </paragraph>
        <paragraph num="(37)">
          <text>“Priority funding” area means an area designated by a county or a municipal corporation in accordance with State Finance and Procurement Article, §§5-7B-02 and 5-7B-03, Annotated Code of Maryland.</text>
        </paragraph>
        <paragraph num="(38)">
          <text>“Proposal” means the response by an offeror to a request for proposals.</text>
        </paragraph>
        <paragraph num="(39)">
          <text>“Quality based selection” means a method of source selection based on a combination of qualification and cost factors.</text>
        </paragraph>
        <paragraph num="(40)">
          <text>“Renewal” means a capital improvement project for an existing school that, on completion, results in a like-new operational condition for the school as defined by the Commission.</text>
        </paragraph>
        <paragraph num="(41)">
          <text>“Renovation” means a construction project to upgrade an existing building and site, or a portion of a building and site, to improve a school facility’s educational, building performance, and/or aesthetic qualities but which does not achieve a renewal or like-new condition.</text>
        </paragraph>
        <paragraph num="(42)">
          <text>“Responsible” means an entity that has:</text>
          <paragraph num="(a)">
            <text>The capability in all respects to perform fully the contract requirements; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The integrity and reliability that shall assure good faith performance.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(43)">
          <text>“Responsive” means a bid submitted in response to an invitation for bids that conforms in all material respects to the requirements contained in the invitation for bids.</text>
        </paragraph>
        <paragraph num="(44)">
          <text>Request for Proposals.</text>
          <paragraph num="(a)">
            <text>“Request for proposals” means any documents used for soliciting proposals from offerors.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>“Request for proposals” may request the offeror's price and terms for the proposed contract, a description of technical expertise, work experience, and any other information.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(45)">
          <text>“Request for qualifications” means any documents used to solicit statements of qualifications including experience, references, team composition, financial stability and condition, and availability of equipment from bidders.</text>
        </paragraph>
        <paragraph num="(46)">
          <text>“Solicited” means an invitation for bid, request for proposals, request for qualifications, or other formal notification to the public of the owner's interest in receiving prices, other information, or both, for a proposed public school construction project or related services, which contains all relevant information to allow members of the public to submit responsive and responsible bids, offers, or proposals.</text>
        </paragraph>
        <paragraph num="(47)">
          <text>“Special education classroom” means a classroom that is used primarily for students who are instructed for more than 60 percent of the day outside of regular classrooms.</text>
        </paragraph>
        <paragraph num="(48)">
          <text>“State” means the government of the State of Maryland.</text>
        </paragraph>
        <paragraph num="(49)">
          <text>“Trade contract” means a contract for specialized construction work including, but not limited to, electrical, plumbing, and carpentry.</text>
        </paragraph>
        <paragraph num="(50)">
          <text>“Trade package” means solicitation documents for a trade contract.</text>
        </paragraph>
        <paragraph num="(51)">
          <text>“Unsolicited proposal” means a written proposal for an original or innovative idea that is submitted on the initiative of the offeror for the purpose of obtaining a contract with the LEA.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <annotations>
      <annotation type="Authority">Education Article, §§4-126, 5-112, and 5-301—5-321, Annotated Code of Maryland</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: May 21, 2007 (34:10 Md. R. 891)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .01B amended effective November 2, 2009 (36:22 Md. R. 1725)</annotation>
      <annotation type="History" subtype="Administrative History">COMAR 23.03.01 recodified to be COMAR 14.39.01 under new subtitle, Interagency Commission on School Construction, effective November 4, 2019 (46:22 Md. R. 979)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .01B amended effective November 4, 2019 (46:22 Md. R. 979); June 28, 2021 (48:13 Md. R. 509); July 7, 2025 (52:13 Md. R. 656)</annotation>
    </annotations>
  </chapter>
  <chapter num="02" heading="Administration of the Public School Construction Program">
    <regulation prefix="Regulation" num=".01" heading="Incorporation by Reference.">
      <text>The Interagency Commission on School Construction Gross Area Baseline Per Student Square Footage Allowances (September 14, 2023) is incorporated by reference.</text>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="Facility Database.">
      <text>The LEA shall update the IAC facility inventory when a State-funded project is substantially complete.</text>
    </regulation>
    <regulation prefix="Regulation" num=".03" heading="Local Educational Facilities Master Plan.">
      <paragraph num="A.">
        <text>A local educational facilities master plan is a written plan that includes:</text>
        <paragraph num="(1)">
          <text>Educational goals, standards, and guidelines;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Community analysis, concluding that the plan conforms to the adopted county and municipal comprehensive plan and growth management strategies;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>An inventory and evaluation of existing school buildings;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Current and projected enrollment data;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Analysis of future school facility needs;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Policies for co-location, shared use, and shared cost of existing and planned school facilities;</text>
        </paragraph>
        <paragraph num="(7)">
          <text>Policies to address school capacity needs in planned growth areas or to address adequate public facilities ordinance requirements; and</text>
        </paragraph>
        <paragraph num="(8)">
          <text>Policies addressing current and planned transportation for students, administrators, and teachers per school.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Annually by the date the IAC specifies, each LEA shall submit to the IAC an educational facilities master plan that its local board has approved.</text>
      </paragraph>
      <paragraph num="C.">
        <text>The IAC or its designee shall:</text>
        <paragraph num="(1)">
          <text>Review each local educational facilities master plan; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Notify the LEA in writing of objections or exceptions to the plan.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>The local educational facilities master plan together with any LEA amendments and IAC or its designee comments is the plan of record.</text>
      </paragraph>
      <paragraph num="E.">
        <text>The IAC may disapprove any school construction project that is not consistent with the plan of record.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".04" heading="Capital Improvement Program.">
      <paragraph num="A.">
        <text>Local Submissions.</text>
        <paragraph num="(1)">
          <text>Annually by the date the IAC specifies, each LEA with approval from its local board shall submit to the IAC a local capital improvement program for the next fiscal year that identifies and prioritizes:</text>
          <paragraph num="(a)">
            <text>New construction projects, including replacement schools and additions, renewal projects, renovation projects, and capital maintenance projects, that are proposed for local planning approval;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>New construction projects, including replacement schools and additions, renewal projects, and renovation projects, that are proposed for project development and design funding;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>New construction projects, including replacement schools and additions, renewal projects, renovation projects, capital maintenance projects, and relocatable facilities that are proposed for funding approval; and</text>
          </paragraph>
          <paragraph num="(d)">
            <text>New construction projects, including replacement schools and additions, renewal projects, and renovation projects, that the LEA has locally funded and for which the LEA seeks planning approval and funding approval.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Annually by the date the IAC specifies, each LEA with approval from its local board shall submit to the IAC a local capital improvement program which shall be:</text>
          <paragraph num="(a)">
            <text>Consistent with the educational facilities master plan of record; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Approved by the county governing body.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>IAC Review.</text>
        <paragraph num="(1)">
          <text>Project Development and Design Funding Approval. The IAC or its designee shall evaluate the merits of project development and design funding requests contained in the local capital improvement programs using the following factors as applicable and rank the requests on a Statewide basis using the following factors:</text>
          <paragraph num="(a)">
            <text>State educational priorities;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Enrollment projections, that is, the extent to which 7-year enrollment projections exceed the State-rated capacity for the applicable schools;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Average year of completed construction of the building;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>The rehabilitation of existing schools to ensure that facilities in established neighborhoods are of equal quality to new schools, including location of a new school or a replacement school that adds capacity within a priority funding area;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>The number of students who receive special education services, who are eligible for free and reduced price meals, or who are English-language learners;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Analysis of the feasibility studies required for projects in which an LEA seeks to abandon an existing school building or demolish more than 50 percent of the gross square footage;</text>
          </paragraph>
          <paragraph num="(g)">
            <text>Documentation for renovation projects for which the State has provided funding for projects within the past 15 years;</text>
          </paragraph>
          <paragraph num="(h)">
            <text>Adequacy of maintenance programs;</text>
          </paragraph>
          <paragraph num="(i)">
            <text>Justification for the transfer of a school building in the same geographic area by a local board to the county government because the property was determined no longer needed for school purposes;</text>
          </paragraph>
          <paragraph num="(j)">
            <text>Progress on previously approved projects;</text>
          </paragraph>
          <paragraph num="(k)">
            <text>Evidence of high performance school design;</text>
          </paragraph>
          <paragraph num="(l)">
            <text>For locally funded projects for which State planning and funding approval is sought, application of the State's Minority Business Enterprise Program and prevailing wage rates;</text>
          </paragraph>
          <paragraph num="(m)">
            <text>Statewide needs measured against the potential for future capacity for State funding; and</text>
          </paragraph>
          <paragraph num="(n)">
            <text>Other factors considered appropriate.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Local Planning Approval. The IAC or its designee shall evaluate the merits of local planning approval requests contained in the local capital improvement programs using the factors in §B(1) of this regulation as applicable and rank the requests on a Statewide basis using the factors in §B(1)(a)—(e) of this regulation.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Funding Approval. The IAC shall evaluate funding approval requests contained in the local capital improvement programs using the following factors when applicable:</text>
          <paragraph num="(a)">
            <text>Status of planning approval.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Enrollment projections, that is, the extent to which 7-year enrollment projections exceed the State-rated capacity for the applicable schools;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Adequacy of maintenance programs;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Adequacy of project description;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Adequacy of project cost estimate;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Progress on project design and anticipated bid date;</text>
          </paragraph>
          <paragraph num="(g)">
            <text>The rehabilitation of existing schools to ensure that facilities in established neighborhoods are of equal quality to new schools;</text>
          </paragraph>
          <paragraph num="(h)">
            <text>Location of a new school or a replacement school that adds capacity within a priority funding area;</text>
          </paragraph>
          <paragraph num="(i)">
            <text>Statewide needs measured against the capacity for State funding;</text>
          </paragraph>
          <paragraph num="(j)">
            <text>For relocatable facilities, the review criteria in Regulation .16 of this chapter;</text>
          </paragraph>
          <paragraph num="(k)">
            <text>Progress on previously approved projects;</text>
          </paragraph>
          <paragraph num="(l)">
            <text>Evidence of high performance school design;</text>
          </paragraph>
          <paragraph num="(m)">
            <text>For locally funded projects for which State planning and funding approval is sought, application of the State's Minority Business Enterprise Program and prevailing wage rates;</text>
          </paragraph>
          <paragraph num="(n)">
            <text>Recurring or unresolved audit exceptions; and</text>
          </paragraph>
          <paragraph num="(o)">
            <text>Other factors considered appropriate.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>After initial review of the local capital improvement programs, the IAC shall:</text>
          <paragraph num="(a)">
            <text>Notify the LEAs of preliminary recommendations; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Allow LEA representatives to present information pertaining to projects that were not recommended for approval by IAC staff for inclusion in the State capital improvement program.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Priority Funding Area Review.</text>
        <paragraph num="(1)">
          <text>Except as provided in §C(3) of this regulation, when an LEA proposes to build a new school or to increase the State-rated capacity of a replacement school outside of a priority funding area, the LEA shall request a waiver in accordance with Regulation .29 of this chapter for approval of planning and funding.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Unless a waiver is granted under Regulation .30 of this chapter, a new school or a replacement school that adds capacity proposed for planning and funding approval shall be in a priority funding area.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The following school construction projects are not subject to the requirement of §C(1) of this regulation:</text>
          <paragraph num="(a)">
            <text>A locally funded project that was funded by an LEA prior to or in Fiscal Year 2012;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>A public school construction project that was approved for planning in an annual capital improvement program prior to or in Fiscal Year 2012;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>A replacement school on the same site when there is no increase of capacity; or</text>
          </paragraph>
          <paragraph num="(d)">
            <text>A renewal, renovation, addition, or capital maintenance renovation project.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Preliminary State Capital Improvement Program.</text>
        <paragraph num="(1)">
          <text>By December 31 annually, the IAC shall approve a preliminary State capital improvement program for the following fiscal year that:</text>
          <paragraph num="(a)">
            <text>Identifies new construction projects, including replacement schools and additions, renewal projects, renovation projects, capital maintenance renovation projects, and relocatable facilities recommended for local planning approval, project development and design funding approval, or funding approval;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Identifies a maximum State construction allocation for each project; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Totals 75 percent of the preliminary school construction allocation, as determined under State Finance and Procurement Article, §8-113, Annotated Code of Maryland.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>A capital maintenance project solicited before IAC approval is eligible for State funding if it has design development and construction document approvals by the IAC and was deemed eligible but deferred due to fiscal constraints in a prior year CIP.</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Interim State Capital Improvement Program.</text>
        <paragraph num="(1)">
          <text>Before March 1 of each year, the IAC shall submit to the presiding officers and the budget committees of the General Assembly and the Department of Legislative Services an interim State capital improvement program that totals 90 percent of the anticipated final capital budget by proposing:</text>
          <paragraph num="(a)">
            <text>New construction projects, including replacement schools and additions;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Renewal projects;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Renovation projects;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Capital maintenance projects;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Relocatable facilities; and</text>
          </paragraph>
          <paragraph num="(f)">
            <text>A maximum State construction allocation for each project.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>The IAC shall take into account:</text>
          <paragraph num="(a)">
            <text>The preliminary State capital improvement program;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Additional information the LEAs provide;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The anticipated final capital budget for public school construction;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Funds added from the Statewide contingency account; and</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Other information the IAC considers appropriate.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>A capital maintenance project solicited before IAC approval is eligible for State funding if it has design development and construction document approvals by the IAC and was deemed eligible but deferred due to fiscal constraints in a prior CIP year.</text>
        </paragraph>
      </paragraph>
      <paragraph num="F.">
        <text>Final State Capital Improvement Program IAC Approval.</text>
        <paragraph num="(1)">
          <text>After May 1 and before June 1, provided that the capital budget is approved during the regular General Assembly Session, the IAC shall approve a final State capital improvement program that identifies new construction projects, including replacement schools and additions, renewal projects, renovation projects, capital maintenance projects, and relocatable facilities recommended for planning approval or funding approval and that identifies a maximum State construction allocation for each project.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The approval shall take into account:</text>
          <paragraph num="(a)">
            <text>The preliminary State capital improvement program;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Additional information the LEAs provide;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The final capital budget for public school construction;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Funds added from the Statewide contingency account;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Requirements in the capital budget bill; and</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Other information the IAC considers appropriate.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>A systemic renovation project solicited before IAC approval is eligible for State funding if it has design development and construction document approvals by the IAC and was deemed eligible but deferred due to fiscal constraints in a prior year CIP.</text>
        </paragraph>
      </paragraph>
      <paragraph num="G.">
        <text>Revisions. After IAC approval of the final State capital improvement program, the program may be revised only upon IAC review and approval.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".05" heading="State-Rated Capacity.">
      <paragraph num="A.">
        <text>Definition. In this regulation, State-rated capacity means the number of students that the IAC or its designee determines that an individual school has the physical capacity to enroll.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Elementary Schools.</text>
        <paragraph num="(1)">
          <text>For the purposes of determining State-rated capacity, elementary schools are schools enrolling students in one or more grades from prekindergarten through grade 6, but no grades higher than grade 6.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>An elementary-school classroom is a space in which the majority of the school day is spent in instruction of the core curriculum.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Elementary school students who circulate through the school to different classrooms for their core curriculum, rather than spending the majority of the school day in a single classroom and leaving the classroom only for special courses (art, music, physical education, and similar), should be considered middle school students for the purposes of calculating State-rated capacity.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>For the purposes of measuring utilization of facilities and allocating State capital dollars for projects in a manner most equitable to the local school systems of the State, the IAC shall count capacity of elementary school classrooms as follows:</text>
          <paragraph num="(a)">
            <text>Prekindergarten classroom — 20;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Kindergarten classroom —  22;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Grades 1 through 5 classroom — 23;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Grade 6 classroom:</text>
            <paragraph num="(i)">
              <text>If located in an elementary school—23; or</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>If located in an elementary/middle school, or a secondary school—25;</text>
            </paragraph>
          </paragraph>
          <paragraph num="(e)">
            <text>Special education classroom—10; and</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Alternative education classroom—10.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(5)">
          <text>State rated capacity for an individual elementary school is calculated according to the following formula:</text>
          <paragraph num="(a)">
            <text>Multiply the number of classrooms in each grade by the approved capacity for that grade; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Then add the resulting products.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(6)">
          <text>Open-space classroom capacity is calculated according to the following formula:</text>
          <paragraph num="(a)">
            <text>Divide the open space area by a square foot number the IAC determines;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Next, round the quotient to the nearest whole number; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Then, multiply the rounded quotient by the State-approved capacity for the elementary grade.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Secondary Schools.</text>
        <paragraph num="(1)">
          <text>For purposes of determining State-rated capacity, secondary schools are schools enrolling students in one or more grades from 6 through 12.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Classrooms.</text>
          <paragraph num="(a)">
            <text>A secondary-school classroom is a space in which any scheduled instruction takes place.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Secondary-school classrooms include but are not limited to laboratories, career technology rooms, music rooms, art rooms, consumer science rooms, gymnasiums, and auxiliary physical education classrooms. One physical education classroom up to 2,500 net square feet which contains specialized equipment hat cannot be stored or relocated may be excluded in facilities functioning as a high school serving grades 9—12, or a middle high school serving grades 6—12, upon application to and approval of the IAC or its designee.</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Auxiliary gymnasiums up to 6,000 net square feet count as one teaching station. A gymnasium over 6,000 net square feet and up to 13,000 net square feet counts as two classrooms. A gymnasium exceeding 13,000 net square feet counts as three classrooms.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>For the purposes of measuring utilization of facilities and allocating State capital dollars for projects in a manner most equitable to the local school systems of the State, the IAC shall count capacity of secondary school classrooms as follows:</text>
          <paragraph num="(a)">
            <text>Grades 6 through 12 classroom—25;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Special education classroom—10; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Alternative education classroom—10.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>State-rated capacity for an individual secondary school is calculated according to the following formula:</text>
          <paragraph num="(a)">
            <text>For regular classrooms:</text>
            <paragraph num="(i)">
              <text>Multiply the number of regular classrooms by the approved capacity;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Next, add the resulting products; and</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Then, multiply this sum by 85 percent;</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>For special education classrooms, multiply the number of special education classrooms by the approved capacity; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Then, add results from §C(4)(a) and (b) of this regulation.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(5)">
          <text>Open-space classroom capacity is calculated according to the following formula:</text>
          <paragraph num="(a)">
            <text>Divide the open space area by a square foot number the IAC determines;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Next, round the quotient to the nearest whole number;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Then, multiply the rounded quotient by the State-approved capacity for the secondary grade; and</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Finally, multiply by 85 percent.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Career and Technology Programs.</text>
        <paragraph num="(1)">
          <text>Career and technology programs are occupational programs approved by the Maryland State Department of Education.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The approved capacity for a career and technology classroom is as the IAC or its designee determines on a case-by-case basis.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>State-rated capacity for an individual career and technology program is calculated according to the following formula:</text>
          <paragraph num="(a)">
            <text>Multiply the number of classrooms by the approved capacity for that career and technology classroom;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Next, add the resulting products; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Then, multiply by 85 percent.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>The IAC or its designee shall determine on a case-by-case basis the State-rated capacity for a school that is not defined in §§B, C, and D of this regulation.</text>
      </paragraph>
      <paragraph num="F.">
        <text>Cooperative use space dedicated in a written agreement to use by a non-LEA entity may not be included in the State-rated capacity unless that space is used for LEA educational purposes during the LEA’s standard school operating hours.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".06" heading="State Cost Share Percentage.">
