<chapter num="09" heading="Safety" title_num="20" subtitle_num="55">
  <regulation prefix="Regulation" num=".01" heading="Protective Measures.">
    <paragraph num="A.">
      <text>Exercise Reasonable Care. Each utility or gas master meter operator shall exercise reasonable care to reduce the hazards to which its employees, its customers, its contractors, and the general public may be subjected.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Investigation by Commission. The utility or gas master meter operator shall give reasonable assistance to the Commission in the investigation of the cause of accidents and in the determination of suitable means of preventing accidents.</text>
    </paragraph>
    <paragraph num="C.">
      <text>Record of Accidents. Each utility or gas master meter operator shall maintain a summary of all reportable accidents arising from its operations or from contractor operations.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".02" heading="Safety Program.">
    <paragraph num="A.">
      <text>Adopt Safety Program. Each utility, including its contractors, shall adopt and execute a safety program, fitted to the size and type of its operations.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Use Suitable Tools and Equipment. Each utility or gas master meter operator may require its employees and contractors to use suitable tools and equipment in order that they may perform their work in a safe manner.</text>
    </paragraph>
    <paragraph num="C.">
      <text>Promote Safe Work Methods. Each utility or gas master meter operator may instruct its employees and contractors in safe methods of performing their work.</text>
    </paragraph>
    <paragraph num="D.">
      <text>Instruct In Artificial Respiration. Each utility should instruct its employees and contractors who, in the course of their work, are subject to the hazard of electric shock, asphyxiation, or drowning, in accepted methods of artificial respiration.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".03" heading="Customer Piping.">
    <paragraph num="A.">
      <text>Before permitting the use of gas at any location, the piping shall be tested for tightness and leaks in accordance with Part 4 of the American National Standard “National Fuel Gas Code”, ANSI Z223.1 (1988), which is incorporated by reference under COMAR 20.55.02.02.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Pressure Test. Before any system of gas piping is finally put in service, it shall be tested for tightness and certified by the proper inspection authority that the test has been made.</text>
    </paragraph>
    <paragraph num="C.">
      <text>Leakage Test. Before turning gas into any piping, it shall be tested for leaks.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".04" heading="Gas Leaks.">
    <text>Each utility or gas master meter operator shall respond promptly to all reports of gas leaks. The response shall include investigating the reports of gas leaks in accordance with COMAR 20.55.02.02B(1).</text>
  </regulation>
  <regulation prefix="Regulation" num=".05" heading="Gas Leakage Surveys.">
    <paragraph num="A.">
      <text>Procedures and Methods. Each utility or gas master meter operator shall establish procedures for making periodic gas leakage surveys as specified in these regulations. For residential customers with meters located outdoors, leakage surveys shall be performed up to the building entry. The leakage surveys shall be conducted by one or more of the following methods:</text>
      <paragraph num="(1)">
        <text>Flame ionization;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Combustible gas indicator and bar hole;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Optical methane detector; or</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Other method approved by the Commission.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Frequency of Surveys.</text>
      <paragraph num="(1)">
        <text>Leakage detection surveys shall be made at frequencies that comply with 49 CFR §§192.706 and 192.723, as amended, which are incorporated by reference, and the requirements of §B(2) and (3) of this regulation.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Places of Public Assembly. Service lines to places of public assembly shall be leakage surveyed at least once each calendar year, but with intervals not exceeding 15 months. The customer shall cooperate with the company in the conduct of these tests as regards accessibility to meters and service lines.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Cast iron, ductile iron, and cathodically unprotected steel pipelines shall be leak surveyed at least once every 3 years. Except as provided in §B(1) of this regulation, segments of these pipelines located inside a building shall be leak surveyed at least once every 5 years.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Field Operations.</text>
      <paragraph num="(1)">
        <text>After a leak repair, a leakage survey shall be performed in accordance with COMAR 20.55.02.02B(1).</text>
      </paragraph>
      <paragraph num="(2)">
        <text>When a utility service person enters a customer's premises for the purpose of inspecting or servicing any gas equipment (excluding meter reading), a leakage survey shall be conducted at appropriate locations, including atmosphere samples, and at all utility service entrances. In multiple-occupancy buildings, an individual apartment or dwelling unit shall constitute the customer's premises specified above. The customer shall cooperate with the company in the conduct of the tests as regards accessibility to meters and service lines.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Leakage surveys shall be conducted on each new or replaced service line before being placed in service but after backfilling and after a reasonable period of gas pressurizing.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Leaks Without Presence of Odorant. A review system shall be established to continuously analyze and monitor the results of all leakage surveys specified in these regulations to determine any areas where leaks were detected without presence of odorant. Any areas so determined shall be leakage surveyed immediately to determine the possible extent of the area, and shall then be leakage surveyed at least annually as long as the condition of odorant absorption exists.</text>
