<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".04" citation="COMAR 20.50.03.04" title_num="20" subtitle_num="50" chapter_num="03" heading="Information to Be Filed with the Commission.">
  <paragraph num="A.">
    <text>Special Contracts. Each utility shall file with the Commission a copy of each contract for service not covered by the utility's filed tariff.</text>
  </paragraph>
  <paragraph num="B.">
    <text>Installation Rules. Each utility shall file with the Commission a copy of the utility's rules, if any, designed by the utility for the use of engineers, architects, electrical contractors, etc., covering meter and service installations.</text>
  </paragraph>
  <paragraph num="C.">
    <text>Bill Forms. Each utility shall file with the Commission a sample of each type of customer bill form, which shall include the information normally shown on a customer's bill for service.</text>
  </paragraph>
  <paragraph num="D.">
    <text>Map of System. Each utility shall file with the Commission a map showing the utility's operating area. This map shall be revised annually unless the revision is unnecessary, in which event the utility shall notify the Commission that the map on file is current. If practicable, the map should show:</text>
    <paragraph num="(1)">
      <text>Generating stations;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Transmission lines with voltages;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Primary distribution lines;</text>
    </paragraph>
    <paragraph num="(4)">
      <text>State boundary crossings; and</text>
    </paragraph>
    <paragraph num="(5)">
      <text>Territorial boundary.</text>
    </paragraph>
  </paragraph>
  <paragraph num="E.">
    <text>Persons to Contact. Each utility shall notify Commission staff, within 30 days of a change, of the name, title, address, telephone number, and email address of the person who should be contacted in connection with:</text>
    <paragraph num="(1)">
      <text>General electric distribution management duties;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Customer relations (complaints);</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Electric distribution operations;</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Electric distribution planning;</text>
    </paragraph>
    <paragraph num="(5)">
      <text>Meter tests and repairs;</text>
    </paragraph>
    <paragraph num="(6)">
      <text>Emergencies during non-office hours;</text>
    </paragraph>
    <paragraph num="(7)">
      <text>Cybersecurity; and</text>
    </paragraph>
    <paragraph num="(8)">
      <text>Regulatory contact for general inquiries.</text>
    </paragraph>
  </paragraph>
  <paragraph num="F.">
    <text>Fatal Accident Notice. In the event of a fatal accident, prompt notice shall be given to the Commission by telephone or email.</text>
  </paragraph>
  <paragraph num="G.">
    <text>Accident Notice. Each utility shall file with the Commission an “Accident Notice” report, on forms provided by the Commission, within 30 days after the end of any month during which an accident occurred.</text>
  </paragraph>
  <paragraph num="H.">
    <text>Line Support Identification. Each.</text>
  </paragraph>
</regulation>