      <paragraph num="A.">
        <text>The State may fund eligible costs of approved public school construction projects according to the State cost share percentage established in this regulation.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Percentages.</text>
        <paragraph num="(1)">
          <text>The minimum State share of public school construction funding for eligible costs of approved projects is 50 percent.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Reductions in the cost share may not exceed 5 percent.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Reduction in the cost share of 4 percent or more shall be phased in over the 2-year period with a reduction of 2 percentage points in the first year and the remaining 2 or 3 percentage points in the second year.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>The maximum State share of public school construction funding is 100 percent of eligible costs of approved projects.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>The State share percentage for the Maryland School for the Blind shall be 93 percent of eligible costs of approved projects.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Revisions to Percentages.</text>
        <paragraph num="(1)">
          <text>By October 2018 and every 2 years thereafter, the IAC shall update, approve, and publish to the IAC’s website the cost share percentage to be applied to projects submitted for approval in the Fiscal Year.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The IAC shall use the formula in §D of this regulation to recommend revisions to the State cost share percentage for each county.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>LEA State Cost Share. The IAC shall add the following amounts to calculate the recommended revised cost share amounts:</text>
        <paragraph num="(1)">
          <text>The LEA's current State share of the Foundation program divided by the Foundation program of the LEA as defined under Education Article, §5-202, Annotated Code of Maryland;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The current amount of State aid provided to the LEA by the guaranteed tax base program as defined under Education Article, §5-210, Annotated Code of Maryland, divided by the Foundation program of the LEA;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>20 percent of the amount by which the LEA's free and reduced price meal percentage exceeds the Statewide free and reduced price meal percentage in the prior school year;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>5 percent if the county where the LEA is located is a Tier I county that has an unemployment rate greater than the average rate or number of percentage points identified in Economic Development Article, §1-101, Annotated Code of Maryland, or has met the average rate or number of percentage points identified in Economic Development Article, §1-101, Annotated Code of Maryland, at some time during the preceding 24-month period;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>5 percent if the county where the LEA is located is a Tier I county that has a median household income level below the level identified in Economic Development Article, §1-101, Annotated Code of Maryland, or has had a median household income level below the level identified in Economic Development Article, §1-101, Annotated Code of Maryland, at some time during the preceding 24-month period;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>The difference between the percent growth in the LEA's full-time equivalent enrollment, as defined by Education Article, §5-202, Annotated Code of Maryland, from the 6th prior year to the prior year, and the percent growth in the Statewide full-time equivalent enrollment from the 6th prior year to the prior year, provided this calculation results in a positive number; and</text>
        </paragraph>
        <paragraph num="(7)">
          <text>10 times the amount by which the county's and local board’s total outstanding school construction debt at the end of the 2nd prior fiscal year plus the county's total school construction expenditures from its operating budget from the 4th to the 2nd prior fiscal years exceeds 1 percent of the county wealth, as defined by Education Article, §5-202, Annotated Code of Maryland, for the prior fiscal year.</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Project Based Add-Ons to State Cost Share. The IAC shall add the following amounts to an LEA’s State Cost share of a proposed school construction project as applicable:</text>
        <paragraph num="(1)">
          <text>10 percentage points if the proposed school construction project, when the LEA submits the project for approval to the IAC, is at a school with a concentration of poverty level, as defined in Education Article, §5-223, Annotated Code of Maryland, of 80 percent or greater;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>5 percentage points if the proposed school construction project, when the LEA submits the project for approval to the IAC, is at a school with a concentration of poverty level, as defined in Education Article, §5-223, Annotated Code of Maryland, of less than 80 percent but greater than 55 percent;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>5 percentage points if the proposed school construction project is at a school that, in the most recent school maintenance effectiveness assessment by the IAC, received an assessment rating of:</text>
          <paragraph num="(a)">
            <text>Good;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Superior; or</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Adequate and the school's most recent school facility assessment average percentage of expected useful lifespan is at least 120 percent; and</text>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>5 percentage points if the proposed school construction project is a net-zero school.</text>
        </paragraph>
      </paragraph>
      <paragraph num="F.">
        <text>For FY 2025 and 2026, the State share percentages of public school construction funding for eligible costs of approved projects are as follows:</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".07" heading="Maximum State Construction Allocation.">
      <paragraph num="A.">
        <text>The maximum State construction allocation is the maximum amount the State may fund of eligible costs for each public school construction project.</text>
      </paragraph>
      <paragraph num="B.">
        <text>The maximum State construction allocation for each approved public school construction project is set in the State capital improvement program.</text>
      </paragraph>
      <paragraph num="C.">
        <text>The maximum State construction allocation is set at the first year of construction funding approval.</text>
      </paragraph>
      <paragraph num="D.">
        <text>The actual funding is based on the costs of approved contracts and may be less than the maximum State construction allocation.</text>
      </paragraph>
      <paragraph num="E.">
        <text>Gross Area Baselines.</text>
        <paragraph num="(1)">
          <text>The gross area baseline is the product of the approved student enrollment and the baseline gross square footage per student, and may be adjusted by the IAC on a case-by-case basis, based upon presented evidence of program need.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The approved student enrollment may be reduced only if the sum of available seat count in all adjacent schools is 15 percent or more of the project school’s enrollment.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The baseline gross square footage per student is set by the IAC and may be adjusted by the IAC on a case-by-case basis, based upon presented evidence of program need.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Gross Area Baseline Concentration of Poverty Add-On. School projects with a concentration of poverty level above 55 percent are eligible for a concentration of poverty square footage add-on, upon submission of a concentration of poverty square footage usage plan, based upon the following:</text>
          <paragraph num="(a)">
            <text>School projects with an eligible enrollment of fewer than 600 students are eligible for a concentration of poverty add-on of up to 1,000 square feet plus the concentration of poverty level percentage points above 55 percent multiplied by 60 square feet, up to a maximum of 1,500 square feet.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>School projects with an eligible enrollment between 600 and 900 students are eligible for a concentration of poverty add-on of up to 1,500 square feet plus the concentration of poverty level percentage points above 55 percent multiplied by 60 square feet, up to a maximum of 2,000 square feet.</text>
          </paragraph>
          <paragraph num="(c)">
            <text>School projects with an eligible enrollment of more than 900 students are eligible for a concentration of poverty add-on of up to 2,000 square feet plus the concentration of poverty level percentage points above 55 percent multiplied by 60 square feet, up to a maximum of 2,500 square feet.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(5)">
          <text>Gross Area Baseline English Learner Add-On. School projects with an English learner population above 10 percent are eligible for an English learner square footage add-on, based upon the following:</text>
          <paragraph num="(a)">
            <text>School projects with an eligible enrollment of fewer than 600 students are eligible for an English learner add-on of 500 square feet plus the number of percentage points of the project school populations of English learners above 10 percent, multiplied by 25 square feet, up to a maximum of 1,500 square feet.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>School projects with an eligible enrollment between 600 and 900 students are eligible for an English learner add-on of 1,000 square feet plus the number of percentage points of the project school populations of English learners above 10 percent, multiplied by 25 square feet, up to a maximum of 2,000 square feet.</text>
          </paragraph>
          <paragraph num="(c)">
            <text>School projects with an eligible enrollment of more than 900 students are eligible for an English learner add-on of 1,500 square feet plus the number of percentage points of the project school populations of English learners above 10 percent, multiplied by 25 square feet, up to a maximum of 2,500 square feet.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(6)">
          <text>Gross Area Baseline Career and Technology Education Add-On. School projects approved for Career and Technology Education programs are eligible for a Career and Technology Education square footage add-on based upon the program size. Program sizes shall be regularly reviewed and updated by the IAC and published to the IAC website. Square footage allocations for program sizes are as follows:</text>
          <paragraph num="(a)">
            <text>Extra small Career and Technology Education programs receive an add-on of 500 gross square feet.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Small Career and Technology Education programs receive an add-on of 1,000 gross square feet.</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Medium Career and Technology Education programs receive an add-on of 3,000 gross square feet.</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Large Career and Technology Education programs receive an add-on of 4,000 gross square feet.</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Extra large Career and Technology Education programs receive an add-on of 6,000 gross square feet.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="F.">
        <text>The average Statewide per-square-foot school building cost that applies to each annual capital improvement program:</text>
        <paragraph num="(1)">
          <text>Is established by July of the calendar year in which applications are submitted;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Is based on:</text>
          <paragraph num="(a)">
            <text>Bids received for new school construction in the prior year; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Cost information derived from industry sources;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>May be adjusted by the IAC to reflect market conditions before submission of the final State capital improvement program; and</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Projects that qualify for the Net-zero State Cost Share add-on pursuant to COMAR 14.39.02.06E(4) for which the applicant project receives a State cost share of 96 percent or greater in accordance with COMAR 14.39.02.06F and including the State Cost Share add-ons pursuant to COMAR 14.39.02.06E(1)—(3), may be eligible for an increase to the cost-per-square-foot described in this regulation equal to the value of a 5 percentage point increase in the State Cost Share for the project minus the value of the difference between 100 percent and the applicant project State cost share including add-ons pursuant to COMAR 14.39.02.06E(1)—(3).</text>
        </paragraph>
      </paragraph>
      <paragraph num="G.">
        <text>New Construction. The maximum State construction allocation for new construction is calculated according to either:</text>
        <paragraph num="(1)">
          <text>The following formula:</text>
          <paragraph num="(a)">
            <text>Multiply the lesser of the gross area baseline or the actual project gross area by the average Statewide per square foot school building cost, which is based on bids received for new school construction in the prior year and cost information derived from industry sources;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Next, add site development costs, figured as a percentage of the building cost set forth in §F(1)(a) of this regulation;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Finally, multiply by the State cost share percentage; or</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>The estimated or actual cost of construction multiplied by the State cost share percentage, not to exceed the amount calculated in §G(1) of this regulation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="H.">
        <text>Renewal.</text>
        <paragraph num="(1)">
          <text>The maximum State construction allocation for projects proposed to renew buildings or portions of buildings, 16 years or older, is calculated according to either:</text>
          <paragraph num="(a)">
            <text>The following formula:</text>
            <paragraph num="(i)">
              <text>Beginning with the oldest portion of the building, and using the gross area baseline as the upper limit, determine the eligible square footage of the renewal categorized according to the age group of the building portion containing the renewal;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Multiply the eligible square footage for each age group by the average Statewide per square-foot building cost, and then multiply each product by the percentage in §H(1)(a)(iii) of this regulation;</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Age of building portion containing the renewal as measured from January 1 following the IAC December 31 submission of the preliminary State capital improvement program: 40 years or older—100 percent;31 to 39 years—85 percent; 26 to 30 years—75 percent; 21 to 25 years—65 percent; 16 to 20 years—50 percent; and 0 to 15 years—0 percent.</text>
            </paragraph>
            <paragraph num="(iv)">
              <text>Add the products calculated in §H(1)(a)(ii) of this regulation;</text>
            </paragraph>
            <paragraph num="(v)">
              <text>Next, add site development costs, figured as a percentage of total building costs set forth in §H(1)(a)(iv) of this regulation; and</text>
            </paragraph>
            <paragraph num="(vi)">
              <text>Finally, multiply by the State cost share percentage; or</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>The estimated or actual cost of construction multiplied by the State cost share percentage, not to exceed the amount calculated in §H(1)(a) of this regulation.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Adjustments to the Maximum State Construction Allocation for Renovation Projects. The IAC may:</text>
          <paragraph num="(a)">
            <text>Subtract funding from the maximum State construction allocation that the State has approved for other projects less than 16 years old at that school; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Adjust the maximum State construction allocation for renovation of a building that exceeds the gross area baseline.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>The State may not further participate in funding projects in the school within 15 years after the project is placed in service.</text>
        </paragraph>
      </paragraph>
      <paragraph num="I.">
        <text>Renovation.</text>
        <paragraph num="(1)">
          <text>The estimated cost of construction of a renovation may not exceed the estimated cost of construction for a renewal.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The maximum State construction allocation for a renovation is calculated by multiplying the estimated costs of construction, including site work, by the State cost share percentage.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>At the time of contract award, the actual funding is based on the costs of items eligible for State participation, up to the maximum State construction allocation.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Adjustments to Maximum State Construction Allocation for a Renovation.</text>
          <paragraph num="(a)">
            <text>The IAC may subtract from the maximum State construction allocation funding approved for other projects not older than 15 years old at that school.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>If projects in the school have been funded within the previous 15 years, the LEA shall provide documentation to identify all previously funded scopes of work that may be replaced or upgraded in the renovation.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(5)">
          <text>For a renovation, the new average year of completed construction of the building or portion of the building is determined by the average year of completed construction of the original building, plus the year of completed construction of the renovation, divided by 2.</text>
        </paragraph>
        <paragraph num="(6)">
          <text>The State may further participate in funding projects in the school within 15 years after the project is placed in service.</text>
        </paragraph>
      </paragraph>
      <paragraph num="J.">
        <text>Addition. When a project involves an addition only, the IAC at its discretion may calculate the maximum State construction allocation according to either:</text>
        <paragraph num="(1)">
          <text>The following formula:</text>
          <paragraph num="(a)">
            <text>Subtract the existing square footage from the gross area baseline; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Then use the lesser of that amount or the actual area of the addition when calculating the maximum State construction allocation according to §E of this regulation; or</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>The estimated or actual cost of construction multiplied by the State cost share percentage.</text>
        </paragraph>
      </paragraph>
      <paragraph num="K.">
        <text>Addition in Conjunction with Renewal or Renovation. When an addition involves both an addition and a renovation or a renewal, the maximum State construction allocation is established by adding the renewal or renovation maximum State construction allocation calculated according to §G or H of this regulation and the addition (new construction) maximum State construction allocation calculated according to §J of this regulation.</text>
      </paragraph>
      <paragraph num="L.">
        <text>Replacement.</text>
        <paragraph num="(1)">
          <text>An LEA that proposes to abandon a facility or demolish more than 50 percent of the gross square footage of a facility shall submit a feasibility study to the reasonable satisfaction of the IAC.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Based on the review of the feasibility study, the IAC may set the maximum State construction allocation for a replacement school based on the cost of renovating an existing school according to §H of this regulation, or the cost of building a new school according to §G of this regulation.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>If the State approves renovating or renewing an existing school and the LEA builds a replacement school, the IAC may reduce the maximum State construction allocation for that project by 15 percent.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>The IAC or its designee may waive the requirement for a feasibility study on submission of supporting documentation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="M.">
        <text>Forward-Funded Project. If the maximum State construction allocation for a forward-funded project is calculated according to the formulas in §G, H, or I of this regulation, the following factors shall be applied:</text>
        <paragraph num="(1)">
          <text>Gross area baseline that applied on the bid-opening date, using the 7-year enrollment projections applied as follows:</text>
          <paragraph num="(a)">
            <text>If the bid opening was between October 1 and March 31, the prior September 30 enrollment is used as the approved student enrollment; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>If the bid opening was between April 1 and September 30, the September 30 enrollment at the end of that time frame is used as the approved student enrollment;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Average square foot school building cost published by the IAC or its designee for the July that falls within the calendar year of the bid-opening date;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>State cost share percentage that applied on the bid-opening date; and</text>
        </paragraph>
        <paragraph num="(4)">
          <text>For a renovation project, the amount of the awarded scope of work, not to exceed the maximum State construction allocation as developed in §H(1)(a) of this regulation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="N.">
        <text>Cooperative Use Space.</text>
        <paragraph num="(1)">
          <text>The maximum State construction allocation for an approved project may include the State's share of eligible costs to construct or renovate up to 3,000 gross square feet of co-located or shared space to support LEA or community initiatives to serve school children and the general community.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>This cooperative use space is in addition to the size of typical school-function areas provided by the LEA.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>There shall be a written agreement between the county board and the space occupant that establishes the term and conditions.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".08" heading="Changes to the Maximum State Construction Allocation.">
      <text>After the IAC sets the maximum State construction allocation in the State capital improvement program:</text>
      <paragraph num="A.">
        <text>The IAC may reduce the maximum State construction allocation if a local board changes a board decision which served as justification for setting the approved scope of the project.</text>
      </paragraph>
      <paragraph num="B.">
        <text>The IAC may increase the maximum State construction allocation for a capital maintenance project when:</text>
        <paragraph num="(1)">
          <text>The LEA submits:</text>
          <paragraph num="(a)">
            <text>The final project scope of work; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>A cost estimate developed by a design professional licensed in the State of Maryland or the bid tabulation for the project;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>The LEA documents that the:</text>
          <paragraph num="(a)">
            <text>LEA has taken reasonable actions to reduce construction costs; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Construction costs have resulted from exceptional circumstances; and</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>The IAC determines that:</text>
          <paragraph num="(a)">
            <text>The requested scope of work is eligible for State funding; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The scope of work and associated costs are reasonable.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>The IAC may increase the maximum State construction allocation for a project other than a capital maintenance project if the LEA documents that the:</text>
        <paragraph num="(1)">
          <text>Project has critical impact on the LEA's budget;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>LEA has taken reasonable actions to reduce construction costs; and</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Construction costs that have resulted from exceptional circumstances or circumstances that are different from those that confront most projects in the State or region.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>The IAC may increase the maximum State construction allocation for a project that qualifies for the net zero add-on as described in COMAR 14.39.02.06E(4) after the establishment of the maximum State construction allocation upon submission of acceptable documentation to become eligible for the add-on, and only up to the amount that the project would have been eligible for had the net zero add-on been in place at the time of establishment of the maximum State construction allocation.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".09" heading="Project Development and Design Funding Allocation.">
      <paragraph num="A.">
        <text>The project development and design funding allocation is the maximum amount the State may fund of eligible project development and design costs for a public school construction project.</text>
      </paragraph>
      <paragraph num="B.">
        <text>The project development and design funding allocation for each approved public school project is set in the State capital improvement program.</text>
      </paragraph>
      <paragraph num="C.">
        <text>The project development and design funding allocation may not exceed 10 percent of a preliminary maximum State construction allocation as set forth in Regulation .06 of this chapter and as calculated in the year of the request for project development and design funding.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".10" heading="Rescinding Planning Approval.">
      <paragraph num="A.">
        <text>If, within 2 years after a project is approved for planning, no part of the project is under contract, the IAC may determine the project to be abandoned and rescind the planning approval.</text>
      </paragraph>
      <paragraph num="B.">
        <text>An LEA that seeks reapproval of a project whose planning approval has been rescinded shall submit a new planning request in a future local capital improvement program.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".11" heading="Rescinding Funding Approval.">
      <paragraph num="A.">
        <text>If, within 2 years after funding is made available for a project, no part of the project is under contract, the IAC shall determine that the project is abandoned and rescind the funding approval.</text>
      </paragraph>
      <paragraph num="B.">
        <text>When the IAC rescinds funding approval, the IAC shall reserve the funding for another eligible project in the county in the current fiscal year or for eligible projects in the county in the next fiscal year.</text>
      </paragraph>
      <paragraph num="C.">
        <text>Funds reserved for a county that have not been used to place a project under contract within 2 years of the date the funds were reserved shall be available for any project approved in a future State capital improvement program.</text>
      </paragraph>
      <paragraph num="D.">
        <text>An LEA that seeks reapproval of a project whose funding approval has been rescinded shall submit a new funding request in a future local capital improvement program.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".12" heading="Eligible Expenditures.">
      <text>The following expenditures may be eligible for State funding:</text>
      <paragraph num="A.">
        <text>Planning, including feasibility studies, programs, educational specifications, equipment specifications, and other planning work that occurs prior to the start of design.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Design expenses and other ancillary costs, including architectural and engineering fees, construction management services, geotechnical surveys, and other services necessary to complete the architectural specifications for a school project.</text>
      </paragraph>
      <paragraph num="C.">
        <text>New construction, as follows:</text>
        <paragraph num="(1)">
          <text>Construction of a new school facility, that is, work necessary to construct a new school facility, including building and site development;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Additions to an existing facility, that is, work necessary to increase space at an existing school facility, including:</text>
          <paragraph num="(a)">
