<chapter num="03" heading="Details of Filing Requirements — Generating Stations" title_num="20" subtitle_num="79">
  <regulation prefix="Regulation" num=".01" heading="Description of Generating Station.">
    <text>An application to construct a generating station shall provide a description of the generating station, including linear facilities, or the generating station modification, and shall include:</text>
    <paragraph num="A.">
      <text>A statement or finding by the county or municipal corporation in which any portion of the project is proposed to be located, under COMAR 20.79.01.05 and .06, of whether the project is consistent with the applicable local comprehensive plan and zoning ordinance, if provided;</text>
    </paragraph>
    <paragraph num="B.">
      <text>A high-resolution concept plan, including:</text>
      <paragraph num="(1)">
        <text>A location map with total site area and applicable land boundaries indicating the location of the proposed project in relation to municipal boundaries, perimeter roads, and traffic facilities;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Project design features;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Setbacks from adjacent properties and rights of way, as applicable;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Characteristics of the land to be developed, including soil classifications and all natural resources and environmental features that require or may require protection in accordance with State and local regulations, including proposed setbacks;</text>
      </paragraph>
      <paragraph num="(5)">
        <text>All existing and proposed structures, existing and proposed parking areas with setbacks and buffers, and areas of impervious surfaces or lot coverage;</text>
      </paragraph>
      <paragraph num="(6)">
        <text>Preliminary information as required under the Forest Conservation Act; and</text>
      </paragraph>
      <paragraph num="(7)">
        <text>Proposed location of landscape buffering, as applicable;</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Operational features, including the expected capacity factor;</text>
    </paragraph>
    <paragraph num="D.">
      <text>The schedule for engineering, construction, and operation;</text>
    </paragraph>
    <paragraph num="E.">
      <text>The life expectancy of the generating station;</text>
    </paragraph>
    <paragraph num="F.">
      <text>A statement of the reasons for the selection of the design and the site of the generating station, including linear facilities, or generating station modification;</text>
    </paragraph>
    <paragraph num="G.">
      <text>A description of the impact of the project on the economics of the State and local and regional impacts;</text>
    </paragraph>
    <paragraph num="H.">
      <text>A description of the impact of the project on the stability and reliability of the electric system, or, if the impact is not known at the time of application, an explanation of the steps undertaken by the applicant to determine the impact, including the expected date for submission of the impact description;</text>
    </paragraph>
    <paragraph num="I.">
      <text>To the extent feasible, the location and major design features of any required major electric system upgrade, including any associated transmission line, as a result of the project; and</text>
    </paragraph>
    <paragraph num="J.">
      <text>A description of the planned interconnection, including the specific connection location and route, and a description of the status of the generating station in the transmission or distribution grid interconnection process.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".02" heading="Environmental Information.">
    <paragraph num="A.">
      <text>The purpose of this regulation is to require the applicant to demonstrate that the application complies with applicable environmental laws, regulations, and restrictions.</text>
    </paragraph>
    <paragraph num="B.">
      <text>The application shall include an environmental review document, which shall include the following environmental information:</text>
      <paragraph num="(1)">
        <text>The following general information:</text>
        <paragraph num="(a)">
          <text>A general description of the physical, biological, aesthetic, and cultural features, and conditions of the site and adjacent areas;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A summary of the environmental effects of the construction and operation of the project, including a description of the unavoidable impact and recommended mitigation, including but not limited to a discussion of impacts to the Chesapeake Bay and its watershed and the Atlantic Coastal Bays, if applicable;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>A copy of all studies of the environmental impact of the proposed project prepared by the applicant; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>A statement of the ability to conform to applicable environmental standards;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>A description of the effect on air quality, including the:</text>
        <paragraph num="(a)">
          <text>Ability of the generating station to comply with:</text>
          <paragraph num="(i)">
            <text>State or federal ambient air quality standards;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>State or federal emission standards;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Federal new source performance standards;</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Federal emission standards for hazardous air pollutants;</text>
          </paragraph>
          <paragraph num="(v)">
            <text>Prevention of significant deterioration and new source review provisions; and</text>
          </paragraph>
          <paragraph num="(vi)">
