<subtitle num="03" heading="Water Supply, Sewerage, Solid Waste, and Pollution Control Planning and Funding" title_num="26" title_heading="Department of the Environment">
  <chapter num="01" heading="Planning Water Supply and Sewerage Systems">
    <regulation prefix="Regulation" num=".01" heading="Definitions.">
      <paragraph num="A.">
        <text>“Approving authority” means one or more officials, agents, or agencies of local government designated by the local governing body or specified by other provisions of Environment Article, Title 9, Subtitle 5, to take certain actions as a part of implementing these regulations.</text>
      </paragraph>
      <paragraph num="B.">
        <text>“Community sewerage system” means any system, whether publicly or privately owned, serving two or more individual lots, for the collection and disposal of sewerage or industrial wastes of a liquid nature, including various devices for the treatment of the sewage and industrial wastes.</text>
      </paragraph>
      <paragraph num="C.">
        <text>“Community water supply system” means a source of water and a distribution system, including treatment and storage facilities, whether publicly or privately owned, serving two or more individual lots.</text>
      </paragraph>
      <paragraph num="D.">
        <text>“County plan” means a comprehensive plan for the provision of adequate water supply systems and sewerage systems, whether publicly or privately owned, throughout the county and all amendments and revisions to it.</text>
      </paragraph>
      <paragraph num="E.">
        <text>“Department” means the Department of the Environment.</text>
      </paragraph>
      <paragraph num="F.">
        <text>“Existing service area” means that area that is currently served.</text>
      </paragraph>
      <paragraph num="G.">
        <text>“Final planning stages” means a work or works of community water supply and community sewerage system for which contract plans and specifications have been completed.</text>
      </paragraph>
      <paragraph num="H.">
        <text>“Financial management plan” means, for:</text>
        <paragraph num="(1)">
          <text>Publicly-owned community sewerage systems, a portion of the county water and sewerage plan, as described in Regulation .08B, of this chapter, which demonstrates to the Department's satisfaction that adequate fiscal resources will be available to support the satisfactory operation and maintenance of each system in the county to meet existing and future needs;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Other sewerage systems or extensions, a package of information for each system, as specified in COMAR 26.03.02.02J, which demonstrates to the Department's satisfaction that adequate fiscal resources will be available to support the satisfactory operation and maintenance of the system to meet existing and future needs.</text>
        </paragraph>
      </paragraph>
      <paragraph num="I.">
        <text>“Five- or six-year period” means that period, depending upon the county's capital improvement program, 5 or 6 years following the date of adoption of the plan, its amendment, or revision by the county.</text>
      </paragraph>
      <paragraph num="J.">
        <text>“Immediate priority” means a work or works of community water supply and community sewerage system for which the beginning of construction is scheduled to start within 2 years following the date of adoption of the plan, its amendments, and its revision.</text>
      </paragraph>
      <paragraph num="K.">
        <text>“Individual sewerage system” means a single system of sewers and piping, treatment tanks or other facilities serving only a single lot and disposing of sewage or individual wastes of a liquid nature, in whole or in part, on or in the soil of the property, into any waters of this State or by other methods.</text>
      </paragraph>
      <paragraph num="L.">
        <text>“Individual water supply system” means a single system of piping, pumps, tanks, or other facilities utilizing a source of ground or surface water to supply only a single lot.</text>
      </paragraph>
      <paragraph num="M.">
        <text>“Maintenance expense” means those expenses for labor, materials, utilities, and other items necessary to preserve the facility for its designed service life. Equipment or tools under $200 should be included in this amount.</text>
      </paragraph>
      <paragraph num="N.">
        <text>“Marina” means a dock, wharf, or basin providing mooring for boats which contain on-board toilet facilities, operated under public or private ownership, either free or on a fee basis, for the convenience of the public or club membership.</text>
      </paragraph>
      <paragraph num="O.">
        <text>“Multi-used sewerage system” means a single system serving a single lot, whether owned or operated by an individual or group of individuals under private or collective ownership and serving a group of individuals for the collection and disposal of sewage or industrial wastes of a liquid nature, including various devices for the treatment of sewage and industrial wastes having a treatment capacity in excess of 5,000 GPD.</text>
      </paragraph>
      <paragraph num="P.">
        <text>“Multi-use water supply system” means a single system of piping, pumps, tanks, or other facilities utilizing a source of ground or surface water to supply a group of individuals on a single lot and having a capacity in excess of 1,500 GPD.</text>
      </paragraph>
      <paragraph num="Q.">
        <text>“Non-point source” means pollution originating from land run-off where no specific outfall can be identified.</text>
      </paragraph>
      <paragraph num="R.">
        <text>“Operation expense” means those expenses such as labor, utilities, supplies, contractual services, training, and insurance, necessary to operate the treatment plant during its designed service life so as to achieve the capacity and performance standards for which it was designed, constructed, and permitted.</text>
      </paragraph>
      <paragraph num="S.">
        <text>“Sewerage service area” is that area served, or potentially served, by a system of sanitary sewers connected to a treatment plant, or in a very large system, sub-areas as delineated by the county.</text>
      </paragraph>
      <paragraph num="T.">
        <text>“Ten-year period” means that period of the 6 or 7 through 10 years following the date of adoption of the plan, its amendment, or its revision by the county.</text>
      </paragraph>
      <paragraph num="U.">
        <text>“Under construction” means a work or works of community water supply and community sewerage systems where actual work is progressing or where a notice to proceed with a contract for this work has been let as of the adoption date of the plan, its amendment or revision.</text>
      </paragraph>
      <paragraph num="V.">
        <text>“Water service area” means that area served, or potentially served, by a single distribution system under control of a single utility, or, in a very large system, sub-areas as delineated by the county.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="General Provisions.">
      <paragraph num="A.">
        <text>Objective of County Plan. The objective of the county plan is to develop the water supply and sewerage systems in a way consistent with county comprehensive planning. The plan shall be used as a tool to implement the county development policy so that:</text>
        <paragraph num="(1)">
          <text>An ample supply of water may be collected, treated, and delivered to points of use;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Waste water may be collected and delivered to points best suited for waste treatment and disposal or for re-use;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Waste water can be either treated before any discharge to State waters, in compliance with applicable water quality standards and discharge permit conditions, or disposed of to minimize most effectively adverse effects on legitimate water uses. Consideration shall be given to related aspects of land use, zoning, population estimates, engineering and economic factors, and all governmental, industrial, and other plans for privately owned facilities regarding water and sewerage at any level.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>County Government Required to Develop Plans. The county governing body is the coordinating agency required to develop county water and sewerage plans. These plans shall incorporate all or part of subsidiary plans of the towns, municipal corporations, sanitary districts, privately owned facilities, and local, State, and federal agencies having existing, planned, or programmed development within the county. The governing body shall give notice to these officials and entities and they shall be provided an opportunity to be heard.</text>
      </paragraph>
      <paragraph num="C.">
        <text>Annual Review of Plan. The county plan shall be reviewed by the governing body at least annually. A report of the review, together with amendments to or revisions of the plan as adopted by the governing body, shall be submitted to the Department.</text>
      </paragraph>
      <paragraph num="D.">
        <text>Comprehensive Planning Agencies Shall Be Consulted. Every official planning agency having any immediate jurisdiction in a county, including those comprehensive planning agencies with multi-county or regional jurisdiction, shall be consulted by the governing body in connection with the preparation, amendment, or revision of county plans. A statement that the above agencies have been consulted shall be attached.</text>
      </paragraph>
      <paragraph num="E.">
        <text>Public Hearings on Amendments Required. A public hearing shall be held on all amendments and revisions to the county water and sewerage plan. The Department shall receive prior written notice of all public hearings on plans, amendments, or revisions.</text>
      </paragraph>
      <paragraph num="F.">
        <text>Sanitary Facilities Fund. The planning part of the Sanitary Facilities Fund established under Environment Article, §9-218, Annotated Code of Maryland, shall be available to the Department to finance planning for water and sewerage facilities including the preparation, amendments, and revisions of county plans. The Department is authorized to use funds appropriated in the program of the annual State operating budget, which provides for general local health services for this purpose. When so used, the proportion of State, federal, and local funds, respectively, shall be that specified for each subdivision's financing of minimum health services at basic matching rates. The planning for water and sewerage facilities to be financed in this manner may be financed jointly by, or under the joint authority of, the Department and any county or Baltimore City or the Washington Suburban Sanitary Commission. The funds to be so used shall appear in the local health department's budget for the fiscal year in which their use is anticipated. The percentage contribution may not be affected by any other State or federal funds received by the subdivision for the same planning unless the total grants exceed the actual cost of the plan, in which case the contribution shall be reduced accordingly.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".03" heading="Submission of County Plans.">
      <paragraph num="A.">
        <text>The governing body of each county and Baltimore City shall develop and submit annual amendments or revisions to the county water and sewerage plan as required by Environment Article, §9-511—9-513, Annotated Code of Maryland. The steps listed below shall be followed in sequence:</text>
        <paragraph num="(1)">
          <text>Submit the plan in preliminary form, with all attachments, to the appropriate multi-county or regional comprehensive planning agency, the Department of State Planning, the Department of Natural Resources, and the Department of the Environment. The preliminary form shall be a rough draft of the entire plan and shall include maps in a complete presentation.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Receive and consider comments from the Department, which will act as the coordinator for comments from the agencies sent a preliminary plan for review according to §A(1), of this regulation.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>A public hearing will be held.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>The plan shall then be formally adopted.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>After adoption, the plan will be prepared in final format as set forth in Regulation .04 of this chapter.</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Four copies of the plan will be submitted in final form to the Department for review. One copy shall be forwarded to the Department of Natural Resources and one to the Department of State Planning.</text>
        </paragraph>
        <paragraph num="(7)">
          <text>The Department shall, within 6 months after submission, approve, disapprove, or approve in part the finally submitted county plan, its amendments or revisions. When disapproved in whole or part, the governing body of the county, within 6 months from the notification of disapproval, shall have the right to appeal the action of the Department to the Secretary of the Environment.</text>
        </paragraph>
        <paragraph num="(8)">
          <text>Following receipt of notification of approval of the county plan, amendments, or revisions, the county shall then have the plan, amendments or revisions reproduced and distributed in accordance with §B, of this regulation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>The counties and Baltimore City shall be the distributing agencies for all copies of the county plans or revisions. At least 50 copies of each should be printed to meet the required distribution. Copies are to be automatically distributed to the following agencies:</text>
        <paragraph num="(1)">
          <text>Four copies to the Department of the Environment;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Four copies to the Department of Natural Resources.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".04" heading="Requirements Applicable to Adopted County Plans.">
      <paragraph num="A.">
        <text>All county plans, amendments, or revisions shall be prepared in conformance with this regulation. Each adopted plan shall be arranged with an introduction and a minimum of four chapters as outlined below.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Introduction:</text>
        <paragraph num="(1)">
          <text>A statement certifying that the plan has been officially adopted by the county governing body;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>A statement certifying that the plan has been submitted to the Department and it meets the requirements of Regulation .02B of this chapter;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>A statement certifying that sections of the plan covering engineering aspects of water and sewerage projects have been prepared and reviewed for adequacy by a registered professional engineer licensed in the State;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>The letter of approval from the Department.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Chapter One. This chapter shall contain:</text>
        <paragraph num="(1)">
          <text>A statement of the goals of the county consistent with county comprehensive planning;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>A brief discussion, with charts, of the organization of the county government as it relates to the management of water supply and sewerage facilities.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Chapter Two. Chapter two shall contain the general background information relevant to the water and sewerage planning. Information shall include the maps, charts, and tables listed below. When a county has previously developed alternative methods for presenting this data, the specific format required in the chapter may be waived by the Department.</text>
        <paragraph num="(1)">
          <text>Physical.</text>
          <paragraph num="(a)">
            <text>General maps showing aquifers, soil drainage characteristics, topography, ground water and surface water patterns.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>A map or table showing water quality criteria in the county.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Population.</text>
          <paragraph num="(a)">
            <text>General maps showing present and projected population distribution and density.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Table No. 1, county population projections.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>Land Use.</text>
          <paragraph num="(a)">
            <text>Maps showing existing land use, zoning, and the adopted comprehensive development plan for the county.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Table No. 2, reflecting existing and zoned land use in acres.</text>
          </paragraph>
          <paragraph num="(c)">
            <text>A map showing existing and proposed major public institutions, such as schools, hospitals, correctional facilities, government complexes; and a table showing the approximate populations of these institutions.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Chapter Three. Chapter three shall contain a description of existing, planned, and future requirements for water service areas including tables, maps, charts, graphs, descriptive information, and all other matter regarding these systems. It shall contain a discussion of ground and surface water resources within the county including the quality and potential quantity of these sources. Summaries of existing and projected water demands and existing sources of pollution or contamination relating to water supplies shall be stated or shown. The chapter shall contain a discussion of alternatives and the rationale used in determining the means of providing future water supplies. For every water service area, the following shall be discussed or shown: operating agency, rated and actual productions, type of treatment, location, operation and maintenance costs, and proposed means of financial improvements. For any proposed new water supply source, a summary of the environmental impact of its development shall be given. Efforts to reduce demands (i.e., metering, rate changes, plumbing codes) shall be outlined. Minimum requirements for tables and maps in this chapter are as follows:</text>
        <paragraph num="(1)">
          <text>Table No. 3, showing population projections and projected water supply demands and planned capacity by water service areas through the year 2000.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Inventories of water sources as follows:</text>
          <paragraph num="(a)">
            <text>An inventory, Table No. 4, of community system wells;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>An inventory, Table No. 5, of impounded supplies;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>An inventory of other surface water supplies showing initial and planned withdrawals (MGD).</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>An inventory, Table No. 6, of existing treatment facilities.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>An inventory, Table No. 7, below, of problem areas such as inadequate portions of community systems (including fire flow inadequacies) and areas where individual systems are experiencing difficulties:</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Immediate, 5 and 10 year priorities for water development, Table No. 8.</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Maps as specified in §G of this regulation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="F.">
        <text>Chapter Four. Chapter four shall contain a description of the existing and planned community and multi-use sewerage systems, including tables, maps, charts, graphs, descriptive information and all other matters regarding these systems. Indicate locations of proposed points of waste discharges. It shall be shown how conformance of existing and programmed sewerage facilities meet or will meet the effluent limitations specified in COMAR 26.08.03.01 of the Department of the Environment. It shall contain a summary of each available point of discharge evaluation, specifically those parts pertaining to protected water uses. It shall discuss the rationale for selecting a planned alternative for any proposed treatment facility, pumping station, or interceptor. For every service area and community system, the following should be discussed: operating agency, design average and peak flows; whether combined or separate collection systems; level and type of treatment given; sludge disposal plans, condition of treatment and transmission facilities; operation and maintenance costs; and proposed means of financing improvements. Minimum requirements for tables and maps in this chapter shall be as follows:</text>
        <paragraph num="(1)">
          <text>Population projections and present and expected demands and capacities by sewerage service area, Table No. 9.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Inventory of existing sewage treatment plants, Table No. 10.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Inventory of problem areas, including inadequate portions of community systems and areas where individual systems are experiencing difficulty, Table No. 11.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>When possible, identify by service area water quality problems due to storm drain outfall and to non-point sources, Table No. 12.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Immediate, 5 and 10 year priorities for sewerage systems development, Table No. 13.</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Maps as outlined in §G of this regulation.</text>
        </paragraph>
        <paragraph num="(7)">
          <text>The county plan shall include an inventory of problem marinas and will include basic planning concepts for sanitary facilities at all marinas.</text>
        </paragraph>
      </paragraph>
      <paragraph num="G.">
        <text>Technical Requirements.</text>
        <paragraph num="(1)">
          <text>The following physical format shall be required for the submission of county plans.</text>
          <paragraph num="(a)">
            <text>Textual materials, tables, charts, graphs, and other illustrations shall be prepared on 8-1/2 × 11-inch stock or any other size which can be folded for inclusion in the binder. Margins on the left-hand edge shall be punched for a multi-ringed 10 × 11-1/2-inch interchangeable stiff-backed binder with identification on the binder.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The Maryland Coordinate Grid System shall be used to determine place locations. The Maryland State Highway System maps use this system with lines spaced at intervals of 50,000 feet bearing due east and due north from the points of origin. Other maps can be used by superimposing a similar grid on any map of Maryland. Referenced to the same point of origin, it then becomes possible to find any place on the map if its coordinates are known. Two numbers define any place location on the map. The first number designates the distance in thousands of feet that the place lies east of the point of origin, and the second number, the distance in thousands of feet that the place lies north of the point of origin.</text>
          </paragraph>
          <paragraph num="(c)">
            <text>All projections shall be made for decade years except that for the first decade. The mid-period shall also be shown (e.g. 1970, 1975, 1980, 1990, 2000).</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Two maps of the entire county to a scale of approximately 1 inch equal to 1 mile shall be included showing, in general, areas served or to be served with community facilities. One map shall be for sewerage facilities and the other water supply facilities. These maps shall be folded, inserted into separate pockets marked “water” and “sewerage” and placed into the multiple-ringed stiff-backed binder.</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Two sets of detailed maps (one for water facilities and the other for sewerage facilities) of each portion of the county shall be prepared on a minimum scale of 1 inch equal to 2,000 feet and in sufficient number so to show actual areas served or to be served as set forth in these regulations. A minimum scale of "1 inch equals 3500 feet" is acceptable in those counties where existing detail mapping is complete or is under preparation. For those counties where detail maps have not been initiated, a scale of "1 inch equals 2000 feet" shall be the minimum requirement. Color coding on the maps is optional.</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Amendments or revisions to the county plan shall be prepared so that the new or additional material may be inserted in the binder in the appropriate places to provide a continuously updated and current county comprehensive water and sewerage plan. Each sheet of the amendment or revision shall be dated to show when the change became effective.</text>
          </paragraph>
          <paragraph num="(g)">
            <text>Measurements as specified in this regulation shall be converted to their metric equivalence when applicable.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>As minimum requirements, the water and sewerage maps in the county plan shall be delineated to show for each existing and proposed community and multi-use water supply and sewerage system the following data located by codes and symbols as specified in this regulation.</text>
          <paragraph num="(a)">
            <text>Delineate on the maps, existing or proposed and planned community and multi-use water and sewerage facilities, including wells, reservoirs, intakes, transmission and feeder mains, storage facilities, interceptor and truck sewers, pumping stations, force mains, treatment works, outfall sewers, and service areas. Show on the detailed maps sizes or capacities, or both, where appropriate.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Delineate on the maps areas served by community and multi-use water and sewerage systems which are either existing or are under construction. The actual bounds of areas served by these systems shall be clearly indicated. The areas so delineated in this category shall be as shown in Table 14 and shall be referred to as W-1 for water systems and S-1 for sewerage systems.</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Delineate on the maps, areas to be served by extensions of existing community and multi-use water supply and sewerage systems which are in the final planning stages. The areas so shown in this category shall be as shown in Table 14 and shall be referred to as W-2 for water systems and S-2 for sewerage systems.</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Delineate on the maps, areas where improvements to, or construction of, new community and multi-use water supply and sewerage systems will be given immediate priority. The areas so shown in this category shall be as shown in Table 14 and shall be referred to as W-3 for water systems and S-3 for sewerage systems.</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Delineate on the maps areas where improvements to, or construction of, new community and multi-use water supply and sewerage systems will be programmed for the 3 to 5/6 year period. The areas so shown in this category shall be as shown in Table 14 and shall be referred to as W-4 for water systems and S-4 for sewerage systems.</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Delineate on the maps those areas where improvements to, or construction of, new community and multi-use water supply and sewerage systems are programmed for inclusion within the 6/7 through 10-year period. The areas so shown in this category shall be as shown in Table 14 and shall be referred to as W-5 for water systems and S-5 for sewerage systems.</text>
          </paragraph>
          <paragraph num="(g)">
            <text>All other areas of the county should be shown as no planned service. The areas so shown in this category shall be as shown in Table 14 and shall be referred to as W-6 for water systems and S-6 for sewerage systems.</text>
          </paragraph>
          <paragraph num="(h)">
            <text>Other map symbols shall be as shown in Table 14.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".05" heading="Individual Water Supply and Individual Sewerage Systems.">
      <text>The installation of individual water supply or individual sewerage systems shall be subject to the following requirements:</text>
      <paragraph num="A.">
        <text>An individual water supply or individual sewerage system may not be permitted to be installed where an adequate community water or sewerage facility is available. If an existing community water or sewerage facility is inadequate or is not available, an interim individual water and sewerage system may be used as set forth in §B(1), (2), and (3), of this regulation.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Interim individual water supply and sewerage systems may be permitted to be installed in any portion of the county, except where otherwise prohibited, where community systems will be programmed for construction within the S-1-2, 3 and 4 and W-1-2, 3 and 4 service categories provided that:</text>
        <paragraph num="(1)">
          <text>The interim systems are adjudged by the local health department to be adequate, safe, and in compliance with pertinent State and local regulations, including minimum lot ownership as set forth in COMAR 26.04.03.02 and .03;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Permits for the interim systems shall bear a notice regarding the interim nature of the permit and stating that connection to a future community system shall be made within 1 year or less after the system becomes available;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>If interim systems are used, provisions shall be made, whenever possible, to locate the systems so as to permit connection to the public facilities in a most economical and convenient manner.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Individual water supply or sewerage systems, not of an interim nature, shall be permitted to be installed in any portion of the county designated as S-5 and 6, and W-5 and 6 where community systems are not planned. The installations shall be governed by the regulations under COMAR 26.04.02 and 26.04.03 as minimum requirements.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".06" heading="Flow Data.">
      <text>For each service area, flow data for all community and multi-use sewerage facilities will be presented according to either Table No. 15 for wastewater treatment plants or Table No. 15A for all principal collector sewers, interceptors, pumping stations, and associated force mains. Information presented previously in either Table No. 9 or Table No. 10 can be omitted from Table No. 15. In Table No. 15A, present data according to the flow pattern of existing sewerage system by starting with principal collector sewers and proceed to the treatment plant.</text>
      <text>Table No. 3Projected Water Supply Demands and Planned Capacity
          
          
            Service Area
            Present 1975
            1980
            1990
            2000
          
          
            Population
            GPCD
            Capacity
            Population
            GPCD
            Capacity
            Population
            GPCD
            Capacity
            Population
            GPCD
            Capacity
          
        
        
          
            total
            served
            unserved
            (gals)
            demand
            planned
            total
            served
            unserved
            (gals)
            demand
            planned
            total
            served
            unserved
            (gals)
            demand
            planned
            total
            served
            unserved
            (gals)
            demand
            planned</text>
      <text>——————</text>
      <text>Table No. 4Inventory of Existing Community System Wells
          
          
            
            Well Nameor Number
            Aquifer
            CoordinateLocation
            DepthFeet
            DiameterInches
            Max. SafeYield
            PumpingCapacity
            WaterQuality
          
        
        
          
            Municipal (Public)
            
            
            
            
            
            
            
            
          
          
            Industrial
            
            
            
            
            
            
            
            
          
          
            Private Community/Institutional</text>
      <text>——————</text>
      <text>Table No. 5Inventory of Existing Impounded Supplies
          
