<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".32" citation="COMAR 14.39.02.32" title_num="14" subtitle_num="39" chapter_num="02" heading="Emergency Management Shelters.">
  <paragraph num="A.">
    <text>Definitions.</text>
    <paragraph num="(1)">
      <text>“Emergency management shelter” means temporary operations that meet the base humanitarian needs of the whole community before, during, or after an emergency event.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>“Fully power” means the capability to provide electrical power to the fixtures, services, appliances, and/or outlets within a specified facility or portion of a facility.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>“Replacement of the electrical system” means a complete new electrical system is installed in an existing or new facility, including when major components of the pre-existing electrical system are either removed or abandoned in place.</text>
    </paragraph>
    <paragraph num="(4)">
      <text>“Upgrade of the electrical system” means an existing electrical system of a facility or a major portion of a facility is improved through either:</text>
      <paragraph num="(a)">
        <text>The replacement or upgrade of existing components; or</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Other improvements that alter the performance characteristics of the electrical system.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="B.">
    <text>Each county board shall determine which public schools within the jurisdiction of the county board should be designated as emergency management shelters.</text>
  </paragraph>
  <paragraph num="C.">
    <text>The county board’s determination is based on consistency with local emergency management plans and criteria and the availability of funding.</text>
  </paragraph>
  <paragraph num="D.">
    <text>For schools that will be used as emergency management shelters based upon the LEA determination, local officials shall consult with the Maryland Department of Emergency Management (MDEM) to determine those areas of the facility that are necessary for public safety when the circumstances require the use of the facility as a public shelter during or after a federal, State, or local declared emergency.</text>
  </paragraph>
  <paragraph num="E.">
    <text>The LEA shall ensure that the areas determined to be emergency management shelters are designed and constructed to be fully powered in the event of an emergency through installation of:</text>
    <paragraph num="(1)">
      <text>A permanent, on-site emergency power source; or</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Other means to accept temporary emergency power source.</text>
    </paragraph>
  </paragraph>
</regulation>