  <regulation prefix="Regulation" num=".01" heading="Scope.">
    <text>These regulations establish appropriate techniques for abatement of lead-containing substances from interior and certain exterior areas in group day care centers, in all residential property including owner-occupied residential property, and in buildings appurtenant to group day care centers and residential properties.</text>
  </regulation>
  <regulation prefix="Regulation" num=".02" heading="Definitions.">
    <paragraph num="A.">
      <text>The following terms have the meanings indicated.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Terms Defined.</text>
      <paragraph num="(1)">
        <text>“Abate” or “abatement” means the elimination of exposure to lead-based substances that may result in lead toxicity or poisoning, by the removal or encapsulation of lead-containing substances, by thorough cleanup procedures, and by post-cleanup treatment of surfaces.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>“Business entity” means a partnership, firm, association, corporation, sole proprietorship, or other business unit and any employee of it.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>“Child” means a person under the age of 6.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>“Contractor” means any business entity, public unit, or person performing the actual abatement for a lead abatement project.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>“Department” means the Maryland Department of the Environment.</text>
      </paragraph>
      <paragraph num="(6)">
        <text>“Encapsulate” or “encapsulation” means to resurface or cover surfaces and to seal or caulk seams with durable material, so as to prevent or control chalking, flaking lead-containing substances from becoming part of house dust or accessible to children.</text>
      </paragraph>
      <paragraph num="(7)">
        <text>“HEPA” or “high efficiency particle air” means a filter capable of filtering out particles of 0.3 microns or greater from a body of air at 99.97 percent efficiency or greater.</text>
      </paragraph>
      <paragraph num="(8)">
        <text>“Lead abatement project” means any work performed in order to abate the presence of a lead-containing substance.</text>
      </paragraph>
      <paragraph num="(9)">
        <text>“Lead-containing substance” means any paint, plaster or other surface coating material containing more than 0.50 percent lead by weight calculated as lead metal in the dried solid, or more than 0.7 milligrams per square centimeter by the X-ray fluorescence analyzer.</text>
      </paragraph>
      <paragraph num="(10)">
        <text>“Owner” means a person, firm, corporation, guardian, conservator, receiver, trustee, executor, or other judicial officer, who, alone or jointly or severally with others, owns, holds, or controls the whole or any part of the freehold or leasehold title to any property, with or without accompanying actual possession of it, and shall include in addition to the holder of legal title, any vendee in possession of it, but may not include a mortgagee or an owner of a reversionary interest under a ground rent lease.</text>
      </paragraph>
      <paragraph num="(11)">
        <text>“Public unit” means:</text>
        <paragraph num="(a)">
          <text>Any agency, bureau, department, or instrumentality of State government;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Any agency, bureau, department, or instrumentality of federal or local government;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Any public, quasi-public, or municipal corporation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(12)">
        <text>“Quantitation limit” means the minimum quantity or level of lead that can reliably be measured or quantified to a specified degree of accuracy and precision.</text>
      </paragraph>
      <paragraph num="(13)">
        <text>“Woodwork” means all wooden or metal interior or exterior fittings or ornamentation, such as moldings, doors, staircases, and window sashes and trim.</text>
      </paragraph>
      <paragraph num="(14)">
        <text>Work Area.</text>
        <paragraph num="(a)">
          <text>“Interior work area” means a hallway, room or group of rooms in which abatement takes place on the inside of a residential property, or group day care center.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>“Exterior work area” means an outdoor porch, stairway, or other element of woodwork on the exterior of a residential property, a group day care center, or a building appurtenant to a residential property or group day care center, on which abatement takes place.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".03" heading="Methods of Abatement.">
    <paragraph num="A.">
      <text>A person performing abatement of lead-containing substances may not use the following methods:</text>
      <paragraph num="(1)">
        <text>Open flame burning;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Dry sanding, except as allowed in §B(2);</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Open abrasive blasting, except as allowed in §B(2);</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Uncontained hydro-blasting;</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Methylene chloride for interior use except that methylene chloride may be used in interior work areas for localized touch-up; or</text>
      </paragraph>
      <paragraph num="(6)">
        <text>Dry scraping; or</text>
      </paragraph>
      <paragraph num="(7)">
        <text>Heat gun operating at or above 1,100°F.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>A person performing abatement of lead-containing substances shall only use the following methods:</text>
      <paragraph num="(1)">
        <text>Replacement. Any component part of a building may be abated by replacement with a part free of lead-containing substances.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Removal.</text>
        <paragraph num="(a)">
          <text>Unless replaced encapsulated, or reversed, woodwork and floors may only be abated by using the following techniques:</text>
          <paragraph num="(i)">