            <text>Any requirement to obtain emission offsets, allowances, and reduction credits;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Impact on prevention of significant deterioration areas and existing nonattainment areas; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Information and forms required by the Department of the Environment regulations relating to permits to construct and operating permits under COMAR 26.11;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>A description of the effect on water quality and appropriation, including:</text>
        <paragraph num="(a)">
          <text>An analysis of the availability and suitability of treated wastewater, municipal water supplies, surface water and ground water for the water supply needs of the proposed generating station;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>An analysis of options to reduce the water supply demand on freshwater resources from the proposed generating station;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>An analysis of construction dewatering needs and estimated amounts;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>The identification of affected streams, nontidal wetlands, watersheds, and aquifers and an assessment of the positive or negative impact the project will have on water quality;</text>
        </paragraph>
        <paragraph num="(e)">
          <text>The information and forms required by the Department of the Environment regulations related to the impacts on Tier II streams under COMAR 26.08.02, if applicable, and analysis of impacts to water quality of Tier II streams, if applicable, including:</text>
          <paragraph num="(i)">
            <text>Permanent alterations to resources that support high water quality; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>An evaluation of alternatives that avoid, minimize, and mitigate impacts;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(f)">
          <text>A description of the impacts on any Maryland Wild and Scenic Rivers and their watersheds, as well as consistency with the Scenic River Plan, if applicable;</text>
        </paragraph>
        <paragraph num="(g)">
          <text>A description of the impact on other water users;</text>
        </paragraph>
        <paragraph num="(h)">
          <text>A description of the mitigation and minimization techniques evaluated; and</text>
        </paragraph>
        <paragraph num="(i)">
          <text>The information and forms required by Department of the Environment regulations relating to water use and appropriation under COMAR 26.17.06.07 and 26.17.07, if applicable;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>A description of the extent and effect on State or private tidal wetlands, nontidal wetlands and their buffers or expanded buffers, or waterways and floodplains, including:</text>
        <paragraph num="(a)">
          <text>Public health and welfare;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Marine fisheries;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Shell fisheries;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Wildlife;</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Protection of life and property from flood, hurricane, or other natural disaster;</text>
        </paragraph>
        <paragraph num="(f)">
          <text>The evaluation of mitigation and minimization techniques, including proposals related to replacement lands; and</text>
        </paragraph>
        <paragraph num="(g)">
          <text>The information and forms required by the Department of the Environment regulations relating to a license for use of State tidal wetlands, nontidal wetlands, or waterways and floodplains under COMAR 26.23 and 26.24;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>A discussion of the economics and availability of means for the disposal of plant-generated wastes; and</text>
      </paragraph>
      <paragraph num="(6)">
        <text>A discussion of the impact of the project on the State's ability to satisfy:</text>
        <paragraph num="(a)">
          <text>The renewable portfolio standard requirements set forth in Public Utilities Article, §7-701, et seq., Annotated Code of Maryland; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The greenhouse gas reduction requirements set forth in Environment Article, §2-1201, et seq., Annotated Code of Maryland.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".03" heading="Natural Resources Information.">
    <paragraph num="A.">
      <text>The purpose of this regulation is to require the applicant to demonstrate that the application addresses impacts of the project on the State’s natural resources.</text>
    </paragraph>
    <paragraph num="B.">
      <text>The applicant’s environmental review document shall include the following natural resources information:</text>
      <paragraph num="(1)">
        <text>A description of the impacts on forests, including:</text>
        <paragraph num="(a)">
          <text>A forest stand delineation;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Any techniques used to minimize forest impact; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The applicant’s proposal to address any applicable forest conservation ordinance of the county or municipal corporation in which any portion of the project is proposed to be located, including:</text>
          <paragraph num="(i)">
            <text>Efforts to comply with the applicable forest conservation ordinance, including the submission of a completed forest conservation worksheet for the county or municipal corporation;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>No action or, alternatively, deviation from the requirements of the applicable forest conservation ordinance, with an explanation of the applicant’s proposal or justification for the proposal and documentation of the county’s or municipal corporation’s agreement to the applicant’s proposal; or</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>If applicable, a statement that the project is exempt from the Forest Conservation Act due to total acreage of forest cover in the county in which the project is proposed to be located;</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>A description of the impacts to rare, threatened, and endangered species, including:</text>