            <text>Building and site development; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Work to physically integrate the addition into the existing school;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>Replacement of a building or building portion, that is, work necessary to reconstruct a school facility that cannot be economically repaired or renovated, including building and site development; and</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Modular construction, that is, factory-fabricated structures that have the same quality systems and materials as used for permanent school construction and that meet the standards of the COMAR 05.02.04;</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Renewal or renovation, that is, the work necessary to restore and modernize an existing school facility or a portion of a facility that is 16 years or older;</text>
      </paragraph>
      <paragraph num="E.">
        <text>Capital maintenance projects as set forth in Regulation .16 of this chapter;</text>
      </paragraph>
      <paragraph num="F.">
        <text>State-owned relocatable facilities as set forth in Regulation .16 of this chapter;</text>
      </paragraph>
      <paragraph num="G.">
        <text>Temporary facilities, including utilities and relocatable facilities, that are necessary on-site during construction of a State-funded project;</text>
      </paragraph>
      <paragraph num="H.">
        <text>Equipment and furnishings as defined by the IAC;</text>
      </paragraph>
      <paragraph num="I.">
        <text>Real time utilities metering measurement and verification equipment as defined by the IAC;</text>
      </paragraph>
      <paragraph num="J.">
        <text>Off-site development costs required by local, State, or federal agencies;</text>
      </paragraph>
      <paragraph num="K.">
        <text>Emergency repairs as set forth in Regulation .17 of this chapter;</text>
      </paragraph>
      <paragraph num="L.">
        <text>E-rate eligible special construction broadband infrastructure projects, including offsite development costs, for E-rate eligible applicants consistent with 47 C.F.R. 54.505, through the State funding of grants to local boards of education.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".13" heading="Ineligible Expenditures.">
      <text>The following expenditures are ineligible for State funding:</text>
      <paragraph num="A.">
        <text>Site acquisition;</text>
      </paragraph>
      <paragraph num="B.">
        <text>Offsite development costs except those listed as eligible in Regulation .10 of this chapter;</text>
      </paragraph>
      <paragraph num="C.">
        <text>Master plans;</text>
      </paragraph>
      <paragraph num="D.">
        <text>Projects proposed in buildings or portions of buildings that have been constructed or renovated within 15 years, except that building or portion of a building in which a renovation was performed is eligible for additional work within 15 years of the date that the renovation construction was completed;</text>
      </paragraph>
      <paragraph num="E.">
        <text>Capital maintenance projects to replace, upgrade, or renovate building systems that have been replaced, upgraded, or renovated within 15 years;</text>
      </paragraph>
      <paragraph num="F.">
        <text>Ancillary construction costs such as:</text>
        <paragraph num="(1)">
          <text>Permits;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Bid advertising;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Water and sewer connection charges;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Models; or</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Renderings;</text>
        </paragraph>
      </paragraph>
      <paragraph num="G.">
        <text>Leasing or purchasing school facilities except as provided in COMAR 14.39.05;</text>
      </paragraph>
      <paragraph num="H.">
        <text>Construction inspection services;</text>
      </paragraph>
      <paragraph num="I.">
        <text>Relocation costs for site occupants;</text>
      </paragraph>
      <paragraph num="J.">
        <text>Salaries of local employees;</text>
      </paragraph>
      <paragraph num="K.">
        <text>Construction of administrative or support facilities, including regional or central administrative offices, warehousing, resource, printing, vehicle storage, and maintenance facilities;</text>
      </paragraph>
      <paragraph num="L.">
        <text>Equipment, furnishings, and artwork with a median useful life of less than 15 years as defined by the IAC;</text>
      </paragraph>
      <paragraph num="M.">
        <text>Maintenance; and</text>
      </paragraph>
      <paragraph num="N.">
        <text>Temporary storage.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".14" heading="School Site Selection.">
      <paragraph num="A.">
        <text>An LEA shall submit a proposed site to the Interagency Commission on School Construction for:</text>
        <paragraph num="(1)">
          <text>Acquisition of a new site planned for a new or replacement school that will be requested for Local Planning approval within 3 years;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Use of an existing site for a new school or a replacement school that adds capacity; or</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Redesignation of an existing site for a new school or a replacement school that adds capacity.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Unless a waiver is granted in accordance with Regulation .31 of this chapter, a proposed site for a new school or a replacement school that adds capacity shall be in a priority funding area.</text>
      </paragraph>
      <paragraph num="C.">
        <text>The IAC and State Superintendent of Schools shall approve or disapprove an LEA's school site selection based on:</text>
        <paragraph num="(1)">
          <text>Consistency with the county comprehensive plan;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The growth element of applicable municipal comprehensive plans;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Available sewer and water service;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Transportation options; and</text>
        </paragraph>
        <paragraph num="(5)">
          <text>The State's economic growth policies to ensure that facilities in established neighborhoods are of equal quality to new schools, including location of a new school or a replacement school that adds capacity within a priority funding area.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Before submitting the request for site approval to the IAC, the LEA shall:</text>
        <paragraph num="(1)">
          <text>Submit the school site selection to the Maryland Department of Planning for State Clearinghouse review; [and]</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Resolve any issues brought up in the State Clearinghouse Review; and</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Submit the school site selection to the State Superintendent for approval or disapproval in accordance with Education Article, §2-303(f), Annotated Code of Maryland.</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>When submitting the site for IAC approval, the LEA shall include:</text>
        <paragraph num="(1)">
          <text>The local board of education’s approval of the school site acquisition;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The State Superintendent’s approval of the school site acquisition; and</text>
        </paragraph>
        <paragraph num="(3)">
          <text>For a new school or a replacement school that adds capacity located outside of a priority funding area, a request for a waiver in accordance with Regulation .31 of this chapter.</text>
        </paragraph>
      </paragraph>
      <paragraph num="F.">
        <text>The IAC may recommend including a project for planning approval in the State capital improvement program only if the school site has been approved or re-approved by the IAC and the State Superintendent in the preceding 3 years.</text>
      </paragraph>
      <paragraph num="G.">
        <text>Priority Funding Area Review.</text>
        <paragraph num="(1)">
          <text>Except as provided in §G(2) of this regulation, priority funding area review shall be conducted by the IAC for sites for new schools and replacement schools that add capacity and are proposed outside of priority funding areas, including review of requests for:</text>
          <paragraph num="(a)">
            <text>Acquisition of new sites for new schools or replacement schools that add capacity;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Reapproval of existing sites that were initially approved after the effective date of this regulation; or</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Redesignation of existing sites that were initially approved after the effective date of this regulation.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>The following sites for school construction projects are not subject to priority funding area review:</text>
          <paragraph num="(a)">
            <text>A site for a replacement school when there is no increase of capacity; or</text>
          </paragraph>
          <paragraph num="(b)">
            <text>A site granted a Priority Funding Area Waiver in accordance with Regulation .31 of this chapter.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".15" heading="New Construction, Renewal, and Renovation Projects.">
      <paragraph num="A.">
        <text>This regulation applies to new construction, renewal, and renovation projects approved in the State capital improvement program.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Architects and Engineers. The LEA shall ensure that:</text>
        <paragraph num="(1)">
          <text>The plans, specifications, and related documents are developed under the supervision and responsibility of an architect or engineer who is licensed to practice in the State, unless waived by the IAC or its designee;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Unless waived by the IAC or its designee, the design of site development or structural, mechanical, or electrical systems includes the design services of a professional engineer licensed to practice in the State with experience in civil, structural, mechanical, or electrical engineering;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The architect/engineer agreement includes:</text>
          <paragraph num="(a)">
            <text>Cost control provisions;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Assurance that the project design is in accordance with the Department of General Services procedure manual for professional services standards for energy conservation, life cycle costs analysis, and roofing; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>IAC or its designee review and approval of the schematic, design development, and construction documents as required.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Educational Specifications.</text>
        <paragraph num="(1)">
          <text>Unless an LEA is certified to complete review of educational specifications as provided by Education Article §5-314, Annotated Code of Maryland, the LEA shall submit the projects educational specifications to the IAC for every new construction, renewal, renovation, and renovation addition project approved in the State capital improvement program.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The IAC or its designee shall notify the LEA of concerns and recommendations about the educational specifications.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The LEA shall resolve the IAC's issues to the reasonable satisfaction of the IAC or its designee.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Feasibility Studies.</text>
        <paragraph num="(1)">
          <text>An LEA that proposes to renew or renovate more than 25 percent of the gross square footage of a facility shall submit a feasibility study.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The IAC or its designee shall notify the LEA of concerns and recommendations about the feasibility study.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The LEA shall resolve the IAC’s issues to the reasonable satisfaction of the IAC or its designee.</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Cost Analysis. An LEA that proposes to renew a facility shall produce evidence that the renewal is more cost effective than a new or replacement school.</text>
      </paragraph>
      <paragraph num="F.">
        <text>Schematic Designs, Design Development Documents, and Construction Documents.</text>
        <paragraph num="(1)">
          <text>Unless the LEA is certified to complete review of schematic design, design development, and construction documents as provided by Education Article §5-314, Annotated Code of Maryland, the LEA shall submit to the IAC or its designee for review and approval of:</text>
          <paragraph num="(a)">
            <text>Schematic designs, before the LEA proceeds to design development documents;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Design development documents, before the LEA proceeds to construction documents; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Construction documents, before the LEA issues the solicitation.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>The LEA shall submit to the IAC or its designee for review and approval information regarding the consistency of the project with the Department of General Services procedure manual for professional services standards for energy conservation, life cycle cost analysis, and roofing.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Schematic designs, design development documents, and construction documents must be approved by local boards of education prior to their submission to the IAC.</text>
        </paragraph>
      </paragraph>
      <paragraph num="G.">
        <text>For new school construction projects that utilize State funding, the LEA shall include waste disposal infrastructure in the design documents submitted to the commission that includes a sink for liquid waste and a place for the disposal of:</text>
        <paragraph num="(1)">
          <text>Trash;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Recyclables; and</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Food scraps.</text>
        </paragraph>
      </paragraph>
      <paragraph num="H.">
        <text>Pedestrian Safety Plans.</text>
        <paragraph num="(1)">
          <text>Definitions.</text>
          <paragraph num="(a)">
            <text>“High-Density county” refers to one of the following jurisdictions:</text>
            <paragraph num="(i)">
              <text>Anne Arundel County;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Baltimore City;</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Baltimore County;</text>
            </paragraph>
            <paragraph num="(iv)">
              <text>Howard County;</text>
            </paragraph>
            <paragraph num="(v)">
              <text>Montgomery County; or</text>
            </paragraph>
            <paragraph num="(vi)">
              <text>Prince George’s County.</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>“Low-Density County” means any county in the State of Maryland not listed in §H(1)(a) of this regulation.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>A County Board in a high-density county seeking State funds for a new school, renewal, or addition to an existing school that would increase the capacity of the school by more than 100 students shall submit a pedestrian safety plan to the IAC.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>A County Board in a low-density county seeking State funds for a project in a city with more than 10,000 residents for a new school, renewal, or addition to an existing school that would increase the capacity by more than 100 students shall submit a pedestrian safety plan to the IAC.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>A pedestrian safety plan shall:</text>
          <paragraph num="(a)">
            <text>Be developed in collaboration with:</text>
            <paragraph num="(i)">
              <text>The County Department of Transportation or equivalent agency of the jurisdiction of the County Board submitting the plan; and,</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>The State Highway Administration;</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>Be limited to the area surrounding the school for which the County Board will not provide transportation to students;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Identify existing and potential safe routes for students to walk or bike to school;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Evaluate the infrastructure, including sidewalk infrastructure, along existing and potential pedestrian or cyclist routes to the school to determine whether increased capacity is necessary;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Analyze existing and potential school zones, including the need for expanding school zones on State and county roads; and</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Include documentation of public participation and input related to the pedestrian safety plan, including minutes from a public hearing or meeting and written comments.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(5)">
          <text>The IAC shall approve a pedestrian safety plan if the plan complies with §H(4) of this regulation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="I.">
        <text>Procurement. The LEA shall procure construction in compliance with COMAR 14.39.03. The IAC may rescind project approval if the procurement does not comply with these requirements.</text>
      </paragraph>
      <paragraph num="J.">
        <text>Construction Inspection. The LEA shall ensure that each construction project is adequately inspected.</text>
      </paragraph>
      <paragraph num="K.">
        <text>Change Orders. The LEA shall maintain contingency funds for change orders. The LEA may issue change orders without prior approval of the IAC or its designees.</text>
      </paragraph>
      <paragraph num="L.">
        <text>State Payments.</text>
        <paragraph num="(1)">
          <text>The LEA shall submit to the IAC requests for payment.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The IAC or its designee shall review the request for payment for determination of whether the request constitutes an eligible expense and whether payment is within the maximum State construction allocation.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The State may:</text>
          <paragraph num="(a)">
            <text>Make payment directly to the contractor or vendor;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Reimburse the LEA if documentation indicates that the contractor or vendor has been paid the amount requested for reimbursement; or</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Make payment to an entity identified by the LEA.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="M.">
        <text>Project Close-Out. Not later than 180 days after final payment to the contractors, the LEA shall submit to the IAC:</text>
        <paragraph num="(1)">
          <text>A close-out cost summary using a form provided by the IAC; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The following information:</text>
          <paragraph num="(a)">
            <text>Contractor's final requisition including a listing of all approved change orders;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The architect's certificate of completion; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The LEA's certificate of acceptance.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".16" heading="Capital Maintenance Projects.">
      <paragraph num="A.">
        <text>This regulation applies to capital maintenance projects approved in the State capital improvement program. Capital maintenance projects may also be referred to as “systemic renovation” projects.</text>
      </paragraph>
      <paragraph num="B.">
        <text>A capital maintenance project:</text>
        <paragraph num="(1)">
          <text>Extends for at least 15 years the life of a properly maintained school building or component that is 16 years old or older;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Installs, upgrades, replaces, or renovates one of the following building systems or system components:</text>
          <paragraph num="(a)">
            <text>Architectural and structural;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Mechanical;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Plumbing;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Electrical;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Fire safety;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Communications; and</text>
          </paragraph>
          <paragraph num="(g)">
            <text>Vertical conveying systems; and</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>May include reasonably related components of other building systems as determined by the IAC or its designee.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Requests.</text>
        <paragraph num="(1)">
          <text>An LEA may submit a request to the IAC to fund a capital maintenance project in the following circumstances:</text>
          <paragraph num="(a)">
            <text>The project has not been released for solicitation; or</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The project has been released for solicitation after being deemed eligible but deferred due to fiscal constraints by the IAC in a prior fiscal year and has design development and construction document approvals by the IAC.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>The request may only be for eligible expenditures in a project for which the total estimated construction cost is:</text>
          <paragraph num="(a)">
            <text>At least $200,000; or</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Less than $200,000 but more than $100,000 when the LEA does not have any capital maintenance project requests that exceed $200,000 in estimated construction costs.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>A county board may bundle, for approval and procurement purposes:</text>
          <paragraph num="(a)">
            <text>Similar capital maintenance projects at different schools; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Interrelated capital maintenance projects at a single school.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Procedures. The requirements of Regulation .15B, F, and I—M of this chapter and COMAR 14.39.03 apply to capital maintenance projects approved in the State capital improvement program.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".17" heading="State-Owned Relocatable Facilities.">
      <paragraph num="A.">
        <text>This regulation applies to State-owned relocatable projects approved in the State capital improvement program.</text>
      </paragraph>
      <paragraph num="B.">
        <text>A relocatable project is one in which the State:</text>
        <paragraph num="(1)">
          <text>Provides a relocatable facility to an LEA, including moving and installing the facility; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Contributes funding only to the initial installation and the final removal of the relocatable facility.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Requests.</text>
        <paragraph num="(1)">
          <text>An LEA may submit a request to the IAC for relocatable facilities in its local capital improvement program.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The request may only be to fund installation of relocatables for the relief of overcrowding, special programs, interim classroom facilities while an approved school construction project is constructed, or an emergency.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>IAC Review. The IAC shall evaluate relocatable facilities funding requests using the following factors:</text>
        <paragraph num="(1)">
          <text>The proposed use of the facility at a public school;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Whether the relocatable facility will be in use for at least 2 years after installation at the requested site; and</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Whether the relocatable facility can be installed in a manner that will not interfere with work associated with proposed renovations, additions, or new construction.</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Procedures. The provisions of Regulation .14B, E(1) and (2)(b), and F—I of this chapter apply to relocatable facility projects approved in the State capital improvement program.</text>
      </paragraph>
      <paragraph num="F.">
        <text>LEA Responsibility After Installation.</text>
        <paragraph num="(1)">
          <text>After installation, the LEA is responsible for obtaining appropriate insurance and maintaining the relocatable facility. These include:</text>
          <paragraph num="(a)">
            <text>Property damage insurance at least in replacement value amount, naming the State and the LEA as payees;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Personal liability insurance;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Drawings, specifications, operating instructions, warranties, and keys associated with the installation; and</text>
          </paragraph>
          <paragraph num="(d)">
            <text>A log of completed maintenance.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>The LEA shall comply with the Federal Asbestos Hazard Emergency Response Act.</text>
        </paragraph>
      </paragraph>
      <paragraph num="G.">
        <text>Repairs After Installation.</text>
        <paragraph num="(1)">
          <text>Except as provided in §G(2) of this regulation, the State may contribute funds, up to the State cost share, toward renovation of relocatable facilities.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The State may not contribute funds for renovation necessary because of vandalism or lack of proper maintenance.</text>
        </paragraph>
      </paragraph>
      <paragraph num="H.">
        <text>Surplus Property. The IAC may declare a State-owned relocatable facility to be surplus property.</text>
        <paragraph num="(1)">
          <text>LEAs who request the disposal of a State-owned relocatable facility must have the request approved by the IAC prior to the disposal of the unit.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>All disposals of State-owned property, including relocatable facilities, are required to follow the Maryland Department of General Services’ disposal procedure.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".18" heading="Emergency Repairs.">
      <paragraph num="A.">
        <text>An emergency condition is a condition in a school building or on school grounds that:</text>
        <paragraph num="(1)">
          <text>Presents an immediate health or safety hazard, or a threat of severe damage to the school building or grounds; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Could not have been reasonably foreseen through regular inspections or corrected through a regular preventive maintenance program.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>The IAC may fund eligible costs of correcting an emergency condition according to the State cost share percentage established in Regulation .05 of this chapter. Funding for emergency repairs is separate from the State capital improvement program.</text>
      </paragraph>
      <paragraph num="C.">
        <text>Requests.</text>
        <paragraph num="(1)">
          <text>An LEA shall submit a request to the IAC for funds to correct an emergency condition not later than 6 months after project completion.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The request may only be for eligible costs that total at least $10,000.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Funding. The IAC may:</text>
        <paragraph num="(1)">
          <text>Provide the funds to the LEA in advance of the project start or after project completion; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Determine whether the emergency repair funds will be deducted from the maximum State construction allocation for future building renewals and renovations based on the nature and cost of the emergency repairs.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".19" heading="Maintenance.">
      <paragraph num="A.">
        <text>Comprehensive Maintenance Plan.</text>
        <paragraph num="(1)">
          <text>A comprehensive maintenance plan is a written plan approved by the local board of education that describes a strategy for maintaining public school facilities.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Annually, each LEA shall submit to the IAC a comprehensive maintenance plan that is compatible with the local educational facilities master plan and the local capital improvement program.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The IAC or its designee shall notify the LEA of concerns and recommendations about the comprehensive maintenance plan.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>The LEA shall resolve the IAC's issues to the reasonable satisfaction of the IAC or its designee.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>The IAC may determine a project is ineligible for planning approval or funding approval for an existing school if:</text>
        <paragraph num="(1)">
          <text>The school is not properly maintained; or</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The LEA does not have an adequate preventive maintenance program.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Maintenance Surveys.</text>
        <paragraph num="(1)">