          
            Owner
            CrestElevation(above sea level)
            SpillwayLength
            Total Length of Dam
            Height of Crest Above Stream Bed
            Flooded Area of Crest Elevation
            Length of Shore Line at Crest Elevation
            Water Overflowed Crest for First Time
            Capacity of Reservoir
            Safe Yield (MGD)
            Average Daily Withdrawal (MGD)
          
        
        
          
            Municipal (Public)
            
            
            
            
            
            
            
            
            
            
          
          
            Industrial
            
            
            
            
            
            
            
            
            
            
          
          
            Private Community/Institutional</text>
      <text>——————</text>
      <text>Table No. 6Inventory of Existing Water Treatment Facilities
          
          
            Owner
            Water Source
            Type Treatment
            Plant Coordinate Location
            Rated Plant Capacity (MGD)
            Average Production (MGD)
            Max Peak Flow(MGD)
            StorageCapacity(MGD)
            Planned Expansion MGD/Dates
            Method of Sludge Disposal
            Operating Agency
          
        
        
          
            Municipal (Public)
            
            
            
            
            
            
            
            
            
            
          
          
            Industrial
            
            
            
            
            
            
            
            
            
            
          
          
            Private Community*/Institutional</text>
      <text>* If transfer to public ownership is recommended, indicate expected date.</text>
      <text>——————</text>
      <text>Table No. 8Immediate, 5 and 10 Year Priorities for Water Development
          
          
            
            Estimated Costs*
            Project StatusConstr. Start
          
          
            Fiscal YearandProject Number
            CountyPriorityAssigned
            CoordinateLocation
            Description
            Total
            Federaland/orState
            Local
            ImmediatePriorityProjects
            5 and 10 YearPeriod Projects
          
        
        
          
            ______Year</text>
      <text>* Based on dollar values as of effective date of plan where applicable.</text>
      <text>——————</text>
      <text>Table No. 9Projected Sewerage Demands and Planned Capacity
          
          
            ServiceArea
            Present 1975
            1980
            1990
            2000
          
          
            Population
            GPCD
            Capacity
            Population
            GPCD
            Capacity
            Population
            GPCD
            Capacity
            Population
            GPCD
            Capacity
          
        
        
          
            total
            served
            unserved
            (gals)
            demand
            planned
            total
            served
            unserved
            (gals)
            demand
            planned
            total
            served
            unserved
            (gals)
            demand
            planned
            total
            served
            unserved
            (gals)
            demand
            planned</text>
      <text>——————</text>
      <text>Table No. 10Inventory of Existing Water Treatment Facilities
          
          
            Owner
            Type Treatment
            Plant Coordinate Location
            Occupied Acres
            Vacant Acres
            Point of Discharge*
            Max Site CapacitySecondary
            Max. Site Capacity (MGD) Advanced
            Existing (MGD) Capacity
            Flows (MGD)Average Peak
            Planned or Expected Abandonment Date of Interim MGD Date
            Operating Agency
          
        
        
          
            Municipal (Public)
            
            
            
            
            
            
            
            
            
            
            
          
          
            Industrial
            
            
            
            
            
            
            
            
            
            
            
          
          
            Private Community**/Institutional</text>
      <text>** If transfer to public ownership is recommended, indicate expected date.</text>
      <text>——————</text>
      <text>Table No. 11Problem Areas Inventory —  Individual and Community
          
        
        
          
            
              Service Area
            
            
              ProblemDescription
            
            
              Location
            
            
              Population
            
            
              Acres
            
            
              Treatment Capacity
            
            
              Treatment Demand
            
            
              PlannedCorrectionDate if Known</text>
      <text>——————</text>
      <text>Table No. 12Water Quality Problem Due to Storm Drainage Outfalls and to Non-point Sources
          
        
        
          
            
              Service Area
            
            
              Problem Description
            
            
              Location
            
            
              Reach Affected</text>
      <text>——————</text>
      <text>Table No. 13Immediate 5 and 10 Year Priorities for Sewerage Development
          
        
        
          
            
            
            
            
            
            Costs**
            
            
            Projected Schedule***
          
          
            Fiscal Year and Project Number
            County PriorityAssigned
            Coordinate* Location
            Description Total
            PL 660 Eligibility
            Other Federal Local
            Preliminary Plans
            Financial Plans
            Start Construction
            Complete Construction
          
          
            _____Year
            
            
            
            
            
            
            
            
            
          
          
            _____Year</text>
      <text>* Where applicable for both treatment facility and point of discharge location.</text>
      <text>** Based on real dollar values.</text>
      <text>*** Month and year—for the last 5 years the “Construction Schedule Column” and need not be filled in.</text>
      <text>Table No. 14Water and Sewerage Map Symbols</text>
      <text>Table No. 15Flow DataWastewater Treatment Plants
          
        
        
          
            Design Parameters
            
            Flow
            Development Occupancy Units (1)
          
          
            Name or Service Area
            Hydraulic (mgd)
            Organic(ppm)
            Avg. Day*(mgd)
            Max. Day&amp; (Date**)
            Existing*
            Anticipated***BPI
            PWA
          
          
            
            BOD
            SS
            
            UC
            NUC
            
          
          
            Example:
            
            
            
            
            
            
            117 R
            7 R
            830 R
          
          
            Clear Water
            3.5
            200
            200
            3.0
            5.5(3-17-76)
            6,500
            7 C
            none
            none</text>
      <text>* Per Effective Date of Plan (7-1-76)</text>
      <text>** During Previous Fiscal Year</text>
      <text>*** List Residential (R) Separately from Commercial (C) and Industrial(i)</text>
      <text>BPI—Building Permits Issued Per Effective Date of Plan</text>
      <text>UC—Building Permits Issued Per Effective Date of Plan for Units under Construction</text>
      <text>NUC—Building Permits Issued Per Effective Date of Plan for Units not under Construction</text>
      <text>PWA—Building Permits for Unexpired Public Works Agreements Per Effective Date of Plan</text>
      <paragraph num="(1)">
        <text>— Includes Industrial, Commercial and Residential Units</text>
      </paragraph>
      <text>——————</text>
      <text>Table No. 15AFlow DataCollector Sewers, Inceptors, Pumping Stations and Force Mains
          
          
            Name or SewerType Designation
            Sewer
            CapabilityPumping Station
            Force Main
          
        
        
          
            
            Diam.(Inches)
            Flow,Avg.Day*
            mgdDesign
            Number of Pumps
            Capacity of Each Pump(mgd)
            Normal PumpingCapacity (mgd)
            Avg. Day Pumpage* (mgd)
            Max. DayPumpageand Mgd(date)**
            Diam. (inches)
            Design FLow (mgd)
          
          
            Example:Collector
            12
            0.5
            1.0
            
            
            
            
            
            
            
          
          
            Clear Branch Interceptor
            18
            3.5
            5.0
            
            
            
            
            
            
            
          
          
            Severn RunP.S. and
            
            
            
            2
            3.6
            3.6
            2.5
            3.0(3-1-76)
            
            
          
          
            F.M.
            
            
            
            
            
            
            
