    <text>Type of Submeter.</text>
    <paragraph num="(1)">
      <text>All submeters installed in compliance with these regulations shall be of a type and class to properly and accurately register electrical consumption.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>The meter type and design shall meet the applicable provisions of the latest edition of the American National Standard for Electric Meters — Code for Electricity Metering, incorporated by reference in COMAR 20.50.02.02C.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>A submeter installed for billing purposes shall have been approved by the Commission.</text>
    </paragraph>
  </paragraph>
  <paragraph num="B.">
    <text>Charges for Electricity. All charges for electricity used by an occupant shall be calculated from the readings of his or her submeter.</text>
  </paragraph>
  <paragraph num="C.">
    <text>Meter Accuracy. All submeters in service shall be tested by the owner as provided by this chapter.</text>
  </paragraph>
  <paragraph num="D.">
    <text>Fast Submetering. If an occupant's submeter is found to be more than 2 percent fast as a result of a test, the owner shall:</text>
    <paragraph num="(1)">
      <text>Recalculate the occupant's bills for the lesser of the period of the occupant's service or the period since the submeter was last tested.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Make a refund or a credit to the occupant, if the adjustment so calculated exceeds $1.</text>
    </paragraph>
  </paragraph>
  <paragraph num="E.">
    <text>Slow Submeter. If a submeter is found to be more than 2 percent slow as a result of a test and the unbilled amount exceeds $5, the owner may bill the occupant 1/2 of the unbilled error for the period of the occupant's service, or since the submeter was last tested, whichever is less, but not for a period longer than 12 months.</text>
  </paragraph>
  <paragraph num="F.">
    <text>Accuracy Calculation. The average accuracy shall be the weighted average of the percentage registration at light load and at heavy load, giving the light load registration a weight of 1 and the heavy load registration a weight of 4.</text>
  </paragraph>
  <paragraph num="G.">
    <text>Overcharge Adjustment. If an occupant has been overcharged as a result of an incorrect submeter reading, incorrect calculation of the bill, or incorrect submeter connection, the owner shall credit or refund the amount of overcharge to the occupant.</text>
  </paragraph>
  <paragraph num="H.">
    <text>Undercharge Adjustment. If an occupant has been undercharged as a result of incorrect submeter reading, incorrect calculation of the bill, incorrect submeter connection, stopped submeter or similar reasons, the amount of undercharge may be billed to the occupant.</text>
  </paragraph>
  <paragraph num="I.">
    <text>Meter Test by Owner. Upon application by occupant, the owner shall test the submeter for accuracy, at a laboratory approved by the Commission or on-site with instruments approved by the Commission, with no charge to the occupant, provided that no test was made within the past 18 months.</text>
  </paragraph>
  <paragraph num="J.">
    <text>Testing upon Installation and Removal of Meters.</text>
    <paragraph num="(1)">
      <text>A submeter may not be placed in service until it has been tested and adjusted by the owner at a laboratory approved by the Commission or on-site with instruments approved by the the Commission to within plus or minus 1 percent of 100 percent accuracy.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>If any submeter is removed from service or replaced by another submeter, it shall be properly tested and adjusted by the owner at a laboratory approved by the Commission before being placed in service again.</text>