          <text>Annual Surveys.</text>
          <paragraph num="(a)">
            <text>The IAC shall annually survey the maintenance conditions at selected schools in each LEA. The survey shall rate:</text>
            <paragraph num="(i)">
              <text>Buildings and site components at the schools surveyed; and</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Each school overall.</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>Within 45 days of receiving notice from the IAC or its designee that a school has been rated less than adequate in any category of building or site component, the LEA shall submit to the IAC a plan of how and when the deficiencies will be corrected.</text>
          </paragraph>
          <paragraph num="(c)">
            <text>If a condition is identified that presents a hazard to occupants of the building or the threat of serious damage to the building, the LEA shall take immediate corrective action and notify the IAC of the steps it has taken.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Annual Report. The IAC shall annually publish a report summarizing the annual surveys.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".20" heading="Aging Schools Program.">
      <paragraph num="A.">
        <text>There is an Aging Schools Program. The Aging Schools Program is separate from the State capital improvement program.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Purpose. An LEA may use Aging Schools Program funds for capital improvements, repairs, and deferred maintenance of school buildings or building components that are 16 years old or older.</text>
      </paragraph>
      <paragraph num="C.">
        <text>Funding.</text>
        <paragraph num="(1)">
          <text>Allocations for each LEA are set forth in Education Article §5-324, Annotated Code of Maryland.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The State cost share percentage does not apply to projects funded through the Aging Schools Program. The State may fund all eligible costs of an approved Aging Schools Program project. An LEA may provide additional funds to increase the scope of work or cost for an approved project.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>An LEA may not use Aging Schools Program funds to supplement the State allocation received for any other project.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Requests. An LEA may submit a request to the IAC for allocated funds for an Aging Schools Program project at any time during the fiscal year of the allocation.</text>
      </paragraph>
      <paragraph num="E.">
        <text>IAC Review. The IAC or its designee shall evaluate Aging Schools Program project requests using the following factors:</text>
        <paragraph num="(1)">
          <text>Type of work;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Age of the building or building component;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>State capital improvement program;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Local capital improvement program;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>School's current and projected enrollments; and</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Maryland Historic Trust review, if applicable.</text>
        </paragraph>
      </paragraph>
      <paragraph num="F.">
        <text>Procurement. The LEA shall procure construction in compliance with COMAR 14.39.03.</text>
      </paragraph>
      <paragraph num="G.">
        <text>State Payment. The LEA shall submit to the IAC one request for payment per contract. The IAC or its designee shall review the request for payment for determination of whether the request comprises eligible expenditures and whether payment is within the allocation. The State shall pay the LEA through a single reimbursement at project completion.</text>
      </paragraph>
      <paragraph num="H.">
        <text>Ineligible Expenditures. The following expenditures are ineligible for funding under the Aging Schools Program:</text>
        <paragraph num="(1)">
          <text>Expenditures set forth in Regulation .12 of this chapter, except maintenance; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Improvements to or the movement of relocatable facilities.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".21" heading="School Safety Grant Program.">
      <paragraph num="A.">
        <text>There is a School Safety Grant Program. The School Safety Grant Program is separate from the State capital improvement program.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Purpose. An LEA may use the School Safety Grant Program to complete eligible school safety and security projects as identified by the IAC in consultation with the Center for School Safety.</text>
      </paragraph>
      <paragraph num="C.">
        <text>LEAs shall follow the Administrative Procedure Guide School Safety Grant Program.</text>
      </paragraph>
      <paragraph num="D.">
        <text>Procurement. The LEA shall procure construction in compliance with COMAR 14.39.03.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".22" heading="Change in School Status.">
      <paragraph num="A.">
        <text>An LEA shall report to the IAC changes in:</text>
        <paragraph num="(1)">
          <text>A school name; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Use of a school when the school will be used for educational purposes other than as a school or when a school will be left vacant, as provided in Regulations .23 and .24 of this chapter.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>The LEA shall request State approval to:</text>
        <paragraph num="(1)">
          <text>Grant easements or rights-of-way on school property;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Lease a portion of a school, as provided in Regulations .23 and .24 of this chapter; and</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Transfer a school site or a school building when the school is no longer needed for school purposes, as provided in Regulation .24 of this chapter.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".23" heading="Temporary or Partial Change in School Use.">
      <paragraph num="A.">
        <text>When an LEA uses more than 10 percent of a school building for educational purposes other than as a school for 5 years or less, the LEA shall notify the IAC of the use, the anticipated time for the use, and the expected date for reactivation as a school.</text>
      </paragraph>
      <paragraph num="B.">
        <text>When an LEA leases more than 10 percent of a school building for 5 years or less:</text>
        <paragraph num="(1)">
          <text>The LEA shall request IAC approval to lease by providing the IAC the information in §A of this regulation and a copy of the proposed lease; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The IAC may require the LEA to:</text>
          <paragraph num="(a)">
            <text>Pay the State a proportional share of the lease proceeds based on the proportion of the State's investment in the school; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Assume the outstanding debt remaining for bonds, the proceeds of which were used to construct or renovate the school.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>When an LEA leaves more than 10 percent of a school building vacant for 5 years or less:</text>
        <paragraph num="(1)">
          <text>The LEA shall report the vacancy to the IAC by providing the information in §A of this regulation; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The IAC may require the LEA to assume the outstanding debt remaining for bonds, the proceeds of which were used to construct or renovate the school.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".24" heading="Non-Public School Use Exceeding 5 Years.">
      <text>When the LEA uses more than 10 percent of a school building other than as a public school for more than 5 years and the State has debt remaining for bonds, the proceeds of which were used to construct or renovate that school, the IAC may require the LEA to pay a proportion of any lease proceeds and assume the remaining State debt, all calculated as of the date the LEA first began to use the school for purposes other than as a school.</text>
    </regulation>
    <regulation prefix="Regulation" num=".25" heading="Local Board Transfer of School Property to County Government.">
      <paragraph num="A.">
        <text>Definitions.</text>
        <paragraph num="(1)">
          <text>In this chapter, the following terms have the meanings indicated.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Terms Defined.</text>
          <paragraph num="(a)">
            <text>“School property” means any land, school site, or school building;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>” Local board transfer to county government” includes, in the case of Baltimore City, the City's change of the dedicated use of the property.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Local Board Transfer to County Government.</text>
        <paragraph num="(1)">
          <text>If, with the approval of the State Superintendent of Schools, a local board determines that any school property is no longer needed for school purposes, the local board shall transfer the property to the county government.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The local board shall submit a request to the IAC for approval to transfer the school property to the county government.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>The IAC may approve, disapprove, or conditionally approve the request to transfer the school property to the county government. The IAC may require that the transfer documents specifically incorporate the conditions.</text>
      </paragraph>
      <paragraph num="D.">
        <text>The local board shall affirm in the request that the county concurs with the local board's intention to transfer the property and commits to repayment of outstanding bond debt if repayment is required.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".26" heading="County Government Disposition of School Property.">
      <paragraph num="A.">
        <text>Definition.</text>
        <paragraph num="(1)">
          <text>In this regulation, the following term has the meaning indicated.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Term Defined. “School property” means any land, school site, or school building.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>A county government:</text>
        <paragraph num="(1)">
          <text>May use, sell, lease, or otherwise dispose of, except by gift, any former school property in accordance with this regulation; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Is encouraged to use the State Clearinghouse or similar procedures to make government agencies aware of the availability of former school property.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>A county government proposing to dispose of former school property shall submit to the IAC a request for approval to dispose. The IAC shall review the request and may approve, disapprove, or conditionally approve the request to dispose of the former school property. The IAC may require that the disposition documents specifically incorporate the conditions.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".27" heading="Assumption of State Debt, Capital Lease Financing Balances, and Disposition Proceeds.">
      <paragraph num="A.">
        <text>Pursuant to Education Article, §5-308, Annotated Code of Maryland, the IAC:</text>
        <paragraph num="(1)">
          <text>Shall require reimbursement of debt service from a county for a school property that:</text>
          <paragraph num="(a)">
            <text>Is sold by the county government; or</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Meets all the following:</text>
            <paragraph num="(i)">
              <text>Was initially constructed or substantially altered by additions, alterations, or renovations, and the cost of the construction at the time of execution exceeded $100,000, and the work was accomplished after February 1, 1971;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Is no longer used for school purposes;</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Has had title transferred to county government;</text>
            </paragraph>
            <paragraph num="(iv)">
              <text>Is being used for local governmental purposes by the State or county, or by any instrumentality of the State or county other than public education; and</text>
            </paragraph>
            <paragraph num="(v)">
              <text>Has outstanding debt that exceeds $5,000;</text>
            </paragraph>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>May require reimbursement of debt service or capital lease financing balances, or both, from a county for a school property that:</text>
          <paragraph num="(a)">
            <text>Has remaining State debt for bonds or capital lease financing balances;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Is no longer used for school purposes;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Has had title transferred to county government; and</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Is not being used for local governmental purposes by the State or county, or by any instrumentality of the State or county.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Reimbursement for Transferred School Building.</text>
        <paragraph num="(1)">
          <text>A county government is not required to reimburse the State for outstanding debt service for a school building that is transferred to the county government in accordance with §A of this regulation until 2 years after the school building is transferred.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>After the 2-year period ends, the county government shall reimburse the State for outstanding debt service for a school building in the amount that the county government would have been required to pay when the school building was transferred to the county.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>The IAC may require the county to pay the State a proportional share of the disposition proceeds based on the proportion of the State's investment in the school property.</text>
      </paragraph>
      <paragraph num="D.">
        <text>The IAC may establish any method of payment of the bond debt or the disposition proceeds including a lump sum payment or an assumption or re-assumption of existing bond debt.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".28" heading="Audits.">
      <paragraph num="A.">
        <text>The IAC or its designee may conduct financial audits and compliance audits of each LEA that receives State funds.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Audit items may include:</text>
        <paragraph num="(1)">
          <text>Transactions and balances reported on financial reports and close-out forms;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>LEA internal controls and management authorizations;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Items ineligible for State participation; and</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Compliance with 'IAC regulations and IAC policies and procedures.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>The LEA shall reconcile audit exceptions and back charges to the IAC's or its designee's satisfaction.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".29" heading="Reconsideration.">
      <paragraph num="A.">
        <text>Reconsideration of Staff Determination.</text>
        <paragraph num="(1)">
          <text>An LEA dissatisfied with a determination made by the IAC’s designee may request the IAC to reconsider the determination.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The LEA shall submit a written request for reconsideration to the IAC within 45 calendar days of the designee’s decisions.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The written request for reconsideration shall include all additional information and documentation the LEA wants the IAC to consider.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>The IAC’s designee may submit to the IAC additional information and documentation it wants the IAC to consider in support of its determination.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>The IAC will notify the LEA of its decision.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Reconsideration of IAC Determination.</text>
        <paragraph num="(1)">
          <text>An LEA dissatisfied with a determination made by the IAC, including determination of projects that were not approved by the IAC, may appeal the decision to the IAC in writing.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The appeal shall be received by the IAC no later than 45 days following the IAC determination.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The written appeal shall contain:</text>
          <paragraph num="(a)">
            <text>The IAC determination from which the appeal is being taken, including funding requests for projects that were not approved by the IAC;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Reasons in support of the appeal;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>A statement of the result sought; and</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Any supporting documents, exhibits, and affidavits.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>Oral Argument.</text>
          <paragraph num="(a)">
            <text>In its written appeal, the LEA may request to present oral argument to the IAC.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Oral argument will not be allowed without a written request to the IAC.</text>
          </paragraph>
          <paragraph num="(c)">
            <text>If oral argument is requested, the IAC shall notify the LEA of the date that the argument will be heard.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(5)">
          <text>The IAC shall issue a decision to the LEA.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>The IAC’s decision is a final decision of the agency.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".30" heading="Waiver.">
      <text>The IAC may waive or vary particular provisions of this chapter to the extent that the waiver or variance is not inconsistent with State statutes if:</text>
      <paragraph num="A.">
        <text>In the IAC's determination, the application of a regulation in a specific case or in an emergency situation would be inequitable or contrary to the purposes of State law; and</text>
      </paragraph>
      <paragraph num="B.">
        <text>The Office of the Attorney General approves the waiver for form and legal sufficiency.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".31" heading="Priority Funding Area Waiver Criteria.">
      <paragraph num="A.">
        <text>In accordance with State Finance and Procurement Article, §5-7B-07, Annotated Code of Maryland, it is the policy of the State to ensure sufficient conditions in existing schools as well as new facilities.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Waiver Procedure.</text>
        <paragraph num="(1)">
          <text>An LEA may request a waiver for approval of planning and funding, or of a site, for a new school or a replacement school that adds capacity located outside of a priority funding area.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>On confirmation by the Maryland Department of Planning that the proposed new school or a replacement school that adds capacity, or the site for same, is outside a priority funding area, the designees shall make a recommendation to the IAC.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Based on the recommendation of the IAC designees, the IAC shall consider whether to grant a waiver for approval of planning and funding, or of a site, for a new school or a replacement school that adds capacity outside of a priority funding area.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>After considering the criteria for a waiver in §B of this regulation, the IAC may:</text>
          <paragraph num="(a)">
            <text>Approve planning and funding, or of a site, for the new school or the replacement school that adds capacity;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Approve planning and funding, or of a site, for the new school or the replacement school that adds capacity with conditions; or</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Deny planning and funding, or of a site, for the new school or the replacement school that adds capacity.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(5)">
          <text>When considering whether to grant a waiver for a new school or a replacement school that adds capacity outside of a priority funding area, the IAC may consult with the Smart Growth Subcabinet.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>The IAC shall consider the following factors when determining whether to grant a waiver to the requirement that a site for a new school or for a replacement school that adds capacity, or a new school or a replacement school that adds capacity that is requested for approval of State planning and funding, be located inside a priority funding area:</text>
        <paragraph num="(1)">
          <text>Evidence of efforts made by the LEA and the local government to secure a site within a priority funding area that is of a size, location, and configuration that can support the proposed educational program and serve an appropriate student body. For each evaluated site, criteria that must be considered include:</text>
          <paragraph num="(a)">
            <text>Costs of each site, including both quantifiable first costs and life cycle costs analysis (LCCA) inclusive of transportation costs, and non-quantifiable costs such as administrative inefficiencies or lost teaching time, in order to demonstrate that sites within the priority funding area are more costly than those outside the priority funding areas; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Benefits of each site, including the impact of the proposed site on community life, walkability of students, access to public transportation, and access of students to educational programs and non-curricular activities;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Evidence that if a site outside a priority funding area is selected because of inability to locate a site within a priority funding area that is of a size, location, and configuration that can support the proposed educational program and serve an appropriate student body:</text>
          <paragraph num="(a)">
            <text>The new site or new school or replacement school that adds capacity is located as proximate to the priority funding area as possible;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The LEA proposes to mitigate potential negative effects of the site on educational delivery and the community; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The local government tools for control of land use, including the comprehensive plan and zoning, restrict the growth of housing development outside of the priority funding area that may result from the new school or replacement school that adds capacity;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>Evidence of efforts made by the LEA and local government to achieve the needed capacity through additions to existing schools inside the priority funding area;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>The location of the student body that will be served by the new school or replacement school that adds capacity;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>The potential of the new school or replacement school that adds capacity to be permanently connected to existing or proposed municipal or county water and sewer service that is in the 6-year local government capital improvement program;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>The effect of the new school or replacement school that adds capacity in relieving an Adequate Public Facilities closure within an existing priority funding area or local growth area;</text>
        </paragraph>
        <paragraph num="(7)">
          <text>Opportunities for co-location or joint use that the new school or replacement school that adds capacity may make possible;</text>
        </paragraph>
        <paragraph num="(8)">
          <text>Opportunities for reuse of an existing facility;</text>
        </paragraph>
        <paragraph num="(9)">
          <text>The increase of capacity for a replacement school is modest;</text>
        </paragraph>
        <paragraph num="(10)">
          <text>Other factors.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".32" heading="Emergency Management Shelters.">
      <paragraph num="A.">
        <text>Definitions.</text>
        <paragraph num="(1)">
          <text>“Emergency management shelter” means temporary operations that meet the base humanitarian needs of the whole community before, during, or after an emergency event.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>“Fully power” means the capability to provide electrical power to the fixtures, services, appliances, and/or outlets within a specified facility or portion of a facility.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>“Replacement of the electrical system” means a complete new electrical system is installed in an existing or new facility, including when major components of the pre-existing electrical system are either removed or abandoned in place.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>“Upgrade of the electrical system” means an existing electrical system of a facility or a major portion of a facility is improved through either:</text>
          <paragraph num="(a)">
            <text>The replacement or upgrade of existing components; or</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Other improvements that alter the performance characteristics of the electrical system.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Each county board shall determine which public schools within the jurisdiction of the county board should be designated as emergency management shelters.</text>
      </paragraph>
      <paragraph num="C.">
        <text>The county board’s determination is based on consistency with local emergency management plans and criteria and the availability of funding.</text>
      </paragraph>
      <paragraph num="D.">
        <text>For schools that will be used as emergency management shelters based upon the LEA determination, local officials shall consult with the Maryland Department of Emergency Management (MDEM) to determine those areas of the facility that are necessary for public safety when the circumstances require the use of the facility as a public shelter during or after a federal, State, or local declared emergency.</text>
      </paragraph>
      <paragraph num="E.">
        <text>The LEA shall ensure that the areas determined to be emergency management shelters are designed and constructed to be fully powered in the event of an emergency through installation of:</text>
        <paragraph num="(1)">
          <text>A permanent, on-site emergency power source; or</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Other means to accept temporary emergency power source.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".33" heading="Built to Learn Program.">
      <paragraph num="A.">
        <text>There is a Built to Learn Program. The Built to Learn Program is separate from the State Capital Improvement Program. The Built to Learn Program is governed by the memorandum of understanding (MOU), as defined in Economic Development Article, §10-650, Annotated Code of Maryland, established between the IAC and the Maryland Stadium Authority.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Funding allocations for the Built to Learn program are mandated in Economic Development Article, §10–650, Annotated Code of Maryland, and shall be distributed accordingly.</text>
      </paragraph>
      <paragraph num="C.">
        <text>IAC review will consist of planning review, priority funding area review, and available funding allocation review, Built to Learn projects must be brought to the IAC for approval. For each project approved by the IAC, the LEA shall establish an MOU with the Maryland Stadium Authority.</text>
      </paragraph>
      <paragraph num="D.">
        <text>Built to Learn funding may be combined with Capital Improvement Program funding, or funding from other IAC programs. Projects that combine funding must meet the contract award requirements pursuant to COMAR 14.39.02 and 14.39.03.</text>
      </paragraph>
    </regulation>
    <annotations>