            
            24
            8.0
          
          
            Clear WaterSTP
            
            (See Table No. 15)</text>
      <text>* Per Effective Date of Plan (7-1-76)</text>
      <text>** During Previous Fiscal Year</text>
    </regulation>
    <regulation prefix="Regulation" num=".07" heading="Compliance with Maryland Water Conservation Plumbing Fixtures Act (MWCPFA).">
      <paragraph num="A.">
        <text>Each county water and sewerage plan shall contain documentation that compliance with the MWCPFA, as codified in Article 56, §445, Annotated Code of Maryland, is being achieved.</text>
      </paragraph>
      <paragraph num="B.">
        <text>The documentation in §A of this regulation shall include:</text>
        <paragraph num="(1)">
          <text>Designation of the county agency responsible for the enforcement of MWCPFA;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>A summary of county programs to assure implementation of and compliance with MWCPFA, including a description of:</text>
          <paragraph num="(a)">
            <text>A procedure which assures compliance with MWCPFA before the issuance of a certificate of occupancy,</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Local actions taken to assure compliance with the prohibition of the sale of non-water-conserving plumbing fixtures,</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The local procedures used to ensure that agreements between a developer and a builder to assure compliance with MWCPFA are made part of the record plat process or a part of a county building, plumbing, or occupancy permit, or bill of sale.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>If the county is not currently complying with the MWCPFA, then the county water and sewerage plan shall include a description of proposed changes to the local program which the county intends to implement to achieve compliance with MWCPFA.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".08" heading="Financial Management of Public Sewerage Systems Required.">
      <paragraph num="A.">
        <text>Each county water and sewerage plan (“county plan”) may be approved only upon inclusion of a financial management plan which includes all publicly-owned community sewerage systems in the county.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Each financial management plan shall contain a:</text>
        <paragraph num="(1)">
          <text>Countywide organizational narrative which includes a brief countywide description of the financial roles and relationships of all public entities involved with providing sewerage service within the county.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Completed Schedule FS for each self-contained, publicly-owned community sewerage system. The content and format of Schedule FS will be specified by the Department. Each Schedule FS shall demonstrate that adequate fiscal resources are or will be available to support the satisfactory operation, maintenance, and repair of each system to meet existing and future needs.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Before issuance of a State permit for the construction of a new, proposed, self-contained, publicly-owned community sewerage system, the following requirements shall be satisfied:</text>
        <paragraph num="(1)">
          <text>The financial management plan described in §§A and B of this regulation has been adopted as part of the county plan and approved by the Department; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The proposed system has been described through new narrative text and revised tables and maps in a county plan amendment or update adopted by the county governing body and approved by the Department.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Each county plan submitted after the effective date of these regulations, for fiscal purposes, shall treat each publicly-owned community sewerage system as a separate entity within the local operating agency budget.</text>
      </paragraph>
      <paragraph num="E.">
        <text>Starting on the effective date of these regulations, each county plan update shall include the complete financial management plan specified in §§A and B, of this regulation. However, a county may not submit its initial financial management plan later than July 1, 1989, regardless of the due date of its next county plan update.</text>
      </paragraph>
      <paragraph num="F.">
        <text>The instructions and definitions necessary for completing Schedule FS shall be sent to all county water and sewer plan contacts.</text>
      </paragraph>
      <paragraph num="G.">
        <text>In addition to the completed Schedule FS, the Department, after review of subsequent county water and sewer plans, may require and the county shall provide the information listed below. This information shall be submitted only at the Department's request, and it should not be included as part of the county plan or Schedule FS:</text>
        <paragraph num="(1)">
          <text>An inventory of the plant and equipment;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Documentation that sewer service rates are sufficient to meet operation and maintenance costs;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>A description of the customer billing procedures;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>A description of the system's “bad debt” situation;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>A description of any construction project or plan for expansion anticipated during the next 2 years, as well as the anticipated method of financing the project;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>A description of the long-term plans for plant replacement or major renovation, as well as the anticipated method of financing the plans or projects;</text>
        </paragraph>
        <paragraph num="(7)">
          <text>A discussion of escrow accounts, existing or contemplated, for construction, maintenance, repair, operation, and emergencies;</text>
        </paragraph>
        <paragraph num="(8)">
          <text>The system's balance sheet as of the last day of the most recent fiscal year.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <annotations>
      <annotation type="Authority">Environment Article, §§9-218, 9-505, 9-506, and 9-510, Annotated Code of Maryland</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: July 1, 1975 (2:3 Md. R. 154)</annotation>
      <annotation type="History" subtype="Administrative History">Regulations .02A, .03A, .04E, F, .05, .06 amended effective Dec. 24, 1975 (2:29 Md. R. 1735)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .07 adopted effective January 26, 1987 (14:2 Md. R. 129)</annotation>
      <annotation type="History" subtype="Administrative History">Chapter recodified from COMAR 10.17.01 to COMAR 26.03.01</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .01 amended effective July 25, 1988 (15:15 Md. R. 1813)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .08 adopted effective July 25, 1988 (15:15 Md. R. 1813)</annotation>
    </annotations>
  </chapter>
  <chapter num="02" heading="Submissions of Plans for Approval and Record of Systems of Water Supply, Sewerage, and Storm Water">
    <regulation prefix="Regulation" num=".01" heading="Definitions.">
      <paragraph num="A.">
        <text>“Approving authority” means the Secretary of the Environment or his designee.</text>
      </paragraph>
      <paragraph num="B.">
        <text>“Department” means the Department of the Environment or its designees.</text>
      </paragraph>
      <paragraph num="C.">
        <text>“Financial management plan” means, for:</text>
        <paragraph num="(1)">
          <text>Publicly owned community sewerage systems, a portion of the county water and sewerage plan, as described in COMAR 26.03.01.08B, which demonstrates to the Department's satisfaction that adequate fiscal resources will be available to support the satisfactory operation and maintenance of each system in the county to meet existing and future needs.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Other sewerage systems or extensions, a package of information for each system, as specified in Regulation .02J of this chapter, which demonstrates to the Department's satisfaction that adequate fiscal resources will be available to support the satisfactory operation and maintenance of the system to meet existing and future needs.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>“Maintenance expense” means those expenses for labor, materials, utilities, and other items necessary to preserve the facility for its designed service life. Equipment or tools under $200 should be included in this amount.</text>
      </paragraph>
      <paragraph num="E.">
        <text>“Operation expense” means those expenses such as labor, utilities, supplies, contractual services, training, and insurance, necessary to operate the treatment plant during its designed service life so as to achieve the capacity and performance standards for which it was designed, constructed, and permitted.</text>
      </paragraph>
      <paragraph num="F.">
        <text>“Schedule FS” means a financial document which demonstrates that adequate fiscal resources are or will be available to support the satisfactory operation, maintenance, and repair of each system to meet existing and future needs. The content and format of Schedule FS shall be specified by the Department.</text>
      </paragraph>
      <paragraph num="G.">
        <text>“Sewage” means human and animal excretions, street wash, and all domestic and manufacturing waste. It may include, if collected and conveyed through one system of pipe lines and treated at one or the same treatment plant, liquid wastes such as rain water discharged from roofs, lawns, paved areas, etc., ground garbage, and manufacturing or industrial wastes.</text>
      </paragraph>
      <paragraph num="H.">
        <text>“Sewerage system” means the channels by which sewage is collected and disposed of, together with the body of water into which it is directly discharged, and all structures and appurtenances made use of in its collection and preparation for discharge in satisfactory condition into the waters of the State, excepting only the plumbing system inside the individual buildings served For the purposes of this subtitle, any sewer, no matter what its length and size may be, shall be sufficient to constitute a sewerage system. It may include the system of pipe lines and appurtenances by which sewage is collected and disposed.</text>
      </paragraph>
      <paragraph num="I.">
        <text>“Storm water or a storm drainage system” means a system of pipe lines, channels, and appurtenances for the collection, transporting, and disposal of water resulting from rainfall plus material foreign to rain water such as roof, lawn, and street wash, intercepted, loosened, and carried by the excess rain water in its course of runoff.</text>
      </paragraph>
      <paragraph num="J.">
        <text>“Waters of the State” means that portion of the Atlantic Ocean and its estuaries within the State, the Chesapeake Bay and its estuaries, and all springs, ponds, streams, wells, and bodies of surface or ground water, whether natural or artificial, within the boundaries of this State or subject to its jurisdiction. It shall also include lakes, rivers, creeks, and other watercourses.</text>
      </paragraph>
      <paragraph num="K.">
        <text>“Waterworks, water supply, and water supply system” means the sources and their surroundings from which water is supplied for drinking or domestic purposes, together with all structures, channels, and appurtenances by means of which it is prepared for use and delivered to consumers, excepting only the piping and fixtures inside the buildings served. It shall also include all pipe lines.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="General Requirements.">
      <paragraph num="A.">
        <text>Applications for Approval. The application for approval of plans shall be made by the proper municipal or county authorities, corporation, or person for whom the work is to be done, or their properly authorized engineers or agents. It shall consist of a letter briefly describing the project for which approval is requested. When applicable, evidence of approval by the Public Service Commission or by the Maryland Geological Survey shall be a requisite part of the application.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Engineer's Report.</text>
        <paragraph num="(1)">
          <text>A complete engineering report, if prepared or required, shall accompany or precede the receipt of plans and specifications for each new major sanitary project.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The report shall contain full information discussing any existing facility, the proposed or new facility, and include all pertinent data necessary to permit a clear and comprehensive review of the subject.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Submission of Plans and Specifications.</text>
        <paragraph num="(1)">
          <text>Plans and complete specifications for proposed work should be submitted for approval at least 30 days before action on them shall be expected, although action, by the State, may be taken before the expiration of that time. Design manuals, standard details, and standard specifications on file with and previously approved by the Department of the Environment will be construed to be applicable to future projects, when so designated, unless modified by supplementary and specific contract plans and specifications.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>All reports, plans, and specifications for sanitary engineering projects shall be prepared by, signed by, and bear the seal of a registered professional engineer. Landscaping and any architectural feature of any building, pumping station, water filtration plant, sewage disposal plant, elevated water storage unit, bathhouse or recreation facility for a swimming pool may also be submitted, signed by and bear the seal of a registered architect. Plans relating to the subdivision of land and prepared for the purpose of filing record plats with clerks of the court in the various political subdivisions of the State shall bear the signature and seal of a registered land surveyor. Plans not conforming with the requirements of this subsection will not be accepted.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Kinds of Plans.</text>
        <paragraph num="(1)">
          <text>All plans shall be neatly and legibly drawn upon tracing cloth or acceptable paper so that copies may be obtained. Except where the originals are presented for preliminary judgment, they shall be kept by the party presenting the plans, and true copies, which may be white, blue, or black-line prints, offset prints, or photostats on a white background, shall be submitted to the Secretary of the Environment.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Plans will not be returned after submission unless revisions are necessary, or unless they have been presented for preliminary review only.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>When revisions are necessary, the revisions shall be made on the original tracings and new prints submitted. Pencil, crayon, ink, typewritten, or other revisions, changes, or additions on prints, photostats, or other reproductions may not be acceptable. Revisions or additions may not be made to prints previously or currently submitted to the Secretary of the Environment.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Plans specifically prepared for each installation will be required.</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Sizes of Plans. A specific size of plans is not mandatory. Drawings not exceeding 30 inches wide by 42 inches long are preferred. Drawings with overall dimensions of less than 8-1/2 × 11 inches will not be accepted.</text>
      </paragraph>
      <paragraph num="F.">
        <text>General Plans--Scales.</text>
        <paragraph num="(1)">
          <text>General plans or key maps of water supply, sanitary, or storm drainage systems; showing the location of sources of water supply, transmission, and distribution mains; lateral, interception, and trunk sewers; water and sewage treatment works; and storm drains should preferably be to a scale not greater than 1 inch equals 40 feet, or less than 1 inch equals 200 feet. Established coordinate systems and U.S. Bench Marks data, if available, shall be given. Locality plans may have a scale as small as 1 inch equals 1 mile. An arrow designating the direction of north shall be shown.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Detailed and sectional plans may be drawn to any scale suitable for the purpose.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Architectural scales for general engineering drawings will not be accepted for review and approval.</text>
        </paragraph>
      </paragraph>
      <paragraph num="G.">
        <text>Number of Plans. Unless otherwise requested, only one report, one drawing, or one set of drawings and one set of specifications shall be submitted for review and approval. If acceptable and approved, they will be retained in the files of the Secretary of the Environment, and an appropriate reference made to them in the written permit.</text>
      </paragraph>
      <paragraph num="H.">
        <text>Title of Plans.</text>
        <paragraph num="(1)">
          <text>In the lower right-hand corner, or along the bottom border, of each separate drawing shall be placed a proper title containing the name of the county, municipality, company, institution, person or persons for whom it is made, the name of the locality to which it refers, a proper description for a full understanding of the nature of the drawing, and the scale, date, and name of the engineer, architect, or surveyor preparing it.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>On every plan showing a locality or street layout, an arrow shall be placed, designating the direction of north. Plans should be so arranged, wherever practicable, that north is towards the top or to the left of the sheet.</text>
        </paragraph>
      </paragraph>
      <paragraph num="I.">
        <text>As Constructed Plans. Upon completion of the work shown by plans originally approved by the Secretary of the Environment, and if material changes in the work developed during the construction operations, a revised set or a totally new set of plans showing all work, as constructed, shall be submitted to the Secretary of the Environment to replace the plans previously approved and to serve as a guide for all future work. If revised drawings are not necessary, a statement shall be supplied indicating all work was done in accordance with the original plans.</text>
      </paragraph>
      <paragraph num="J.">
        <text>Adequate Financial Management Plans.</text>
        <paragraph num="(1)">
          <text>Before the Department may issue a permit for the construction of a publicly-owned community sewerage system, a financial management plan sufficient to ensure the dependable and safe operation of the system shall be adopted in the county water and sewerage plan (“the county plan”) and approved by the Department. The following requirements shall be satisfied:</text>
          <paragraph num="(a)">
            <text>For a new, proposed, self-contained, publicly-owned community sewerage system:</text>
            <paragraph num="(i)">
              <text>The proposed system shall be described through new narrative text and revised tables and maps in a county plan amendment or update, and this amendment or update shall be adopted by the county governing body and approved by the Department, and</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>A Schedule FS and a countywide financial organizational narrative meeting the requirements of COMAR 26.03.01.08B for the new sewerage system shall be adopted within the county plan and approved by the Department;</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>For an extension to an existing publicly-owned community or multi-use sewerage system:</text>
            <paragraph num="(i)">
              <text>A completed Schedule FS for the system shall appear in the county plan and be approved by the Department,</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>For the first year following the adoption of this regulation, instead of §J(1)(b)(i), of this regulation, the Department may accept a certification from the county or its attorney that the appropriate local governing body has the authority to collect revenues to cover sewerage system costs.</text>
            </paragraph>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Before the Department may issue a permit for the construction of a new, self-contained, privately-owned community or multi-use sewerage system, or of an extension to an existing or self-contained, privately-owned community or multi-use sewerage system, the following requirements shall be satisfied:</text>
          <paragraph num="(a)">
            <text>The project shall be described in the county plan in the correct service area category designation and designated by the appropriate map symbol.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>A Schedule FS shall be submitted to the Department for review and approval.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".03" heading="Water Supply Systems.">
      <paragraph num="A.">
        <text>General Plan — Sources of Supply.</text>
        <paragraph num="(1)">
          <text>The general plan shall show the location of the source or sources of supply, the location of all reservoirs, wells, springs, purification plants, pumping stations, standpipes, elevated tanks, main delivery pipes to the distribution system, and any special structures or appurtenances. These various parts shall be designated either by proper descriptions opposite them or by suitable symbols in the key. The size, depth, and capacity of all reservoirs shall be shown, together with contours, where consisting of natural basins or formed by impounding streams. The elevations of high and low water in the reservoirs shall be indicated, and also the location and elevation of all intakes and valves.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>In case a source of supply is a long distance from the main distribution system, a plan drawn to as small a scale as 2000 feet to the inch may be used to show the general location of the sources of supply and the main delivery pipe, together with a profile taken along the pipe line from the source to the point at which it joins the distribution system. In this case, however, the location of reservoirs, wells, purification plants, pumping stations, standpipes, and other structures shall still be shown on plans drawn to the larger scales, and all plans shall be of the same size, or multiples of that size so they can be conveniently folded.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Wells — Source of Supply. When deep wells are used as a source of water supply, at least two will be required to serve 100 or more family dwelling units or other water users totalling an equivalent use to that for 100 families. Each well shall have a daily yield equal to, or in excess of, 1 average day's water use by the properties served.</text>
      </paragraph>
      <paragraph num="C.">
        <text>General Plan — Distribution System.</text>
        <paragraph num="(1)">
          <text>A general plan shall be submitted showing all existing or proposed streets within the limits of the municipality or area served by the system (a complete layout of all buildings shall be shown in the case of an institution); the boundary of the municipality or area, the surface elevation at intermediate high and low points within the municipality or area, and at all street intersections, unless the area is relatively level and not more than one pressure zone will be utilized. The location of all water mains, fire hydrants, valves and other fittings, together with sizes of pipe are also to be shown. The surface elevations should be placed in the upper right-hand angle of the street intersections, and where shown at other points should be opposite, either above or to the right of, their respective positions in the street. For relatively level communities or areas, contours, with intervals not exceeding 5 feet, may be substituted for numerical elevations. Proposed water mains shall be shown by heavy solid lines and shall have the sizes placed immediately above or to the left of the line designating the main, the size to be shown in each block, or between all connecting mains. Street names shall be placed outside of the street lines. For major improvements and additions, the concurrence or approval of the National Board of Fire Underwriters may be required.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Contemplated future extensions should be designated by dotted, dark or light lines. Any and all existing utilities shall be shown to the correct location and elevation as determined from the most authentic data available.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>A key or legend shall be placed near the title describing the symbols used to designate the various features of the drawing.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Watersheds. The watersheds of storage reservoirs and stream intakes may be shown on plans with scales smaller than 1 inch equals 200 feet. The watershed area, in square miles, shall be designated.</text>
      </paragraph>
      <paragraph num="E.">
        <text>Dams. If dams are to be constructed, complete detailed plans showing all features of the structures shall be submitted. This shall include the volume of water to be stored at spillway level, the area of the reservoir at spillway level, the tributary drainage area in square miles, and the arrangements for releasing or withdrawing water. Evidence of approval by the Maryland Geological Survey shall be submitted.</text>
      </paragraph>
      <paragraph num="F.">
        <text>Wells, Springs, Pumping Stations, Purification Plants.</text>
        <paragraph num="(1)">
          <text>Plans shall be presented showing:</text>
          <paragraph num="(a)">
            <text>The location and dry-weather yield of all springs;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The location, depth, and size and yield of all wells;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>All connecting piping, valves, metering devices, etc.; and</text>
          </paragraph>
          <paragraph num="(d)">
            <text>The layout of pumping stations, together with the arrangement and size of all suction pipes, force mains and valves.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Complete detailed plans of all purification plants shall be submitted, showing all special appurtenances, intakes, tanks, aerators, base exchange units, filters, character and depth of filter media therein, valves, blow-offs, metering devices, chemical application devices, clear-water basins, high and low water elevations of nearby streams, and all features connected with the plants. Plans, elevations, and sections of these parts shall be shown, as may be necessary to supply a complete understanding of the entire installation. When necessary to clarify the review of a project, hydraulic profiles shall be submitted.</text>
        </paragraph>
      </paragraph>
      <paragraph num="G.">
        <text>Information to be Submitted. Information as to the existing or predicted water consumption, the present and future population to be served, the number of proposed services, and the calculations used in determining the sizes, rates of flow, detention periods, capacities, etc., of all treatment and storage units or pumping units shall be submitted in advance of or with the plans. For major works a tabulation may be used. For simple problems a statement may suffice.</text>
      </paragraph>
      <paragraph num="H.">
        <text>Extensions.</text>
        <paragraph num="(1)">
          <text>Plans submitted for extensions to existing systems shall be drawn to sizes and scales as indicated for the general plans, shall show all details as planned for installation, and shall be accompanied by a general or partial plan of the system showing all details as planned for installation, unless the plans have been previously submitted to the Secretary of the Environment. In all cases, they shall show the connections of the proposed extensions to the existing system and enough of the latter from the best data available, to designate their relation to it. Plans for water main extensions will not be approved unless this requirement is met.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Plans for water main extensions shall be for a distance of at least 400 feet or one block in length unless a terminal main is involved.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Plans for the installation of a valve or fire hydrant, for lowering an existing water main, or for other similar minor alterations or additions need not be supplied for review or approval because they do not constitute a material change, and a permit for this work will not be issued.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".04" heading="Sewerage Systems.">
      <paragraph num="A.">
        <text>Plans. Plans shall be drawn up substantially as indicated for general plans under Regulation .02 of this chapter. Those portions of the work intended for immediate construction shall be shown by heavy, solid lines, while contemplated future extensions should be designated by dotted, dark or light, lines. The plans shall show the complete drainage area for which it is intended ultimately to provide sewers. All existing utilities shall be shown to the correct location and elevation, as determined from the most authentic data available.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Profiles.</text>
        <paragraph num="(1)">
          <text>Accompanying each set of plans for proposed systems shall be:</text>
          <paragraph num="(a)">
            <text>Complete profiles of all sewer lines, showing the location of manholes;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The elevation of the sewer invert at each manhole;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The size and grade of the sewer between each manhole; and</text>
          </paragraph>
          <paragraph num="(d)">
            <text>The existing or proposed ground surface along the line of the sewer.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>The location of each manhole shall be designated by a station number, the stationing to begin at the lower end of the sewer. The elevation of sewer inverts should be shown by a figure placed immediately below in a horizontal position, and the size and grade of the sewer, together with the character of the material of which the sewer is constructed, should be placed just above or below the invert line and parallel to it, unless the sewer is large, in which case the information may be written above the invert line.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Profiles should be drawn to scales not greater than 1 inch equals 40 feet horizontally, and 1 inch equals 4 feet vertically; and not less than 1 inch equals 200 feet horizontally, and 1 inch equals 10 feet vertically. A horizontal scale of 100 feet to the inch, and a vertical scale of 10 feet to the inch is preferable in most cases.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>The location of existing properties and cellar depths or elevations shall be shown, particularly if plumbing in cellars is or may be involved.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>The profiles of existing pipe lines and the locations, classifications, elevations, and sizes of all existing pipe lines, passing under or over the proposed lines, shall be shown according to the best information available.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Pumping Stations and Treatment Plants. In case a pumping station or treatment plant forms a portion of the system, drawings showing the general layout, all piping arrangements, control devices, provisions for ventilation, and all constructional details relating to the station or plant shall be submitted.</text>
      </paragraph>
      <paragraph num="D.">
        <text>Detailed Plans. A plan showing details of sewer sections, except where prefabricated or molded pipe is used, of standard and special manholes, inlets, manhole covers, frames and steps, gratings, and any other special appurtenances or structures, shall be submitted with the general plan.</text>
      </paragraph>
      <paragraph num="E.">
        <text>Information to be Submitted.</text>
        <paragraph num="(1)">
          <text>Information as to the existing or predicted amount of sewage, the physical and chemical characteristics of the sewage, the present and future population to be served by the sewers, the number of proposed house connections, and the calculations used in determining the sizes, rates of flow, detention periods, capacities, etc., of all treatment and pumping units shall be submitted with the plans or previous to the plans.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Calculations may be required to determine the amount of treatment plant effluent the receiving stream or body of water can readily assimilate without degrading them below an acceptable dissolved oxygen level and without jeopardizing shellfish or bathing areas.</text>
        </paragraph>
      </paragraph>
      <paragraph num="F.">
        <text>Extensions.</text>
        <paragraph num="(1)">
          <text>Plans submitted for extensions to existing systems shall be drawn to sizes and scales as indicated for the general plans, and shall be accompanied by a general or partial plan of the system, showing all details as planned for construction, unless the plans shall have been previously submitted to the Secretary of the Environment. In all cases they shall show the connections of the proposed extensions to the existing system and enough of the latter to designate their relation to it. The area under immediate consideration and tributary to, and that which at some future time may become tributary to, and sewer extensions for which plans are presented shall be shown. Proper and adequate data giving the basis upon which the extensions have been designed shall be submitted with the plans. Extensions of sewer lines are to be made only in conformity with a general or long-range plan in order to properly provide for future needs.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Plans for sanitary sewer extensions or for storm drain extensions shall be for a distance of at least 400 feet or one block in length unless a terminal section is involved.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".05" heading="Storm Drains.">
      <paragraph num="A.">
        <text>Plans, profiles, and details for storm drains may be prepared on separate drawings or on the same drawings used for sanitary sewers.</text>
      </paragraph>
      <paragraph num="B.">
        <text>All calculations leading to the locations of inlets and the sizes and slopes of storm drains shall be submitted with the plans or previous to the plans. This is to include:</text>
        <paragraph num="(1)">
          <text>The intensity of rainfall to be considered;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Its frequency of occurrence;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The coefficients of runoff;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>The inlet time;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>The summation of calculated flows at various progressive distances along the drains;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>The spacing and types of inlets;</text>
        </paragraph>
        <paragraph num="(7)">
          <text>The hydraulic calculations leading to the selection of pipe sizes and slopes; and</text>
        </paragraph>
        <paragraph num="(8)">
          <text>Details of manholes, inlets, headwalls, and appurtenances.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".06" heading="Purification of Water and the Treatment of Sewerage.">
      <text>The Secretary of the Environment has no hard and fast rules relating to the purification of water supplies, nor has he deemed it wise to establish written standards of purity for streams or other bodies of water into which sewage shall discharge. Conditions are very different in various sections of the State, and also even in neighboring districts. Each water supply and each sewerage system presents a separate problem which shall be solved in a satisfactory manner to conform with the surrounding conditions.</text>
    </regulation>
    <annotations>
      <annotation type="Authority">Environment Article, §§9-506 and 9-510, Annotated Code of Maryland</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: January 1, 1964</annotation>
      <annotation type="History" subtype="Administrative History">Amended effective December 1, 1970</annotation>
      <annotation type="History" subtype="Administrative History">Regulations .01B—E, .07, and .08 repealed effective August 8, 1980 (7:16 Md. R. 1595)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .02C amended effective August 8, 1980 (7:16 Md. R. 1595)</annotation>
      <annotation type="History" subtype="Administrative History">Chapter recodified from COMAR 10.17.05 to COMAR 26.03.02</annotation>
      <annotation type="History" subtype="Administrative History">Regulations .01 amended effective July 25, 1988 (15:15 Md. R. 1813)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .02J adopted effective July 25, 1988 (15:15 Md. R. 1813)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .02J amended effective June 18, 2018 (45:12 Md. R. 618)</annotation>
    </annotations>
  </chapter>
  <chapter num="03" heading="Development of County Comprehensive Solid Waste Management Plans">