            <text>Offsite chemical stripping;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Heat gun operating below 1,100°F;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Non-flammable chemical strippers which do not contain methylene chloride, except that chemical strippers containing methylene chloride may be used for localized touch-up;</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Sander equipped with HEPA vacuum;</text>
          </paragraph>
          <paragraph num="(v)">
            <text>Vacuum-blasting in exterior work areas only; or</text>
          </paragraph>
          <paragraph num="(vi)">
            <text>Contained hydro-blasting in exterior work areas only.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Unless replaced or encapsulated, walls or ceilings may only be abated by using the following techniques:</text>
          <paragraph num="(i)">
            <text>Wet-scraping of loose material if scraping is followed by encapsulation;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Vacuum-blasting in exterior work areas only; or</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Contained hydro-blasting in exterior work areas only.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Encapsulation.</text>
        <paragraph num="(a)">
          <text>A wall or ceiling surface may be abated by encapsulation using only the following materials:</text>
          <paragraph num="(i)">
            <text>Gypsum board;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Fiberglass mats;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Canvas backed vinyl wall coverings;</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Formica;</text>
          </paragraph>
          <paragraph num="(v)">
            <text>Tile;</text>
          </paragraph>
          <paragraph num="(vi)">
            <text>Paneling; or</text>
          </paragraph>
          <paragraph num="(vii)">
            <text>Other durable material that does not readily tear, chip, or peel.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>A floor surface may be abated by encapsulation using only the following materials:</text>
          <paragraph num="(i)">
            <text>Tile;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Vinyl flooring;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Wood; or</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Stone.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(c)">
          <text>A woodwork surface may be abated by encapsulation using only the following materials:</text>
          <paragraph num="(i)">
            <text>Plastic;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Metal; or</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Wood.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>Reversal. A woodwork surface may be abated by reversal of its component parts so long as no lead-containing surface remains exposed at the completion of the process, and all seams are caulked and sealed.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Windows Generally. Windows, when abated, shall be completely treated, including inside, outside and sides of sashes. Window frames shall be abated to the outside edge of the frame, including slides, sash guides and window wells.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Alternative Procedures.</text>
      <paragraph num="(1)">
        <text>The Department may, on a case-by-case basis, allow an alternative procedure for abatement of a lead paint hazard, provided that the owner or contractor who uses this procedure shall submit a written description of the alternative procedure to the Department which demonstrates to the satisfaction of the Department that the proposed alternative procedure provides the equivalent control and removal.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>In all cases in which the Department allows the use of an alternative procedure under §C(1), the owner and resident shall, for a 1-year period after completion of the lead abatement project, permit the Department to enter the area where the abatement occurred in order to inspect the property for the purpose of determining the effectiveness and durability of the allowed alternative procedure. Before conducting such an inspection the Department shall give written notice to the owner and resident of the property.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".04" heading="Personal Protection.">
    <paragraph num="A.">
      <text>A business entity or public unit shall ensure that its employees are protected in accordance with all applicable federal, state, and local standards, in particular those set forth in the Maryland Occupational Safety and Health (MOSH) regulations governing Occupational Exposure to Lead in Construction (COMAR 09.12.32).</text>
    </paragraph>
    <paragraph num="B.">
      <text>All persons not covered by COMAR 09.12.32 and working on a lead abatement project shall, when present in the work site, wear disposable clothing, shoe covers and, if a heat gun or sander equipped with HEPA vacuum is being used for abatement, a half-mask air purifying respirator equipped with high efficiency filters.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".05" heading="Control of Access.">
    <paragraph num="A.">
      <text>Except as provided in §D of this regulation, a person or pet may not enter or remain in the work area of a group day care center, residential property, or building appurtenant to a group day care center or residential property, until the Department determines that the lead abatement project has been completed in a satisfactory manner under Regulation .12J, unless that person is:</text>
      <paragraph num="(1)">
        <text>The owner of the building or the owner's designee;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The contractor engaged for the lead abatement project and his employees;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>A State, county, or local enforcement official or his designee;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>An inspector who represents a lender with a security interest in the building which is being abated; or</text>
      </paragraph>