      <annotation type="Authority">Education Article, §§2-303, 4-126, 5-112, and 5-303 and 5-308; State Finance and Procurement Article, §5-7B-07; Annotated Code of Maryland;Ch. 32, §5, Acts of 2022</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: May 21, 2007 (34:10 Md. R. 891)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .01B amended effective November 2, 2009 (36:22 Md. R. 1725)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .01-1 adopted effective November 2, 2009 (36:22 Md. R. 1725)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .02A amended effective November 2, 2009 (36:22 Md. R. 1725)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .03 amended effective November 2, 2009 (36:22 Md. R. 1725); November 14, 2011 (38:23 Md. R. 1423)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .04C amended effective November 2, 2009 (36:22 Md. R. 1725)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .04F adopted effective November 2, 2009 (36:22 Md. R. 1725)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .05B amended effective November 14, 2011 (38:23 Md. R. 1423); September 28, 2015 (42:19 Md. R. 1229)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .05B, C amended effective November 2, 2009 (36:22 Md. R. 1725); February 26, 2018 (45:4 Md. R. 208)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .06 amended effective March 22, 2010 (37:6 Md. R. 480)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .06H amended effective September 28, 2015 (42:19 Md. R. 1229)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .11 amended effective November 2, 2009 (36:22 Md. R. 1725)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .11I amended effective August 1, 2016 (43:15 Md. R. 865)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .11J adopted effective September 11, 2017 (44:18 Md. R. 866)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .12 amended effective November 2, 2009 (36:22 Md. R. 1725)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .12B amended effective September 11, 2017 (44:18 Md. R. 866)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .13 amended effective November 14, 2011 (38:23 Md. R. 1423)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .13A, B amended effective November 2, 2009 (36:22 Md. R. 1725)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .14 amended effective November 2, 2009 (36:22 Md. R. 1725)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .15B amended effective November 2, 2009 (36:22 Md. R. 1725)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .16 amended effective November 2, 2009 (36:22 Md. R. 1725)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .23D amended effective November 2, 2009 (36:22 Md. R. 1725)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .24E, F repealed effective November 2, 2009 (36:22 Md. R. 1725)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .24-1 adopted effective November 2, 2009 (36:22 Md. R. 1725)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .28 adopted effective November 14, 2011 (38:23 Md. R. 1423)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .29 adopted effective November 14, 2011 (38:23 Md. R. 1423)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .29 amended effective November 24, 2014 (41:23 Md. R. 1376)</annotation>
      <annotation type="History" subtype="Administrative History">COMAR 23.03.02 recodified to be COMAR 14.39.02 under new subtitle, Interagency Commission on School Construction, effective November 4, 2019 (46:22 Md. R. 979)</annotation>
      <annotation type="History" subtype="Administrative History">Chapter revised effective November 4, 2019 (46:22 Md. R. 979)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .05B, C amended effective October 5, 2020 (47:20 Md. R. 876)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .06 amended effective October 5, 2020 (47:20 Md. R. 876)</annotation>
      <annotation type="History" subtype="Administrative History">Chapter revised effective June 28, 2021 (48:13 Md. R. 509)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .05 amended effective October 17, 2022 (49:21 Md. R. 951)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .05B, F amended effective November 13, 2023 (50:22 Md. R. 977)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .06 amended effective February 6, 2023 (50:2 Md. R. 51)</annotation>
      <annotation type="History" subtype="Administrative History">Chapter revised effective August 5, 2024 (51:15 Md. R. 711)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .04 amended effective July 7, 2025 (52:13 Md. R. 656)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .05B, C amended effective July 7, 2025 (52:13 Md. R. 656); May 11, 2026 (53:9 Md. R. 414)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .05F amended effective January 20, 2025 (52:1 Md. R. 19)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .07 amended effective July 7, 2025 (52:13 Md. R. 656)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .08A, C amended effective May 11, 2026 (53:9 Md. R. 414)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .08B, C amended effective July 7, 2025 (52:13 Md. R. 656)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .08D adopted effective May 11, 2026 (53:9 Md. R. 414)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .09 amended effective July 7, 2025 (52:13 Md. R. 656)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .10A amended effective May 11, 2026 (53:9 Md. R. 414)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .11A amended effective May 11, 2026 (53:9 Md. R. 414)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .12 amended effective July 7, 2025 (52:13 Md. R. 656)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .13D, E amended effective July 7, 2025 (52:13 Md. R. 656)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .14 amended effective July 7, 2025 (52:13 Md. R. 656)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .15 amended effective July 7, 2025 (52:13 Md. R. 656)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .16 amended effective July 7, 2025 (52:13 Md. R. 656)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .17D, H amended effective July 7, 2025 (52:13 Md. R. 656)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .18D amended effective July 7, 2025 (52:13 Md. R. 656)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .20 amended effective July 7, 2025 (52:13 Md. R. 656)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .32D amended effective July 7, 2025 (52:13 Md. R. 656)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .33 adopted effective July 7, 2025 (52:13 Md. R. 656):</annotation>
    </annotations>
  </chapter>
  <chapter num="03" heading="Construction Procurement Methods">
    <regulation prefix="Regulation" num=".01" heading="Scope.">
      <paragraph num="A.">
        <text>This chapter applies to a public school construction project for building, improvement, supplies, or equipment if it:</text>
        <paragraph num="(1)">
          <text>Exceeds $50,000 and has IAC planning or funding approval; or</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Requires review by the State Superintendent of Schools under Education Article, §2-303, Annotated Code of Maryland.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>This chapter does not apply to a project in a building that is not used primarily for the instruction of students, including an office building, warehouse, or vehicle maintenance or repair building.</text>
      </paragraph>
      <paragraph num="C.">
        <text>In this chapter, “IAC or its designee” includes “State Superintendent or designee” when State Superintendent approval is required by Education Article, §2-303(f), Annotated Code of Maryland.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="Project Procurement Proposal Review Assistance.">
      <text>The State Superintendent or designee may request assistance from the IAC or its designee when reviewing project procurement proposals.</text>
    </regulation>
    <regulation prefix="Regulation" num=".03" heading="Methods of Source Selection.">
      <text>Unless otherwise authorized, school construction procurement contracts shall be awarded by one of the following methods:</text>
      <paragraph num="A.">
        <text>Competitive sealed bidding, including competitive multistep sealed bidding;</text>
      </paragraph>
      <paragraph num="B.">
        <text>Quality-based selection;</text>
      </paragraph>
      <paragraph num="C.">
        <text>Competitive negotiation;</text>
      </paragraph>
      <paragraph num="D.">
        <text>Unsolicited proposals;</text>
      </paragraph>
      <paragraph num="E.">
        <text>Intergovernmental cooperative purchasing;</text>
      </paragraph>
      <paragraph num="F.">
        <text>Sole source; or</text>
      </paragraph>
      <paragraph num="G.">
        <text>Negotiated award after unsatisfactory competitive sealed bidding.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".04" heading="Choice of Method.">
      <paragraph num="A.">
        <text>Except as this regulation otherwise provides, an LEA shall use competitive sealed bidding.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Quality-Based Selection; Competitive Negotiation; Unsolicited Proposals.</text>
        <paragraph num="(1)">
          <text>An LEA may use quality-based selection or competitive negotiation or accept an unsolicited proposal in order to finance or to speed delivery of, transfer risks of, or otherwise enhance the delivery of public school construction.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>An LEA intending to use quality-based selection or competitive negotiation or to pursue an unsolicited proposal shall:</text>
          <paragraph num="(a)">
            <text>Present a written determination that the circumstances listed in §B(1) of this regulation exist; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Obtain authorization from the IAC or its designee.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>An LEA may use intergovernmental cooperative purchasing when the circumstances set forth in Regulation .12B of this chapter exist.</text>
      </paragraph>
      <paragraph num="D.">
        <text>Sole Source.</text>
        <paragraph num="(1)">
          <text>If the LEA determines that a competitive source selection method cannot be used because there is only one available source for the subject of the procurement, the LEA may award a contract without competition to the sole source.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>An LEA intending to use sole source selection shall present a written determination that the circumstances listed in §B(1) of this regulation exist.</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>An LEA may use negotiated award after unsatisfactory competitive sealed bidding when the circumstances set forth in Regulation .14A of this chapter exist.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".05" heading="Approvals.">
      <paragraph num="A.">
        <text>IAC or designee authorization to use quality based selection or competitive negotiation or to pursue an unsolicited proposal is distinct from IAC or designee approval of project planning and funding. If the IAC or designee approves the project for use of a competitive negotiation method but does not approve the project for planning, the project may proceed as a locally funded project.</text>
      </paragraph>
      <paragraph num="B.">
        <text>The LEA shall obtain State approval of each construction contract.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".06" heading="Other Requirements.">
      <paragraph num="A.">
        <text>All projects shall comply with State procedures and requirements for educational and design review.</text>
      </paragraph>
      <paragraph num="B.">
        <text>A county board is encouraged, consistent with competitive bidding, to use bulk purchasing, bundling, and intergovernmental purchasing.</text>
      </paragraph>
      <paragraph num="C.">
        <text>Project Delivery Methods. The requirements of COMAR 14.39.04 apply to procurements conducted in accordance with this chapter.</text>
      </paragraph>
      <paragraph num="D.">
        <text>Minority Business Enterprise (MBE). The State’s minority business enterprise program applies to procurements conducted in accordance with this chapter that the State funds in whole or part. Any LEA utilizing State funding for school construction projects shall;</text>
        <paragraph num="(1)">
          <text>Adopt an MBE policy and procedures guiding document;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Provide the LEA’s board-adopted MBE policy and any related guiding documents to the IAC annually by a date specified by the IAC; and</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Certify that all MBE policies are in compliance with the State’s MBE program.</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Prevailing Wage. To the extent required by law, the State's prevailing wage requirements apply to procurements conducted in accordance with this chapter that the State funds in whole or part.</text>
      </paragraph>
      <paragraph num="F.">
        <text>Debriefing and Protests.</text>
        <paragraph num="(1)">
          <text>The LEA shall establish procedures by which unsuccessful bidders and offerors may be debriefed upon written request within a reasonable time by a procurement official familiar with the rationale for the selection decision and contract award.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The LEA shall establish procedures by which an interested party may file a protest relating to the solicitation or award of a procurement contract.</text>
        </paragraph>
      </paragraph>
      <paragraph num="G.">
        <text>If a single bid or offer is submitted following appropriate notification and solicitation procedures, the LEA may award the contract to the single bidder or offeror if the bid or offer is determined responsible and responsive.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".07" heading="Competitive Sealed Bidding — One Step Sealed Bidding.">
      <paragraph num="A.">
        <text>Prequalification. The LEA may establish procedures to ensure that bidders are responsible. The LEA may require a bidder to be prequalified according to LEA procedures before submitting a bid.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Invitation for Bids.</text>
        <paragraph num="(1)">
          <text>The invitation for bids shall be used to initiate a competitive sealed bid procurement.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The invitation for bids shall include:</text>
          <paragraph num="(a)">
            <text>Instructions and information concerning bid submission requirements including the date, time, and place for receipt of bids;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Whether electronic bids will be accepted;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Specifications or drawings or both that clearly and accurately describe the functional characteristics of or the nature of the work to be procured;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>The delivery or performance schedule;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>MBE goals, if applicable;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Prevailing wage requirements, if applicable;</text>
          </paragraph>
          <paragraph num="(g)">
            <text>Requirement that bidders acknowledge receipt of each amendment and addendum issued;</text>
          </paragraph>
          <paragraph num="(h)">
            <text>Requirement for submission of bid bond;</text>
          </paragraph>
          <paragraph num="(i)">
            <text>Information with respect to prebid conference if a conference is to be held;</text>
          </paragraph>
          <paragraph num="(j)">
            <text>Requirement for submission of bid affidavit; and</text>
          </paragraph>
          <paragraph num="(k)">
            <text>Any other information the LEA requires.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Public Notice. The LEA shall publish notice of an invitation for bid at least 14 calendar days before the bid due date in:</text>
        <paragraph num="(1)">
          <text>eMaryland Marketplace;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>An electronic posting or a physical posting on the LEA's bid board; or</text>
        </paragraph>
        <paragraph num="(3)">
          <text>A newspaper of general circulation in the LEA's region.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Bid Receipt, Opening, Disclosure.</text>
        <paragraph num="(1)">
          <text>Upon its receipt, each bid shall be stored in a secure place until the time set for bid opening.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Bids shall be opened publicly in the presence of at least one LEA employee and read aloud at the time, date, and place designated in the invitation for bids, or are to be made available to the public through a method in accordance with local policy and procurement practice. The name of each bidder, the bid price, and other appropriate information shall be read aloud or otherwise made available. This information shall be recorded at the time of bid opening. The bids shall be tabulated or a bid abstract made.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Opened bids shall be available for public inspection at a reasonable time after bid opening and before contract award. Bidders may designate trade secrets, financial data, or other proprietary data as confidential; material so designated shall be readily separable from the bid in order to facilitate public inspection of the nonconfidential portion of the bid. The LEA shall examine the bids to determine the validity of any requests for nondisclosure of trade secrets and other proprietary data identified in writing. All information submitted by bidders is subject to State and local public disclosure laws.</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>IFB Cancellation; Bid Rejection; Irregularities.</text>
        <paragraph num="(1)">
          <text>Before opening of bids, the LEA may cancel the invitation for bids in whole or in part if the LEA determines that the cancellation is fiscally advantageous or otherwise in its best interest.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>After opening of bids but before award, the LEA may reject all bids in whole or in part if the LEA determines that the rejection is fiscally advantageous or otherwise in its best interest.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The LEA may reject any bid in whole or in part if it is in the LEA's best interest to do so. Reasons for rejecting a bid may include that the bidder is not responsible, that the bid is not responsive, that the price is unreasonable, or that the bidder is debarred or otherwise ineligible.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Irregularities.</text>
          <paragraph num="(a)">
            <text>Minor; Material; Correction.</text>
            <paragraph num="(i)">
              <text>The LEA may permit a bidder to correct a minor irregularity or may waive a minor irregularity. A minor irregularity is one that is merely a matter of form and not of substance or pertains to an immaterial or inconsequential defect or variation in a bid, the correction or waiver of which would not be prejudicial to other bidders.</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>The LEA may not waive or permit a bidder to correct a defect or variation in a bid that is material as to price, quantity, quality, or delivery.</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>Up to and including the time for bid opening, a bidder may correct a defect or variation with respect to:</text>
            <paragraph num="(i)">
              <text>Bid bond;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Acknowledgment of addenda; or</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>MBE submission materials.</text>
            </paragraph>
          </paragraph>
          <paragraph num="(c)">
            <text>After bid opening, the LEA may not waive or permit a bidder to correct a defect or variation with respect to these requirements unless the defect or variation is determined to be minor and does not affect the competitiveness of the bid.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="F.">
        <text>Bid Evaluation and Award.</text>
        <paragraph num="(1)">
          <text>The LEA shall award the contract to the responsible bidder who provides the best value and conforms to specifications with consideration given to:</text>
          <paragraph num="(a)">
            <text>The quantities involved;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The time required for delivery;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The purpose for which required;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>The competency and responsibility of the bidder;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>The ability of the bidder to perform satisfactory service;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>The plan for utilization of minority contractors; and</text>
          </paragraph>
          <paragraph num="(g)">
            <text>The price offered by the bidder.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>The LEA may not evaluate a bid for any criterion that is not disclosed in the invitation for bids.</text>
        </paragraph>
      </paragraph>
      <paragraph num="G.">
        <text>Single Bidder. If after proper publication of invitation for bid and proper bid opening, the LEA receives one responsive bid, the LEA may:</text>
        <paragraph num="(1)">
          <text>Award the contract to the single responsible bidder; or</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Reissue the invitation for bid.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".08" heading="Competitive Sealed Bidding — Multistep Sealed Bidding.">
      <paragraph num="A.">
        <text>General.</text>
        <paragraph num="(1)">
          <text>Competitive sealed bidding may be conducted through multistep sealed bidding.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Multistep sealed bidding is a multiphase process in which bidders submit a technical offer (statement of qualifications) and a second phase in which those bidders who are determined qualified during the first phase may have price bids considered.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Request for Qualifications.</text>
        <paragraph num="(1)">
          <text>The request for qualifications is used to initiate a competitive two-step sealed bid procurement.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The request for qualifications shall set forth the factors by which the bidder's qualifications will be evaluated.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Evaluation factors shall include:</text>
          <paragraph num="(a)">
            <text>Bidder's understanding of the scope and schedule of the work;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Bidder's prior experience with projects of similar size and scope, and if bidder is a joint venture, experience of at least one of the members of the joint venture entity;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Bidder's plan for management of the project, and the organizational structure proposed for the project;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Experience of bidder's individual staff members with projects of similar size and scope;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>MBE plan, if applicable; and</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Other factors that the LEA sets forth.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>The request for qualifications shall set forth the minimum standards that a bidder shall meet to be found qualified.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>The request for qualifications may include information concerning the project scope, schedule, MBE, and prevailing wage as the LEA considers appropriate.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Public Notice. The LEA shall publish notice of a request for qualification at least 14 calendar days before the technical-offer due date in:</text>
        <paragraph num="(1)">
          <text>eMaryland Marketplace;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>An electronic posting or a physical posting on the LEA's bid board; or</text>
        </paragraph>
        <paragraph num="(3)">
          <text>A newspaper of general circulation in the LEA's region.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Qualifications Evaluation.</text>
        <paragraph num="(1)">
          <text>The LEA shall evaluate the bidder's qualifications to determine whether the bidder meets the minimum qualification standards.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The LEA shall compile a list of bidders that are determined to meet the minimum qualification standards. Only the bidders on that list shall be permitted to submit bids.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Interviews may be conducted as a component of the qualifications process.</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Invitation For Bids.</text>
        <paragraph num="(1)">
          <text>After preparing the list of qualified bidders, the LEA may issue an invitation for bids to all bidders on that list.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The invitation for bids shall include:</text>
          <paragraph num="(a)">
            <text>Instructions and information concerning bid submission requirements including the date, time, and place for receipt of bids;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Whether electronic bids will be accepted;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Specifications, drawings, or both, that clearly and accurately describe the functional characteristics of or the nature of an item to be procured;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>The delivery or performance schedule;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>MBE goals, if applicable;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Prevailing wage requirements, if applicable;</text>
          </paragraph>
          <paragraph num="(g)">
            <text>Requirement that bidders acknowledge receipt of each amendment and addendum issued;</text>
          </paragraph>
          <paragraph num="(h)">
            <text>Requirement for submission of bid bond;</text>
          </paragraph>
          <paragraph num="(i)">
            <text>Information with respect to pre-bid conference if a conference is to be held;</text>
          </paragraph>
          <paragraph num="(j)">
            <text>Requirement for submission of bid affidavit; and</text>
          </paragraph>
          <paragraph num="(k)">
            <text>Any other information the LEA requires.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>The LEA shall obtain approval from the IAC or its designee before issuing the invitation for bids.</text>
        </paragraph>
      </paragraph>
      <paragraph num="F.">
        <text>Bid Receipt and Opening; Disclosure.</text>
        <paragraph num="(1)">
          <text>Upon receipt, each bid shall be stored in a secure place until the time set for bid opening.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Bids shall be opened publicly in the presence of at least one LEA employee and read aloud at the time, date, and place designated in the invitation for bids. The name of each bidder, the bid price, and other appropriate information shall be read aloud or otherwise made available. This information shall be recorded at the time of bid opening. The bids shall be tabulated or a bid abstract made.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Opened bids shall be available for public inspection at a reasonable time after bid opening and before contract award. Bidders may designate trade secrets or other proprietary data as confidential; material so designated shall be readily separable from the bid in order to facilitate public inspection of the nonconfidential portion of the bid. The LEA shall examine the bids to determine the validity of any requests for nondisclosure of trade secrets and other proprietary data identified in writing. All information submitted by bidders is subject to State and local public disclosure laws.</text>
        </paragraph>
      </paragraph>
      <paragraph num="G.">
        <text>IFB Cancellation; Bid Rejection; Irregularities.</text>
        <paragraph num="(1)">
          <text>Before opening bids, the LEA may cancel the invitation for bids in whole or in part if the LEA determines that the cancellation is fiscally advantageous or otherwise in its best interest.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>After opening of bids but before award, the LEA may reject all bids in whole or in part if the LEA determines that the rejection is fiscally advantageous or otherwise in its best interest.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The LEA may reject any bid in whole or in part if it is in the LEA's best interest to do so. Reasons for rejecting a bid include that the bidder is not responsible, that the bid is not responsive, that the price is unreasonable, or that the bidder is debarred or otherwise ineligible.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Irregularities.</text>
          <paragraph num="(a)">
            <text>Minor; Material; Correction.</text>
            <paragraph num="(i)">
              <text>The LEA may permit a bidder to correct a minor irregularity or may waive a minor irregularity. A minor irregularity is one that is merely a matter of form and not of substance or pertains to an immaterial or inconsequential defect or variation in a bid, the correction or waiver of which would not be prejudicial to other bidders.</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>The LEA may not waive or permit a bidder to correct a defect or variation in a bid that is material as to price, quantity, quality, or delivery.</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>Up to and including the time for bid opening, a bidder may correct a defect or variation with respect to:</text>
            <paragraph num="(i)">
              <text>Bid bond;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Acknowledgment of addenda; or</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>MBE submission materials.</text>
            </paragraph>
          </paragraph>
          <paragraph num="(c)">
            <text>After bid opening, the LEA may not waive or permit a bidder to correct a defect or variation with respect to these requirements unless the defect or variation is determined to be minor and does not affect the competitiveness of the bid.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="H.">
        <text>Bid Evaluation and Award.</text>
        <paragraph num="(1)">