    <regulation prefix="Regulation" num=".01" heading="Definitions.">
      <paragraph num="A.">
        <text>In this chapter, the following terms have the meanings indicated.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Terms Defined.</text>
        <paragraph num="(1)">
          <text>“County” means any of the 23 Maryland counties or Baltimore City.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>County Plan.</text>
          <paragraph num="(a)">
            <text>“County plan” means a comprehensive plan for adequately providing throughout the county (including all towns, municipal corporations, and sanitary districts) the following facilities and services by public or private ownership:</text>
            <paragraph num="(i)">
              <text>Solid waste disposal systems;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Solid waste acceptance facilities; and</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Systematic collection and disposal of solid waste, including litter.</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>“County plan” includes all revisions to the plan.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>“Department” means the Department of the Environment.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>“Governing body” means the Board of County Commissioners, or the County Executive and Council, or the Mayor and City Council of Baltimore.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>“Litter” means any waste materials, refuse, garbage, trash, debris, dead animals, or other discarded material.</text>
        </paragraph>
        <paragraph num="(6)">
          <text>“Refuse” means any solid, liquid, semi-solid, or contained gaseous material resulting from industrial, commercial, mining, or agricultural operations, or from community activities, which:</text>
          <paragraph num="(a)">
            <text>Is discarded, or is being accumulated, stored, or physically, chemically, or biologically treated before being discarded; or</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Has served its original intended use and sometimes is discarded; or</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Is a manufacturing or mining by-product and sometimes is discarded.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(7)">
          <text>“Revision” means either an adopted amendment to, or a periodic update of, a county plan.</text>
        </paragraph>
        <paragraph num="(8)">
          <text>“Solid waste” means any garbage, refuse, sludge, or liquid from industrial, commercial, mining, or agricultural operations, and from community activities, but does not include solid or dissolved material in domestic sewage or in irrigation return flows.</text>
        </paragraph>
        <paragraph num="(9)">
          <text>“Solid waste acceptance facility” means any sanitary landfill, incinerator, transfer station or plant, whose primary purpose is to dispose of, treat, or process solid waste.</text>
        </paragraph>
        <paragraph num="(10)">
          <text>Solid Waste Disposal System.</text>
          <paragraph num="(a)">
            <text>“Solid waste disposal system” means any publicly or privately owned system that:</text>
            <paragraph num="(i)">
              <text>Provides a scheduled or systematic collection of solid waste;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Transports the solid waste to a solid waste acceptance facility; and</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Treats or otherwise disposes of the solid waste at the solid waste acceptance facility.</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>A solid waste disposal system includes each solid waste acceptance facility that is used in connection with it.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(11)">
          <text>“Solid waste management” means the systematic administration of activities which provide for the collection, source separation, storage, transportation, transfer, processing, treatment, re-use, or disposal of solid waste.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="General Provisions.">
      <paragraph num="A.">
        <text>Each county shall maintain a current, comprehensive, solid waste plan which covers at least the succeeding 10-year period. Each plan shall be prepared in accordance with these regulations, and shall be arranged with an introduction and five chapters as set forth in Regulation .03 of this chapter.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Each county plan shall include all or part of the subsidiary plans of the towns, municipal corporations, sanitary districts, privately owned facilities, and local, State and federal agencies having existing, planned, or programmed development within the county to the extent that these inclusions shall promote the public health, safety, and welfare. These subsidiary plans may be incorporated by reference into the county plan.</text>
      </paragraph>
      <paragraph num="C.">
        <text>The Department may require the installation of a solid waste disposal system, if deemed necessary, after considering the factors listed in Environment Article, Title 9, Subtitle 5, Annotated Code of Maryland. The Department may permit the establishment of a solid waste acceptance facility without a collection and transportation system if a solid waste disposal system is either not available or not required to be installed in the area.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".03" heading="Plan Content.">
      <paragraph num="A.">
        <text>The introduction shall contain:</text>
        <paragraph num="(1)">
          <text>A statement certifying that the plan has been prepared in accordance with these regulations and that it has been officially adopted by the governing body of the county; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The letter of approval from the Department.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Chapter One shall contain a:</text>
        <paragraph num="(1)">
          <text>Statement of the county's goals regarding solid waste management, the objectives and policies necessary to achieve these goals, and a discussion of the conformance of these objectives and policies with those of State, regional, and local comprehensive land use plans and programs;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Brief discussion, with charts, of the structure of the county government as it relates to solid waste management; and</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Brief discussion of State, federal and local agencies, laws, and regulations which affect the planning, establishment, and operation by the county of solid waste disposal systems.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Chapter Two shall contain a:</text>
        <paragraph num="(1)">
          <text>Table which shows the county's present and projected population (if more than one set of projections is shown, the set upon which the plan is based shall be noted);</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Map which shows the location of municipalities and federal facilities within the county;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Discussion of current county zoning requirements as they relate to solid waste management activities; and</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Discussion of the current status of the county comprehensive land-use plan, including the date that the plan was adopted and last updated.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Chapter Three shall contain:</text>
        <paragraph num="(1)">
          <text>A table that shows the existing and projected, for at least the succeeding 10-year period, annual generation (in tons, cubic yards, or gallons, as appropriate) of:</text>
          <paragraph num="(a)">
            <text>Residential (household, domestic) wastes;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Commercial wastes;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Industrial (nonhazardous) solids, liquids, and sludges;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Institutional (schools, hospitals, government buildings) waste;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Land clearing and demolition debris (rubble);</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Controlled hazardous substances (CHS);</text>
          </paragraph>
          <paragraph num="(g)">
            <text>Dead animals;</text>
          </paragraph>
          <paragraph num="(h)">
            <text>Bulky or special wastes (automobiles, large appliances, etc.);</text>
          </paragraph>
          <paragraph num="(i)">
            <text>Vehicle tires;</text>
          </paragraph>
          <paragraph num="(j)">
            <text>Wastewater treatment plant sludges;</text>
          </paragraph>
          <paragraph num="(k)">
            <text>Septage; and</text>
          </paragraph>
          <paragraph num="(l)">
            <text>Other wastes (water treatment plant sludges, residues collected by a pollution control device, agricultural wastes, mining wastes, litter, street sweepings, recreational wastes, etc.) unless they are generated in insignificant quantities. However, the Department may require the county to substantiate any omission.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>A discussion of the bases for the data presented in the table required by §D(1) of this regulation.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>A discussion of the types and quantities of solid waste, if significant, which are entering or leaving the county for processing, recovery, or disposal.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>A description of existing solid waste collection systems, including service areas.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Information concerning each existing public or private solid waste acceptance facility (incinerators, transfer stations, major composting sites, sanitary and rubble landfills, dumps, major resource recovery facilities, CHS facilities, injection wells, and industrial waste liquid holding impoundments) including:</text>
          <paragraph num="(a)">
            <text>Its location on a map;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Its Maryland grid coordinates;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Its size in acres;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>The types and quantities of solid wastes accepted;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Ownership;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Permit status; and</text>
          </paragraph>
          <paragraph num="(g)">
            <text>Anticipated years of service life remaining.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Chapter Four.</text>
        <paragraph num="(1)">
          <text>Chapter four shall contain an assessment (using a narrative description, maps, charts, and graphs as appropriate) of the county's needs to alter, extend, modify, or add to existing solid waste disposal systems during the next 10 years.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The assessment above shall use, when appropriate, the background information contained in chapters one, two, and three.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The assessment shall consider the constraints imposed upon the establishment of solid waste acceptance facilities by:</text>
          <paragraph num="(a)">
            <text>Topography;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Soil types and their characteristics;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Geologic conditions;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Location;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Use and depth of aquifers;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Location of wetlands;</text>
          </paragraph>
          <paragraph num="(g)">
            <text>Location of surface water sources and their flood plains and watersheds;</text>
          </paragraph>
          <paragraph num="(h)">
            <text>Existing water quality conditions;</text>
          </paragraph>
          <paragraph num="(i)">
            <text>Incompatible land use;</text>
          </paragraph>
          <paragraph num="(j)">
            <text>Planned long-term growth patterns;</text>
          </paragraph>
          <paragraph num="(k)">
            <text>Federal, State and local laws and areas of critical State concern (as designated by the Department of State Planning).</text>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>The assessment shall evaluate:</text>
          <paragraph num="(a)">
            <text>The use of source separation and source reduction programs to reduce the quantities of solid wastes which shall be collected for disposal;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Resource recovery options to reduce land disposal capacity needs;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Consumer education programs, and cooperation with appropriate suppliers for the purchase of recycled products to encourage, and help create a market for, resource recovery and source separation programs;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>The need for disposal capacity for asbestos;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Programs and procedures needed to respond to the unplanned (emergency) spillage or leaking of hazardous wastes within the county; and</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Whether existing local master plans and zoning regulations provide for the appropriate siting, operation, or both, of solid waste management systems or facilities.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="F.">
        <text>Chapter Five.</text>
        <paragraph num="(1)">
          <text>Chapter five shall contain the county's plan of action with respect to all types of solid waste and all phases of solid waste management.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The plan of action in §F(1), of this regulation, shall cover at least the succeeding 10-year period and, at a minimum, shall:</text>
          <paragraph num="(a)">
            <text>Discuss the solid waste disposal systems and solid waste acceptance facilities, both public and private, which will be in use during the planning period, including proposed systems and facilities;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Provide a mechanism for managing each of the waste streams identified in §D(1) of this regulation;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Demonstrate, through tables, charts and graphs, that the sizing, staging, and capacity of all systems and facilities in §F(2)(a) and (b), of this regulation, will be adequate for the county's needs during the planning period;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Establish schedules for placing new public or private solid waste disposal systems or solid waste acceptance facilities into operation, including a description of necessary actions and their timing, to bring the county's solid waste disposal systems into compliance with the mandates of pertinent federal and State laws, and any permits or orders issued under these laws;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Describe provisions and methods for financing existing and proposed solid waste disposal systems, including planning and implementation;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Include a projected closure date for each public solid waste acceptance facility which is scheduled to cease operations during the planning period, the projected use of each closed site, and the relationship of that use to the county's comprehensive land use plan; and</text>
          </paragraph>
          <paragraph num="(g)">
            <text>Discuss changes in programs, plans, regulations, and procedures as a result of the assessment conducted under §E, of this regulation.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".04" heading="Technical Requirements Applicable to County Plans.">
      <paragraph num="A.">
        <text>Maps in the county plans shall be of sufficient scale and clarity to clearly show the required information.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Projections in the county plans shall be given for at least the succeeding 10-year period at intervals of not more than 5 years.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".05" heading="Plan Revisions.">
      <paragraph num="A.">
        <text>Except as provided in §B, of this regulation, each county plan shall be:</text>
        <paragraph num="(1)">
          <text>Revised if deemed necessary by the Department;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Reviewed in its entirety at the interval specified by Environment Article, Title 9, Subtitle 5, Annotated Code of Maryland; and</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Revised to include the installation or extension of either a solid waste acceptance facility, or solid waste disposal system, before the issuance of a permit by the Department under Environment Article, Title 9, Subtitle 2, Annotated Code of Maryland.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Exceptions. A revision for the sole purpose of including a private facility is not necessary if the:</text>
        <paragraph num="(1)">
          <text>Facility accepts only wastes generated by the owner's operations;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Facility is in general conformance with the management mechanism described in Regulation .03F(2)(b) of this chapter; and</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Information listed in Regulation .03D(5), of this chapter, is provided for the facility when the county plan is reviewed and revised in accordance with §A(2), of this regulation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Revisions pertaining to county plans shall be adopted and submitted in accordance with the following process:</text>
        <paragraph num="(1)">
          <text>The county shall solicit input concerning the proposed revision from each of the entities listed in Regulation .02B, of this chapter, and from any other entity likely to be affected by the proposed revision.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The county shall provide a reasonable opportunity for a public hearing concerning the proposed revision to the county plan. Prince George's County and Montgomery County are required by Environment Article, Title 9, Subtitle 5, Annotated Code of Maryland, to conduct a public hearing. The Department, the public, and the entities listed in Regulation .02B, of this chapter, shall receive prior notice of a hearing.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Following the public hearing or public meeting, or a decision not to conduct a public hearing or public meeting, the governing body of the county shall adopt the revision and submit it to the Department. This submittal shall be accompanied by a discussion of substantive issues raised at the public hearing or public meeting, and how they were resolved.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>The Department shall distribute copies of the adopted revision to the Departments of Natural Resources, State Planning, and Agriculture, for review and comment.</text>
      </paragraph>
      <paragraph num="E.">
        <text>The Department shall, within 60 days after receiving the submission, approve, disapprove, or approve in part, the adopted revision unless the review period has been extended under Environment Article, Title 9, Subtitle 5, Annotated Code of Maryland. If the submittal is disapproved in whole, or in part, the Department shall, in a written notice to the county, clearly define the inadequacies of the submittal, and provide a suggested outline of the tasks needed to improve the submittal so that it can be approved by the Department.</text>
      </paragraph>
      <paragraph num="F.">
        <text>The governing body shall, for 6 months following the disapproval, have the right to appeal the Department's action by sending a written notice of appeal to the Department.</text>
      </paragraph>
    </regulation>
    <annotations>
      <annotation type="Authority">Environment Article, Title 9, Subtitle 5, Annotated Code of Maryland</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: January 1, 1971</annotation>
      <annotation type="History" subtype="Administrative History">Regulations .01—.05 repealed and new Regulations .01—.05 adopted effective November 4, 1985 (12:22 Md. R. 2104)</annotation>
      <annotation type="History" subtype="Administrative History">Chapter recodified from COMAR 10.17.08 to COMAR 26.03.03</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .05C, E, F amended effective June 18, 2018 (45:12 Md. R. 618)</annotation>
    </annotations>
  </chapter>
  <chapter num="04" heading="Distribution of Funds for Sanitary Sewerage Facilities to Abate Health Hazards">
    <regulation prefix="Regulation" num=".01" heading="Scope.">
      <text>The following regulations provide procedures for the application, review, and approval of State grants awarded under section 5.2(a) of Chapter 55 for the purpose of assisting the construction, extension, and improvement of existing public sanitary sewer systems and, where necessary, for the construction of temporary sewerage treatment plants and related facilities to abate or prevent health hazards arising out of the failure or inadequacy of individual sewerage systems.</text>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="Definitions.">
      <paragraph num="A.">
        <text>“Applicant” means any bona fide governmental agency or incorporated nonprofit organization or association responsible for construction of sewerage facilities.</text>
      </paragraph>
      <paragraph num="B.">
        <text>“Construction” means pertinent design and engineering services and the physical installation of any new, or extension of, an existing public sewer system or of any temporary sewage treatment facility.</text>
      </paragraph>
      <paragraph num="C.">
        <text>“Extension” means adding sewage collecting facilities and equipment to an existing system.</text>
      </paragraph>
      <paragraph num="D.">
        <text>“Improvement” means the installation of adequate means for collecting and treating sewage to abate or prevent public health hazards.</text>
      </paragraph>
      <paragraph num="E.">
        <text>“Individual sewerage system” means a single system of sewers and piping, treatment tanks or other facilities serving only a single lot and disposing of sewage or individual wastes of a liquid nature, in whole or in part, on or in the soil of the property into any waters of this State, or by other methods.</text>
      </paragraph>
      <paragraph num="F.">
        <text>“Public sanitary sewer system” means any system serving two or more individual lots for the collection and disposal of sewage, including various devices for the treatment of the sewage.</text>
      </paragraph>
      <paragraph num="G.">
        <text>“Temporary sewage treatment plant” means any facility constructed to treat sewage before discharge into a stream or onto the ground surface or into the soil, which is to be abandoned when a permanent system is declared available by the Department of the Environment.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".03" heading="General Provisions.">
      <paragraph num="A.">
        <text>These regulations apply to projects which are eligible for State grants under section 5.2(a) of the “Water Quality Loan of 1973”.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Applications for State grants shall contain a statement by the applicant that potential sources of federal funding have been reviewed and are not available or are insufficient for the construction project.</text>
      </paragraph>
      <paragraph num="C.">
        <text>Grant funds may be made available for the construction of temporary sewage treatment plants and related facilities to abate or prevent health hazards arising out of the failure or inadequacy of individual sewerage systems existing as of April 26, 1973.</text>
      </paragraph>
      <paragraph num="D.">
        <text>The health officer of the county or Baltimore City in which the project is situated shall certify to the Secretary of the Environment, or his designee, concerning the inadequacy of the individual sewerage system, its effect on the public health, and that the system existed before April 26, 1973.</text>
      </paragraph>
      <paragraph num="E.">
        <text>The need for the construction, extension, or improvement shall be included as an approved sewerage service area in the county water and sewerage plan adopted by the county governing body pursuant to Environment Article, Title 9, Subtitle 5, Annotated Code of Maryland. As a prerequisite to eligibility for a grant, each county shall submit an annual inventory, as part of the county water and sewerage plan, of specific locations where failing or inadequate systems occur, and proposed solutions.</text>
      </paragraph>
      <paragraph num="F.">
        <text>Any project on which a State grant is requested shall comply with all applicable federal and State requirements.</text>
      </paragraph>
      <paragraph num="G.">
        <text>A State grant may not exceed 87-1/2 percent of the cost of the project except that in the case of a project to be operated by the State owned institution or facility, the State grant offer may equal the total cost of the project.</text>
      </paragraph>
      <paragraph num="H.">
        <text>More than $2,500,000 may not be granted for projects in any one political subdivision.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".04" heading="Application Requirements.">
      <text>Applications shall be made in letter and report form to the Water Management Administration of the Department of the Environment. The application shall include:</text>
      <paragraph num="A.">
        <text>A statement that federal funds are not available or are insufficient for the construction work, and what sources of funds were investigated;</text>
      </paragraph>
      <paragraph num="B.">
        <text>A detailed narrative of the need for the project, including a discussion of alternative solutions investigated, if any, and why the proposed solution was selected;</text>
      </paragraph>
      <paragraph num="C.">
        <text>Evidence from the deputy state health officer for the county in which the proposed construction will be situated of the public health need;</text>
      </paragraph>
      <paragraph num="D.">
        <text>Fiscal information submitted in a manner prescribed by the Secretary of the Environment, including the following:</text>
        <paragraph num="(1)">
          <text>A schedule of construction costs;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Estimated user charges including amortization of capital and financing costs;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>A brief explanation of the need for State grant funds to assist in financing the project;</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Preliminary plan of sewers needed with houses and buildings shown and maps delineating the service area of the project, identifying:</text>
        <paragraph num="(1)">
          <text>The health hazard areas;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Undeveloped areas;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Developed areas not having existing or potential health hazards, and a tabulation identifying the proportion (percent of flow) of the project to be used for relieving health hazards;</text>
        </paragraph>
      </paragraph>
      <paragraph num="F.">
        <text>Population to be served and anticipated sewage flow;</text>
      </paragraph>
      <paragraph num="G.">
        <text>Total bonded indebtedness of the area to be served or other information which will indicate the financial burden for county and municipal services of the properties to be served by the proposed sewers;</text>
      </paragraph>
      <paragraph num="H.">
        <text>Total assessed value of properties to be served;</text>
      </paragraph>
      <paragraph num="I.">
        <text>Any other data deemed of value for evaluation of the need for State grant funds;</text>
      </paragraph>
      <paragraph num="J.">
        <text>Priority list of projects where two or more projects are involved.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".05" heading="Review and Evaluation.">
      <paragraph num="A.">
        <text>Applications for grants under section 5.2(a) of Chapter 55 shall be reviewed by the Water Management Administration. The review shall include the following:</text>
        <paragraph num="(1)">
          <text>An evaluation to determine that:</text>
          <paragraph num="(a)">
            <text>The project is ineligible for a federal grant; or</text>
          </paragraph>
          <paragraph num="(b)">
            <text>A timely and sufficient federal grant is not available.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>The Secretary shall submit a copy of the grant application and supporting material to the A-95 clearinghouse for review and comment.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>A determination of the amount of grant funds necessary to permit the project to proceed. These funds may not exceed 87-1/2 percent of the eligible construction cost.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>A recommendation to the Secretary of the Environment which shall indicate a course of action to be taken.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>The Secretary shall:</text>
        <paragraph num="(1)">
          <text>Approve the application and send a letter of recommendation to the Board of Public Works for approval of State grant funds for the project;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Reject the application either because it is not suitable under the “Water Quality Loan of 1973” or does not have high enough priority to qualify under section 5.2(a); or</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Cause the return of the application with a request for additional information required by him.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>When the State grant is approved by the Board of Public Works, the Secretary shall give notification to the applicant that preparation of contract plans and specifications may proceed for review by his staff and the federal agency, if any, before issuing a construction permit required by Environment Article, §9-204, Annotated Code of Maryland.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".06" heading="Severability.">
      <text>If any section or provision of these regulations is declared unconstitutional or void by any court of competent jurisdiction, or the applicability thereof to any person or circumstances is held invalid, the constitutionality or validity of the remainder of the regulations and the applicability thereof to other persons and circumstances is not affected thereby, and to this end, the sections and provisions of these regulations are declared to be severable.</text>
    </regulation>
    <annotations>
      <annotation type="Authority">Environment Article, §9-218, Annotated Code of Maryland</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: July 10, 1974 (1:10 Md. R. 73)</annotation>
      <annotation type="History" subtype="Administrative History">Chapter recodified from COMAR 10.17.09 to COMAR 26.03.04</annotation>
    </annotations>
  </chapter>
  <chapter num="05" heading="Innovative and Alternative On-Site Sewage Disposal System Grant Program">
    <regulation prefix="Regulation" num=".01" heading="Purposes and Scope.">
      <paragraph num="A.">
        <text>The purpose of this program is to identify additional types of on-site sewage disposal systems that can be used in Maryland. The Department is authorized to make grants available to political subdivisions for the purpose of constructing innovative and alternative on-site sewage disposal systems.</text>
      </paragraph>
      <paragraph num="B.">
        <text>The subdivisions shall use the State grants to provide grants to owners of improved properties with failed conventional systems and owners of previously recorded land that has failed a soil percolation test.</text>
      </paragraph>
      <paragraph num="C.">
        <text>Grants shall be used only for installing experimental systems using Department approved innovative and alternative system design criteria.</text>
      </paragraph>
      <paragraph num="D.">
        <text>This chapter establishes eligibility criteria for participation by local political subdivisions and property owners in the program.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="Definitions.">
      <paragraph num="A.">
        <text>The following terms have the meanings indicated.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Terms Defined.</text>
        <paragraph num="(1)">
          <text>“Department” means the Department of the Environment.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>“Includes or including” means includes or including by way of illustration and not by way of limitation.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>“Innovative and alternative on-site sewage disposal system” means any new, experimental, or non-conventional technology that is added to or used in place of a conventional septic or other on-site sewage system.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>“Program” means the innovative and alternative on-site sewage disposal system grant program.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".03" heading="General Provisions.">
      <paragraph num="A.">
        <text>This program may not be applied to the development of an unimproved parcel of land that is proposed to be subdivided into building lots.</text>
      </paragraph>
      <paragraph num="B.">
        <text>The Department shall manage and supervise the program and make grant available to political subdivisions under conditions listed in Regulation .04 of this chapter.</text>
      </paragraph>
      <paragraph num="C.">
        <text>A project for which State financial assistance is granted shall comply with all applicable State laws and regulations governing the safe and adequate disposal of sewage.</text>
      </paragraph>
      <paragraph num="D.">
        <text>State financial assistance may not provide more than $10,000 or 50 percent of the anticipated construction costs of the project, whichever is less.</text>
      </paragraph>
      <paragraph num="E.">
        <text>The Department shall request comment from the Department of State Planning or any community planning agency regarding demographics, land use, and fiscal impact or any other pertinent information regarding program projects.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".04" heading="Political Subdivision Eligibility.">
      <paragraph num="A.">
        <text>To be eligible for State funds, a political subdivision shall:</text>
        <paragraph num="(1)">
          <text>Have local funding and manpower resources available to establish and maintain local innovative and alternative on-site sewage disposal system programs including the ability to:</text>
          <paragraph num="(a)">
            <text>Collect data;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Prepare technical reports; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Inspect the operation and performance of the systems installed.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Submit an agreement to be signed with the Department as outlined in Regulation .06 of this chapter, and their innovative and alternative program plan within 3 months of their notification by the Department of the availability of program funds. The program plan and agreement shall detail the role of the local county health department in the innovative and alternative program.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Have known hydrogeological problems, such as permanently high or seasonally high water table conditions, shallow soils, or slowly permeable soils, which can be addressed by innovative and alternative sewage disposal systems.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Submit a final eligibility and priority list of applicants to the Department for review and approval as outlined in Regulation .06 of this chapter within 1 year of the execution of the Department agreement with the political subdivision.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Priority for allocating funds to eligible political subdivisions shall be given to those subdivisions whose collective innovative and alternative program plans offer the best opportunity to satisfy the purpose of the program, as defined in Regulation .01A, of this chapter, on a Statewide basis.</text>
      </paragraph>
      <paragraph num="C.">
        <text>Funds not dispensed to applicants by political subdivisions within 6 months of their receipt shall be returned to the Department for reallocation.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".05" heading="Applicant Eligibility.">
      <paragraph num="A.">
        <text>To be eligible for State funds from a political subdivision under the program an applicant shall:</text>
        <paragraph num="(1)">
          <text>Own property in this State that is included in the county master water and sewer plan as an area where individual on-site water and sewer systems may be used that:</text>
          <paragraph num="(a)">
            <text>Has an existing failed septic system, or</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Is unimproved, was platted before 1972, and has failed percolation testing requirements;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Have made a good faith effort to obtain approval of, or to use a conventional septic system;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Agree to conditions of the experiment as outlined in Regulation .07 of this chapter; and</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Be limited to one grant to serve one homesite to:</text>
