# COMAR Title 20 — Public Service Commission

## Subtitle 40 — Electric and Gas Companies — Affiliate Regulations

### Chapter 02 — Utility Code of Conduct

#### Regulation .07 Cost Allocation Manual (CAM).

*COMAR 20.40.02.07*

A. This regulation does not apply to a utility that does not have a core or non-core service affiliate.

B. Any time a utility files a general rate case, a utility shall file its CAM with the Commission.

  (2) A utility shall file with the Commission any change to a CAM policy that allocates or assigns cost, within 30 days of the effective date of the change.

  (3) A utility filing required under §B(2) of this regulation shall include a detailed narrative that describes and justifies each change including a showing of the estimated impact of the change.

  (4) A CAM shall contain the:

    (a) Corporate organization chart;

    (b) Officers of the parent or holding company, the utility, and the service company, as applicable;

    (c) Complete description of the types of all costs shared with an affiliate; and

    (d) Methodology and procedure used to allocate costs.