          <text>The LEA shall award the contract to the lowest responsible and responsive bidder whose bid meets the requirements and evaluation criteria set forth in the invitation for bids and is the most favorable bid.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The LEA may not evaluate a bid for any criterion that is not disclosed in the invitation for bids.</text>
        </paragraph>
      </paragraph>
      <paragraph num="I.">
        <text>Single Bidder. If after proper publication of invitation for bid and proper bid opening, the LEA receives one responsive bid, the LEA may:</text>
        <paragraph num="(1)">
          <text>Award the contract to the single responsible bidder; or</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Reissue the invitation for bid.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".09" heading="Quality-Based Selection.">
      <paragraph num="A.">
        <text>General. Quality-based selection means a method of source selection based on a combination of qualification and cost factors.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Request for Proposals.</text>
        <paragraph num="(1)">
          <text>The request for proposals is used to initiate a quality-based selection procurement.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The request for proposals shall include:</text>
          <paragraph num="(a)">
            <text>Instructions and information concerning proposal submission requirements including the date, time, and place for receipt of proposals;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Whether electronic proposals will be accepted;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Specifications, drawings, or both, that clearly and accurately describe the functional characteristics of or the nature of the work to be procured, delivery or performance schedule, and any special instructions;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>The evaluation factors and an indication of the relative importance of each evaluation factor including price;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>MBE goals, if applicable;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Prevailing wage requirements, if applicable;</text>
          </paragraph>
          <paragraph num="(g)">
            <text>Information with respect to preproposal conference if a conference is to be held;</text>
          </paragraph>
          <paragraph num="(h)">
            <text>Requirement for submission of proposal affidavit;</text>
          </paragraph>
          <paragraph num="(i)">
            <text>Requirement that offerors acknowledge receipt of each amendment and addendum issued;</text>
          </paragraph>
          <paragraph num="(j)">
            <text>Requirement for submission of bid bond; and</text>
          </paragraph>
          <paragraph num="(k)">
            <text>Any other information the LEA requires.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>LEAs may request that qualification factors in the proposal be submitted separately from price information.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Public Notice. The LEA shall publish notice of a request for proposals at least 14 calendar days before the proposal due date in:</text>
        <paragraph num="(1)">
          <text>eMaryland Marketplace;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>An electronic posting or a physical posting on the LEA's bid board; or</text>
        </paragraph>
        <paragraph num="(3)">
          <text>A newspaper of general circulation in the LEA's region.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Proposal Receipt. The LEA shall keep submitted proposals in a secure place until the due date. Proposals may not be opened publicly but shall be opened in the presence of at least two LEA employees.</text>
      </paragraph>
      <paragraph num="E.">
        <text>Proposal Disclosure. Offerors shall indicate clearly the portions of their proposals that they consider confidential information. All information submitted by offerors is subject to State and local public disclosure laws.</text>
      </paragraph>
      <paragraph num="F.">
        <text>Proposal Evaluation.</text>
        <paragraph num="(1)">
          <text>The LEA shall evaluate the proposal based on the evaluation factors set forth in the request for proposals.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Evaluation factors shall include:</text>
          <paragraph num="(a)">
            <text>Offeror's understanding of scope of the work;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Offeror's prior experience with projects of similar size and scope, and if offeror is a joint venture, experience for at least one of the members of the joint venture entity;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Offeror's plan for management of the project and organizational structure proposed for the project;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Experience of offeror's individual staff members with projects of similar size and complexity;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>MBE plan, if applicable;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Other qualification factors that the LEA sets forth; and</text>
          </paragraph>
          <paragraph num="(g)">
            <text>Price.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>Interviews may be conducted as a component of the qualification process.</text>
        </paragraph>
      </paragraph>
      <paragraph num="G.">
        <text>IFB Cancellation; Proposal Rejection; Irregularities.</text>
        <paragraph num="(1)">
          <text>Before opening of proposals, the LEA may cancel the request for proposals in whole or in part if the LEA determines that the cancellation is fiscally advantageous or otherwise in its best interest.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>After opening of proposals but before award, the LEA may reject all proposals in whole or in part if the LEA determines that the rejection is fiscally advantageous or otherwise in its best interest.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The LEA may reject any proposal in whole or in part if it is in the LEA's best interest to do so. Reasons for rejecting a proposal include that the offeror is not responsible, that the proposal is not susceptible of award, that the price is unreasonable, or that the offeror is debarred or otherwise ineligible.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Irregularities.</text>
          <paragraph num="(a)">
            <text>Minor; Material; Correction.</text>
            <paragraph num="(i)">
              <text>The LEA may permit an offeror to correct a minor irregularity or may waive a minor irregularity. A minor irregularity is one that is merely a matter of form and not of substance or pertains to an immaterial or inconsequential defect or variation in a proposal, the correction or waiver of which would not be prejudicial to other bidders.</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>The LEA may not waive or permit an offeror to correct a defect or variation in a proposal that is material as to price, quantity, quality, or delivery.</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>Up to and including the time for proposal opening, an offeror may correct a defect or variation with respect to:</text>
            <paragraph num="(i)">
              <text>Bid bond;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Acknowledgment of addenda; or</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>MBE submission materials.</text>
            </paragraph>
          </paragraph>
          <paragraph num="(c)">
            <text>After proposal opening, the LEA may not waive or permit an offeror to correct a defect or variation with respect to these requirements unless the defect or variation is determined to be minor and does not affect the competitiveness of the bid.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="H.">
        <text>Evaluation and Award.</text>
        <paragraph num="(1)">
          <text>The LEA may not evaluate a proposal for any criterion that is not disclosed in the request for proposals.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The LEA shall award the contract to the offeror whose proposal is, in the LEA's determination, the highest ranked proposal based on the factors contained in the request for proposals including price.</text>
        </paragraph>
      </paragraph>
      <paragraph num="I.">
        <text>Single Offeror. If after proper publication of request for proposal and proper proposal opening, the LEA receives one responsive offer, the LEA may:</text>
        <paragraph num="(1)">
          <text>Award the contract to the single responsible offeror; or</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Reissue the request for proposal.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".10" heading="Competitive Negotiation.">
      <paragraph num="A.">
        <text>Definition.</text>
        <paragraph num="(1)">
          <text>In this regulation, the following term has the meaning indicated.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Term Defined. Competitive negotiation means a method of source selection that:</text>
          <paragraph num="(a)">
            <text>Permits offerors to demonstrate creativity, experience, and knowledge;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Allows offerors to submit proposals that vary widely in scope, cost, and other factors; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Allows negotiating between the LEA and the qualified offerors with the objective that the final proposal be the most advantageous to the LEA.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Request for Proposals.</text>
        <paragraph num="(1)">
          <text>The request for proposals is used to initiate a competitive negotiation procurement.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The request for proposals shall include:</text>
          <paragraph num="(a)">
            <text>Instructions and information concerning proposal submission requirements including the date, time and place for receipt of proposals;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>A statement as to whether electronic proposals will be accepted;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>At a minimum, a general description of the final product or services the LEA seeks;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>The evaluation factors and an indication of the relative importance of each evaluation factor, including price;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>A statement that discussions may be conducted with those responsible offerors that submit proposals judged to be in the competitive range, as previously determined by the LEA;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>MBE goals, if applicable;</text>
          </paragraph>
          <paragraph num="(g)">
            <text>Prevailing wage requirements, if applicable;</text>
          </paragraph>
          <paragraph num="(h)">
            <text>Information with respect to preproposal conference if a conference is to be held;</text>
          </paragraph>
          <paragraph num="(i)">
            <text>Requirement for submission of a proposal affidavit;</text>
          </paragraph>
          <paragraph num="(j)">
            <text>Requirement that offerors acknowledge receipt of each amendment and addendum issued;</text>
          </paragraph>
          <paragraph num="(k)">
            <text>Requirement for bid bond, if applicable; and</text>
          </paragraph>
          <paragraph num="(l)">
            <text>Any other information the LEA requires.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>The LEA shall obtain authorization from the IAC or its designee before issuing the request for proposals.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Public Notice. The LEA shall publish notice of a request for proposals at least 14 calendar days before the proposal due date in:</text>
        <paragraph num="(1)">
          <text>eMaryland Marketplace;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>An electronic posting or a physical posting on the LEA's bid board; or</text>
        </paragraph>
        <paragraph num="(3)">
          <text>A newspaper of general circulation in the LEA's region.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Proposal Receipt. The LEA shall keep submitted proposals in a secure place until the due date. Proposals are not required to be opened publicly but shall be opened in the presence of at least two LEA employees.</text>
      </paragraph>
      <paragraph num="E.">
        <text>Proposal Disclosure. Offerors shall indicate clearly the portions of their proposals that they consider confidential information. All information submitted by offerors is subject to State and local public disclosure laws.</text>
      </paragraph>
      <paragraph num="F.">
        <text>Proposal Evaluation.</text>
        <paragraph num="(1)">
          <text>LEAs may interview offerors as part of the evaluation process.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The LEA shall evaluate the proposals based on the evaluation factors set forth in the request for proposals.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The LEA shall evaluate the technical proposals and price proposals independently of each other.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Evaluation factors shall include:</text>
          <paragraph num="(a)">
            <text>Offeror's understanding of scope of the work;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Advantages of the offeror's proposal to the LEA and to the public in general;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Offeror's prior experience with projects of similar size and scope, and if offeror is a joint venture, experience for at least one of the members of the joint venture entity;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Offeror's plan for management of the project, and the organizational structure proposed for the project;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Experience of offeror's individual staff members with projects of similar size and scope;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Financial resources of team and team members;</text>
          </paragraph>
          <paragraph num="(g)">
            <text>MBE plan, if applicable;</text>
          </paragraph>
          <paragraph num="(h)">
            <text>Price;</text>
          </paragraph>
          <paragraph num="(i)">
            <text>If applicable, process by which operation and maintenance of the facility will be transferred to the LEA; and</text>
          </paragraph>
          <paragraph num="(j)">
            <text>Other factors that the LEA sets forth.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(5)">
          <text>The LEA shall establish a competitive range based on the ratings of each proposal.</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Price may be a component in the first evaluation phase of the request for proposals, but is not required. The LEA may exclude price as a factor in the first phase of the request for proposals in order to assess the range of conceptual options that are available for a particular project.</text>
        </paragraph>
      </paragraph>
      <paragraph num="G.">
        <text>Negotiations.</text>
        <paragraph num="(1)">
          <text>The primary objective of negotiations is to obtain the most advantageous contract for the LEA.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The LEA shall undertake negotiations with each offeror in the competitive range. During negotiations, an offeror may revise its proposal.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>During negotiations, the LEA may establish a final competitive range. The LEA may limit the number of offerors that are included in the final competitive range.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>After negotiation, the LEA shall give each offeror in the final competitive range the opportunity for a final proposal revision.</text>
        </paragraph>
      </paragraph>
      <paragraph num="H.">
        <text>Award.</text>
        <paragraph num="(1)">
          <text>The LEA shall select the offeror whose proposal is, in the LEA's determination, the most advantageous to the LEA.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Before seeking approval of the award from the local board of education, the LEA shall:</text>
          <paragraph num="(a)">
            <text>Discuss the project in an open meeting; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Notify the public as to when the proposed contract will be brought before the board of education for approval.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>Following approval of the award by the local board of education, the LEA shall prepare and submit to the IAC or its designee a statement that explains why the proposal is the most advantageous. The explanation shall:</text>
          <paragraph num="(a)">
            <text>Describe the proposed scope of work, including alternative financing arrangements, if applicable;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Include a cost schedule, indicating the costs associated with various services to be provided by the vendor or phases of the work, and whether those costs are eligible for State reimbursement;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Summarize the evaluation system used to select the offeror;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Summarize the apparent successful offeror's proposal; and</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Describe the MBE plan.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".11" heading="Unsolicited Proposals.">
      <paragraph num="A.">
        <text>Receipt of Unsolicited Proposals; Competing Proposals.</text>
        <paragraph num="(1)">
          <text>If an LEA receives a proposal other than one submitted in response to a solicitation and it determines that it is interested in pursuing the unsolicited proposal, the LEA shall:</text>
          <paragraph num="(a)">
            <text>Publish notice that it has received an unsolicited proposal;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Briefly describe the nature of the proposal;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Give any other interested offeror at least 28 days to submit a competing proposal after the public notice is issued; and</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Inform the IAC or its designee of its intention and provide a description of the proposed method to procure the project.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>The unsolicited proposal and any competing proposals shall be in writing and sufficiently detailed to permit the LEA to determine if it is advantageous and should be the basis for a contract award.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Notice. Notices required under this regulation shall be placed in:</text>
        <paragraph num="(1)">
          <text>eMaryland Marketplace;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>An electronic posting or a physical posting on the LEA's bid board; or</text>
        </paragraph>
        <paragraph num="(3)">
          <text>A newspaper of general circulation in the LEA's region.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>If the LEA receives one or more competing proposals, the LEA shall evaluate and negotiate the proposals consistent with Regulations .09F and G of this regulation.</text>
      </paragraph>
      <paragraph num="D.">
        <text>Award.</text>
        <paragraph num="(1)">
          <text>The LEA may award a contract that it determines to be advantageous based on an unsolicited proposal or a competing proposal.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The LEA shall prepare and submit to the IAC or its designee a statement that explains why the proposal is the most advantageous. The explanation shall:</text>
          <paragraph num="(a)">
            <text>Describe the proposed scope of work or services, including alternative financing if applicable;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Include a cost schedule, indicating the costs associated with various services to be provided by the vendor or phases of the work, and whether those costs are eligible for State reimbursement;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Summarize the evaluation system used to select the offeror;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Summarize the apparent successful offeror's proposal; and</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Describe the MBE plan, if applicable.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>Before seeking approval from the Board of Education, the LEA shall:</text>
          <paragraph num="(a)">
            <text>Discuss the project in an open meeting; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Notify the public as to when the proposed contract will be brought before the Board of Education for approval.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".12" heading="Intergovernmental Cooperative Purchasing.">
      <paragraph num="A.">
        <text>General. Intergovernmental cooperative purchasing means a method of source selection that permits an LEA to aggregate with other government entities their common requirements for purposes of maximizing economies of scale when soliciting bids or proposals for goods and commodities or to purchase its requirements from another governmental entity's contract if that contract is an intergovernmental cooperative purchasing agreement.</text>
      </paragraph>
      <paragraph num="B.">
        <text>An LEA may use the intergovernmental cooperative purchasing method if it determines that the method:</text>
        <paragraph num="(1)">
          <text>Will provide cost benefits, promote administrative efficiencies, or promote governmental cooperation; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Is not intended to avoid competition.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Types. An LEA may use the following types of intergovernmental cooperative purchasing method:</text>
        <paragraph num="(1)">
          <text>Pooling, a method that includes the following steps:</text>
          <paragraph num="(a)">
            <text>Each participating governmental entity agrees to procure its respective requirements from the successful bidder or offeror;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>A lead jurisdiction conducts the procurement on behalf of all participants; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Either a master contract award or awards is made by the lead jurisdiction on behalf of all participants or each participant awards its own contract; and</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Piggybacking, a method wherein an LEA purchases its requirements from another governmental entity's contract if that contract contains an intergovernmental cooperative purchasing clause.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".13" heading="Sole Source.">
      <paragraph num="A.">
        <text>Sole source procurement is permissible if a requirement is available from only a single vendor.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Examples of circumstances that might necessitate a sole source procurement are as follows:</text>
        <paragraph num="(1)">
          <text>Only one source exists which meets the requirements;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The compatibility of equipment, accessories, or replacement parts is the paramount consideration;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>A sole vendor's item is needed for trial use or testing; or</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Public or regulated utility services are to be procured and only one source exists.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>The LEA shall submit a written sole source justification to the IAC or its designee.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".14" heading="Negotiated Award After Unsatisfactory Competitive Sealed Bidding.">
      <paragraph num="A.">
        <text>General. An LEA may make a negotiated award after unsatisfactory competitive sealed bidding if, after bids have been opened, the LEA:</text>
        <paragraph num="(1)">
          <text>Rejects all bids pursuant to Regulation .07F(2) or .08G(2) of this chapter; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Determines that:</text>
          <paragraph num="(a)">
            <text>Funding does not permit an award to the lowest responsible and responsive bidder;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Any delay resulting from a resolicitation with revised specifications under competitive sealed bidding would be fiscally disadvantageous or would not otherwise be in the best interest of the LEA or the State; or</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Both.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Invitation for Revised Bids. The LEA shall:</text>
        <paragraph num="(1)">
          <text>Issue an invitation for revised bids based on revised specifications to the original bidders as promptly as possible; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Require a prompt response.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Discussion. Discussion may not be conducted with bidders after revised bids have been submitted unless the LEA determines that there is compelling need for further negotiation. Any discussion concerning revised specifications shall be conducted with all responsible bidders in a fair and equal manner.</text>
      </paragraph>
      <paragraph num="D.">
        <text>Award. The LEA shall award the contract to the lowest responsive and responsible bidder whose bid meets the invitation for revised bids.</text>
      </paragraph>
    </regulation>
    <annotations>
      <annotation type="Authority">Education Article, §§4-126, 5-112, and 5-303, Annotated Code of Maryland</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: May 21, 2007 (34:10 Md. R. 891)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .04C amended effective November 14, 2011 (38:23 Md. R. 1423)</annotation>
      <annotation type="History" subtype="Administrative History">COMAR 23.03.03 recodified to be COMAR 14.39.03 under new subtitle, Interagency Commission on School Construction, effective November 4, 2019 (46:22 Md. R. 979)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .01A amended effective November 4, 2019 (46:22 Md. R. 979)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .05 amended effective November 4, 2019 (46:22 Md. R. 979)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .06B, C amended effective November 4, 2019 (46:22 Md. R. 979)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .06D amended effective May 11, 2026 (53:9 Md. R. 414)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .07 amended effective November 4, 2019 (46:22 Md. R. 979)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .09B amended effective November 4, 2019 (46:22 Md. R. 979)</annotation>
    </annotations>
  </chapter>
  <chapter num="04" heading="Project Delivery Methods">
    <regulation prefix="Regulation" num=".01" heading="Scope.">
      <paragraph num="A.">
        <text>This chapter applies to a public school construction project for building, improvement, supplies, or equipment if it:</text>
        <paragraph num="(1)">
          <text>Exceeds $50,000 and has IAC planning or funding approval; or</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Requires review by the State Superintendent of Schools under Education Article, §2-303, Annotated Code of Maryland.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>This chapter does not apply to a project in a building that is not used primarily for the instruction of students, including an office building, warehouse, or vehicle maintenance or repair building.</text>
      </paragraph>
      <paragraph num="C.">
        <text>In this chapter, “IAC or its designee” includes “State Superintendent or designee” if State Superintendent approval is required by Education Article, §2-303(f), Annotated Code of Maryland.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="Project Delivery Proposal Review Assistance.">
      <text>The State Superintendent or designee may request assistance from the IAC or its designee when reviewing project delivery proposals.</text>
    </regulation>
    <regulation prefix="Regulation" num=".03" heading="Methods of Project Delivery.">
      <text>For a public school construction project, an LEA may use one of the following methods:</text>
      <paragraph num="A.">
        <text>General contracting; or</text>
      </paragraph>
      <paragraph num="B.">
        <text>Alternative project delivery including:</text>
        <paragraph num="(1)">
          <text>Construction management agency;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Construction management at risk;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Design build; and</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Job order contracting.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".04" heading="Other Requirements.">
      <paragraph num="A.">
        <text>The requirements of COMAR 14.39.03 apply to all projects conducted under this chapter.</text>
      </paragraph>
      <paragraph num="B.">
        <text>All projects regardless of delivery method shall comply with State procedures for project design review.</text>
      </paragraph>
      <paragraph num="C.">
        <text>Regardless of project delivery method, the LEA may not begin construction until the IAC or its designee has authorized the LEA to proceed.</text>
      </paragraph>
      <paragraph num="D.">