          <paragraph num="(a)">
            <text>Upgrade an existing system;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Abate an existing pollution or public health problem related to sewage disposal; or</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Improve one unimproved site with a new home and innovative and alternative on-site sewage disposal system.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Priority for program participation shall be given to applicants who have:</text>
        <paragraph num="(1)">
          <text>An existing failed on-site sewage disposal system which cannot be repaired using conventional methods;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>An existing pollution or public health problem related to sewage disposal; and</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Property which offers a significant opportunity for providing useful data to the experimental effort.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".06" heading="Department Agreements with Political Subdivisions.">
      <text>Political subdivisions receiving grants under this program are required to enter into an agreement with the Department. This agreement shall provide for:</text>
      <paragraph num="A.">
        <text>The political subdivision to commit adequate resources for establishing a local innovative and alternative on-site sewage disposal system program to be conducted in accordance with requirements established by the Department and including:</text>
        <paragraph num="(1)">
          <text>Applicant screening and site evaluations;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Input to and review of system design;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>System inspection and monitoring;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Technical reporting on system performance in accordance with requirements established by the Department; and</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Review by the local planning agency for relation to land use or other pertinent information.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>The role the local county health departments will serve in the program including a description of their participation in:</text>
        <paragraph num="(1)">
          <text>Applicant screening;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Site evaluation;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Review of system design; and</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Monitoring and reporting.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>A selection process for choosing projects to be funded when the number of eligible, priority applicants exceeds available funding levels. With the concurrence of the Department, State grant participation may be established at less than 50 percent of the project costs for any individual project.</text>
      </paragraph>
      <paragraph num="D.">
        <text>The political subdivision to screen and list applications for project eligibility and priority ranking in accordance with requirements in this chapter. The screening process shall include:</text>
        <paragraph num="(1)">
          <text>A site evaluation and determination of the nature of the project and its suitability to receive grant assistance including:</text>
          <paragraph num="(a)">
            <text>The applicant's name;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>A plat description of site to be served, including size, property boundaries, and location;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>A statement as to whether the property is improved or unimproved;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>The number of bedrooms in the house;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>The estimated sewage flow;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Site characteristics including slope, soil data, surface and subsurface drainage, vegetation and well location; and</text>
          </paragraph>
          <paragraph num="(g)">
            <text>Relation of the project to the local comprehensive plan and relation to other State or local programs for management of development, including the Chesapeake Bay Critical Areas Program and Agricultural Land Preservation Program;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Preparation of a site location map or maps which identify the location of the eligible sites in relation to the nearest roads and topographical features; and</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Prioritization of eligible applicants.</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>The political subdivision to conduct in-depth site evaluations for each site meeting eligibility and priority requirements to ascertain ability of the site to support an innovative and alternative system. Site evaluation shall be conducted in accordance with Department requirements and include description or assessment of the following site characteristics:</text>
        <paragraph num="(1)">
          <text>Soil depth to ground water or bedrock, or both;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Soil profiles;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Soil permeability;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Extent of tree cover; and</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Any other site characteristics which may affect the performance of innovative and alternative sewage disposal systems considered applicable for the site.</text>
        </paragraph>
      </paragraph>
      <paragraph num="F.">
        <text>The political subdivision to make recommendations for each site evaluated, including the type of innovative and alternative sewage disposal system best suited to the site, and a relisting of eligible and priority applicants given in-depth evaluation findings. This listing shall be submitted in accordance with the timetable outlined in Regulation .04 of this chapter.</text>
      </paragraph>
      <paragraph num="G.">
        <text>The Department to approve of political subdivisions' screening listing and in-depth evaluation results before State grant awards to political subdivisions. The Department's approval process shall include:</text>
        <paragraph num="(1)">
          <text>Review of screening, prioritization, and site evaluation procedures and results;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Consideration of the ability of available technologies to meet site constraints;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Consideration of the potential of the site to support feasible and economical monitoring systems and provide useful experimental data; and</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Consideration of comments received from the Department's submittal of the final priority listing of eligible projects and the site location map or maps of the eligible sites to the State Clearinghouse for intergovernmental review in accordance with the process described in COMAR 16.02.01.</text>
        </paragraph>
      </paragraph>
      <paragraph num="H.">
        <text>The political subdivision to make progress reports to the Department on the administration of the local programs, including status reports on the performance of funded projects.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".07" heading="Political Subdivision Agreements with Applicants.">
      <paragraph num="A.">
        <text>Before Department and political subdivision approval of funding for innovative and alternative on-site sewage disposal systems, an agreement shall be signed by the applicant, political subdivision, and the Department which:</text>
        <paragraph num="(1)">
          <text>Identifies project elements and fixes their cost based upon a fair assessment of project installation costs, and establishes that the amount of State grant participation may not exceed 50 percent of the anticipated total project cost.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Establishes financial responsibility of homeowners for:</text>
          <paragraph num="(a)">
            <text>Costs incurred in installation above the fixed amount; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>All operating and maintenance costs.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>Limits the State's share of the project installation cost to $10,000 or less.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Establishes applicant repayment requirements for the full amount of funds provided under this agreement if, for reasons of neglect, the innovative and alternative system is not adequately maintained or is damaged beyond repair.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Establishes the applicant's financial responsibility for system modification which may be required by the Department or the political subdivision when failure of the system to operate satisfactorily poses a threat to the public health, safety, or comfort. In these cases, necessary system modifications shall be in accordance with the requirements established by the Department or the local health department. System modifications may include requirements for installing holding tanks and regular pumping and hauling of sewage wastes from the holding tanks.</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Establishes salvage rights of the State upon default of the applicant.</text>
        </paragraph>
        <paragraph num="(7)">
          <text>Establishes access for the political subdivision and the Department to enter the applicant's land in order to make periodic inspection and to monitor the system for at least 2 years from initiation of system use or for the duration of the project.</text>
        </paragraph>
        <paragraph num="(8)">
          <text>Requires installation by the applicant of either a water meter or cycle counter (for effluent pumping systems), which shall be monitored.</text>
        </paragraph>
        <paragraph num="(9)">
          <text>Acknowledges that the proposed innovative and alternative sewage system is experimental and that the applicant's participation is voluntary.</text>
        </paragraph>
        <paragraph num="(10)">
          <text>Acknowledges that the political subdivision, the Department and any of their agents or employees do not, either officially or individually, underwrite the operation of any innovative and alternative system approved under this program or incur any liability to the applicant if the innovative and alternative system fails.</text>
        </paragraph>
        <paragraph num="(11)">
          <text>Requires that the applicant assure continued, efficient, and effective operation of the system.</text>
        </paragraph>
        <paragraph num="(12)">
          <text>Requires the terms of this agreement to run with the land and bind the applicant, his heirs, successors or assigns, and that this agreement shall be recorded in the land records of the political subdivision where the property is located.</text>
        </paragraph>
        <paragraph num="(13)">
          <text>Provides for this agreement to be voided at the discretion of the Department if the system construction is not completed within 6 months of the grant award and requires the applicant to repay all funds with interest.</text>
        </paragraph>
        <paragraph num="(14)">
          <text>Establishes any special requirements or conditions deemed necessary by the Department and the political subdivision.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Representatives of the Department and the political subdivision shall meet with program participants, individually or in groups, before the signing of the agreement to:</text>
        <paragraph num="(1)">
          <text>Outline applicant responsibilities in the program;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Describe the innovative and alternative system most appropriate for the site; and</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Explain any special design or maintenance features of the system which may require applicant involvement beyond that required for a conventional septic system.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <annotations>
      <annotation type="Authority">Environment Article, §§9-1401—9-1406, Annotated Code of Maryland</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: December 2, 1985 (12:24 Md. R. 2348)</annotation>
      <annotation type="History" subtype="Administrative History">Chapter recodified from COMAR 10.17.16 to COMAR 26.03.05</annotation>
    </annotations>
  </chapter>
  <chapter num="06" heading="Stormwater Pollution Control Cost-Share Program">
    <regulation prefix="Regulation" num=".01" heading="General.">
      <text>These regulations establish the State's cost-sharing program to assist local governments in installing certain stormwater pollution control practices intended to protect, restore, and improve the water quality of the Chesapeake Bay and other waters of the State by reducing water pollution from stormwater runoff in existing urbanized areas.</text>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="Definitions.">
      <paragraph num="A.">
        <text>In this chapter, the following terms have the meanings indicated.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Terms Defined.</text>
        <paragraph num="(1)">
          <text>“Agreement” means a legally binding contract which governs each grant awarded under this program.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>“Applicant” means a county or incorporated municipality.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>“Department” means the Department of the Environment.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>“Grant” means the funds transferred under this program for financial assistance which do not have to be repaid.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>“Includes or including” means includes by way of illustration and not by way of limitation.</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Project.</text>
          <paragraph num="(a)">
            <text>“Project” means a structural or nonstructural measure or a combination of measures which work as a unit to reduce water pollution from stormwater runoff on one or more properties.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>“Project” includes feasibility studies and the design and monitoring of a structural or nonstructural measure or measures to reduce stormwater pollution.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(7)">
          <text>“Secretary” means the Secretary of the Environment.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".03" heading="General Provisions.">
      <paragraph num="A.">
        <text>A grant awarded under this regulation may not exceed:</text>
        <paragraph num="(1)">
          <text>Seventy-five percent of the total project cost; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>$500,000.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>A grant may be used for construction on privately-owned property if:</text>
        <paragraph num="(1)">
          <text>Necessary for the purpose of the project; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>An agreement has been made with the property owner and the applicant.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>The proposed grant and the related project shall be subject to State Clearinghouse review procedures.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".04" heading="Applicant Eligibility.">
      <text>An applicant is eligible to apply for financial assistance for one or more projects if the following conditions are fulfilled:</text>
      <paragraph num="A.">
        <text>The applicant shall be a county or an incorporated municipality in Maryland;</text>
      </paragraph>
      <paragraph num="B.">
        <text>The applicant shall submit evidence which demonstrates that the project will:</text>
        <paragraph num="(1)">
          <text>Provide pollutant reduction benefits for the stormwater which it handles,</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Handle stormwater generated primarily from existing residential, commercial, industrial, or institutional use.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".05" heading="Selection Criteria and Priority System Establishment.">
      <paragraph num="A.">
        <text>The Department shall establish and maintain a stormwater pollution control project priority list.</text>
      </paragraph>
      <paragraph num="B.">
        <text>The selection criteria for grant awards shall provide the basis for developing the project priority list. These criteria shall include:</text>
        <paragraph num="(1)">
          <text>The local water quality impacts caused by existing stormwater runoff conditions;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Previous efforts expended to correct any existing stormwater problem;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The level of pollution control provided by a proposed project;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Over-all project cost;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>The applicant's ability and commitment to:</text>
          <paragraph num="(a)">
            <text>Inspect and review construction performance,</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Provide the 25 percent match through funds or in-kind services and fulfill all grant conditions,</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Assure accountability for all funds awarded;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(6)">
          <text>Innovative or alternative nature of the project;</text>
        </paragraph>
        <paragraph num="(7)">
          <text>Public visibility of the completed project.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".06" heading="Preapplication Procedures.">
      <paragraph num="A.">
        <text>The applicant shall complete a preapplication form supplied by the Department which shall include:</text>
        <paragraph num="(1)">
          <text>Type and general description of the stormwater pollution control practice to be used;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Project location, existing and proposed land use, ownership, drainage area, topography, and soil characteristics;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Approximate cost, based on accepted engineering judgment;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Approximate project implementation schedule;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Location of any water supply in immediate vicinity;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Adjacent watercourse and structures.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>The applicant shall forward the preauthorization form to the Department within 60 days of the adoption of this regulation.</text>
      </paragraph>
      <paragraph num="C.">
        <text>Within 45 days after the receipt of the preapplication form, the Department shall notify the applicant as to whether its preapplication is approved or disapproved.</text>
      </paragraph>
      <paragraph num="D.">
        <text>Departmental approval of the preapplication form assures placement on the priority list, although not necessarily within the fundable range.</text>
      </paragraph>
      <paragraph num="E.">
        <text>If the preapplication is approved, the applicant will be notified of the project's position on the priority list and the availability of funding.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".07" heading="Application Procedures.">
      <text>Upon receiving written notice by the Department as to the availability of funding for a particular project, the applicant shall submit within 30 days an application which includes:</text>
      <paragraph num="A.">
        <text>A final schedule for the completion of the project which sets out significant milestones and the dates for the preparation of design plans and specifications;</text>
      </paragraph>
      <paragraph num="B.">
        <text>All design, construction, maintenance, and other plans, and the final cost estimates of the project in accordance with the final schedule.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".08" heading="Technical Design Review.">
      <paragraph num="A.">
        <text>The Department, upon receipt of the application, shall prepare a technical project review.</text>
      </paragraph>
      <paragraph num="B.">
        <text>The Department shall submit copies of the technical project review to the State Clearinghouse.</text>
      </paragraph>
      <paragraph num="C.">
        <text>The applicant, upon receipt of the technical project review comments and State Clearinghouse recommendations, shall respond to all comments and recommendations.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".09" heading="Cost-Sharing Agreement.">
      <paragraph num="A.">
        <text>The project summary report of each approved project will be prepared by the Department and submitted to the Board of Public Works. Upon approval by the Board of Public Works, the Department shall execute an agreement with the applicant. The agreement shall require the applicant to do the following:</text>
        <paragraph num="(1)">
          <text>Establish, construct, or install the stormwater pollution control practices in accordance with the technical design standards and plans submitted to and approved by the Department;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Secure all necessary local, State, or federal permits;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Maintain the project for at least 15 years in the manner necessary to obtain the intended water quality benefits;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>If constructed on private property, bind any successor in title, for the term of the project as specified in the agreement; and</text>
        </paragraph>
        <paragraph num="(5)">
          <text>If requested, grant the Department a security interest in any equipment or similar item purchased with State stormwater pollution control cost-sharing funds.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>If the project is constructed on private property, the applicant shall obtain all necessary legal agreements with the private property owner before the Department executes a cost-sharing agreement with the applicant.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".10" heading="Project Execution.">
      <paragraph num="A.">
        <text>After all parties execute the cost-share agreement, the applicant shall begin the approved project.</text>
      </paragraph>
      <paragraph num="B.">
        <text>The applicant shall submit monthly progress reports to the Department. Failure to adhere to the approved project schedule may result in the withdrawal of cost-share funds by the Department.</text>
      </paragraph>
      <paragraph num="C.">
        <text>The Department may inspect the construction or installation of a project to ensure that it complies with the technical design specifications approved by the Department.</text>
      </paragraph>
      <paragraph num="D.">
        <text>The applicant shall agree to:</text>
        <paragraph num="(1)">
          <text>Permit the inspection of the construction site; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Assist State employees in making inspections.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".11" heading="Distribution of Stormwater Management Cost-Sharing Funds.">
      <paragraph num="A.">
        <text>Payment may be made in total or incrementally at the discretion of the Department. The nature of payment will be specified in the executed cost-share agreement.</text>
      </paragraph>
      <paragraph num="B.">
        <text>The Department shall authorize payment to reimburse the applicant if it has determined that all of the following conditions have been met:</text>
        <paragraph num="(1)">
          <text>The applicant has submitted an itemized statement for the portion of the project for which it requests payment.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The itemized statement is supported by payment receipts or unpaid invoices from vendors.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The applicant signs each receipt and certifies that the invoice is true and correct to the best of his knowledge. Each receipt for payment or invoice shall show:</text>
          <paragraph num="(a)">
            <text>Vendor names;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Type of material, labor, or equipment supplied; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The unit cost paid for each item, the total number of units, and the total amount paid to each vendor.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>The total amount of any claim for payment shall be shown clearly on a separate line on the face of the receipt. Items which were not used on the approved project shall be noted and the total adjusted on any receipt or invoice submitted to the Department.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>The Department had determined that the project has been installed or initiated, whichever applies under the terms of the cost-share agreement, or in the case of equipment, structures, or similar items, that it has been received and properly installed by the applicant.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>The applicant shall certify to the Department with the seal and signature of a Maryland Registered Professional Engineer that the project meets all applicable standards and specifications in the technical design before final payment is made.</text>
      </paragraph>
      <paragraph num="D.">
        <text>The applicant agrees not to authorize any significant extra work order or change order without the approval of the Department.</text>
      </paragraph>
      <paragraph num="E.">
        <text>The Department, at its discretion, may fund extra work or change orders. However, the cost of all extra work or change orders in excess of 5 percent of the grant or not authorized by the Department are the responsibility of the applicant.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".12" heading="Project Inspection.">
      <paragraph num="A.">
        <text>After the Department has distributed the grant funds for a project, the Department shall periodically inspect the project to ensure proper maintenance in conformance with the grant agreement.</text>
      </paragraph>
      <paragraph num="B.">
        <text>The applicant shall maintain a complete record of the maintenance inspections and overall performance of the project in accordance with procedures set forth in COMAR 26.09.02. The records will be available to the Department upon request.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".13" heading="Failure to Establish or Maintain Stormwater Management Cost-Sharing Projects.">
      <text>If the applicant fails to establish, install, construct, or maintain the stormwater management project in accordance with any agreement executed with the Department, the applicant shall be liable for the full amount of State stormwater management cost-sharing funds paid for the project. However, the applicant is not liable for adequate maintenance of the stormwater management project if damage is caused by an act of nature that could not be reasonably anticipated.</text>
    </regulation>
    <annotations>
      <annotation type="Authority">Environment Article, §§9-345 and 9-350, Annotated Code of Maryland</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: April 8, 1985 (12:7 Md. R. 707)</annotation>
      <annotation type="History" subtype="Administrative History">Chapter recodified from COMAR 10.50.05 to COMAR 26.03.06</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .02B amended effective November 20, 1994 (21:23 Md. R. 1937)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .05B amended effective November 20, 1994 (21:23 Md. R. 1937)</annotation>
    </annotations>
  </chapter>
  <chapter num="07" heading="Water Pollution Control Fund Construction Financial Assistance Regulations (Industrial User Section)">
    <regulation prefix="Regulation" num=".01" heading="Scope.">
      <text>The laws of Maryland have been amended by Laws of Maryland 1984, Chapter 795, codified at Environment Article, §§9-345—9-349, Annotated Code of Maryland, to allow financial assistance to industrial users for loans or loan guarantees for projects that provide pretreatment of pollutants that are discharged directly or indirectly into publicly owned treatment works or into any conveyance leading to a publicly owned treatment works.</text>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="Definitions.">
      <paragraph num="A.">
        <text>The following terms have the meanings indicated.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Terms Defined.</text>
        <paragraph num="(1)">
          <text>“Board” means the Water Science Advisory Board.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>“Department” means the Department of the Environment.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>“Discharge permit” means a permit issued by the Department for the discharge of any pollutant or combination of pollutants into the waters of this State.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>“Federal Clean Water Act” means the United States statute codified at 33 U.S.C. §§1251 et seq., as amended, and such regulations, policies, and guidelines as published from time to time pertaining to the Act.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>“Includes or including” means includes by way of example and not by limitation.</text>
        </paragraph>
        <paragraph num="(6)">
          <text>“Sewage” means any human or animal excretion, domestic waste, or industrial waste. Industrial waste, for the purpose of this regulation, means all water-carried solid, liquid, or gaseous wastes resulting from any process of industry, manufacturing, or trade, or from the development or recovery of any natural resource.</text>
        </paragraph>
        <paragraph num="(7)">
          <text>“Sewerage system”:</text>
          <paragraph num="(a)">
            <text>Means the channels used or intended to be used to collect or dispose of sewage;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Means structure and appurtenance used or intended to be used to collect or prepare sewage for discharge into the waters of the State;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Includes a sewer of any size; but</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Does not include the plumbing system inside a building served by the sewerage system.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".03" heading="General Provisions.">
      <paragraph num="A.">
        <text>The Department of the Environment and the Department of Housing and Community Development, in accordance with these regulations, may jointly award loans to industrial users for projects that provide for pretreatment of pollutants that are discharged directly or indirectly into publicly owned treatment works or into a conveyance leading to a publicly owned treatment works.</text>
      </paragraph>
      <paragraph num="B.">
        <text>An applicant for a loan shall:</text>
        <paragraph num="(1)">
          <text>Obtain applicable federal, State, and local permits, including construction, discharge, highway, waterway, and wetland permits;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Comply with other applicable federal and State laws before application to the Board of Public Works for the loan;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Maintain in force applicable permits as required by law; and</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Comply with applicable federal and State laws throughout the life of the loan.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".04" heading="Priority System.">
      <text>The State priority system for the award of loans shall be developed by the Department of the Environment, may be subjected to public hearings, and will result in a priority list which shall be used to award the financial assistance. The priority system shall take into account, as appropriate:</text>
      <paragraph num="A.">
        <text>The EPA National Pretreatment Standards, 40 CFR §403.6, which are incorporated by reference;</text>
      </paragraph>
      <paragraph num="B.">
        <text>The water quality or public health impacts of the existing circumstances;</text>
      </paragraph>
      <paragraph num="C.">
        <text>The problem prevention aspects of the proposed project;</text>
      </paragraph>
      <paragraph num="D.">
        <text>Previous efforts expended to correct an existing problem;</text>
      </paragraph>
      <paragraph num="E.">
        <text>The financial capacity of the applicant to repay the loan;</text>
      </paragraph>
      <paragraph num="F.">
        <text>Cost effectiveness of the proposed project;</text>
      </paragraph>
      <paragraph num="G.">
        <text>Planning requirements;</text>
      </paragraph>
      <paragraph num="H.">
        <text>Applicant's plans for monitoring and report; and</text>
      </paragraph>
      <paragraph num="I.">
        <text>Measures to assure accountability for loans.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".05" heading="Application Requirements.">
      <paragraph num="A.">
        <text>Preapplication to Establish Eligibility and Ranking. Anyone interested in applying for a loan shall submit to the Department of Housing and Community Development sufficient information, as indicated on the preapplication form, for the Department of Housing and Community Development and the Department of the Environment to determine tentative project eligibility, ranking, and cost and applicant financial capability.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Application After Eligibility and Ranking Determined. After the eligibility and ranking of potential applicants has been tentatively determined, a person tentatively determined to be eligible may apply to the Department of the Environment for a loan by submitting, in the number of copies directed by the Department of the Environment, the following:</text>
        <paragraph num="(1)">
          <text>An application on the form furnished by the Department of the Environment;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>A detailed narrative description of the project;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Plans and specifications for the project;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Schedule for construction of the project;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Description of the applicant's:</text>
          <paragraph num="(a)">
            <text>Management system for construction and operation of the project, and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Bookkeeping and accounting system for accounting for expenditures for construction of the project and repayment of the loan; and</text>
          </paragraph>
        </paragraph>
        <paragraph num="(6)">
          <text>A certification that the applicant for the loan is unable to obtain, on reasonable terms, sufficient credit to finance the applicant's actual needs without the loan.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".06" heading="Project Eligibility.">
      <paragraph num="A.">
        <text>A loan may not be awarded that will cause a project to be funded at a level exceeding 100 percent of the total project costs.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Loans may be awarded up to 100 percent of the eligible costs of the project.</text>
      </paragraph>
      <paragraph num="C.">
        <text>Loans may be made to refinance existing financing that has been already obtained at terms that are found to be not reasonable.</text>
      </paragraph>
      <paragraph num="D.">
        <text>Eligible Costs. Costs eligible for a loan are actual construction costs. In addition, at the discretion of the Department of the Environment, loans may be awarded to include some or all of the following supplementary project costs:</text>
        <paragraph num="(1)">
          <text>Reports;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Plans;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Specifications;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Rehabilitation and improvement of process facilities which will reduce the discharge of pollutants more effectively than the installation of additional pretreatment equipment.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".07" heading="Award of a Loan.">
      <text>The Department of the Environment may only approve a loan to industrial users for projects that provide pretreatment of pollutants that are discharged directly or indirectly into publicly owned treatment works if:</text>
      <paragraph num="A.">
        <text>The Secretary of Housing and Community Development determines that there is a reasonable assurance of repayment of the loan;</text>
      </paragraph>
      <paragraph num="B.">
        <text>The Secretary of Housing and Community Development determines that the applicant for a loan is unable to obtain, on reasonable term sufficient credit to finance the applicant's actual needs without the loan;</text>
      </paragraph>
      <paragraph num="C.">
        <text>The Department of the Environment determines that the project meets applicable technical standards and that cost estimates are reasonable and represent eligible cost;</text>
      </paragraph>
      <paragraph num="D.">
