# COMAR Title 20 — Public Service Commission

## Subtitle 26 — Energy Allocation Systems

### Chapter 01 — General

#### Regulation .03 Filing Requirements.

*COMAR 20.26.01.03*

A. An owner shall file an application with the Commission for approval of an energy allocation system.

B. The application shall include the following information:

  (1) The name and address of the owner;

  (2) The name and address of the general partner, if the owner is a partnership;

  (3) The name and address of the management agent, if any;

  (4) The name and address of the apartment house;

  (5) The number of individual dwelling units;

  (6) A description of the energy allocation system, including a technical description of the energy allocation equipment;

  (7) A description of the method for converting a measurement unit into approximate energy use;

  (8) A description of the method for calculating the energy costs directly billed to an occupant, including the calculation of a per unit energy cost;

  (9) A copy of all written information provided to an occupant including lease terms; and

  (10) A copy of the proposed billing format.