        <text>The IAC may specifically designate an individual or group to act on requests, provide the State approvals on behalf of the IAC, or both, as required in this chapter.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".05" heading="Construction Management Agency.">
      <paragraph num="A.">
        <text>General. Construction management agency (CMA) means a project delivery method in which the LEA:</text>
        <paragraph num="(1)">
          <text>Directly contracts with trade contractors; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Either:</text>
          <paragraph num="(a)">
            <text>Engages a construction manager as its agent to manage the project; or</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Acts as the construction manager.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>The LEA shall disclose in the solicitation documents if the project may be converted to the construction management at risk method or other project delivery method.</text>
      </paragraph>
      <paragraph num="C.">
        <text>State Reimbursement.</text>
        <paragraph num="(1)">
          <text>The IAC or its designee shall maintain a list of CMA services that are eligible for State reimbursement.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>If the LEA intends to seek reimbursement of CMA costs with State funds, the LEA shall:</text>
          <paragraph num="(a)">
            <text>Submit the solicitation documents to the IAC or its designee for review not later than 1 month before the documents are released to offerors; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Identify in the solicitation documents the construction management services that are eligible for State reimbursement.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>An LEA intending to seek State reimbursement for construction manager services shall procure a construction manager in accordance with COMAR 14.39.03.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Trade Contracts.</text>
        <paragraph num="(1)">
          <text>Trade contracts may be procured concurrently or over the life of the project.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The LEA shall submit the bidding schedule for the trade packages with proposed bid dates to the IAC or its designee and provide notice of any changes.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The LEA shall procure each trade contract in accordance with COMAR 14.39.03.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>The LEA shall submit each trade contract to the IAC for approval.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>If the project is subject to prevailing wage rate requirements, each trade contract within the project is subject to prevailing wage rate requirements.</text>
        </paragraph>
        <paragraph num="(6)">
          <text>MBE goals shall be based on the total project price, but MBE goals may vary in individual trade contracts if the overall MBE project goal is acknowledged.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".06" heading="Construction Management at Risk.">
      <paragraph num="A.">
        <text>General.</text>
        <paragraph num="(1)">
          <text>Construction management at risk means a project delivery method in which the LEA engages a construction manager at risk (CMR) to:</text>
          <paragraph num="(a)">
            <text>Contract directly with trade contractors; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Provide a guaranteed maximum price for project procurement and construction.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>The CMR warrants that the work will be completed at or below the guaranteed maximum price with provisions for change order adjustments for work that is outside the agreed-upon work scope.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Cost savings resulting from projects completed below the guaranteed maximum price may be shared between the LEA and the CMR.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Guaranteed Maximum Price.</text>
        <paragraph num="(1)">
          <text>Guaranteed maximum price (GMP) means an arrangement between the LEA and the CMR in which the total amount payable to the CMR for the project is restricted to a pre-agreed maximum and includes the cost of construction and construction management services that is generally determined before the design is complete.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The LEA and CMR may determine the guaranteed maximum price as follows:</text>
          <paragraph num="(a)">
            <text>In competitive sealed bidding or quality based selection, the guaranteed maximum price is based on construction documents that are sufficiently developed to allow bidders to reasonably estimate and include costs for unspecified items, and includes:</text>
            <paragraph num="(i)">
              <text>Cost of the work;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Construction management fee; and</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>General conditions; and</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>In competitive negotiation, including projects in which a construction manager has provided pre-GMP services, the LEA may begin negotiations to establish a guaranteed maximum price with the construction manager only after:</text>
            <paragraph num="(i)">
              <text>The LEA has provided public notice of its intent and a request for competing proposals; and</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>At least 28 days have elapsed for receipt of competing proposals.</text>
            </paragraph>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>If the LEA receives competing proposals, the proposals shall be evaluated in accordance with COMAR 14.39.03.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Notice to IAC.</text>
        <paragraph num="(1)">
          <text>Not later than 2 months before the release of solicitation documents to offerors, the LEA shall provide written notice to the IAC or its designee that the CMR method will be used.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The LEA shall acknowledge in the notice that the State is not responsible for any project cost overruns.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Not later than 1 month before release to offerors, the LEA shall submit the solicitation documents to the IAC or its designee for approval.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>State Reimbursement.</text>
        <paragraph num="(1)">
          <text>State funds may be used to reimburse:</text>
          <paragraph num="(a)">
            <text>Allowable pre-GMP costs only if related to the solicitation of trade packages; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Allowable post-GMP costs.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Allowable post-GMP construction management services, as determined by the IAC, shall be included in total construction cost as if the CMR were a general contractor for purposes of determining the maximum State construction allocation, payment of requisitions, and project close out.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Total State reimbursement of eligible costs may not exceed the lesser of:</text>
          <paragraph num="(a)">
            <text>The State's share of the guaranteed maximum price based on the cost-share formula; or</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The maximum State construction allocation.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>If an LEA intends to seek State reimbursement of any of the construction management services, the services shall be procured through one of the procurement methods provided in COMAR 14.39.03.</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Trade Contracts.</text>
        <paragraph num="(1)">
          <text>The CMR assumes all risk for cost, schedule, and performance of the trade contracts except for a trade contract that the LEA separately procures.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Trade contracts may be procured concurrently or over the life of the project.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>After the guaranteed maximum price is finalized, any trade contract previously awarded by the LEA may be assigned to the CMR who then assumes all risk for coordination and completion of the trade contracts.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Subcontracts solicited by the CMR as components of the final guaranteed maximum price do not require IAC approval.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>If the LEA intends to award a separate trade contract, the LEA shall submit the trade contract to the IAC for approval notwithstanding the subsequent inclusion of the trade contract in the guaranteed maximum price.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".07" heading="Design-Build.">
      <paragraph num="A.">
        <text>General.</text>
        <paragraph num="(1)">
          <text>Design-build means a project delivery method in which a single entity is contractually responsible for both design and construction of a project.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The LEA provides sufficient information to the design-build entity to guide it in the design of the project and specifies the reviews and approvals that will be required of the project.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The design-build entity is responsible for the following:</text>
          <paragraph num="(a)">
            <text>Quality of the design;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Project costs;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Construction quality;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Adherence to the LEA's schedule for project completion and occupancy; and</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Other factors the LEA requires.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>Design-build may extend beyond the design and construction phases of a project to include:</text>
          <paragraph num="(a)">
            <text>Financing, in which case the method is called finance-design-build; or</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Provision of furniture and equipment, occupant move-in, or other post-construction tasks, except as limited by §A(5) of this regulation.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(5)">
          <text>The design-build entity may not perform the routine maintenance and operation of a school building after occupancy.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>IAC Approval.</text>
        <paragraph num="(1)">
          <text>If the LEA decides to use the design-build method, the LEA:</text>
          <paragraph num="(a)">
            <text>Shall request approval from the IAC or its designee 2 months prior to the release of the solicitation; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>May not proceed with the design-build method until approval is obtained from the IAC or its designee.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>The request for approval shall at a minimum include the proposed:</text>
          <paragraph num="(a)">
            <text>Brief description of the scope of work;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Project phasing;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Schedule for the submission of plans and specifications for review by the IAC or its designee;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Solicitation schedule;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Procurement method;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Financing arrangement, if applicable; and</text>
          </paragraph>
          <paragraph num="(g)">
            <text>Performance expectations.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>The LEA shall acknowledge in the request for approval that the State is not responsible for any project cost overruns.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>The LEA shall send the draft design-build solicitation to the IAC or its designee for approval not later than 1 month before it is released to bidders.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Authorization by the IAC or its designee to proceed with the design-build method is independent of approvals of project planning and funding. If the IAC or its designee authorizes the use of the design-build method but project planning is not approved, the project may proceed as a locally funded project.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Design-Build Procurement.</text>
        <paragraph num="(1)">
          <text>The LEA may develop a design-build solicitation based on:</text>
          <paragraph num="(a)">
            <text>Performance specification;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Performance specification combined with concept or schematic design; or</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Performance specification combined with the LEA's prototype design.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>The performance specification shall include at a minimum:</text>
          <paragraph num="(a)">
            <text>Educational specifications;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Performance characteristics of the school facility;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>A schedule for completion and occupancy; and</text>
          </paragraph>
          <paragraph num="(d)">
            <text>General conditions that clearly describe the respective responsibilities of the LEA and the design-build entity.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>State Reimbursement.</text>
        <paragraph num="(1)">
          <text>If the LEA intends to seek State reimbursement, the LEA shall distinguish between preconstruction and construction scopes of work to allow the IAC or its designee to determine the costs that are eligible for State reimbursement.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The State's maximum participation in the project is calculated when:</text>
          <paragraph num="(a)">
            <text>The construction documents are complete; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The full scope of the project is known including ineligible items.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>Allowable preconstruction services, as determined by the IAC, shall be included in total construction cost.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Final adjustment of the State's participation shall be made at project closeout.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Total State reimbursement of eligible costs may not exceed the lesser of:</text>
          <paragraph num="(a)">
            <text>The State's share of the guaranteed maximum price based on the cost-share formula; or</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The maximum State construction allocation.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".08" heading="Job Order Contracting.">
      <paragraph num="A.">
        <text>In this regulation, the following term has the meaning indicated.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Term Defined. “Job order contracting (JOC)” means a project delivery method in which the LEA selects a contractor through a competitive procurement process based on a multiplier or coefficient that:</text>
        <paragraph num="(1)">
          <text>Reflects the bidder's determination of the actual cost to perform the work plus overhead and profit; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Is applied to a fixed-price list of construction items and activities.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>The fixed prices of the construction items and activities are defined by the LEA or through a standard project cost source.</text>
      </paragraph>
      <paragraph num="D.">
        <text>The schedule of fixed prices may include a construction escalation factor for multiyear contracts.</text>
      </paragraph>
      <paragraph num="E.">
        <text>Procurement and Award.</text>
        <paragraph num="(1)">
          <text>An LEA shall obtain a JOC through a competitive procurement process, whether or not the LEA intends to execute State-funded projects through the JOC.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The JOC may include extension clauses, but the State may not participate in a project executed under a JOC that:</text>
          <paragraph num="(a)">
            <text>Has more than three annual extensions; or</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Has been increased by change order above the maximum combined price indicated in the solicitation, including all potential extensions, except for changes of scope to individual projects already begun before completion of the final annual extension.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>When submitting a contract approval to the IAC, the LEA must acknowledge that the State is not responsible for any project cost overruns.</text>
        </paragraph>
      </paragraph>
      <paragraph num="F.">
        <text>Approvals. If an LEA intends to execute a State-funded project through a JOC, it:</text>
        <paragraph num="(1)">
          <text>Shall provide the IAC or its designee with a brief description of the anticipated scope of work, the duration of the JOC contract, the number of annual extensions, and the maximum combined cost of the projects to be performed under the JOC;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Shall submit the project for design review prior to the start of construction [shall be required] if it would be required for similar project funded through the same State funding program;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>May reference an earlier approval and the JOC solicitation if approval is requested for a project to be executed through a JOC under which a State-funded project was previously approved, but is not required to resubmit all relevant information;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Shall obtain approval of contract award, reimbursement, or both, in the manner and timeframe required for all projects funded under the relevant program;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Shall, for design-build JOC projects, clearly indicate on the request for approval of contract award or for reimbursement those portions of the project cost that are associated with preconstruction activities in order to allow the IAC or its designee to determine which costs are eligible for State reimbursement;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Shall include in the total construction cost allowable preconstruction services, as determined by the IAC; and</text>
        </paragraph>
        <paragraph num="(7)">
          <text>Shall acknowledge that final adjustment of the State’s participation will be made at project closeout.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <annotations>
      <annotation type="Authority">Education Article, §§4-126, 5-112, and 5-303, Annotated Code of Maryland</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: May 21, 2007 (34:10 Md. R. 891)</annotation>
      <annotation type="History" subtype="Administrative History">COMAR 23.03.04 recodified to be COMAR 14.39.04 under new subtitle, Interagency Commission on School Construction, effective November 4, 2019 (46:22 Md. R. 979)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .01A amended effective November 4, 2019 (46:22 Md. R. 979)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .03 amended effective June 28, 2021 (48:13 Md. R. 509)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .04A amended effective November 4, 2019 (46:22 Md. R. 979)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .05 amended effective August 18, 2025 (52:16 Md. R. 848)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .05D, E amended effective November 4, 2019 (46:22 Md. R. 979)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .06B, D amended effective November 4, 2019 (46:22 Md. R. 979)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .08E, F amended effective August 18, 2025 (52:16 Md. R. 848)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .09 repealed effective June 28, 2021 (48:13 Md. R. 509)</annotation>
    </annotations>
  </chapter>
  <chapter num="05" heading="Alternative Financing">
    <regulation prefix="Regulation" num=".01" heading="Scope.">
      <paragraph num="A.">
        <text>This chapter applies to a public school construction project for building, improvement, supplies, or equipment if it:</text>
        <paragraph num="(1)">
          <text>Exceeds $50,000 and has IAC planning or funding approval; or</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Requires review by the State Superintendent of Schools under Education Article, §2-303, Annotated Code of Maryland.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>This chapter does not apply to a project in a building that is not used primarily for the instruction of students, including an office building, warehouse, or vehicle maintenance or repair building.</text>
      </paragraph>
      <paragraph num="C.">
        <text>In this chapter, “IAC or its designee” includes “State Superintendent or designee” if State Superintendent approval is required by Education Article, §2-303(f), Annotated Code of Maryland.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="Alternative Project Proposal Review Assistance.">
      <text>The State Superintendent or designee may request assistance from the IAC or its designee when reviewing alternative project financing proposals.</text>
    </regulation>
    <regulation prefix="Regulation" num=".03" heading="Educational and Design Standards Apply.">
      <text>All projects financed through alternative methods shall comply with State procedures for project design review.</text>
    </regulation>
    <regulation prefix="Regulation" num=".04" heading="Use of Alternative Financing Methods.">
      <paragraph num="A.">
        <text>A county or an LEA may use alternative financing methods for public school construction.</text>
      </paragraph>
      <paragraph num="B.">
        <text>An LEA shall obtain the approval of the county governing body to use an alternative financing method.</text>
      </paragraph>
      <paragraph num="C.">
        <text>Alternative financing shall be conducted consistent with Education Article, §4-126, Annotated Code of Maryland.</text>
      </paragraph>
    </regulation>
    <annotations>
      <annotation type="Authority">Education Article, §§4-126, 5-112, and 5-303, Annotated Code of Maryland</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: May 21, 2007 (34:10 Md. R. 891)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .02 amended effective September 28, 2015 (42:19 Md. R. 1229)</annotation>
      <annotation type="History" subtype="Administrative History">COMAR 23.03.05 recodified to be COMAR 14.39.05 under new subtitle, Interagency Commission on School Construction, effective November 4, 2019 (46:22 Md. R. 979)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .01A amended effective November 4, 2019 (46:22 Md. R. 979)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .04C adopted effective November 4, 2019 (46:22 Md. R. 979)</annotation>
    </annotations>
  </chapter>
  <chapter num="06" heading="Relocatable Classroom Indoor Environmental Quality Standards">
    <regulation prefix="Regulation" num=".01" heading="Definitions.">
      <paragraph num="A.">
        <text>In this regulation, the following terms have the meanings indicated.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Terms Defined.</text>
        <paragraph num="(1)">
          <text>“Locally-constructed relocatable classroom” means a relocatable classroom that is constructed at the school site.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>“Model Performance Code” means the construction standards stated in COMAR 09.12.50.03:</text>
        </paragraph>
        <paragraph num="(3)">
          <text>“Pre-manufactured unit” means a relocatable classroom that is constructed off-site and transported to the school site.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>“Relocatable classroom” means a classroom unit that is capable of being disconnected and transported from one school site and reinstalled at another school site.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="Relocatable Classrooms Indoor Environmental Quality Standards.">
      <paragraph num="A.">
        <text>All relocatable classrooms used for student instruction at public schools must conform to Indoor Environmental Quality Standards that meet the Maryland Green Building Council International Green Construction Code (IgCC) Supplement, Chapter 8, Section 801 through 806, which is incorporated by reference; and</text>
      </paragraph>
      <paragraph num="B.">
        <text>One of the following:</text>
        <paragraph num="(1)">
          <text>The Model Performance Code for pre-manufactured units; or</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Local building codes for locally-constructed relocatable classrooms.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".03" heading="Exceptions.">
      <text>This chapter does not apply to relocatable classrooms constructed before July 1, 2015.</text>
    </regulation>
    <annotations>
      <annotation type="Authority">Education Article, §5-303(b), Annotated Code of Maryland</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: September 28, 2015 (42:19 Md. R. 1229)</annotation>
      <annotation type="History" subtype="Administrative History">COMAR 23.03.06 recodified to be COMAR 14.39.06 under new subtitle, Interagency Commission on School Construction, effective November 4, 2019 (46:22 Md. R. 979)</annotation>
    </annotations>
  </chapter>
  <chapter num="07" heading="Public School Facilities Educational Sufficiency Standards">
    <regulation prefix="Regulation" num=".01" heading="Purpose.">
      <text>The purpose of Maryland Public School Facilities Educational Sufficiency Standards is to establish acceptable minimum levels for the physical attributes, capacity, and educational suitability of existing public PreK—12 school facilities in order to assess existing facilities against a defined standard to identify deficiencies.</text>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="Scope.">
      <paragraph num="A.">
        <text>As required by Education Article, §5-310, Annotated Code of Maryland, the Facilities Educational Sufficiency Standards established in this chapter shall be used to complete assessments of existing school facilities Statewide.</text>
      </paragraph>
      <paragraph num="B.">
        <text>The chapter is to be used for assessment purposes only and are not requirements for school facility design or construction.</text>
      </paragraph>
      <paragraph num="C.">
        <text>This chapter may not supersede or obviate compliance with applicable building and fire codes or any other code, regulation, law, or standard that has been adopted by State agencies.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".03" heading="General Requirements.">
      <paragraph num="A.">
        <text>Building Condition.</text>
        <paragraph num="(1)">
          <text>A school facility shall be safe and capable of being maintained.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>A school facility shall be structurally sound. A school facility shall be considered structurally sound if the building presents:</text>
          <paragraph num="(a)">
            <text>No imminent danger;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>No major visible signs of decay or distress; or</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Structural systems support the loads imposed on them.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>An exterior envelope is safe and capable of being maintained if:</text>
          <paragraph num="(a)">
            <text>Walls and roof are weather-tight under normal conditions with routine upkeep; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Doors and windows are weather-tight under normal conditions with routine upkeep.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>An interior surface is safe and capable of being maintained if it is:</text>
          <paragraph num="(a)">
            <text>Structurally sound;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Capable of supporting a finish; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Capable of continuing in its intended use with normal maintenance and repair.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(5)">
          <text>An interior finish is safe and capable of being maintained if it is:</text>
          <paragraph num="(a)">
            <text>Free of exposed lead paint;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Free of exposed friable asbestos; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Capable of continuing in its intended use with normal maintenance and repair.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Building Systems.</text>
        <paragraph num="(1)">
          <text>Building systems in a school facility shall be in working order and capable of being properly maintained.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Building systems include but are not limited to the following:</text>
          <paragraph num="(a)">
            <text>Roof;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Plumbing;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Telephone;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Electrical;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Heating and cooling systems;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Fire alarm;</text>
          </paragraph>
          <paragraph num="(g)">
            <text>Two-way internal communication;</text>
          </paragraph>
          <paragraph num="(h)">
            <text>Technological infrastructure; and</text>
          </paragraph>
          <paragraph num="(i)">
