  <paragraph num="A.">
    <text>The Department may inspect a work area at any time during a lead abatement project to determine compliance with this regulation.</text>
  </paragraph>
  <paragraph num="B.">
    <text>After receipt of notice of completed cleanup required by Regulation .08D the Department shall, within 24 hours, notify the contractor or owner of the time and date on which an initial inspection will take place, if one is to be made. If the contractor or owner is not reachable by telephone, notice shall be sent by first class mail. Any inspection performed under this subsection shall be completed within 2 working days of giving telephone notice to the contractor or owner. Notice by mail will require an additional 5 working days for completion of the inspection.</text>
  </paragraph>
  <paragraph num="C.">
    <text>The inspection performed under §B shall be a visual inspection to determine whether surfaces requiring abatement have been abated.</text>
  </paragraph>
  <paragraph num="D.">
    <text>The inspector shall immediately notify the contractor or owner, if either is present, of the results of the inspection under §B, and shall point out and describe any areas with inadequate treatment. If the contractor or owner is not present during the inspection under §B, the inspector shall notify the contractor and owner of the results of the inspection, and shall include the locations and characteristics of surfaces with inadequate treatment, by letter mailed within 24 hours of the inspection, by first class mail.</text>
  </paragraph>
  <paragraph num="E.">
    <text>Before repainting or recoating under Regulation .08C, the contractor shall receive notice of:</text>
    <paragraph num="(1)">
      <text>A satisfactory inspection under §B; or</text>
    </paragraph>
    <paragraph num="(2)">
      <text>The decision not to conduct an inspection under §B.</text>
    </paragraph>
  </paragraph>
  <paragraph num="F.">
    <text>Upon completion of all requirements of Regulations .08 and .09, a contractor shall notify the Department of readiness for final inspection.</text>
  </paragraph>
  <paragraph num="G.">
    <text>Within 24 hours of receipt of notice under §F, the Department shall notify the contractor or owner of the time and date on which an inspection will take place, if one is to be made. If the contractor or owner is not reachable by telephone, notice shall be sent by first class mail. Any inspection performed under this section shall be completed within 2 working days of giving this notice to the contractor and owner. Notice by mail will require an additional 5 working days for completion of the inspection.</text>
  </paragraph>
  <paragraph num="H.">
    <text>Every inspection performed under §G shall include at least:</text>
    <paragraph num="(1)">
      <text>Dust sampling to be followed by analysis in accordance with §I; and</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Visual inspection.</text>
    </paragraph>
  </paragraph>
  <paragraph num="I.">
    <text>The Department shall submit a dust sample collected under §H of this regulation for extractable lead analysis to a laboratory:</text>
    <paragraph num="(1)">
      <text>Recognized by the U.S. Environmental Protection Agency under 15 U.S.C. §2685(b) as accredited under the National Lead Laboratory Accreditation Program; and</text>
    </paragraph>
    <paragraph num="(2)">
      <text>That demonstrates it can achieve a quantitation limit equal to or less than 50 percent of the lowest lead dust level specified in §K(1) of this regulation.</text>
    </paragraph>
  </paragraph>
  <paragraph num="J.">
    <text>The Department shall notify the owner and the contractor in writing, sent by first class mail, of the results of the final inspection within 24 hours of receiving the results of lead dust analysis conducted under §I. If the results of the lead dust analysis conducted under §I do not meet the standards set out in §K, the contractor shall perform a further cleanup as described in Regulation .08H. If results of the lead dust analysis meet the standards set out in §K, the Departmental notice shall state that the lead abatement project has been completed and complies with the standards set out in §K. A statement of completion and compliance may not preclude the Department from taking any future enforcement action against the same group day care center, residential property, or building appurtenant to a group day care center or residential property.</text>
  </paragraph>
  <paragraph num="K.">
    <text>The Department shall consider a lead abatement project to be in compliance with this chapter if:</text>
    <paragraph num="(1)">
      <text>Floor lead dust levels are less than 10 micrograms per square foot;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Window sill lead dust levels are less than 100 micrograms per square foot;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Window well lead dust levels are less than 100 micrograms per square foot; and</text>
    </paragraph>
    <paragraph num="(4)">
      <text>All abated surfaces and all floors have been treated to provide smooth and easily cleanable surfaces.</text>
    </paragraph>
  </paragraph>
  <paragraph num="L.">
    <text>This regulation does not apply to abatement projects conducted in owner-occupied dwellings by the owner, unless the abatement is ordered by the Department, a local government unit, or a court of competent jurisdiction.</text>