      <paragraph num="(5)">
        <text>A federal, State, or local official, or his designee, engaged in research on lead buildings.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Exemption. If a renovation process is not reasonably expected to break or disturb any lead based substance, then the requirements of §A do not apply.</text>
    </paragraph>
    <paragraph num="C.">
      <text>Except as provided in §D, all persons entering a work area during a lead abatement project which involves the removal of lead paint shall wear:</text>
      <paragraph num="(1)">
        <text>Disposable shoe covers which shall be removed when leaving the work area; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A half-mask air purifying respirator equipped with high efficiency filters during or after the use of a heat-gun or sander equipped with HEPA vacuum.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Multiple Family Dwellings. At all times when a lead abatement project is being conducted in a common area of a dwelling occupied by three or more households:</text>
      <paragraph num="(1)">
        <text>Residents and pets shall use alternative entrances and exits which do not require passage through the work area, if such an entrance and exit exists;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The contractor shall use all reasonable efforts to create an uncontaminated passage for entrance and egress of all building occupants; and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>If the entrance and egress to a building can only be through the work area, abatement in common areas shall be conducted between the hours of 9 a.m. to 3 p.m. only, and the work area shall be cleaned with a HEPA vacuum at the end of each working day until all surfaces are free of visible dust and debris.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".06" heading="Removable Objects.">
    <paragraph num="A.">
      <text>Except in an emergency, at least 7 days, but not more than 30 days before a contractor may commence a lead abatement project, the owner of the building where the lead abatement project is to take place shall notify all residents of:</text>
      <paragraph num="(1)">
        <text>The area which is to be abated;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The date abatement is to commence; and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The residents' obligation under §B to place all personal items in a box or other closed, easily handled container.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Every resident of an area, which is to be abated, who has received a notice under §A, shall be responsible for placing all personal items in boxes or other closed, easily handled containers, and shall pay the reasonable costs of packing and storage of any loose personal items remaining in the work area at the time designated for commencement of abatement in the notice issued under §A.</text>
    </paragraph>
    <paragraph num="C.">
      <text>Before a contractor may commence a lead abatement project, the owner of the building where the lead abatement project is to take place shall remove all furniture and packed personal items from the work area and store them in a secure place.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".07" heading="Control of Emissions and Dust.">
    <paragraph num="A.">
      <text>Caution Signs.</text>
      <paragraph num="(1)">
        <text>At each separate work area, the contractor performing an abatement shall display a caution sign in the following manner wherever the treatment process is reasonably expected to break or disturb any lead-containing substances:</text>
        <paragraph num="(a)">
          <text>At least 3 days before removing or encapsulating lead paint, the contractor shall post signs immediately outside all entrances and exits to the area except that, in emergency situations, posting shall be done as soon as possible;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The contractor shall keep the signs posted until the Department issues the written notice of completion and compliance under Regulation .12J; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The contractor shall ensure that the sign required by §A(1) meets the following description:</text>
          <paragraph num="(i)">
            <text>The sign is at least 20" by 14", and states the date and place of the lead abatement project,</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Except as provided in §A(1)(c)(iii), the sign includes the phrase “Caution Lead Hazard, Keep Out” in bold lettering at least 2 inches high, and</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>In dwellings occupied by 3 or more households where common areas are to be abated the sign includes the phrase “Caution Lead Hazard, Do Not Remain in Work Area Unless Authorized” in bold lettering at least 2 inches high.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Multiple Family Dwellings.</text>
        <paragraph num="(a)">
          <text>In dwellings occupied by three or more households, where common areas are to be abated, the contractor shall post a notice meeting the description in §A(2)(b) on the door of each apartment in the building at least 3 days before a lead abatement project commences.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The notice required in §A(2)(a) shall contain:</text>
          <paragraph num="(i)">
            <text>The date of commencement of abatement and the area to be abated; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>The statement “Please observe caution signs, instruct children not to remain in work area.”</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Containment.</text>
      <paragraph num="(1)">
        <text>Interior Containment. Before beginning to abate a lead-containing substance in an interior work area, the contractor performing an abatement shall:</text>
        <paragraph num="(a)">
