<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".04" citation="COMAR 20.58.01.04" title_num="20" subtitle_num="58" chapter_num="01" heading="General Requirements.">
  <paragraph num="A.">
    <text>Required Information. Each operator shall file with the Commission the following information in writing:</text>
    <paragraph num="(1)">
      <text>The location of each hazardous liquid pipeline facility;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>The name, address, and telephone number of the person responsible for each hazardous liquid pipeline facility;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>A complete set of “as built” plans and maps of the pipeline facility; and</text>
    </paragraph>
    <paragraph num="(4)">
      <text>A copy of:</text>
      <paragraph num="(a)">
        <text>The procedural manual for operation, maintenance, emergencies, and operator qualification required under 49 CFR 195; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Revisions to the manual at the time they are incorporated.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="B.">
    <text>Notice of Heated Fuel Oil Pumping. As soon as practicable, an operator shall give advanced notice to the Commission's designated safety engineer of the start of pumping operations involving heated fuel oil.</text>
  </paragraph>
  <paragraph num="C.">
    <text>Construction Notice. An operator shall provide written notice to the Commission, at least 30 days or as soon as practicable before commencement of construction, a description of any significant change, repair, or replacement to the pipeline system.</text>
  </paragraph>
  <paragraph num="D.">
    <text>Breakout Tank Notice.</text>
    <paragraph num="(1)">
      <text>If a breakout tank is removed from service for maintenance required under 49 CFR Part 195, an operator shall notify the Commission 30 days before the removal.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>If removal of a breakout tank is not covered by §D(1) of this regulation, an operator shall notify the Commission as soon as practicable.</text>
    </paragraph>
  </paragraph>
</regulation>