    </paragraph>
    <paragraph num="E.">
      <text>Leak Repairs. Leaks located by leakage surveys shall be investigated promptly and corrective action initiated.</text>
    </paragraph>
    <paragraph num="F.">
      <text>Records of Surveys.</text>
      <paragraph num="(1)">
        <text>Each utility or gas master meter operator shall maintain a record of each leak survey showing by location and date:</text>
        <paragraph num="(a)">
          <text>Leaks detected;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Severity of each leak; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Action taken to repair leaks.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>These records are to be kept as long as the segment of pipeline involved remains in service.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".06" heading="Odorization.">
    <paragraph num="A.">
      <text>Distinctive Odor Required. The odorant level throughout the entire company distribution system shall be sufficient so that gas is detectable at 1/10 of the lower explosive limit.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Tests. A system to monitor the odorant level within the distribution system shall be installed and maintained to insure the requirements of §A of this regulation.</text>
    </paragraph>
    <paragraph num="C.">
      <text>Odorant Injection. On-site odorant injection or other recognized protection means shall be provided to prevent odor fading wherever necessary when new steel mains are installed, to insure the requirements of §A of this regulation.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".07" heading="Pipeline Location.">
    <paragraph num="A.">
      <text>Burial. All pipelines shall be buried a minimum of 24 inches, or 18 inches in solid rock, where the term solid rock indicates the necessity for blasting or the use of pneumatic equipment.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Exceptions. Burial depths less than that specified but not less than 12 inches will be allowed if underground obstructions preclude those depths, if special line protection as accepted by the Commission is provided. The above requirements shall be applicable to existing pipelines within a reasonable period of time upon discovery of burial depth 12 inches or less, or of burial depths less than specified and deemed to be hazardous.</text>
    </paragraph>
    <paragraph num="C.">
      <text>Identification.</text>
      <paragraph num="(1)">
        <text>Tracer wire shall be installed with all plastic pipe.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>When the open trenching method of pipeline construction is used, suitable identification tape shall be installed at a minimum of 12 inches above the top of the pipe.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Location of Residential Service Lines and Meters.</text>
      <paragraph num="(1)">
        <text>Residential customer meters shall be placed as close to the exterior building wall as possible.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Gas service may not be provided to new or renewed service lines if there is any underground pipeline after the meter, unless the pipeline carries gas only to gas utilization equipment located outdoors.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>If it is not possible to comply with §D(2) of this regulation, written permission shall be obtained from the Commission before placing the meter.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>If a residential service line is replaced, the new service line shall be installed as provided in §D(1)—(3) of this regulation.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".08" heading="Increasing Maximum Allowable Operating Pressure.">
    <text>A utility or gas master meter operator may not increase the maximum allowable operating pressure of a pipeline until it has submitted to the Engineering Division a copy of the written procedure required by 49 CFR §192.553(c), as amended, which is incorporated by reference.</text>
  </regulation>
  <annotations>
    <annotation type="Authority">State Government Article, §7-207(a); Public Utilities Article, §§2-113, 2-121, and 5-101; Annotated Code of Maryland</annotation>
    <annotation type="History" subtype="Administrative History">Effective date: July 1, 1964 (Order No. 55567)</annotation>
    <annotation type="History" subtype="Administrative History">Chapter revised effective October 21, 1974 (Order No. 60922)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01 amended effective January 15, 1996 (23:1 Md. R. 35)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .02 amended effective February 7, 2000 (27:2 Md. R. 146)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .02E adopted effective December 25, 1989 (16:25 Md. R. 2715)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .03A amended effective December 25, 1989 (16:25 Md. R. 2715)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .04 amended effective February 7, 2000 (27:2 Md. R. 146)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .05A amended effective February 7, 2000 (27:2 Md. R. 146)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .05A, F amended effective January 15, 1996 (23:1 Md. R. 35)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation. 05B amended effective October 23, 1975 (Order No. 61510); January 23, 1981 (8:2 Md. R. 117); April 10, 1995 (22:7 Md. R. 538); March 26, 2007 (34:6 Md. R. 629)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .07C amended effective March 19, 1990 (17:5 Md. R. 639)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .07D adopted effective April 10, 1995 (22:7 Md. R. 538)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .07D amended effective December 29, 1997 (24:26 Md. R. 1760)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .08 adopted effective December 29, 1997 (24:26 Md. R. 1760)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .08 amended effective March 26, 2007 (34:6 Md. R. 629)</annotation>
  </annotations>
</chapter>