            <text>Security systems.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>A building system shall be considered to be in working order and capable of being maintained if the following apply:</text>
          <paragraph num="(a)">
            <text>The system is capable of being operated as intended and maintained;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Newly manufactured or cost-effective refurbished replacement parts are available;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The system is capable of supporting the standards established in this rule; and</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Components of the system present no imminent danger of personal injury.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>Sanitary Facilities.</text>
          <paragraph num="(a)">
            <text>Fixtures shall include but are not limited to the following:</text>
            <paragraph num="(i)">
              <text>Water closets;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Urinals;</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Lavatories; and</text>
            </paragraph>
            <paragraph num="(iv)">
              <text>Drinking fountains.</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>Wherever possible within reasonable cost constraints, restrooms shall be accessible to general classrooms for grades 3 and below and for special-needs classrooms without having to exit the building.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".04" heading="Classifications of Public Schools.">
      <text>The classifications for public schools under these standards are as follows:</text>
      <paragraph num="A.">
        <text>Elementary School, which houses pre-kindergarten through grade 5 or any subset thereof;</text>
      </paragraph>
      <paragraph num="B.">
        <text>Middle School, which houses grade 6 through grade 8;</text>
      </paragraph>
      <paragraph num="C.">
        <text>High School, which houses grade 9 through grade 12;</text>
      </paragraph>
      <paragraph num="D.">
        <text>Combination School, which houses a combination of any grade levels; and</text>
      </paragraph>
      <paragraph num="E.">
        <text>Other School, which includes but is not limited to the following:</text>
        <paragraph num="(1)">
          <text>Early-childhood-education centers;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Special-education centers;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Career-technology centers; and</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Alternative-education schools.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".05" heading="School Site.">
      <paragraph num="A.">
        <text>A school site shall be of sufficient size to accommodate safe access, parking, drainage, and security and shall have an adequate source of water and appropriate means of effluent disposal.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Safe Access.</text>
        <paragraph num="(1)">
          <text>A school site shall be configured for safe and controlled access that separates pedestrian traffic from vehicular traffic.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>If buses are used to transport students, then bus loading and unloading areas shall be separated from vehicular-traffic areas wherever possible.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Dedicated student drop-off and pickup areas shall be provided for safe use by student passengers arriving or departing by automobile.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Parking. A school site shall include a surfaced area that is capable of being maintained, stable, firm, slip resistant, and large enough to accommodate 1.5 parking spaces per full-time-equivalent employee and one student space per ten high school students. Alternative parking may be approved after the sufficiency of parking at the site is reviewed by the IAC based on the following criteria:</text>
        <paragraph num="(1)">
          <text>Availability of street parking around the school;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Availability of any nearby parking lots;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Availability of public transit;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Number of staff who drive to work on a daily basis; and</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Average number of visitors on a daily basis.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Drainage. A school site shall be configured such that runoff does not undermine the structural integrity of the school buildings located on-site or create flooding, ponding, or erosion resulting in a threat to health, safety, or welfare.</text>
      </paragraph>
      <paragraph num="E.">
        <text>Security. All schools shall have safe and secure site fencing or other barriers with accommodations for safe passage through openings to protect students from the hazards of traffic, railroad tracks, animal nuisance, and steep slopes.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".06" heading="Site Recreation and Outdoor Physical Education.">
      <paragraph num="A.">
        <text>A school facility shall have area, space, and fixtures, in accordance with the standard equipment necessary to meet the educational requirements of the public education department, for physical-education activity.</text>
      </paragraph>
      <paragraph num="B.">
        <text>An elementary school shall provide:</text>
        <paragraph num="(1)">
          <text>At least one safe play area (and playground, including a hard surfaced court and unpaved recreation area, which shall be conveniently accessible to the students;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>At least one play area and appropriate equipment for physical education and school recreational purposes, based on the planned school program capacity;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>For schools that serve students in grade 5 and below, a protected play area; and</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Play-equipment areas with surfacing materials that meet or exceed safety specifications for shock-absorbing qualities as outlined by the U.S. Consumer Product Safety Commission.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>A middle school shall provide at least one hard surfaced court and playing field for physical-education activities; and the number of playing fields and quantity and type of equipment shall be based on the planned school program capacity.</text>
      </paragraph>
      <paragraph num="D.">
        <text>A high school shall provide a playing field for physical-education activities, and the number of laying fields and quantity and type of equipment shall be based on the planned school program capacity.</text>
      </paragraph>
      <paragraph num="E.">
        <text>A combination school shall provide the elements of the grades served by §§B—D of this regulation without duplication, but shall meet the highest standard.</text>
      </paragraph>
      <paragraph num="F.">
        <text>Other schools shall provide the elements above necessary to meet the educational requirements of the specific programs and capacity of the schools.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".07" heading="Academic Classroom Space.">
      <paragraph num="A.">
        <text>Classroom spaces, including those for physical education, shall be sufficient for educational programs that are appropriate for the class-level needs.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Classroom Fixtures and Equipment.</text>
        <paragraph num="(1)">
          <text>With the exception of physical-education spaces, each general and specialty classroom shall contain a work surface and seat for each student in the classroom. The work surface and seat shall be appropriate for the normal activity of the class conducted in the room.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Each general and specialty classroom shall have an erasable surface and a surface suitable for projection purposes, appropriate for group classroom instruction, and a display surface. A single surface may meet one or more of these purposes.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Each general and specialty classroom shall have storage for classroom materials or access to conveniently located storage.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>With the exception of physical-education spaces and music-education spaces, each general and specialty classroom shall have a work surface and seat for the teacher and for any aide assigned to the classroom. The classroom shall have secure storage for student records that is located in the classroom or is conveniently accessible to the classroom.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Classroom Lighting.</text>
        <paragraph num="(1)">
          <text>Each general and specialty classroom shall have a light system capable of maintaining at least 50 foot-candles of well-distributed light. A school shall provide appropriate task lighting in specialty classrooms where enhanced visibility is required.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The light level shall be measured at a work surface located in the approximate center of the classroom, between clean light fixtures.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Classroom Temperature and Relative Humidity.</text>
        <paragraph num="(1)">
          <text>Each general and specialty classroom shall have a heating, ventilation, and air conditioning (HVAC) system capable of maintaining a temperature between 68°F and 75°F and a relative humidity between 30 and 60 percent at full occupancy.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The temperature and humidity shall be measured at a work surface in the approximate center of the classroom.</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Classroom Acoustics.</text>
        <paragraph num="(1)">
          <text>With the exception of physical-education spaces, each general and specialty classroom shall be maintainable at a sustained background sound level of less than 55 decibels.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The sound level shall be measured at a work surface in the approximate center of the classroom.</text>
        </paragraph>
      </paragraph>
      <paragraph num="F.">
        <text>Classroom Air Quality.</text>
        <paragraph num="(1)">
          <text>Each general, science, and fine-arts classroom shall have an HVAC system that continuously moves air and is capable of maintaining a carbon dioxide level of not more than 1,200 parts per million.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The air quality shall be measured at a work surface in the approximate center of the classroom.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".08" heading="General Use Classrooms.">
      <paragraph num="A.">
        <text>Cumulative classroom net square foot requirements, excluding in-classroom storage space and any in-classroom toilet rooms, shall be at least:</text>
        <paragraph num="(1)">
          <text>For prekindergarten, 50 net square feet per student;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>For kindergarten, 50 net square feet per student;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>For grades 1—8, 32 net square feet per student; and</text>
        </paragraph>
        <paragraph num="(4)">
          <text>For grades 9—12, 25 net square feet per student;</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>At least 2 net square feet per student shall be available for dedicated, in-classroom storage and may be provided vertically to avoid the need for additional floor area.</text>
      </paragraph>
      <paragraph num="C.">
        <text>Sufficient number of classrooms shall be provided to meet State and local board mandated student-to-staff ratio requirements Administrative History.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".09" heading="Specialty Classrooms.">
      <paragraph num="A.">
        <text>Special Education.</text>
        <paragraph num="(1)">
          <text>To the maximum extent appropriate, students with disabilities shall be educated in the least restrictive environment with students who are not disabled. A continuum of alternative placements shall be provided.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>If a special-education space for pull-out purposes other than calming is provided and the space is required to support educational programs, services, and curricula, the space may not be smaller than 450 net square feet.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>When the need is demonstrated by a local education agency, additional space in the classroom shall be provided with, or students shall have an accessible route to an accessible unisex restroom with one toilet, sink, washer/dryer, and shower stall/tub, as needed, and at least 15 net square feet of storage.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>When the need is demonstrated by a local education agency, in 6th grade classrooms and above, a kitchenette of least 30 net square feet shall be provided.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Science Classrooms.</text>
        <paragraph num="(1)">
          <text>For grades PreK through 5, no additional space is required beyond the classroom requirement.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>For grades 6 through 12, 4 net square feet per student of the specialty program capacity for science is required. The space may not be smaller than the average classroom at the facility. This space is included in the academic classroom requirement and may be used for other instruction. The space shall have science fixtures and equipment, in accordance with the standard equipment necessary to meet the educational requirements of the Maryland Science Content Standards.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>For grades 9 through 12 only, at least 40 net square feet of space is provided for securable, well-ventilated storage or prep space for each science room having science fixtures and equipment. Storage/prep rooms may be combined and shared between more than one classroom.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Fine-Arts Education.</text>
        <paragraph num="(1)">
          <text>A school facility shall have classroom space to deliver fine-arts education programs which include the following:</text>
          <paragraph num="(a)">
            <text>Art;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Music;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Dance; and</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Theater.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Elementary school fine-arts education programs:</text>
          <paragraph num="(a)">
            <text>May be accommodated within a general-use or dedicated arts classroom;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Shall provide one dedicated classroom for each fine-arts subject area staffed with greater than 0.5 full-time fine-arts teacher; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Shall provide additional dedicated fine-arts program storage of at least 60 net square feet for each subject area per facility.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>A middle school shall provide classroom space for fine-arts education programs that:</text>
          <paragraph num="(a)">
            <text>Contains no less than 4 net square feet per student of the specialty program capacity for fine-arts subjects;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Provides one dedicated classroom for each fine-arts subject area staffed with greater than 0.5 full-time fine-arts teacher; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Provides additional 60 net square feet of storage for each fine-arts program subject.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>A high school shall provide classroom spaces for fine-arts education programs that contain no less than 5 net square feet of the specialty program capacity for fine-arts subjects.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>A combination school shall provide the elements of the grades served by §C(1)—(4) of this regulation without duplication but meeting the highest square footage standards.</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Other schools shall provide the elements included in §C(1)—(4) of this regulation that are necessary to meet the educational requirements of the specific programs and capacity of the schools.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Technology Education and Computer Science.</text>
        <paragraph num="(1)">
          <text>For grades K through 5, no additional space is required beyond the classroom requirement.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>For grades 6 through 8, 3 net square feet, and 4 net square feet for grades 9 through 12, of the specialty program capacity for technology education and family and consumer science is required. The space shall be no smaller than the average classroom at the facility. This space is included in the academic classroom requirement and may be used for other instruction.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The space shall have technology fixtures and equipment, in accordance with the standard equipment necessary to meet the educational requirements of the Maryland Technology Education Content Standards, and, in high school, the requirements of Maryland Advanced Technology Education electives where such electives are offered.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Provide at least 80 net square feet for securable, well-ventilated storage/prep space for each technology education room having technology fixtures and equipment. Storage/prep rooms may be combined and shared between more than one classroom.</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Career and Technology Education.</text>
        <paragraph num="(1)">
          <text>Elementary schools have no requirement.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Middle schools shall include space for career-development and career-exploration activities. Each program lab or classroom space shall be no smaller than 650 net square feet.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>High School Career and Technology Education.</text>
          <paragraph num="(a)">
            <text>Program space shall be provided with no less than 4 net square feet of the specialty program capacity of the school for career education.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Each program lab or classroom space shall be no smaller than 650 net square feet.</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Spaces for programs requiring licensing, certification, or accreditation by a State board or agency shall meet all applicable health and safety standards. Cosmetology and barber programs shall comply with the sanitation requirements of the State Board of Cosmetologists and the State Board of Barbers, respectively.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>A combination school shall provide the elements of the grades served by §E(1)—(3) of this regulation without duplication, but meeting the higher standards.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Other schools shall provide the elements above necessary to meet the educational requirements of the specific programs and capacity of the schools.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".10" heading="School Library/Media Center.">
      <paragraph num="A.">
        <text>A school facility shall have a unified school library/media program for the use of all students which shall include an organized and centrally managed collection of instructional materials and technologies and direct instruction.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Elementary schools shall include an area for stacks and seating space which shall be at least 3 net square feet of the planned school program capacity. The instructional space may not be smaller than the average classroom at the facility. In addition, office/workroom space and secure storage shall be provided.</text>
      </paragraph>
      <paragraph num="C.">
        <text>Middle and high schools shall include an area for stacks and seating space which shall be at least 3 net square feet of the planned school program capacity. The space may not be smaller than the average classroom at the facility. In addition, office/workroom space and secure storage shall be provided.</text>
      </paragraph>
      <paragraph num="D.">
        <text>Combination schools shall include the elements of the grades set out in §§B and C of this regulation without duplication, but meeting the higher standards.</text>
      </paragraph>
      <paragraph num="E.">
        <text>Other schools shall include the elements in §§A—D of this regulation necessary to meet the educational requirements of the specific programs and capacity of the schools.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".11" heading="Physical Education.">
      <paragraph num="A.">
        <text>General Requirements.</text>
        <paragraph num="(1)">
          <text>Each school shall provide an instructional program in physical education each year for all students in grades PreK-8. Each school shall offer a physical-education program in grades 9—12 which shall enable students to meet graduation requirements and to select physical-education electives. The following minimum spaces are required:</text>
          <paragraph num="(a)">
            <text>A gymnasium;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>A teacher office or planning area;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Equipment storage; and</text>
          </paragraph>
          <paragraph num="(d)">
            <text>An outdoor instructional playing field.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Elementary schools shall include a gymnasium with at least 2,200 net square feet. This space may have multi-purpose use in accommodating other educational program activities such as art program performances.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Middle schools shall include a gymnasium with a minimum of 5,200 net square feet plus an additional 4 net square feet times 40 percent of the enrollment of the school devoted to bleacher seating.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>High schools shall include a gymnasium with at least 6,500 net square feet plus an additional 4 net square feet times 40 percent of the enrollment of the school devoted to bleacher seating.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Combination schools shall include the elements of the grades served by §A(2)—(4) of this regulation without duplication, but meeting the higher net square feet standards.</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Other schools shall include the elements above necessary to meet the educational requirements of the specific programs and capacity of the schools.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Physical-Education Requirements in Addition to Space Requirements in §A of This Regulation.</text>
        <paragraph num="(1)">
          <text>Elementary schools shall include one office. Separate physical-education equipment storage shall be provided.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Middle schools shall include one office. Separate physical-education equipment storage space shall be provided.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>High schools shall include two dressing rooms with lockers, showers, and restroom fixtures. Two offices shall be provided. Separate physical-education equipment storage space shall be provided.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Combination schools shall include the elements of the grades served by §B(1)—(3) of this regulation without duplication, but meeting the higher standards.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Other schools shall provide the elements above necessary to meet the educational requirements of the specific programs and capacity of the schools.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".12" heading="Food Services.">
      <paragraph num="A.">
        <text>Dining Area. A school facility shall have a space to permit students to eat within the school outside of general classrooms. This space may have more than one function and may fulfill more than one sufficiency standards requirement. The dining area shall be sized to accommodate no less than one third of the planned school program capacity of the school. The dining area shall have no less than 15 net square feet per seated student.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Serving Area. A serving area shall be provided in addition to a dining area.</text>
      </paragraph>
      <paragraph num="C.">
        <text>Kitchen Area. A kitchen shall have a telephone, plumbing providing potable water, a sink suitable for use both in preparing food and washing utensils, and a separate hand-washing sink. Kitchen and equipment shall comply with either the food preparation kitchen or the serving kitchen standards defined as follows:</text>
        <paragraph num="(1)">
          <text>Food preparation kitchen: Provide at least the greater of:</text>
          <paragraph num="(a)">
            <text>A minimum of 2 net square feet per meal served during the single largest serving period; or</text>
          </paragraph>
          <paragraph num="(b)">
            <text>No fewer than 2 square feet per enrolled student eligible for free or reduced-price meals.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Serving kitchen: Where food is not prepared, there shall be a minimum of 200 net square feet.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".13" heading="Other Facility Areas.">
      <paragraph num="A.">
        <text>Administrative Space. A school facility shall have space to be used for the administration of the school. The space shall consist of a minimum of 150 net square feet, plus 1 net square foot per student of the planned school program capacity.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Faculty Workroom/Lounge. A school facility shall have a workspace/lounge available to the faculty. This space is in addition to any workspace/lounge available to a teacher in or near a classroom. The space shall consist of 1 net square foot per student of the planned school program capacity with no less than 150 net square feet. The space may consist of more than one room and may have more than one function. This space shall include a break area with a sink.</text>
      </paragraph>
      <paragraph num="C.">
        <text>Health Services. A school facility shall have a dedicated health services space with a minimum of 500 net square feet that includes:</text>
        <paragraph num="(1)">
          <text>Areas for waiting, examination and treatment, resting, storage;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>An accessible toilet room;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>A separate room for private consultations and for use as a health service professional’s office;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Lockable cabinets for medical records and medications; and</text>
        </paragraph>
        <paragraph num="(5)">
          <text>At least one sink that provides both hot and cold water in addition to the sink in the toilet room.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Pupil Services. A school shall provide a coordinated program of pupil services for all students, which shall include, but not be limited to, school counseling, pupil personnel, school psychology, and health services. The school facility shall provide a minimum of 120 net square feet for each discipline, except school health services, and be staffed with greater than a 0.5 full-time professional.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".14" heading="General Storage.">
      <text>For general storage, which excludes lockers, janitorial, kitchen, general classroom, specialty classrooms, and administrative storage, at least 1 net square foot of the planned school program capacity may be distributed in or throughout any type of room or space, but may not count toward required room square footages. General storage shall be securable and include textbook storage.</text>
    </regulation>
    <regulation prefix="Regulation" num=".15" heading="Maintenance and Janitorial Space.">
      <text>Each school shall designate 0.5 net square feet per student of the planned school program capacity for maintenance and janitorial space. Janitorial space shall include a janitorial sink.</text>
    </regulation>
    <regulation prefix="Regulation" num=".16" heading="Standards Variance.">
      <text>The IAC may grant a variance from any of the Sufficiency Standards if it determines that the intent of the standard can be met by the school system in an alternate manner or if a variance is required for appropriate programmatic needs as demonstrated by the school system. If the IAC grants the variance, the school system shall be deemed to have met the standard.</text>
    </regulation>
    <regulation prefix="Regulation" num=".17" heading="Facility Assessment.">
      <text>Each school facility shall be assessed at least once every 4 years.</text>
    </regulation>
    <annotations>
      <annotation type="Authority">Education Article, §5-310, Annotated Code of Maryland; Ch. 14, Acts of 2018</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: November 4, 2019 (46:22 Md. R. 979)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .02D adopted effective October 5, 2020 (47:20 Md. R. 876)</annotation>
      <annotation type="History" subtype="Administrative History">Chapter revised effective December 12, 2022 (49:25 Md. R. 1050)</annotation>
    </annotations>
  </chapter>
</subtitle>