        <paragraph num="(a)">
          <text>An environmental review letter provided by the Maryland Department of Natural Resources;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Information obtained from the U.S. Fish and Wildlife Service Information for Planning and Consultation online project planning tool; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>An evaluation of mitigation and minimization actions to address impacts to rare, threatened, and endangered species, as needed;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>A Phase I environmental site assessment report, prepared in accordance with the American Society for Testing Materials (ASTM) standard E1527;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>A description and site plan concerning impacts to the Critical Area, consistent with COMAR 27.01, COMAR 27.02 (for State agency projects on State-owned lands), and COMAR 27.03 (regarding notice requirements);</text>
      </paragraph>
      <paragraph num="(5)">
        <text>For solar photovoltaic generating stations, the description and site plan required in §B(4) of this regulation shall also include:</text>
        <paragraph num="(a)">
          <text>Calculations of any required reservation of resource conservation area density rights for projects located in a resource conservation area consistent with COMAR 27.01.14.05D; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The identification and location of any conservation easements, restrictive covenants, or other protective instrument over the property;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(6)">
        <text>An analysis of potential noise impacts from construction and operation activities, including:</text>
        <paragraph num="(a)">
          <text>Sound power levels or sound pressure levels at specific distances associated with noise-generating sources; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Identification of the closest noise-sensitive receptor locations;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(7)">
        <text>A geotechnical report within all areas of planned subsurface disturbance, if applicable; and</text>
      </paragraph>
      <paragraph num="(8)">
        <text>Identification of sea level rise projects, if applicable.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".04" heading="Socioeconomic Information.">
    <paragraph num="A.">
      <text>The purpose of this regulation is to require the applicant to demonstrate that the application addresses the socioeconomic effects of the project.</text>
    </paragraph>
    <paragraph num="B.">
      <text>The applicant’s environmental review document shall include the following socioeconomic information:</text>
      <paragraph num="(1)">
        <text>A summary of the socioeconomic effects of the construction and operation of the project, including a description of the unavoidable impact and recommended mitigation;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A description of historic and archeological resources of the site and impacts from the project on those resources, including:</text>
        <paragraph num="(a)">
          <text>The Maryland Historic Trust’s response to a review intake questionnaire submitted by the applicant;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Labeled photographs of the project site including images of all buildings and structures located within the project area and keyed to a site plan, if possible;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Drawings and a written scope of work illustrating any plans to construct, demolish, or rehabilitate buildings or other structures; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>A brief description of the project area, including:</text>
          <paragraph num="(i)">
            <text>The past and present land uses and conditions; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Any known construction dates for the buildings in the project area;</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>A description of any agricultural resources affected by the project, including:</text>
        <paragraph num="(a)">
          <text>A map of the project site identifying any areas of prime farmland by metes and bounds;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The area or acreage of prime farmland impacted by the project;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>An itemized list of all conservation easements impacted by the project;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>The number of acres planned for removal from agricultural production; and</text>
        </paragraph>
        <paragraph num="(e)">
          <text>The current agricultural use of the prime farmland, if applicable;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>A description of the project’s effect on public safety and transportation impacts, including:</text>
        <paragraph num="(a)">
          <text>Planned measures to address impacts to public services and safety, including but not limited to fire safety and emergency vehicle traffic plans;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A description of transportation information associated with the project, including:</text>
          <paragraph num="(i)">
            <text>Construction traffic routes;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Road permits;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Dust control methods; and</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Road damage avoidance and mitigation;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(c)">