        <text>When the applicant does not own the property where the pretreatment project will be constructed, the landowner consents to the terms and conditions of the agreement;</text>
      </paragraph>
      <paragraph num="E.">
        <text>The Secretary of the Department of the Environment determines that the project will cost-effectively reduce the discharge of pollutants and improve water quality; and</text>
      </paragraph>
      <paragraph num="F.">
        <text>The loan:</text>
        <paragraph num="(1)">
          <text>Bears at least the same rate of interest as the most recent State general obligation bond sale preceding the date of approval by the Board of Public Works;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Shall be repaid within 30 years; and</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Does not exceed, as an aggregate principal amount to a single applicant in a calendar year, $500,000, unless the Board of Public Works determines that extraordinary circumstances exist.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".08" heading="Conditions of Loan Agreements.">
      <text>Loan agreements shall include:</text>
      <paragraph num="A.">
        <text>Specification of the purpose, amount, manner of repayment, and other conditions required by the Board of Public Works;</text>
      </paragraph>
      <paragraph num="B.">
        <text>The obligation of the applicant to:</text>
        <paragraph num="(1)">
          <text>Construct, install, and operate the pretreatment project in a manner which ensures compliance with pretreatment requirements and technical specifications;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Maintain the project for its expected life span;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Bind a successor in interest;</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>On loans over $2,500, a granting to the State of a security interest specified by the Department of the Environment in equipment, structures, or property purchased in whole or part with State monies.</text>
      </paragraph>
    </regulation>
    <annotations>
      <annotation type="Authority">Environment Article, §§9-345—9-349, Annotated Code of Maryland</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: April 21, 1986 (13:8 Md. R. 900)</annotation>
      <annotation type="History" subtype="Administrative History">Chapter recodified from COMAR 10.50.06 to COMAR 26.03.07</annotation>
    </annotations>
  </chapter>
  <chapter num="08" heading="Water Pollution Control Fund Construction Financial Assistance Regulations (State and Local Government Section)">
    <regulation prefix="Regulation" num=".01" heading="Scope.">
      <text>The laws of Maryland have been amended to allow financial assistance to State and local governmental entities in the form of grants and loans for projects that provide protection, restoration, and improvement of the quality of the waters of the State.</text>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="Definitions.">
      <paragraph num="A.">
        <text>“Applicant” means any State or local governmental entity.</text>
      </paragraph>
      <paragraph num="B.">
        <text>“Board” means the Water Science Advisory Board.</text>
      </paragraph>
      <paragraph num="C.">
        <text>“Department” means the Department of the Environment.</text>
      </paragraph>
      <paragraph num="D.">
        <text>“Discharge permit” means a permit issued by the Department for the discharge of any pollutant or combination of pollutants into the waters of this State.</text>
      </paragraph>
      <paragraph num="E.">
        <text>“Federal Clean Water Act” means the United States of America, Statute 33 U.S.C. 1251 et seq., as amended and such regulations, policies and guidelines as published from time to time pertaining to the Act.</text>
      </paragraph>
      <paragraph num="F.">
        <text>“House connection” means the sewerage system from the “Y” branch on the lateral sewer to the building lot property line.</text>
      </paragraph>
      <paragraph num="G.">
        <text>“Includes or including” means includes by way of example and not by limitation.</text>
      </paragraph>
      <paragraph num="H.">
        <text>“Project schedule” means a listing of significant events in the anticipated order of time of execution to ensure the orderly and timely progression and completion of a project.</text>
      </paragraph>
      <paragraph num="I.">
        <text>“Sewage” means any human or animal excretion, domestic waste, or industrial waste.</text>
      </paragraph>
      <paragraph num="J.">
        <text>“Sewerage system” means the channels used or intended to be used to collect or dispose of sewage, and any structure or appurtenance used or intended to be used to collect or prepare sewage for discharge into the waters of the State. This includes any sewer of any size, but does not include the plumbing system inside any building served by the sewerage system.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".03" heading="General Provisions.">
      <paragraph num="A.">
        <text>Financial Assistance for Control of Nonpoint Sources of Agriculturally Related Water Pollution.</text>
        <paragraph num="(1)">
          <text>Except for the provisions promulgated in §A(2)—(4), of this regulation, all requirements for State financial assistance for control of nonpoint sources of agriculturally related water pollution are contained in the Department of Agriculture's regulations, COMAR 15.01.05.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Notwithstanding limitations in the percent of eligible costs set forth in COMAR 15.01.05, grants awarded to governmental entities or for projects on State-owned land may be awarded for up to 100 percent of the total eligible cost of a project.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>In awarding the grants, the Department will consider both the applicant's financial capability to cost share and any resultant economic benefit in determining the extent of any matching dollar amount.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>The Department shall award the grants only after prior consultation with the Secretary of Agriculture.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>The Board of Public Works, upon recommendation made by the Department of the Environment in accordance with these regulations, may award grants or loans to State and local governmental entities for the eligible costs of projects that will provide protection, restoration, and improvement of the quality of the waters of the State. The Department, in consultation with the Secretaries of State Planning, Natural Resources, Agriculture, and Housing and Community Development, shall establish priority systems for determining which projects shall receive financial assistance.</text>
      </paragraph>
      <paragraph num="C.">
        <text>An applicant shall obtain all applicable federal, State, and local permits, including construction, discharge, highway, waterway and wetland permits, and comply with all other applicable federal and State laws before application to the Board of Public Works for the grant or loan. Initiation of construction before approval of the Board of Public Works may disqualify the project for financial assistance.</text>
      </paragraph>
      <paragraph num="D.">
        <text>The proposed project shall be subject to State Clearinghouse review procedures found in COMAR 16.02.01 at the preapplication stage and again at the application stage if there is a substantial change in the scope of the project.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".04" heading="Priority System.">
      <paragraph num="A.">
        <text>The State priority system for the award of financial assistance shall be developed by the Department, may be subjected to public hearings and will result in a priority list which shall be used to award the financial assistance. The priority system shall take into account, as appropriate:</text>
        <paragraph num="(1)">
          <text>The water quality or public health impacts of the existing circumstances;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The problem prevention aspects of the proposed project;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Previous efforts expended to correct any existing problem;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>The financial capacity of the applicant;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Cost effectiveness of a proposed project;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Planning requirements;</text>
        </paragraph>
        <paragraph num="(7)">
          <text>Applicant's plans for monitoring and review; and</text>
        </paragraph>
        <paragraph num="(8)">
          <text>Measures to assure accountability for all financial assistance.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Based on the priority system, the Department of the Environment shall develop a priority list of projects.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".05" heading="Application Requirements.">
      <paragraph num="A.">
        <text>Preapplication to Establish Eligibility and Ranking. Anyone interested in applying for financial assistance shall submit to the Department on the form provided by the Department sufficient information for the Department to determine tentative project eligibility and priority ranking, financial capability, preliminary cost estimates, and certification that the project is consistent with the County Water and Sewer Plan. Projects applying for financial assistance under the Federal Clean Water Act shall be submitted annually on or about June 1.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Application after Eligibility and Ranking Determined. After the eligibility and ranking of potential applicants has been tentatively determined, any person tentatively determined to be eligible may apply to the Department of the Environment for financial assistance by submitting, in the number of copies directed by the Department of the Environment, the following:</text>
        <paragraph num="(1)">
          <text>For projects applying for financial assistance under the Clean Water Act, the requirements are contained in 40 CFR §35.2040 which is incorporated by reference.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>For projects applying for financial assistance for chlorine removal, nitrogen removal, special water quality needs or public health needs:</text>
          <paragraph num="(a)">
            <text>An application on the form furnished by the Department.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>A report on the feasibility of the project.</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Clearinghouse review and comment.</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Certification of consistency with the County Water and Sewer Plan.</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Project schedule.</text>
          </paragraph>
          <paragraph num="(f)">
            <text>When required by the Department, approved plans and specifications.</text>
          </paragraph>
          <paragraph num="(g)">
            <text>A certification that other fund sources are not available or are insufficient for the proposed project. The certification shall be accompanied by evidence of financial inability to fund the project and a description of efforts expended to obtain funds from other governmental and private entities.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".06" heading="Project Eligibility.">
      <paragraph num="A.">
        <text>Financial assistance may not be awarded that will cause a project to be funded at a level exceeding 100 percent of the total project cost.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Combined State and federal financial assistance normally may not exceed 87-1/2 percent of the federally eligible cost of a project except grants may be awarded for up to 96-1/4 percent of the eligible cost of projects which contain innovative or alternative technology as define in the Clean Water Act and up to 100 percent of the eligible costs of projects undertaken for chlorine removal, nitrogen removal, existing special water quality needs or public health needs, constructing, equipping, rehabilitating and improving sewerage systems at a State-owned institution or facility.</text>
      </paragraph>
      <paragraph num="C.">
        <text>State financial assistance in the form of loans shall be as set forth in Regulation .07 of this chapter.</text>
      </paragraph>
      <paragraph num="D.">
        <text>Eligible Cost.</text>
        <paragraph num="(1)">
          <text>Costs eligible for combined federal and State grants shall be as specified in the Clean Water Act.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Costs eligible for State grants or loans are actual construction-related costs. In addition the following may, in the discretion of the Department of the Environment, be awarded to include some or all of the following supplementary project costs:</text>
          <paragraph num="(a)">
            <text>Reports;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Plans;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Specifications;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Legal and administrative services;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Equipment;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Rehabilitation or improvement;</text>
          </paragraph>
          <paragraph num="(g)">
            <text>Acquisition of interest in land;</text>
          </paragraph>
          <paragraph num="(h)">
            <text>Acquisition of interest in easements; and</text>
          </paragraph>
          <paragraph num="(i)">
            <text>Acquisition of rights-of-way.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>Eligibility of supplementary costs will be determined by the Department based on the financial capability of the applicant to bear the additional cost. State financial assistance for supplementary costs may be in the form of a loan.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Ordinary cost of government such as salaries and expenses of elected and appointed officials, and other staff, except as may be eligible on federally funded projects, preparation of routine financial reports and studies and development of sewer-use ordinances are not eligible.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".07" heading="Special Requirements.">
      <paragraph num="A.">
        <text>A reserve fund shall be established for grant and loan amendments to meet cost increases.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Loans:</text>
        <paragraph num="(1)">
          <text>Shall bear at least the same rate of interest as the most recent State general obligation bond sale preceding the date of approval by the Board of Public Works;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Shall be repaid within 30 years;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>May not exceed $500,000 as an aggregate principal amount to a single applicant in any calendar year, unless the Board of Public Works determines that extraordinary circumstances exist.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Loan agreements shall include specification of the purpose, amount, manner of repayment, the obligation of the applicant to construct, install and operate the project in a manner which ensures compliance with all contract documents and the discharge permit, maintain the project for its expected life span, and any other condition required by the Board of Public Works.</text>
      </paragraph>
      <paragraph num="D.">
        <text>Authorization of payments of State funds may be made by the Department of the Environment only in accordance with policy and procedures of the Board of Public Works.</text>
      </paragraph>
    </regulation>
    <annotations>
      <annotation type="Authority">Environment Article, §§9-302, 9-345--350; Agriculture Article, §8-701; Annotated Code of Maryland</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: April 21, 1986 (13:8 Md. R. 901)</annotation>
      <annotation type="History" subtype="Administrative History">Chapter recodified from COMAR 10.50.07 to COMAR 26.03.08</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .01 amended effective August 6, 1990 (17:15 Md. R. 1863)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .03 amended effective August 6, 1990 (17:15 Md. R. 1863)</annotation>
    </annotations>
  </chapter>
  <chapter num="09" heading="Water Supply Construction Financial Assistance Regulations">
    <regulation prefix="Regulation" num=".01" heading="Scope.">
      <text>Sections 5(b) and 5(c) of Chapter 306, Acts of 1982, Laws of Maryland, authorizes the Board of Public Works to award financial assistance to State and local governmental entities for the purpose of assisting in the acquisition, construction, equipping, rehabilitation, and improvement of water supply facilities where these projects are critical to public health or necessary to assure compliance with Safe Drinking Water Requirements.</text>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="Definitions.">
      <paragraph num="A.">
        <text>“Applicant” means any State or local governmental entity.</text>
      </paragraph>
      <paragraph num="B.">
        <text>“Construction” means the physical installation of any new water supply facility, or the upgrading or rehabilitation of any existing water supply facility.</text>
      </paragraph>
      <paragraph num="C.">
        <text>“Department” means the Department of the Environment.</text>
      </paragraph>
      <paragraph num="D.">
        <text>“Financial assistance” means State grants, loans, or loan guarantees.</text>
      </paragraph>
      <paragraph num="E.">
        <text>“Local governmental entity” includes a county, municipality, sanitary commission, and local or regional water authority.</text>
      </paragraph>
      <paragraph num="F.">
        <text>“Secretary” means the Secretary of the Environment.</text>
      </paragraph>
      <paragraph num="G.">
        <text>“Significant change order” means one which introduces a new element or goal in the approved water facility project. It may consist of a change in treatment capacity or flow capacity, a different area to be served, the purchase of equipment not contemplated in the original contract, or the substitution of a piece of equipment by another which has a capability greater or less than that originally specified. The dollar amount of the change may not be the sole determining factor as to whether or not a change order significantly alters the project.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".03" heading="General Provisions.">
      <paragraph num="A.">
        <text>Funds available under this program are intended to be used as a last resort measure to assist regional and local governmental agencies in solving water supply system inadequacies, when it can be demonstrated that the applicant has insufficient or limited financial capability to proceed with necessary construction projects.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Financial assistance is limited to State and local governmental entities. Eligible project costs are determined by the Department using principles set forth in Regulation .05 of this chapter.</text>
      </paragraph>
      <paragraph num="C.">
        <text>The Department shall use a project priority system in determining which projects will receive financial assistance.</text>
      </paragraph>
      <paragraph num="D.">
        <text>Financial assistance may only be provided up to a maximum of 87-1/2 percent of the eligible costs of the project.</text>
      </paragraph>
      <paragraph num="E.">
        <text>Project applications shall consist of a pre-application and final application, including documentation of need and such other information as may be required by the Department.</text>
      </paragraph>
      <paragraph num="F.">
        <text>A water facility construction permit, as required by the Environment Article, §9-204, Annotated Code of Maryland, shall be required before the Board of Public Works' consideration of financial assistance for construction of the project.</text>
      </paragraph>
      <paragraph num="G.">
        <text>The proposed project is subject to State Clearinghouse review procedures.</text>
      </paragraph>
      <paragraph num="H.">
        <text>The applicant shall follow all local bidding requirements. When local bidding requirements do not exist, bidding procedures satisfactory to the Board of Public Works shall be followed.</text>
      </paragraph>
      <paragraph num="I.">
        <text>A governmental entity receiving financial assistance under this chapter may not award a contract on a “cost-plus” basis.</text>
      </paragraph>
      <paragraph num="J.">
        <text>Any project for which State financial assistance is granted shall comply with all applicable State Law.</text>
      </paragraph>
      <paragraph num="K.">
        <text>The documents listed below are incorporated by reference. Each is available for public inspection at the appropriate office in each county, and in Baltimore City. The documents are:</text>
        <paragraph num="(1)">
          <text>Allegany County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Anne Arundel County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Baltimore County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Calvert County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Caroline County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Carroll County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(7)">
          <text>Cecil County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(8)">
          <text>Charles County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(9)">
          <text>Dorchester County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(10)">
          <text>Frederick County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(11)">
          <text>Garrett County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(12)">
          <text>Harford County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(13)">
          <text>Howard County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(14)">
          <text>Kent County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(15)">
          <text>Montgomery County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(16)">
          <text>Prince George's County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(17)">
          <text>Queen Anne's County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(18)">
          <text>St. Mary's County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(19)">
          <text>Somerset County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(20)">
          <text>Talbot County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(21)">
          <text>Washington County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(22)">
          <text>Wicomico County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(23)">
          <text>Worcester County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(24)">
          <text>Baltimore City Comprehensive Water and Sewerage Plan.</text>
        </paragraph>
      </paragraph>
      <paragraph num="L.">
        <text>Before the award of State financial assistance for construction, the need for facility construction or improvement shall be identified, and a project to meet that need shall be contained in the approved County Comprehensive Water and Sewerage Plan. The Department may also require a public hearing on the project, in addition to the public hearing required pursuant to adoption of the county water and sewerage plan.</text>
      </paragraph>
      <paragraph num="M.">
        <text>A water appropriation and use permit, as required by Natural Resources Article, §8-811, Annotated Code of Maryland, shall be required before the Board of Public Work's approval of financial assistance for construction of the project.</text>
      </paragraph>
      <paragraph num="N.">
        <text>Financial assistance may be approved by the Board of Public Works for community associations if the assistance is passed through a governmental entity. In these cases, a governmental entity shall be the responsible applicant. The Department shall require that the community association be incorporated and be responsible for financial and ownership requirements as are found necessary to assure continued, efficient, and effective operation of the system. The governmental entity shall agree to act as the agent for the community association in applying for financial assistance and shall be jointly responsible for complying with the terms of the grant or loan agreement.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".04" heading="Application Requirements.">
      <paragraph num="A.">
        <text>An applicant shall submit a pre-application which includes sufficient information for the Department to determine:</text>
        <paragraph num="(1)">
          <text>Project eligibility;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Priority ranking;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The extent to which funds will be available to support projects on the annual priority list.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Final Application. The Department shall require the applicant to submit, within 1 year, a final application when the project falls within the fundable range on the annual priority list. The Department may, at its discretion, extend the application deadline. The application shall contain any additional information the Department may require including:</text>
        <paragraph num="(1)">
          <text>Certification that the project is in conformance with the County Comprehensive Water and Sewerage Plan;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Copies of pertinent State construction permits;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Copies of design plans and specifications;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Studies and reports which demonstrate the engineering feasibility and cost effectiveness of projects where acquisition, equipment, and construction or any combination of these costs exceed $5,000;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Certification that all other requirements for eligibility found in Regulations .05 and .07 of this chapter are met; and</text>
        </paragraph>
        <paragraph num="(6)">
          <text>In addition to all other eligibility and special requirements, grant applicants may be required to demonstrate a plan of action that will provide for the future financial stability of the water supply system. The plan of action may include a rational rate structure, scheduled capital improvements, and assurances that sufficient funding will be available to provide for continued, efficient, and effective operation of the system.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>If the Department determines that under Regulation .05E, of this chapter, feasibility studies, planning, and plans and specifications are eligible for funding, the Department may petition the Board of Public Works for these funds before determining the extent to which the State may participate in providing financial assistance for construction.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".05" heading="Project Eligibility.">
      <paragraph num="A.">
        <text>The award of financial assistance may not cause a project to be funded at a level exceeding 100 percent of the total project costs.</text>
      </paragraph>
      <paragraph num="B.">
        <text>State financial assistance may not exceed 87-1/2 percent of the eligible cost of a project, except that in the case of a project to be undertaken by the Maryland Environmental Service, pursuant to an order issued by the Secretary, the State financial assistance may equal the total cost of the project less the amount of any federal grant application to project costs.</text>
      </paragraph>
      <paragraph num="C.">
        <text>The total amount of a State grant for any project may not exceed $1,500,000.</text>
      </paragraph>
      <paragraph num="D.">
        <text>Project Costs Eligible for Financial Assistance. Project costs which are eligible for financial assistance under this chapter may include:</text>
        <paragraph num="(1)">
          <text>The acquisition of facilities;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The construction of new facilities;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Additions to or modifications of existing facilities;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Equipment purchases;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Lands, easements, and rights-of-way; and</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Planning, design, and project administration.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".06" heading="Priority System.">
      <paragraph num="A.">
        <text>The Department shall annually rank applications for grant and loan assistance.</text>
      </paragraph>
      <paragraph num="B.">
        <text>The Department shall hold a public hearing, following public notification in the Maryland Register and the Department's web site regarding the annual priority list.</text>
      </paragraph>
      <paragraph num="C.">
        <text>Following the public hearing, the Department may change the rankings of projects based on public input.</text>
      </paragraph>
      <paragraph num="D.">
        <text>Projects Not on Annual Priority List. The Board of Public Works may award financial assistance for projects not included on the annual priority list, if it determines that:</text>
        <paragraph num="(1)">
          <text>The project arises out of an unanticipated immediate need; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Irreparable damage to the public health would result if the project is not constructed.</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Priority System.</text>
        <paragraph num="(1)">
          <text>The State priority system for the award of financial assistance shall be developed by the Department, may be subject to public hearings, and will result in a priority list that shall be used to award the financial assistance. The priority system shall take into account, as appropriate:</text>
          <paragraph num="(a)">
            <text>The public health benefits of the project;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The project's ability to comply with any mandatory legal requirements;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The environmental benefits, system reliability benefits, or both of the project;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>The project's compliance with water conservation requirements;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>The size of the community, with a preference given to small community projects; and</text>
          </paragraph>
          <paragraph num="(f)">
            <text>The financial, technical, and managerial capacity of the applicant.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Based on the priority system, the Department shall develop a priority list of projects.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".07" heading="Special Requirements.">
      <paragraph num="A.">
        <text>The Department annually shall establish a reserve fund to be used for grant and loan amendments in order to meet change orders, cost overruns, and emergency projects.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Financial assistance provided under this chapter may not be applied to projects whose construction was initiated before approval by the Board of Public Works.</text>
      </paragraph>
      <paragraph num="C.">
        <text>State Loans.</text>
        <paragraph num="(1)">
          <text>Loans for water supply facility projects shall bear the same rate of interest as the bonds from which the proceeds are used to provide the loan.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The loan shall be repaid within 30 years and the first payment shall be made at a time stipulated by the Board of Public Works.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Costs associated with the sale, administration, and registration of bonds may be included in the repayment schedule, as required by the Board of Public Works.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>State Loan Guarantees. A loan guarantee of the principal of, or interest on, any commercial loan or obligation to finance an eligible project may be made under the following conditions:</text>
        <paragraph num="(1)">
          <text>The applicant certifies that it is unable to obtain sufficient credit on reasonable terms to finance its actual needs without the guarantee; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The Board of Public Works determines that there is a reasonable assurance of repayment of the loan obligation.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".08" heading="Financial Agreement.">
      <paragraph num="A.">
        <text>Terms of Financial Agreement. The financial agreement required by the Board of Public Works as a condition of financial assistance shall include terms which:</text>
        <paragraph num="(1)">
          <text>Provide salvage rights by the State upon default of the applicant;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Require that the applicant maintain adequate accounting records and submit monthly accounting reports to the Department;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Describe the grant, loan, or loan guarantee payment and repayment schedules;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Provide that a project sign will be erected when total State participation in the project exceeds $10,000;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Require the applicant to follow all State and local environmental control laws in constructing the project;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Require the applicant to operate and maintain the water supply facility in accordance with applicable sections of Environment Article, Title 9, Annotated Code of Maryland;</text>
        </paragraph>
        <paragraph num="(7)">
          <text>Provide that the agreement may be voided by the Department if construction has not commenced within 6 months of the award for construction and, if voided, shall require the applicant to repay all funds with interest;</text>
        </paragraph>
        <paragraph num="(8)">
          <text>Require that all significant extra work orders or change orders be approved by the Department before the contractor is authorized to proceed and, upon approval, the applicant may request an amendment to the grant or loan agreement; and</text>
        </paragraph>
        <paragraph num="(9)">
          <text>Require that the applicant agree that the total amount of all change orders not exceed 5 percent of the original total award of financial assistance and that all costs exceeding this amount or costs not authorized by the Department are the responsibility of the applicant.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Financial agreements may also include any special conditions or requirements recommended by the Department and approved by the Board of Public Works.</text>
      </paragraph>
    </regulation>
    <annotations>
      <annotation type="Authority">Environment Article, §§9-404 and 9-420—9-426, Annotated Code of Maryland</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: December 19, 1983 (10:25 Md. R. 2269)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .05L adopted as an emergency provision effective August 17, 1984 (11:18 Md. R. 1582); emergency status expired December 15, 1984; adopted permanently effective December 17, 1984 (11:25 Md. R. 2134)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .05L amended effective July 15, 1985 (12:14 Md. R. 1432)</annotation>
      <annotation type="History" subtype="Administrative History">Chapter recodified from COMAR 10.17.12 to COMAR 26.03.09</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .05 amended effective October 6, 2008 (35:20 Md. R. 1776)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .05C amended as an emergency provision effective March 6, 1996 (23:7 Md. R. 550); emergency status expired June 28, 1996; amended permanently effective December 2, 1996 (23:24 Md. R. 1685)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .06 amended effective October 6, 2008 (35:20 Md. R. 1776)</annotation>
    </annotations>
  </chapter>
  <chapter num="10" heading="Financial Assistance for the Construction of Solid Waste Processing and Disposal Facilities">
    <regulation prefix="Regulation" num=".01" heading="Definitions.">
      <paragraph num="A.">
        <text>In this chapter, the following terms have the meanings indicated.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Terms Defined.</text>
        <paragraph num="(1)">
          <text>“Applicant” means a State or local governmental entity requesting financial assistance under this chapter.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>“Construction” means either physically installing a new solid waste processing or disposal facility, or rehabilitating or improving an existing facility.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>“Department” means the Maryland Department of the Environment.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>“Financial assistance” means grants, loans, or loan guarantees approved by the State's Board of Public Works.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>“Local governmental entity” means a county, municipality, sanitary commission, or a regional solid waste authority.</text>
        </paragraph>
        <paragraph num="(6)">
          <text>“Secretary” means the Secretary of the Environment.</text>
