<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".02" citation="COMAR 20.79.04.02" title_num="20" subtitle_num="79" chapter_num="04" heading="Description of Transmission Line.">
  <text>The description of a proposed transmission line or modification to an existing transmission line shall include, to the extent feasible at the time of application, the:</text>
  <paragraph num="A.">
    <text>Engineering and construction features, including the:</text>
    <paragraph num="(1)">
      <text>Width, length, and total acreage of the right-of-way,</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Line voltage,</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Number of circuits,</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Number of circuits per structure,</text>
    </paragraph>
    <paragraph num="(5)">
      <text>Structure type and dimensions,</text>
    </paragraph>
    <paragraph num="(6)">
      <text>Conductor configuration and size,</text>
    </paragraph>
    <paragraph num="(7)">
      <text>Nominal capacity (MVA), and</text>
    </paragraph>
    <paragraph num="(8)">
      <text>Nominal length of span between structures;</text>
    </paragraph>
  </paragraph>
  <paragraph num="B.">
    <text>Property or property right acquired or to be acquired;</text>
  </paragraph>
  <paragraph num="C.">
    <text>Access roads for construction or maintenance either existing or to be built;</text>
  </paragraph>
  <paragraph num="D.">
    <text>Location and identification of the following sites from which the project would be clearly visible:</text>
    <paragraph num="(1)">
      <text>Historical,</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Institutional land,</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Recreational area,</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Esthetic,</text>
    </paragraph>
    <paragraph num="(5)">
      <text>Archeological,</text>
    </paragraph>
    <paragraph num="(6)">
      <text>Wildlife management area, and</text>
    </paragraph>
    <paragraph num="(7)">
      <text>Park or forest;</text>
    </paragraph>
  </paragraph>
  <paragraph num="E.">
    <text>Location and identification of all portions of the right-of-way requiring construction within the 100-year floodplain of any stream;</text>
  </paragraph>
  <paragraph num="F.">
    <text>Location and identification of any public airport 1 mile or less from the transmission line; and</text>
  </paragraph>
  <paragraph num="G.">
    <text>Depiction on suitable topographic map (minimum scale: 1 inch = 2,000 feet) of §§B—F of this regulation.</text>
  </paragraph>
</regulation>