          <text>The proximity of the project to any nearby airport and information from the Federal Aviation Administration and Maryland Aviation Administration on the impacts of the project on air navigation and any proposed mitigation; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>When applicable, an evaluation of the project’s potential radiofrequency or thermal impacts to communication systems and military operations, and any proposed mitigation;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>A description of any proposals to buffer the project’s visual impacts;</text>
      </paragraph>
      <paragraph num="(6)">
        <text>A description of vegetation management plans for the project site, including:</text>
        <paragraph num="(a)">
          <text>Topographic contour grading maps;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A grounds management plan, including weed control plans;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Any inclusion of pollinator habitat; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>For solar generating stations:</text>
          <paragraph num="(i)">
            <text>An affirmative statement whether the applicant intends to apply for the pollinator-friendly solar designation, pursuant to COMAR 08.13.02; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>An affirmative statement whether the applicant intends to incorporate agrivoltaics;</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(7)">
        <text>A description of the project’s effects on the local economy, including:</text>
        <paragraph num="(a)">
          <text>Person-years of employment, including direct and indirect employment, during the project’s construction phase;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Person-years of employment, including estimates of direct and indirect employment, for the 5 years immediately following the completion of the project’s construction; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Impacts to State and local tax revenues;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(8)">
        <text>A description of the project’s impacts, if any, on other applicable State, regional, and local plans or programs, including a reference to each appropriate agency or unit with authority to review, evaluate, or comment on behalf of the plan or program; and</text>
      </paragraph>
      <paragraph num="(9)">
        <text>For solar photovoltaic generating stations, a preliminary study of reflective glare impacts on adjacent public and private rights of way, non-participating occupied structures, and flight paths associated with airports within 3 miles of the project site.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Where applicable, the application shall address environmental justice information in accordance with Regulation .05 of this chapter.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".05" heading="EJSCREEN Reports.">
    <text>An application for a proposed qualifying generating station shall be accompanied by:</text>
    <paragraph num="A.">
      <text>A copy of the applicant’s EJSCREEN Standard Report, or comparable report if the EJSCREEN is unavailable, which shall be based on a 3-mile circular buffer centered at the Geographic Information System coordinates of the proposed qualifying generating station and shall include a statement of the numerical thresholds applied to generate the report as required under COMAR 20.79.01.04; and</text>
    </paragraph>
    <paragraph num="B.">
      <text>A copy of the applicant’s EJSCREEN ACS Report, which shall be based on the same 3-mile circular buffer as the EJSCREEN Standard Report and shall utilize the U.S. Census Bureau American Community Survey data available through EJSCREEN.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".06" heading="Statement of Public Engagement and Participation Certification.">
    <text>An application for a proposed qualifying generating station shall be accompanied by a signed statement of public engagement and participation, which shall include:</text>
    <paragraph num="A.">
      <text>A description of the time, place, and manner in which the applicant held the public meeting with members of the affected communities;</text>
    </paragraph>
    <paragraph num="B.">
      <text>A description of the manner in which the applicant provided notice to the affected communities of the proposed public meeting with members of the affected communities;</text>
    </paragraph>
    <paragraph num="C.">
      <text>A copy of any meeting sign-in sheet voluntarily indicating persons of interest; and</text>
    </paragraph>
    <paragraph num="D.">
      <text>A description of any terms, incentives, or resolutions reached between the applicant and the affected communities.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".07" heading="Condemnation.">
    <text>If the applicant is requesting authority to exercise a right of condemnation in connection with the construction of a generating station, a statement of the reasons the generating capacity is necessary to ensure a sufficient supply of electricity to customers in the State as required under Public Utilities Article, §7-207(b)(2), Annotated Code of Maryland.</text>
  </regulation>
  <annotations>
    <annotation type="Authority">Public Utilities Article, §§2-113, 2-121, and 7-205—7-208, Annotated Code of Maryland</annotation>
    <annotation type="History" subtype="Administrative History">Effective date: February 10, 1997 (24:3 Md. R. 189)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01 amended effective November 8, 2004 (31:22 Md. R. 1598)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .02B amended effective November 8, 2004 (31:22 Md. R. 1598)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .03 adopted effective November 8, 2004 (31:22 Md. R. 1598)</annotation>
    <annotation type="History" subtype="Administrative History">Chapter revised effective November 30, 2020 (47:24 Md. R. 1034)</annotation>
    <annotation type="History" subtype="Administrative History">Chapter revised effective September 6, 2021 (48:18 Md. R. 694)</annotation>
  </annotations>
</chapter>