          <text>Check to make sure that all movable objects have been removed from the work area as required by Regulation .06;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>If the work area is a room or group of rooms within a building, seal the work area from all other portions of the building with plastic sheeting at least 6 mils thick, waterproof tape, and industrial staples;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Seal opening seams of all kitchen cabinets and refrigerators individually with tape;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Cover all non-movable objects, such as radiators, refrigerators, stoves, kitchen cabinets, built in furniture, and bookcases, with plastic sheeting at least 6 mils thick taped securely in place;</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Cover floors in the work area with plastic sheeting at least 6 mils thick sealed with tape and staples;</text>
        </paragraph>
        <paragraph num="(f)">
          <text>Shut down all forced air ventilation in the work area and seal exhaust and intake points in the work area; and</text>
        </paragraph>
        <paragraph num="(g)">
          <text>Remove for professional cleaning, or replace, all carpeting present before abatement.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Exterior Containment. Before beginning to abate a lead-containing substance in an exterior work area, the contractor performing the abatement shall use the following procedures:</text>
        <paragraph num="(a)">
          <text>Liquid Waste Produced by Abatement Technique.</text>
          <paragraph num="(i)">
            <text>For all situations, when liquid waste is produced by any abatement technique is used, the contractor shall place plastic sheeting at least 6 mil thick on the ground as close as possible to the building foundation, or on the floor when applicable.</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>When sheeting is placed on the ground, it shall be raised at its edge and extend a sufficient distance to contain the liquid waste. Plastic sheeting may not be required to extend beyond the edge of the nearest sidewalk.</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>When sheeting is placed on an exterior floor, it shall cover the entire exterior floor.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Non-liquid Waste Produced by Abatement Technique.</text>
          <paragraph num="(i)">
            <text>For all situations, when non-liquid waste is produced by any abatement technique used, the contractor shall place plastic sheeting at least 6 mils thick on the ground as close as possible to the foundation, or on the floor when applicable.</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>When sheeting is placed on the ground, it shall extend out from the foundation 3 feet per story being abated, with a minimum of 5 feet and a maximum of 20 feet. Plastic may not be required to extend beyond the edge of the nearest sidewalk.</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>When sheeting is placed on an exterior floor, it shall cover the entire exterior floor.</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>The contractor shall weight the sheeting at the foundations, and along all edges and seams.</text>
          </paragraph>
          <paragraph num="(v)">
            <text>If the constant wind speed is over 15 mph, exterior abatement producing dry waste may not be performed unless vertical shrouds are erected.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>For all sealing and covering the contractor shall use:</text>
        <paragraph num="(a)">
          <text>Plastic sheeting, at least 6 mils thick or equivalent;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Duct tape or equivalent waterproof tape;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Staples of industrial size; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Other additional appropriate work practices to contain particulate lead or lead containing liquids.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>Exception. A surface or object may not be covered or sealed while that surface itself is actively being abated.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Alternative Procedures. The Department may, on a case-by-case basis, allow an alternative procedure for containment of lead within a work area, provided that the owner or contractor who uses this procedure shall submit a written description of the alternative procedure to the Department which demonstrates to the satisfaction of the Department that the proposed alternative procedure provides the equivalent containment.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".08" heading="Cleanup of Work Area.">
    <paragraph num="A.">
      <text>Interior Cleanup. After completion of the removal, replacement, encapsulation, or reversal involved in an abatement project, the contractor shall:</text>
      <paragraph num="(1)">
        <text>Deposit all lead waste, including sealing tape, plastic sheeting, mop heads, sponges, filters, and disposable clothing in double plastic bags of at least 4 mils thick, or single bags 6 mils thick, and seal the bags;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Before washing as required in §A(3), vacuum-clean all surfaces in the work area including woodwork, walls, windows, window wells, and floors with a HEPA vacuum;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>After vacuum-cleaning as required in §A(2), wet wash all surfaces in the work area including woodwork, walls, windows, window wells, ceilings and floors with a solution containing at least 1 ounce of 5 percent trisodium phosphate to each gallon of water; and</text>
      </paragraph>
      <paragraph num="(4)">
        <text>After washing as required by §A(3), vacuum-clean all surfaces, after they have dried, as described in §A(2), with a HEPA vacuum until no visible residue remains.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Exterior Cleanup. After completion of the replacement, removal, encapsulation, or reversal involved in an exterior abatement project, the contractor shall:</text>
      <paragraph num="(1)">
