    <text>Caution Signs.</text>
    <paragraph num="(1)">
      <text>At each separate work area, the contractor performing an abatement shall display a caution sign in the following manner wherever the treatment process is reasonably expected to break or disturb any lead-containing substances:</text>
      <paragraph num="(a)">
        <text>At least 3 days before removing or encapsulating lead paint, the contractor shall post signs immediately outside all entrances and exits to the area except that, in emergency situations, posting shall be done as soon as possible;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The contractor shall keep the signs posted until the Department issues the written notice of completion and compliance under Regulation .12J; and</text>
      </paragraph>
      <paragraph num="(c)">
        <text>The contractor shall ensure that the sign required by §A(1) meets the following description:</text>
        <paragraph num="(i)">
          <text>The sign is at least 20" by 14", and states the date and place of the lead abatement project,</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Except as provided in §A(1)(c)(iii), the sign includes the phrase “Caution Lead Hazard, Keep Out” in bold lettering at least 2 inches high, and</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>In dwellings occupied by 3 or more households where common areas are to be abated the sign includes the phrase “Caution Lead Hazard, Do Not Remain in Work Area Unless Authorized” in bold lettering at least 2 inches high.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>Multiple Family Dwellings.</text>
      <paragraph num="(a)">
        <text>In dwellings occupied by three or more households, where common areas are to be abated, the contractor shall post a notice meeting the description in §A(2)(b) on the door of each apartment in the building at least 3 days before a lead abatement project commences.</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The notice required in §A(2)(a) shall contain:</text>
        <paragraph num="(i)">
          <text>The date of commencement of abatement and the area to be abated; and</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>The statement “Please observe caution signs, instruct children not to remain in work area.”</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="B.">
    <text>Containment.</text>
    <paragraph num="(1)">
      <text>Interior Containment. Before beginning to abate a lead-containing substance in an interior work area, the contractor performing an abatement shall:</text>
      <paragraph num="(a)">
        <text>Check to make sure that all movable objects have been removed from the work area as required by Regulation .06;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>If the work area is a room or group of rooms within a building, seal the work area from all other portions of the building with plastic sheeting at least 6 mils thick, waterproof tape, and industrial staples;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Seal opening seams of all kitchen cabinets and refrigerators individually with tape;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Cover all non-movable objects, such as radiators, refrigerators, stoves, kitchen cabinets, built in furniture, and bookcases, with plastic sheeting at least 6 mils thick taped securely in place;</text>
      </paragraph>
      <paragraph num="(e)">
        <text>Cover floors in the work area with plastic sheeting at least 6 mils thick sealed with tape and staples;</text>
      </paragraph>
      <paragraph num="(f)">
        <text>Shut down all forced air ventilation in the work area and seal exhaust and intake points in the work area; and</text>
      </paragraph>
      <paragraph num="(g)">
        <text>Remove for professional cleaning, or replace, all carpeting present before abatement.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>Exterior Containment. Before beginning to abate a lead-containing substance in an exterior work area, the contractor performing the abatement shall use the following procedures:</text>
      <paragraph num="(a)">
        <text>Liquid Waste Produced by Abatement Technique.</text>
        <paragraph num="(i)">
          <text>For all situations, when liquid waste is produced by any abatement technique is used, the contractor shall place plastic sheeting at least 6 mil thick on the ground as close as possible to the building foundation, or on the floor when applicable.</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>When sheeting is placed on the ground, it shall be raised at its edge and extend a sufficient distance to contain the liquid waste. Plastic sheeting may not be required to extend beyond the edge of the nearest sidewalk.</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>When sheeting is placed on an exterior floor, it shall cover the entire exterior floor.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(b)">
        <text>Non-liquid Waste Produced by Abatement Technique.</text>
        <paragraph num="(i)">
          <text>For all situations, when non-liquid waste is produced by any abatement technique used, the contractor shall place plastic sheeting at least 6 mils thick on the ground as close as possible to the foundation, or on the floor when applicable.</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>When sheeting is placed on the ground, it shall extend out from the foundation 3 feet per story being abated, with a minimum of 5 feet and a maximum of 20 feet. Plastic may not be required to extend beyond the edge of the nearest sidewalk.</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>When sheeting is placed on an exterior floor, it shall cover the entire exterior floor.</text>
        </paragraph>
        <paragraph num="(iv)">
          <text>The contractor shall weight the sheeting at the foundations, and along all edges and seams.</text>
        </paragraph>
        <paragraph num="(v)">
          <text>If the constant wind speed is over 15 mph, exterior abatement producing dry waste may not be performed unless vertical shrouds are erected.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>For all sealing and covering the contractor shall use:</text>
      <paragraph num="(a)">
        <text>Plastic sheeting, at least 6 mils thick or equivalent;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Duct tape or equivalent waterproof tape;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Staples of industrial size; and</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Other additional appropriate work practices to contain particulate lead or lead containing liquids.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(4)">
      <text>Exception. A surface or object may not be covered or sealed while that surface itself is actively being abated.</text>
    </paragraph>
    <paragraph num="(5)">
      <text>Alternative Procedures. The Department may, on a case-by-case basis, allow an alternative procedure for containment of lead within a work area, provided that the owner or contractor who uses this procedure shall submit a written description of the alternative procedure to the Department which demonstrates to the satisfaction of the Department that the proposed alternative procedure provides the equivalent containment.</text>