        </paragraph>
        <paragraph num="(7)">
          <text>“Solid waste disposal facility” means a sanitary landfill or any other facility which is used for the final disposal of solid waste.</text>
        </paragraph>
        <paragraph num="(8)">
          <text>“Solid waste processing facility” means an incinerator, transfer station, resource recovery plant, composting facility, or any other combination of structures, machinery, or devices used to reduce or alter the volume, chemical characteristics, or physical characteristics of solid waste before disposal or use.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="General Provisions.">
      <paragraph num="A.">
        <text>Funds available under this program are intended to be used as a last resort measure to assist regional and local governmental entities in solving solid waste disposal or processing system inadequacies, when it can be demonstrated that the applicant has insufficient or limited financial capability to proceed with necessary construction projects.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Financial assistance under this chapter shall be limited to:</text>
        <paragraph num="(1)">
          <text>Projects involving solid waste processing or disposal facilities;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>State and local governmental entities; and</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Not more than 87-1/2 percent of eligible project costs.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>A project may receive financial assistance under this chapter if:</text>
        <paragraph num="(1)">
          <text>The project is in conformance with the approved county solid waste management plan;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>A public hearing required by the Department on the project has been held, in addition to a hearing held before the adoption of the solid waste management plan; and</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The project conforms with other applicable State and federal requirements.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Proposed projects are subject to State Clearinghouse review procedures in accordance with COMAR 16.02.01. Each project which the Department submits to the Board of Public Works for financial assistance approval shall be accompanied by the comments from the Clearinghouse's intergovernmental review process.</text>
      </paragraph>
      <paragraph num="E.">
        <text>The award of State financial assistance may not cause project funding to exceed 100 percent of the total project costs.</text>
      </paragraph>
      <paragraph num="F.">
        <text>State assistance may not exceed 87-1/2 percent of eligible project costs as described in Regulation .03, of this regulation. For a project undertaken by the Maryland Environmental Service, pursuant to an order by the Secretary, eligible costs shall be as authorized under Natural Resources Article, §3-101(b), Annotated Code of Maryland, as amended.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".03" heading="Project Eligibility.">
      <paragraph num="A.">
        <text>Project costs which are eligible for financial assistance under this chapter may include:</text>
        <paragraph num="(1)">
          <text>The acquisition of new facilities;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The construction of new facilities;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Additions to, or modifications of, existing facilities;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Equipment purchases; and</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Lands, easements, and rights-of-way.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Project costs which may not be funded, except as provided for in §C, of this regulation, include:</text>
        <paragraph num="(1)">
          <text>Feasibility studies;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Planning;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Administrative costs and overhead; or</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Plans and specifications.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Project costs outlined in §B, of this regulation, may be funded if the:</text>
        <paragraph num="(1)">
          <text>Secretary determines that the applicant does not have the financial capability to produce the necessary feasibility studies, plans, and specifications; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Applicant is requesting financial assistance in the form of a loan or a loan guarantee.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>The award of a loan or loan guarantee does not eliminate the requirement that the applicant obtain all required permits for a solid waste processing or disposal facility. The applicant shall remain liable for repayment of all applicable loans regardless of whether a permit is issued or the facility becomes operational.</text>
      </paragraph>
      <paragraph num="E.">
        <text>Allowances. The additional costs permitted in §C, of this regulation, may not exceed the percent of the total project cost as interpolated from Tables 1 and 2. State participation for these costs shall require a bona fide commitment from the applicant that construction of the proposed project will begin within 2 years.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".04" heading="Applications for Assistance.">
      <paragraph num="A.">
        <text>Applications for assistance under this chapter shall consist of two parts, the preliminary application and the final application. They shall include documentation of need and such other information as may be required by the Department.</text>
      </paragraph>
      <paragraph num="B.">
        <text>The preliminary application shall be submitted to the Department (who shall submit it to the State Clearinghouse) and shall include sufficient information for the Department to determine the following:</text>
        <paragraph num="(1)">
          <text>Project eligibility;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Project need and priority ranking;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Financial capability of the applicant; and</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Previous attempts by the applicant to fund the project using other resources.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>If the project falls within the fundable range of the annual priority list, the Department shall require that the applicant submit a final application which includes:</text>
        <paragraph num="(1)">
          <text>Certification that the project is consistent with the appropriate approved county solid waste management plan;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Certification by the applicant to the Board of Public Works that:</text>
          <paragraph num="(a)">
            <text>Other sources of funding are either unavailable or insufficient for the proposed project; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Federal grants for the project are not jeopardized by the award of State financial assistance by the Board of Public Works;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>Certification of the applicant's inability to fund the proposed project; and</text>
        </paragraph>
        <paragraph num="(4)">
          <text>For applications which include the cost of construction:</text>
          <paragraph num="(a)">
            <text>Copies of pertinent State construction permits;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Copies of design plans and specifications; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Studies and reports which demonstrate the engineering feasibility and cost-effectiveness of projects.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".05" heading="Priority List and Ranking System.">
      <paragraph num="A.">
        <text>The Department, once a year, shall rank separately applications for grants, loans, and loan guarantees. The Department shall consider the comments and recommendations provided by the State Clearinghouse's intergovernmental review in the ranking process.</text>
      </paragraph>
      <paragraph num="B.">
        <text>The Department shall provide adequate notice and opportunity for public comment concerning the annual priority list.</text>
      </paragraph>
      <paragraph num="C.">
        <text>The Department may change the ranking of projects as a result of public comment.</text>
      </paragraph>
      <paragraph num="D.">
        <text>Upon recommendation of the Secretary, the Board of Public Works may award financial assistance for projects not included on the annual priority list, if it determines that:</text>
        <paragraph num="(1)">
          <text>The project is the result of an unanticipated immediate need; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Serious damage to public health or the environment would result if approval of the project is delayed until after the next annual priority list is prepared.</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Priority Rankings.</text>
        <paragraph num="(1)">
          <text>Priority rankings shall be determined by a scoring system based on weighted scores. Highest scores will receive the highest priority ranking.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>If a tie exists, preference shall be given to correction of the most severe public health or environmental problem as determined by the Department.</text>
        </paragraph>
      </paragraph>
      <paragraph num="F.">
        <text>Scoring System. Scores assigned to each category are as follows:</text>
        <paragraph num="(1)">
          <text>Category I--Public Health and Environmental Impacts (Points Available in Each Sub-Category).</text>
          <paragraph num="(a)">
            <text>Facility described in the application for assistance is:</text>
            <paragraph num="(i)">
              <text>Causing an increase in waters of the State, of at least one order of magnitude in any three key chemical parameters, as specified by the Department; or</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Not in compliance with 40 CFR §257.3-3, which is incorporated by reference.  Maximum points under §F(1) of this regulation ----------------------------------- 100.</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>Facility is not in compliance with at least one of the criteria in 40 CFR 257 (except part 257.3-3), 10 points for each criterion listed there, maximum of ------------ 100.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Category II — Problem Prevention (Points Available in Each Sub-Category).</text>
          <paragraph num="(a)">
            <text>Aggregate life of all solid waste disposal facilities within the applicant's jurisdiction is less than 3 years for the principal type of solid waste to be accepted at the</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The percentage of the jurisdiction's solid waste disposal capacity provided by the facility described in the application for assistance is:</text>
            <paragraph num="(i)">
              <text>75—100 ---------------------------------------------- 100,</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>50—74 ----------------------------------------------- 75,</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Less than 50 ---------------------------------------- 50;</text>
            </paragraph>
          </paragraph>
          <paragraph num="(c)">
            <text>The percentage of the jurisdiction's solid waste processing capacity provided by the facility described in the application for assistance is:</text>
            <paragraph num="(i)">
              <text>75—100 ----------------------------------------------- 75,</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>50—74 ----------------------------------------------- 50,</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Less than 50 ---------------------------------------- 25.</text>
            </paragraph>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>Category III — Previous Efforts by the Applicant to Solve the Problem (Points Available in Each Sub-Category). Points will be assigned to reflect previous efforts made by the applicant to correct the problem as follows:</text>
          <paragraph num="(a)">
            <text>Development of scope of work ---------------------------- 20;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Preparation of plans and specifications ----------------- 20;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Certification by applicant that federal, local, and private funding sources have been solicited ------------------- 40;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Certification by applicant that equipment has been purchased or reasonable attempts have been made to effect the necessary improvements ------------------------------ 20.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>Category IV — Applicant's Financial Capability. The financial capability of applicants will be assessed based on a comparison of median household income within the total areas to be served. Points will be assigned as follows:</text>
          <paragraph num="(a)">
            <text>Application is for loan guarantee ----------------------- 25.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Table 3. Financial Capability.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="G.">
        <text>Ordinary operating expenses of local government, for example, salaries, are not eligible for funding under this chapter.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".06" heading="Allocation of Funds.">
      <text>The Department annually shall allocate available funds as described below:</text>
      <paragraph num="A.">
        <text>Up to 10 percent of the funds shall be placed in a reserve fund for emergency projects and for grant amendments and loan or loan guarantee increases necessitated by change orders and cost overruns;</text>
      </paragraph>
      <paragraph num="B.">
        <text>Not more than 25 percent of the funds not reserved under §A, of this regulation, shall be set aside for grants; and</text>
      </paragraph>
      <paragraph num="C.">
        <text>Funds remaining after the reserve fund and grant fund are established shall be used for loans and loan guarantees.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".07" heading="Financial Agreement.">
      <paragraph num="A.">
        <text>Approval by the Board of Public Works of financial assistance shall be conditioned upon the execution of a suitable financial agreement between the State and the applicant.</text>
      </paragraph>
      <paragraph num="B.">
        <text>The financial agreement required by the Board of Public Works as a condition of financial assistance shall include terms which:</text>
        <paragraph num="(1)">
          <text>Provide salvage rights by the State upon default of the applicant;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Require the applicant to maintain accounting records and submit monthly accounting reports to the Department;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Describe the grant, loan, or loan guarantee payment and repayment schedules;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Provide that a project sign will be erected when total State participation in the project exceeds $10,000;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Require the applicant to follow all State environmental control laws and regulations in constructing the project;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Require the applicant to operate and maintain the facility in accordance with Environment Article, Title 7, Subtitle 2 or §9-204, Annotated Code of Maryland;</text>
        </paragraph>
        <paragraph num="(7)">
          <text>Provide that the agreement may be voided by the Department if construction has not begun within 6 months of the award of financial assistance and, if voided, shall require the applicant to repay all previously awarded funds with interest;</text>
        </paragraph>
        <paragraph num="(8)">
          <text>Require that extra work orders or change orders be approved by the Department before the contractor is authorized to proceed, and upon approval, the applicant may request an amendment to the grant or loan agreements; and</text>
        </paragraph>
        <paragraph num="(9)">
          <text>Require the applicant to accept responsibility for costs which exceed 5 percent of the original total award for assistance, unless change orders have been authorized by the Department under §B(8), of this regulation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Financial agreements may also include special conditions or requirements recommended by the Department and approved by the Board of Public Works.</text>
      </paragraph>
      <paragraph num="D.">
        <text>The applicant shall follow local bidding requirements. If local bidding requirements do not exist, bidding procedures satisfactory to the Board of Public Works shall be followed.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".08" heading="Special Requirements.">
      <paragraph num="A.">
        <text>A governmental entity receiving financial assistance under this chapter may not award a contract on a cost-plus basis.</text>
      </paragraph>
      <paragraph num="B.">
        <text>The following conditions apply to loans approved under this chapter:</text>
        <paragraph num="(1)">
          <text>Loans shall bear the same rate of interest as the bonds from which the proceeds are used to provide the loan. Costs associated with the sale of bonds may be included in the repayment schedule as required by the Board of Public Works;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The loan shall be repaid within 30 years and the first payment shall be made at a time stipulated by the Board of Public Works.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>A loan guarantee of the principal of, or interest on, any commercial loan or obligation to finance an eligible project may be made only if the:</text>
        <paragraph num="(1)">
          <text>Applicant certifies that it is unable to obtain sufficient credit on reasonable terms to finance its actual needs without a guarantee; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Board of Public Works determines that there is a reasonable assurance of repayment of the loan obligation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Financial assistance provided under this chapter may not be applied to projects whose construction was initiated before approval by the Board of Public Works.</text>
      </paragraph>
    </regulation>
    <annotations>
      <annotation type="Authority">Chapter 306, Acts of 1982, Laws of Maryland</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: August 12, 1985 (12:16 Md. R. 1606)</annotation>
      <annotation type="History" subtype="Administrative History">Chapter recodified from COMAR 10.17.14 to CIMAR 26.03.10</annotation>
    </annotations>
  </chapter>
  <chapter num="11" heading="Environmental Review Procedures for Facilities Receiving Financial Assistance from the Maryland Water Quality Financing Administration">
    <regulation prefix="Regulation" num=".01" heading="Purpose and Policy.">
      <paragraph num="A.">
        <text>This chapter specifies the procedures for the review of projects funded through the Maryland Water Quality Financing Administration for impacts on the human and natural environment.</text>
      </paragraph>
      <paragraph num="B.">
        <text>The regulations establish the Department's policy and procedures for identifying and analyzing environmental impacts of proposed projects.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="Definitions.">
      <paragraph num="A.">
        <text>In this chapter, the following terms have the meanings indicated.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Terms Defined.</text>
        <paragraph num="(1)">
          <text>“Applicant” means a local government as defined in Environment Article, §9-1601, Annotated Code of Maryland, or other person that desires to construct a project, and that has applied for a loan pursuant to Environment Article, Title 9, Subtitle 16, Annotated Code of Maryland.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>“Categorical exclusion” is a determination by the Department of categories of projects that do not have a significant effect on the environment.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>“Department” means the Maryland Department of the Environment.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>“EID” means an environmental information document.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>“EIS” means an environmental impact statement.</text>
        </paragraph>
        <paragraph num="(6)">
          <text>“FNSI” means a finding of no significant impact.</text>
        </paragraph>
        <paragraph num="(7)">
          <text>“Loan agreement” means a written agreement between the Maryland Water Quality Financing Administration and an applicant with respect to a loan.</text>
        </paragraph>
        <paragraph num="(8)">
          <text>“Project” means a project for the construction of a facility, as defined under Environment Article, §9-1601, Annotated Code of Maryland, which is financed, in whole or in part, by the Maryland Water Quality Financing Administration.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".03" heading="Applicability.">
      <text>This chapter applies to all projects financed, in whole or in part, by the Maryland Water Quality Financing Administration as required by federal law.</text>
    </regulation>
    <regulation prefix="Regulation" num=".04" heading="Categorical Exclusions.">
      <paragraph num="A.">
        <text>General. EIDs and environmental assessments or EISs are not required for excluded categories of projects.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Categories of Projects Eligible for Exclusion. The following categories of projects are eligible for exclusion:</text>
        <paragraph num="(1)">
          <text>Minor rehabilitation of existing facilities;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Functional replacement of equipment or structures, or both;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>New ancillary facilities that do not increase the capacity of the existing facility;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Infiltration and inflow corrections;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Construction of water distribution or wastewater collection systems, or both, for existing communities;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Refinancing of projects previously constructed; or</text>
        </paragraph>
        <paragraph num="(7)">
          <text>Projects where funding is being provided for planning.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Determination.</text>
        <paragraph num="(1)">
          <text>The Department shall determine whether a project is eligible for a categorical exclusion as early as possible following the receipt from an applicant of a preloan application containing a project description.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Before the Department makes a final decision to grant an exclusion, the Department will publish a notice of eligibility for categorical exclusion in a prominent advertisement in at least one newspaper of general circulation in the area concerned. The public notice shall:</text>
          <paragraph num="(a)">
            <text>Reference the preloan application;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Include a brief description of the proposed project; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Include a brief statement of how the project meets the criteria for a categorical exclusion.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>The Department shall submit the notice of eligibility for categorical exclusion to those lead State and federal agencies responsible for the federal laws itemized in Appendix F of the Initial Guidance for State Revolving Funds (January 28, 1988).</text>
        </paragraph>
        <paragraph num="(4)">
          <text>The Department shall allow a 20-day comment period, following public notice, before issuing its final decision on the categorical exclusion.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>The Department's final decision will be issued to the applicant.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Revocation. The Department shall revoke a categorical exclusion and shall require an environmental review if, subsequent to the granting of an exclusion, the Department determines that:</text>
        <paragraph num="(1)">
          <text>The proposed project no longer meets the requirements for a categorical exclusion due to changes in the proposed project;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>New evidence indicates that the project may seriously impact the environment; or</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Federal, State, or local environmental laws are being or may be violated.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".05" heading="Environmental Information Documents.">
      <paragraph num="A.">
        <text>An EID consists of a written analysis prepared by an applicant describing the environmental impacts of a proposed project.</text>
      </paragraph>
      <paragraph num="B.">
        <text>An applicant shall prepare an EID on a form supplied by the Department as part of the application for the loan agreement.</text>
      </paragraph>
      <paragraph num="C.">
        <text>The EID shall be prepared as early in the application process as possible so that the Department can conduct its environmental review as early as possible.</text>
      </paragraph>
      <paragraph num="D.">
        <text>The EID shall be of sufficient scope to enable the Department to identify and evaluate related environmental impacts of a proposed project.</text>
      </paragraph>
      <paragraph num="E.">
        <text>An EID does not have to be prepared for projects when a categorical exclusion is granted.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".06" heading="Environmental Review.">
      <text>An environmental review consists of a study of a project to identify and evaluate the related environmental impacts. The process shall include a review of the EID to determine whether any significant impacts are anticipated and whether any changes can be made in the project to eliminate or mitigate significant adverse impacts. The Department has overall responsibility for this review, although applicants will contribute to the review through submission of EIDs. The Department may determine to partition or divide its environmental review of a large project intended to be built in several phases.</text>
    </regulation>
    <regulation prefix="Regulation" num=".07" heading="Environmental Assessments.">
      <text>At the conclusion of the environmental review, the Department shall prepare an environmental assessment which is a concise summary of the review.</text>
    </regulation>
    <regulation prefix="Regulation" num=".08" heading="Finding of No Significant Impact.">
      <paragraph num="A.">
        <text>Determination. If the Department determines, at the conclusion of the environmental review, that no significant environmental impacts are anticipated, or when the project design and scope is altered or other measures are taken to eliminate or mitigate any significant environmental impacts, the Department shall issue a proposed FNSI to the applicant. The environmental assessment prepared by the Department shall be included as part of the proposed FNSI.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Public Inspection of Documents. After the Department issues the proposed FNSI, the Department will make available for public inspection in at least one location in the region in which the project is located, a copy of the proposed FNSI, the EID, the environmental assessment, the loan application, and a copy or summary of other materials considered by the Department.</text>
      </paragraph>
      <paragraph num="C.">
        <text>Written Comments and Request for Hearing. Within 10 days after the Department issues the proposed FNSI, the Department will publish a prominent advertisement in at least one newspaper of general circulation in the area concerned. The advertisement shall include:</text>
        <paragraph num="(1)">
          <text>A summary of the proposed project;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The place where the materials required by §B of this regulation are available for public inspection;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>A statement that the public has 20 days after the advertisement publication date to submit written comments; and</text>
        </paragraph>
        <paragraph num="(4)">
          <text>The address to which the comments may be sent.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Notification to State and Federal Agencies. The Department shall submit the FNSI to those lead State and federal agencies responsible for the federal laws itemized in Appendix F of the Initial Guidance for State Revolving Funds (January 28, 1988).</text>
      </paragraph>
      <paragraph num="E.">
        <text>Determination of Need for Public Hearing.</text>
        <paragraph num="(1)">
          <text>The Department may schedule a public hearing, to be held jointly by the Department and the applicant, before issuing a FNSI if the:</text>
          <paragraph num="(a)">
            <text>Department determines the environmental impact of the project is of broad, general interest; or</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Project generated substantial public interest as indicated by written comments concerning the environmental impact.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Notwithstanding the factors in §E(1), of this regulation the Department may determine that previous opportunities for public participation have been adequate to allow the Department to determine whether a final FNSI should be issued.</text>
        </paragraph>
      </paragraph>
      <paragraph num="F.">
        <text>Notification of Public Hearing. If the Department schedules a joint public hearing on the proposed FNSI, the Department will notify the public of the scheduled public hearing by placing a prominent advertisement in at least one newspaper of general circulation in the region affected. The notice shall:</text>
        <paragraph num="(1)">
          <text>Give the date, time, location, and subject of the hearing; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Be published at least 20 days before the scheduled hearing.</text>
        </paragraph>
      </paragraph>
      <paragraph num="G.">
        <text>The Department will respond to comments on the proposed FNSI before issuing the final FNSI.</text>
      </paragraph>
      <paragraph num="H.">
        <text>Issuance of Final FNSI. If no information is presented that would affect the issuance of the final FNSI, the Department will issue the final FNSI to the applicant.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".09" heading="Environmental Impact Statement.">
      <paragraph num="A.">
        <text>Criteria for Initiating Environmental Impact Statements. If the Department determines, after the environmental review, that significant environmental impacts may occur and cannot adequately be mitigated or that any of the conditions set forth in 40 CFR §6.108(a)—(g) and 6.509 exist, the applicant shall prepare a draft EIS and shall submit it to the Department for preliminary approval.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Content of Environmental Impact Statements. Preparers of EIS's shall conform with the requirements of 40 CFR §§6.201 — 6.205 in intent and scope. The Department may specify any additional issues it requires to be addressed in the EIS.</text>
      </paragraph>
      <paragraph num="C.">
        <text>After the Department grants preliminary approval of the draft EIS, the Department shall assure the review of the draft EIS by State and federal agencies through the State Clearinghouse, and shall allow these agencies a 20-day comment period.</text>
      </paragraph>
      <paragraph num="D.">
        <text>Public Inspection of Documents. Within 10 days after the Department grants preliminary approval of a draft EIS, the Department will make available for public inspection in at least one location in the region in which the project is located, a copy of the draft EIS, the EID, the environmental assessment, the loan application, and a copy or summary of other materials considered by the Department.</text>
      </paragraph>
      <paragraph num="E.">
        <text>Written Comments and Request for Hearing. Within 10 days after preliminary approval of the draft EIS, the applicant shall publish a prominent advertisement in at least one newspaper of general circulation in the area concerned. The advertisement shall be made at the applicant's expense and in a format stipulated by the Department and shall include:</text>
        <paragraph num="(1)">
          <text>A summary of the nature and location of the proposed project;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The place where the materials required by §D, of this regulation, are available for public inspection;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>A statement that the public has 10 days after the advertisement publication date to submit a written request for a public hearing, to be held jointly by the Department and the applicant, on the draft EIS;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>A statement that the public has 20 days after the advertisement publication date to submit written comments; and</text>
        </paragraph>
        <paragraph num="(5)">
          <text>The address to which the comments or request for a public hearing may be sent.</text>
        </paragraph>
      </paragraph>
      <paragraph num="F.">
        <text>The applicant shall file a copy of the public notice and a certification of publication with the Department.</text>
      </paragraph>
      <paragraph num="G.">
        <text>The Department may schedule a joint public hearing on the draft EIS if the:</text>
        <paragraph num="(1)">
          <text>Department determines the environmental impact of the project is of broad, general interest; or</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Project generated substantial public interest as indicated by written comments concerning the environmental impact.</text>
        </paragraph>
      </paragraph>
      <paragraph num="H.">
        <text>Notification of Public Hearing. If the Department schedules a joint public hearing on the draft EIS, the applicant shall notify the public of the scheduled public hearing by placing a prominent advertisement in at least one newspaper of general circulation in the region affected. The notice shall:</text>
        <paragraph num="(1)">
          <text>Be at the applicant's expense;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Give the date, time, location, and subject of the hearing; and</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Be published at least 20 days before the scheduled hearing.</text>
        </paragraph>
      </paragraph>
      <paragraph num="I.">
        <text>Upon request by the Department, the applicant shall have 10 working days to respond to any comments on the draft EIS.</text>
      </paragraph>
      <paragraph num="J.">
        <text>Proposed Final EIS. Not sooner than 5 working days after concluding any public hearing held under the provisions of this regulation, and if no information is presented that would affect the issuance of a proposed final EIS, the Department, in writing, will authorize the applicant to prepare a proposed final EIS.</text>
      </paragraph>
      <paragraph num="K.">
        <text>Review of Proposed Final EIS. The Department will make the proposed final EIS available to the public by distribution to a mailing list consisting of persons who submitted comments to or attended any public hearing on the draft EIS, and to public libraries in the area concerned.</text>
      </paragraph>
      <paragraph num="L.">
        <text>Final EIS. After a 15-day comment period, the Department will determine to proceed or not to proceed with the project and will issue its record of decision in the final EIS.</text>
      </paragraph>
      <paragraph num="M.">
        <text>Mitigation Measures. In the final EIS, the Department shall list any mitigation measures necessary to make the project environmentally acceptable. Mitigation measures shall be included in the loan agreement and may be included in the construction permit or NPDES discharge permit.</text>
      </paragraph>
      <paragraph num="N.">
        <text>Cost of EIS. The cost to the applicant of preparing the EIS is eligible to be financed with loans made by the Administration.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".10" heading="Reaffirmation.">
      <text>If 5 or more years has lapsed since a previously determined categorical exclusion, FNSI, or EIS, the Department may determine to reaffirm or modify the decision contained in a previously issued categorical exclusion, FNSI, or EIS, following the Department's environmental reevaluation of the proposed project. The Department's decision to reaffirm a categorical exclusion, FNSI, or EIS more than 5 years old shall follow the public review procedures described in Regulations .04, .08, or .09, respectively, of this chapter.</text>
    </regulation>
    <annotations>