        <text>Recover all visible debris from all exterior areas;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Vacuum all porches treated;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Wet wash all surfaces in the work area, including woodwork, windows, window wells, and floors with a solution containing at least 1 ounce of 5 percent trisodium phosphate to each gallon of water.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Except as provided in §F, after the cleaning outlined in §§A and B, after a satisfactory inspection under Regulation .12B, every contractor shall repaint with a paint containing not more than 0.06 percent lead in the dried solid, or recoat all surfaces treated, except those encapsulated surfaces which have smooth easily cleanable factory-finished surfaces.</text>
    </paragraph>
    <paragraph num="D.">
      <text>Before repainting or recoating under §C, each contractor shall notify the Department that the cleanup required under §§A and B is completed, and shall undergo any inspection required by Regulation .12B.</text>
    </paragraph>
    <paragraph num="E.">
      <text>After painting or coating as required under §C, the contractor shall repeat the cleaning process set forth in §A in all interior work areas.</text>
    </paragraph>
    <paragraph num="F.">
      <text>After completion of the cleaning required under §E, the contractor shall seal all floors in interior work areas with:</text>
      <paragraph num="(1)">
        <text>Polyurethane;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Gloss deck enamel;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>A tight fitting vinyl floor covering; or</text>
      </paragraph>
      <paragraph num="(4)">
        <text>An equivalent impermeable material, if a smooth, cleanable surface is not already present.</text>
      </paragraph>
    </paragraph>
    <paragraph num="G.">
      <text>In owner-occupied dwellings in which a lead abatement project is being done by the owner and not by a hired contractor, after completion of the replacement, removal, encapsulation, or reversal involved in a lead abatement project, the owner may, instead of following the cleanup procedures set forth in §A:</text>
      <paragraph num="(1)">
        <text>Deposit all waste, including sealing tape, plastic sheeting, mop heads, sponges, filters, and disposable clothing, in double plastic bags at least 4 mils thick, or single plastic bags at least 6 mils thick, and seal the bags;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Wet wash all surfaces in the work area, including woodwork, walls, windows, window wells, and floors with a solution containing at least 1 ounce of 5 percent trisodium phosphate to each gallon of water, twice, and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Wet vacuum-clean all surfaces in the work area, including woodwork, walls, windows, window wells, and floors while surfaces are still wet.</text>
      </paragraph>
    </paragraph>
    <paragraph num="H.">
      <text>Alternative Procedures. The Department may on a case-by-case basis allow an alternative procedure for cleanup of a lead abatement project, provided that the owner or contractor who uses this procedure shall submit to the Department a written description of the alternative procedure which demonstrates to the satisfaction of the Department that the proposed alternative procedure provides the equivalent degree of dust removal.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".09" heading="Waste Disposal.">
    <paragraph num="A.">
      <text>Each owner or contractor engaged in a lead abatement project shall:</text>
      <paragraph num="(1)">
        <text>Remove lead waste from the site of a lead abatement project not later than 48 hours after completing the cleanup; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Comply with applicable hazardous waste regulations.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Transport and Disposal. Each owner and contractor engaged in a lead abatement project shall transport and dispose of lead waste in a manner to prevent lead from becoming airborne.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".10" heading="Records.">
    <paragraph num="A.">
      <text>Each business entity and public unit shall make a record of the following information for every lead abatement project which it performs:</text>
      <paragraph num="(1)">
        <text>Name and address of the contractor responsible for the project;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The location and description of the project, and location of lead-based substances within the work area which was abated;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Starting and completion dates of the lead abatement project; and</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Summary of abatement techniques used to comply with Regulations .04—.08 of this chapter.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Each business entity and public unit shall:</text>
      <paragraph num="(1)">
        <text>Retain the record required to be made under §A of this regulation for 6 years from the date of the completion of the lead abatement project; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Make this record available to the Department upon request.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>This regulation does not apply to owner-occupied dwellings in which abatement is being done by the owner.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".11" heading="Repealed." />
  <regulation prefix="Regulation" num=".12" heading="Procedures for Determining Compliance.">
    <paragraph num="A.">
      <text>The Department may inspect a work area at any time during a lead abatement project to determine compliance with this regulation.</text>
    </paragraph>
    <paragraph num="B.">
      <text>After receipt of notice of completed cleanup required by Regulation .08D the Department shall, within 24 hours, notify the contractor or owner of the time and date on which an initial inspection will take place, if one is to be made. If the contractor or owner is not reachable by telephone, notice shall be sent by first class mail. Any inspection performed under this subsection shall be completed within 2 working days of giving telephone notice to the contractor or owner. Notice by mail will require an additional 5 working days for completion of the inspection.</text>
    </paragraph>
    <paragraph num="C.">
      <text>The inspection performed under §B shall be a visual inspection to determine whether surfaces requiring abatement have been abated.</text>
    </paragraph>
    <paragraph num="D.">
      <text>The inspector shall immediately notify the contractor or owner, if either is present, of the results of the inspection under §B, and shall point out and describe any areas with inadequate treatment. If the contractor or owner is not present during the inspection under §B, the inspector shall notify the contractor and owner of the results of the inspection, and shall include the locations and characteristics of surfaces with inadequate treatment, by letter mailed within 24 hours of the inspection, by first class mail.</text>
    </paragraph>
    <paragraph num="E.">
      <text>Before repainting or recoating under Regulation .08C, the contractor shall receive notice of:</text>
      <paragraph num="(1)">
        <text>A satisfactory inspection under §B; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The decision not to conduct an inspection under §B.</text>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>Upon completion of all requirements of Regulations .08 and .09, a contractor shall notify the Department of readiness for final inspection.</text>
    </paragraph>
    <paragraph num="G.">
      <text>Within 24 hours of receipt of notice under §F, the Department shall notify the contractor or owner of the time and date on which an inspection will take place, if one is to be made. If the contractor or owner is not reachable by telephone, notice shall be sent by first class mail. Any inspection performed under this section shall be completed within 2 working days of giving this notice to the contractor and owner. Notice by mail will require an additional 5 working days for completion of the inspection.</text>
    </paragraph>
    <paragraph num="H.">
      <text>Every inspection performed under §G shall include at least:</text>
      <paragraph num="(1)">
        <text>Dust sampling to be followed by analysis in accordance with §I; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Visual inspection.</text>
      </paragraph>
    </paragraph>
    <paragraph num="I.">
      <text>The Department shall submit a dust sample collected under §H of this regulation for extractable lead analysis to a laboratory:</text>
      <paragraph num="(1)">
        <text>Recognized by the U.S. Environmental Protection Agency under 15 U.S.C. §2685(b) as accredited under the National Lead Laboratory Accreditation Program; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>That demonstrates it can achieve a quantitation limit equal to or less than 50 percent of the lowest lead dust level specified in §K(1) of this regulation.</text>
      </paragraph>
    </paragraph>
    <paragraph num="J.">
      <text>The Department shall notify the owner and the contractor in writing, sent by first class mail, of the results of the final inspection within 24 hours of receiving the results of lead dust analysis conducted under §I. If the results of the lead dust analysis conducted under §I do not meet the standards set out in §K, the contractor shall perform a further cleanup as described in Regulation .08H. If results of the lead dust analysis meet the standards set out in §K, the Departmental notice shall state that the lead abatement project has been completed and complies with the standards set out in §K. A statement of completion and compliance may not preclude the Department from taking any future enforcement action against the same group day care center, residential property, or building appurtenant to a group day care center or residential property.</text>
    </paragraph>
    <paragraph num="K.">
      <text>The Department shall consider a lead abatement project to be in compliance with this chapter if:</text>
      <paragraph num="(1)">
        <text>Floor lead dust levels are less than 10 micrograms per square foot;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Window sill lead dust levels are less than 100 micrograms per square foot;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Window well lead dust levels are less than 100 micrograms per square foot; and</text>
      </paragraph>
      <paragraph num="(4)">
        <text>All abated surfaces and all floors have been treated to provide smooth and easily cleanable surfaces.</text>
      </paragraph>
    </paragraph>
    <paragraph num="L.">
      <text>This regulation does not apply to abatement projects conducted in owner-occupied dwellings by the owner, unless the abatement is ordered by the Department, a local government unit, or a court of competent jurisdiction.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".13" heading="Liability of Department.">
    <text>The issuance of a statement of completion and compliance under Regulation .12J by the Department to an owner or contractor does not subject the Department to any claims for liability if the issuance of the statement was made in good faith.</text>
  </regulation>
  <regulation prefix="Regulation" num=".14" heading="Enforcement.">
    <text>A person who violates any provision of this chapter shall be subject to all equitable, legal and administrative remedies set forth in Environment Article, §§7-258—7-268 inclusive, Annotated Code of Maryland.</text>
  </regulation>
  <annotations>
    <annotation type="Authority">Environment Article, §§1-404 and 7-206—7-208, Annotated Code of Maryland</annotation>
    <annotation type="History" subtype="Administrative History">Effective date: August 8, 1988 (15:16 Md. R. 1918)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .02B amended effective July 1, 2020 (476:13 Md. R. 643)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .03A, B amended effective December 20, 2004 (31:25 Md. R. 1792)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .11 repealed effective May 20, 1996 (23:10 Md. R. 734)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .12I amended effective June 29, 2020 (476:13 Md. R. 643)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .12K amended effective February 17, 2003 (30:3 Md. R. 182); July 1, 2020 (476:13 Md. R. 643)</annotation>
  </annotations>
</chapter>