      <annotation type="Authority">Environment Article, §§9-204 and 9-1604, Annotated Code of Maryland</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: September 18, 1989 (16:18 Md. R. 2025)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .01B amended effective May 5, 1997 (24:9 Md. R. 658)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .02B amended effective May 5, 1997 (24:9 Md. R. 658)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .04B amended effective May 5, 1997 (24:9 Md. R. 658)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .08C, D amended effective May 5, 1997 (24:9 Md. R. 658)</annotation>
    </annotations>
  </chapter>
  <chapter num="12" heading="Construction Permits and Certain Related Requirements for Major Water Supply and Major Sewerage Systems">
    <regulation prefix="Regulation" num=".01" heading="Scope.">
      <text>These regulations set forth certain requirements in connection with the installation, material alteration, or material extension of major water supply systems and major sewerage systems, including the requirement that a permit must first be issued by the Department of the Environment, and the related fees.</text>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="Definitions.">
      <paragraph num="A.">
        <text>In this chapter, the following terms have the meanings indicated.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Terms Defined.</text>
        <paragraph num="(1)">
          <text>“Department” means the Department of the Environment.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>“Design capacity” means the maximum flow capacity that something is capable of providing while achieving and maintaining the level of performance for which it was designed.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>“Includes” means including but not limited to.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>“Local government" means a Maryland county, municipality, sanitary commission, sanitary district, or other local government entity or unit of it.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>“MGD” means million gallons per day.</text>
        </paragraph>
        <paragraph num="(6)">
          <text>“Major sewerage system” means the pipes or other channels by which sewage is or is intended to be collected, conveyed, prepared for discharge and disposed of, together with all structures, pumping stations, tanks, equipment, and appurtenances used or intended to be used in its collection, conveyance, or preparation for discharge in satisfactory condition into the ground waters or other waters of the State, excluding only:</text>
          <paragraph num="(a)">
            <text>Minor building connections;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The plumbing systems, including pumping stations, inside the buildings served;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Septic tanks and their related drain fields and other appurtenances; and</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Gravity sewers with diameters 15 inches or smaller.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(7)">
          <text>“Major water supply system” means a system consisting of all pipes or other channels, structures, pumping stations, equipment, and appurtenances by means of which water is, or is intended to be, collected, treated, or conveyed for drinking or domestic purposes, which serves, or is intended to serve, 25 or more of the same persons on a day-to-day basis at least 6 months out of the year or which serves, or is intended to serve, 15 or more residential connections, excluding only:</text>
          <paragraph num="(a)">
            <text>Minor building connections;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The plumbing systems, including pumping stations, inside the buildings served;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Wells; and</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Water mains with diameters 15 inches or smaller.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(8)">
          <text>“Materially alters” means any alteration other than:</text>
          <paragraph num="(a)">
            <text>Normal maintenance and repair;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The addition of a minor building connection; or</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The installation of a meter, valve, or hydrant, and similar minor alterations.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(9)">
          <text>“Materially extends” means any extension of water mains or gravity sewers with diameters greater than 15 inches.</text>
        </paragraph>
        <paragraph num="(10)">
          <text>“Minor building connection” means a pipe or other channel having a projected flow not exceeding 5,000 gallons per day average daily flow running from a particular building, structure, or other facility that it serves to that point at which it is first connected to a:</text>
          <paragraph num="(a)">
            <text>Pipe or other channel that runs along a right-of-way area;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Pipe or other channel which also serves other buildings; or</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Pumping station.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(11)">
          <text>“Person” includes:</text>
          <paragraph num="(a)">
            <text>Any individual, partnership, firm, association, corporation, or other entity;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Any receiver, trustee, guardian, personal representative, fiduciary, or representative of any kind; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The federal government, a state, a local government, or unit of them.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(12)">
          <text>“Pumping station” means a facility or system with a total design capacity greater than 5,000 gallons per day average daily flow that is designed to deliver water or sewage from a lower elevation to a higher elevation. The facility may include pumps, controls, and auxiliary equipment, as well as the structures containing these items.</text>
        </paragraph>
        <paragraph num="(13)">
          <text>“Right-of-way area” means:</text>
          <paragraph num="(a)">
            <text>A road, street, alley, or other easement or right-of-way area benefitting more than one parcel of land; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>An existing or proposed road, street, alley, or other easement or right-of-way area benefitting more than one lot or parcel of land, as shown on a subdivision plat that is recorded in the local land records or as shown on a plat submitted to a governmental entity for review in connection with an intended or planned subdivision.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(14)">
          <text>“Sewage” means:</text>
          <paragraph num="(a)">
            <text>Any human excretion or water-carried domestic waste; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>A mixture of any human excretion or water-carried domestic waste with any other liquid or water-carried waste, such as manufacturing or industrial waste, street wash, rain water discharged from roofs, lawns, paved areas, etc., and ground garbage.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(15)">
          <text>“Sewage collection lines” means the part, if any, of a major sewerage system consisting of the pipes and other channels by which sewage is collected and conveyed to the place for its treatment and disposal, including sanitary sewer lines and force main lines, but excluding pumping stations.</text>
        </paragraph>
        <paragraph num="(16)">
          <text>“Sewage treatment plant” means the part, if any, of a major sewerage system consisting of a facility, other than a septic tank, using chemical, physical, or biological processes, or all of these, to prepare sewage in a satisfactory condition for discharge into the ground waters or other waters of the State or for application on land after it is treated.</text>
        </paragraph>
        <paragraph num="(17)">
          <text>Unit Process.</text>
          <paragraph num="(a)">
            <text>“Unit process” means the equipment and other improvements at a water supply plant or sewage treatment plant used in each distinct step in the process of treating water or sewage.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>“Unit process” includes:</text>
            <paragraph num="(i)">
              <text>Clarifiers;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Activated sludge aeration tanks;</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Disinfection facilities;</text>
            </paragraph>
            <paragraph num="(iv)">
              <text>Filtration units;</text>
            </paragraph>
            <paragraph num="(v)">
              <text>Digestors; and</text>
            </paragraph>
            <paragraph num="(vi)">
              <text>Belt filter presses.</text>
            </paragraph>
          </paragraph>
        </paragraph>
        <paragraph num="(18)">
          <text>“Water distribution lines” means the part, if any, of a major water supply system consisting of the pipes and other channels by which water that has been prepared for human consumption is conveyed from the place of its treatment to the consumer or other user, excluding pumping stations.</text>
        </paragraph>
        <paragraph num="(19)">
          <text>“Water supply plant” means the part, if any, of a major water supply system consisting of a facility using chemical, physical, or biological processes, or all of these, to prepare water that is safe for human consumption and domestic purposes, together with all water storage facilities irrespective of their location.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".03" heading="General Requirements.">
      <paragraph num="A.">
        <text>Permit. A person shall have a permit issued by the Department under Environment Article, §9-204, Annotated Code of Maryland, before the person installs, materially alters, or materially extends a major water supply system or major sewerage system within the State.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Construction in Accordance with Permit. Within the State, a person may not:</text>
        <paragraph num="(1)">
          <text>Install, materially alter, or materially extend a major water supply system or major sewerage system except in accordance with a permit, and including any conditions or requirements set forth in the permit, issued to the person by the Department under Environment Article, §9-204, Annotated Code of Maryland; or</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Embody any material change in construction until the Department has issued a revised permit based on the submission to the Department of any material change in the plans and specifications, together with the reason for the change.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Capacity Development Assessment Program. Before a permit may be issued under Environment Article, §9-204, Annotated Code of Maryland, for new major water supply systems, a permit applicant shall demonstrate to the satisfaction of the Department that it has the technical, financial, and managerial capacity to operate the system as required by COMAR 26.04.01.36.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".04" heading="Application for Permit.">
      <paragraph num="A.">
        <text>Application Contents.</text>
        <paragraph num="(1)">
          <text>To apply for a permit, an applicant shall submit to the Department an application consisting of all of the following:</text>
          <paragraph num="(a)">
            <text>A completed application form as specified by the Department;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>A fee equal to the sum of the amounts due under Regulations .05 and .06 of this chapter unless the permit is exempt from the requirement to pay a fee under the provisions of the governmental exemption set forth in Regulation .07 of this chapter;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The complete plans and specifications for the installation, alteration, or extension of the major water supply system or major sewerage system, prepared in accordance with all requirements of §§B—E of this regulation;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>If required by the Department, an engineering report prepared in accordance with the requirements of §F of this regulation;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Information the Department may require to demonstrate that the requirements of the county water and sewer comprehensive plan and applicable laws are satisfied; and</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Other information the Department requires, including information required by the Department in COMAR 26.04.01.36.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Upon receiving an application, the Department shall determine the total fee due and, if the applicant has paid less than the total amount which the Department determines is due, the Department shall promptly notify the applicant of the need to pay the additional amount due. Until the Department has received the total fee which it has determined is due, together with everything required under or pursuant to §A(1) of this regulation, and any changes or corrections required by the Department have been made, the complete application is not considered to have been submitted and the Department is under no obligation to issue or deny a permit.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Fees are nonrefundable.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Fees may be paid by check or money order made payable to the Maryland Department of the Environment.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Submittal of plans and specifications shall be made by the person or persons for whom the work is to be done, or their properly authorized engineers or agents.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Submission of Plans and Specifications.</text>
        <paragraph num="(1)">
          <text>Complete plans and specifications for proposed work should be submitted for approval at least 30 days before action on them is expected, although action may be taken by the Department before the expiration of that time.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Reports, plans, and specifications shall be prepared by, signed by, and bear the seal of, a professional engineer licensed in Maryland, except that landscaping and any architectural feature of any building, pumping station, water filtration plant, sewage treatment plant, or elevated water storage unit may also be submitted, signed by, and bear the seal of, an architect licensed in Maryland. Plans not conforming with the requirements of this subsection may not be accepted.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Plans shall be neatly and legibly drawn upon transparencies or acceptable paper so that copies may be obtained. Except when the originals are presented to the Department for preliminary review, the originals shall be kept by the party presenting the plans, and true copies, which may be white, blue, or black line prints, offset prints, or photostats on a white background, shall be submitted to the Department.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Plans may not be returned after submission.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>When revisions are necessary, the revisions shall be made on the original tracings and new true copies shall be submitted to the Department. Revisions or additions may not be made directly on the true copies previously or currently submitted to the Department.</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Plans shall be specifically prepared for each project.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Size of Plans. Plans may not be greater than 30 × 42 inches or less than 8-1/2 × 11 inches.</text>
      </paragraph>
      <paragraph num="D.">
        <text>Number of Plans.</text>
        <paragraph num="(1)">
          <text>Two sets of plans and specifications shall be submitted for water supply plants, sewage treatment plants, and pumping stations.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>One set of plans and specifications shall be submitted for water distribution lines, sewage collection lines, and any other improvements for which a permit is required by this chapter.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>If acceptable and approved, the plans shall be retained in the Department's files, and an appropriate reference made to them in the written permit.</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Title of Plans.</text>
        <paragraph num="(1)">
          <text>Each separate drawing shall include a proper title containing the name of the person or persons for whom it is made, the name of the locality to which it refers, a proper description for a full understanding of the nature of the drawing, and the scale, date, and name of the engineer, architect, or surveyor preparing it.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>On each plan showing a locality or street layout, an arrow shall be placed designating the direction of north. Plans should be so arranged, whenever practicable, so that north is towards the top or to the left of the sheet.</text>
        </paragraph>
      </paragraph>
      <paragraph num="F.">
        <text>Engineer's Report.</text>
        <paragraph num="(1)">
          <text>A complete engineering report, if required by the Department, shall accompany or precede the application for each new major project.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The report shall contain full information discussing any existing facility and the proposed or new facility, and include all pertinent data necessary to permit a clear and comprehensive review of the subject.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".05" heading="Major Water Supply System Application and Permit Fees.">
      <paragraph num="A.">
        <text>Exception. Notwithstanding §§B—E of this regulation and Regulation .09 of this chapter, and in the discretion of the Department, fees for minor improvements or revisions to existing permits may be waived or reduced.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Application and Permit Fees. An applicant for a permit to install, materially alter, or materially extend a major water supply system shall pay the sum of the applicable fees set forth in the fee schedules in §§C—E of this regulation.</text>
      </paragraph>
      <paragraph num="C.">
        <text>Water Supply Plants.</text>
        <paragraph num="(1)">
          <text>Fees for a new plant and fees for an existing plant at which two or more new unit processes are to be constructed are as follows:</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Fees for an existing plant at which only one new unit process is to be constructed are as follows:</text>
        </paragraph>
        <paragraph num="(3)">
          <text>If no fee is due under §C(1) or (2) of this regulation, the fee shall be the lesser of the:</text>
          <paragraph num="(a)">
            <text>Amount listed in §C(2) of this regulation for the design capacity of the particular plant; or</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Sum of the following:</text>
            <paragraph num="(i)">
              <text>$125 for each unit process that is installed, materially altered, or materially extended, plus</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>$125 for each component, which is not part of a unit process, that is installed, materially altered, or materially extended.</text>
            </paragraph>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>In §C(3)(b) of this regulation, examples of components which are not part of a unit process include bar screens, intake structures, storage tanks, flow diversion structures, and chemical feed pumps.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Water Distribution Lines.</text>
        <paragraph num="(1)">
          <text>Fees for new lines and material alterations and material extensions to existing lines are set forth in §D(2) and (3) of this regulation. Water supply plant and pumping station fees are additional.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Fees for distribution lines and appurtenances are as follows:</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Pumping Stations.</text>
        <paragraph num="(1)">
          <text>Fees for new pumping stations and for material alterations and material extensions to existing pumping stations are set forth in the following fee schedule in this section:</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The combined design capacity of all lift stations applied for under the permit shall be used in calculating the design capacity.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".06" heading="Major Sewerage System Application and Permit Fees.">
      <paragraph num="A.">
        <text>Exception. Notwithstanding §§B—E of this regulation and Regulation .09 of this chapter, and in the discretion of the Department, fees for minor improvements or revisions to existing permits may be waived or reduced.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Application and Permit Fees. An applicant for a permit to install, materially alter, or materially extend a major sewerage system shall pay the sum of the applicable fees set forth in the fee schedules in §§C—E of this regulation.</text>
      </paragraph>
      <paragraph num="C.">
        <text>Sewage Treatment Plants.</text>
        <paragraph num="(1)">
          <text>Fees for a new plant and fees for an existing plant at which two or more new unit processes are to be constructed are as follows:</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Fees for an existing plant at which only one new unit process is to be constructed are as follows:</text>
        </paragraph>
        <paragraph num="(3)">
          <text>If no fee is due under §C(1) or (2) of this regulation, the fee shall be the lesser of the:</text>
          <paragraph num="(a)">
            <text>Amount listed in §C(2) of this regulation for the design capacity of the particular plant; or</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Sum of the following:</text>
            <paragraph num="(i)">
              <text>$125 for each unit process that is installed, materially altered, or materially extended, plus</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>$125 for each component, which is not part of a unit process, that is installed, materially altered, or materially extended.</text>
            </paragraph>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>In §C(3)(b) of this regulation, examples of components which are not part of a unit process include bar screens, comminutors, splitter boxes, flow meters, sludge holding tanks, and sludge drying beds.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Sewage Collection Lines.</text>
        <paragraph num="(1)">
          <text>Fees for new lines and material alterations and material extensions to existing lines are set forth in §D(2) and (3) of this regulation. Sewage treatment plant and pumping station fees are additional.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Fees for sewage collection lines and appurtenances are as follows:</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Pumping Stations.</text>
        <paragraph num="(1)">
          <text>Fees for new pumping stations and for material alterations and material extensions to existing pumping stations are set forth in the following fee schedule:</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The combined design capacity of all lift stations applied for under the permit shall be used in calculating the design capacity.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".07" heading="Governmental Exemption from Payment of Fee.">
      <paragraph num="A.">
        <text>General. Improvements to be constructed pursuant to a permit are not exempt from the fees due under this chapter unless they will be governmentally owned as soon as they become affixed to the real property, that is, as they are constructed, and satisfy all requirements of either §B or C of this regulation. The applicant for the permit shall be a governmental entity as listed in Regulation .02B(11)(c) of this chapter, and the permit shall be issued in the name of that governmental entity.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Local Governments.</text>
        <paragraph num="(1)">
          <text>When the applicant is a local government, the application and permit are exempt from the fee that would otherwise be due if:</text>
          <paragraph num="(a)">
            <text>The requirements of §A of this regulation are satisfied; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>As part of its application, the local government submits documentation, satisfactory to the Department, that less than half of the total cost of the improvements to be constructed pursuant to the permit are expected to be directly or indirectly funded from amounts private developers or other private persons have previously contractually agreed to pay, in connection with the development of a project or projects that the improvements authorized by the permit will serve.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Unless the Department requires additional documentation in a specific instance, the documentation required by §B(1)(b) of this regulation may be in the form of a certification, signed by a local government official, that the requirement of §B(1)(b) of this regulation is satisfied.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>State and Federal Governments. When the applicant is a state, the federal government, or a unit of them, the application and permit are exempt from the fee that would otherwise be due, provided that the requirements of §A of this regulation are satisfied.</text>
      </paragraph>
      <paragraph num="D.">
        <text>Satisfactory Documentation. Before exempting a permit from payment of the fee that otherwise would be due, the Department may require documentation satisfactory to it that the applicable requirements of this regulation are satisfied.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".08" heading="As-Constructed Plans.">
      <text>Within 60 days after the completion of the work under a permit, the holder of the permit shall submit to the Department, for permanent record, a copy of the plans, with a certification satisfactory to the Department, that shows the work as built, or a certification satisfactory to the Department that the work was built in accordance with the original plans approved by the Department.</text>
    </regulation>
    <regulation prefix="Regulation" num=".09" heading="Revised Permits and Revised Permit Fees.">
      <text>An applicant for a revised permit to install, materially alter, or materially extend a major water supply system or major sewerage system shall submit any information the Department requires and pay a nonrefundable revised permit application fee of $100.</text>
    </regulation>
    <regulation prefix="Regulation" num=".10" heading="Permit Expiration and Extensions.">
      <paragraph num="A.">
        <text>Permits expire 3 years after the date of issuance, unless an extension is granted by the Department.</text>
      </paragraph>
      <paragraph num="B.">
        <text>The permit holder may apply to the Department for a 1-year extension of the permit expiration date. The nonrefundable fee for applying for the extension is $50.</text>
      </paragraph>
      <paragraph num="C.">
        <text>The granting of a permit extension is in the discretion of the Department.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".11" heading="Applicability.">
      <paragraph num="A.">
        <text>This chapter implements the requirements of Environment Article, §9-204, Annotated Code of Maryland, in connection with major water supply systems and major sewerage systems.</text>
      </paragraph>
      <paragraph num="B.">
        <text>This chapter may not be interpreted as meaning that a permit issued under Environment Article, §9-204, Annotated Code of Maryland, is not required for the installation, material alteration, or material extension of a:</text>
        <paragraph num="(1)">
          <text>Water supply system, as defined in Environment Article, §9-201, Annotated Code of Maryland, that is not a major water supply system; or</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Sewerage system, as defined in Environment Article, §9-201, Annotated Code of Maryland, that is not a major sewerage system.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".12" heading="Penalties.">
      <text>Persons violating these regulations or any permit issued under these regulations are subject to Environment Article, §§9-268 and 9-334—9-342, Annotated Code of Maryland, and the penalties set forth there.</text>
    </regulation>
    <annotations>
      <annotation type="Authority">Environment Article, §§9-204 and 9-510, Annotated Code of Maryland</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: January 1, 1992 (18:25 Md. R. 2759)</annotation>
      <annotation type="History" subtype="Administrative History">Regulations .02, .05, and .06 amended as an emergency provision effective November 17, 1995 (22:25 Md. R. 1959); amended permanently effective February 26, 1996 (23:4 Md. R. 274)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .03C adopted effective October 4, 1999 (26:20 Md. R. 1548)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .04A amended effective October 4, 1999 (26:20 Md. R. 1548)</annotation>
    </annotations>
  </chapter>
  <chapter num="13" heading="Bay Restoration Fund Implementation">
    <regulation prefix="Regulation" num=".01" heading="Scope.">
      <text>This chapter specifies the procedures for implementing the Bay Restoration Fund authorized under Environment Article, §9-1605.2, Annotated Code of Maryland. The Bay Restoration Fund is administered by the Maryland Water Quality Financing Administration, a unit of the Department, and is comprised of two sub-funds:</text>
      <paragraph num="A.">
        <text>Wastewater Fund: Bay Restoration Fund fees collected from customers or users of wastewater treatment plants are deposited by the Comptroller into this fund and are used to provide grants for the upgrade of wastewater treatment plants with enhanced nutrient removal technology, a portion of the operation and maintenance costs related to ENR, and other authorized uses.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Onsite Sewage Disposal System Fund: Bay Restoration Fund fees collected from users of onsite sewage disposal systems (such as septic systems or holding tanks) are deposited by the Comptroller into this fund and are used to provide grants or loans for the upgrade of onsite sewage disposal systems with best available technology for removal of nitrogen, and other authorized uses.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="Definitions.">
      <paragraph num="A.">
        <text>In this chapter, the following terms have the meanings indicated.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Terms Defined.</text>
        <paragraph num="(1)">
          <text>“Administration” means the Maryland Water Quality Financing Administration.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>“Biological nutrient removal” has the meaning stated in Environment Article, §9-1601, Annotated Code of Maryland.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>“Department” means the Maryland Department of the Environment.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>“Eligible cost” has the meaning stated in Environment Article, §9-1605.2, Annotated Code of Maryland.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>“Enhanced nutrient removal” or “ENR” has the meaning stated in Environment Article, §9-1601, Annotated Code of Maryland.</text>
        </paragraph>
        <paragraph num="(6)">
          <text>“Local government” has the meaning stated in Environment Article, §9-1601, Annotated Code of Maryland.</text>
        </paragraph>
        <paragraph num="(7)">
          <text>“Low-income homeowner” means a household with an income less than the income eligible standards established by the Maryland Department of Human Services for its Energy Assistance Program.</text>
        </paragraph>
        <paragraph num="(8)">
          <text>“Nonconforming onsite sewage disposal systems” means existing onsite sewage disposal systems that do not comply with current State or local laws, regulations, or policies.</text>
        </paragraph>
        <paragraph num="(9)">
          <text>“Onsite Sewage Disposal System” means a sewage system that discharges treated effluent into the ground, such as a septic system.</text>
        </paragraph>
        <paragraph num="(10)">
          <text>“Person” has the meaning stated in Environment Article, §1-101, Annotated Code of Maryland.</text>
        </paragraph>
        <paragraph num="(11)">
          <text>“Seller” means any person or local government entering into a contract to sell nutrient or sediment load reductions to the Department in accordance with Regulation .03F of this chapter.</text>
        </paragraph>
        <paragraph num="(12)">
          <text>“Septic equivalent dwelling unit” means a measure determined based on the average daily flow of a septic system as follows:</text>
          <paragraph num="(a)">
            <text>A household septic or any other septic system with average daily flow of 195 gallons per day or less is considered one septic equivalent dwelling unit; or</text>
          </paragraph>
          <paragraph num="(b)">
            <text>For a larger septic system, septic equivalent dwelling units are determined by the average daily flow of the system divided by 195 gallons per day.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".03" heading="Wastewater Fund.">
      <paragraph num="A.">
        <text>Bay Restoration Fund fees deposited into the Wastewater Fund shall be used:</text>
        <paragraph num="(1)">
          <text>To provide a source of revenue or security for the payment of principal and interest on bonds issued by the Administration, and the cost of issuance, if the bond proceeds are deposited in the Bay Restoration Fund;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>To provide grant awards to wastewater treatment plants whose users have contributed to the Bay Restoration Fund for up to 100 percent of the eligible cost to upgrade wastewater treatment plants to enhanced nutrient removal treatment levels at the design capacity approved by the Department;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>For a portion of the operation and maintenance costs, starting in FY 2010, of wastewater treatment plants that operate at the enhanced nutrient removal treatment levels, not to exceed 10 percent of the amount deposited into the Wastewater Fund annually;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Starting in FY 2016, to provide for up to 87.5 percent of project costs relating to combined sewer overflow abatement, rehabilitation of existing sewers, and upgrading conveyance systems, including pumping stations;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>To provide for up to 100 percent of project costs for the implementation of a stormwater alternative compliance plan, authorized by a local government pursuant to Environment Article, §4-202.1(K)(3), Annotated Code of Maryland, and undertaken by an organization exempt from taxation under IRS §501(C)(3) or §501(C)(4) or §501(C)(19) or §501(D);</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Starting in FY 2018, for additional funding to be used in accordance with Regulation .04 of this chapter for the upgrade of onsite sewage disposal systems and other eligible uses pursuant to Environment Article, §9-1605.2(h)(2)(i)1, Annotated Code of Maryland;</text>
        </paragraph>
        <paragraph num="(7)">
          <text>Starting in FY 2018, to provide for up to 50 percent of the eligible cost of cost-effective and efficient stormwater projects undertaken by local governments who have implemented a system of charges. To be eligible for funding, the local governments shall show evidence of funds set aside and available to cover the balance of project costs;</text>
        </paragraph>
        <paragraph num="(8)">
          <text>To provide for the Department’s reasonable operating expenses to administer the Bay Restoration Wastewater Fund not to exceed 1.5 percent of the fees deposited into the Wastewater Fund annually;</text>
        </paragraph>
        <paragraph num="(9)">
          <text>To provide for future upgrades of wastewater treatment plants to achieve additional nutrient removal or water quality improvements at ENR treatment levels or better;</text>
        </paragraph>
        <paragraph num="(10)">
          <text>To earn interest;</text>
        </paragraph>
        <paragraph num="(11)">
          <text>To purchase nitrogen, phosphorus, and sediment load reductions.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Project Prioritization.</text>
        <paragraph num="(1)">
          <text>Before FY 2018, priority for funding shall be:</text>
          <paragraph num="(a)">
            <text>First for ENR upgrades at wastewater treatment plants with a design capacity of 500,000 gallons per day or more that discharge to the Chesapeake Bay;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Second for the most cost-effective ENR upgrades at wastewater treatment plants with a design capacity of less than 500,000 gallons per day that discharge to the Chesapeake Bay;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Third for ENR upgrades at wastewater treatment plants that discharge into the Atlantic Coastal Bay or other waters of the State;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Fourth for future upgrades of wastewater treatment plants to achieve additional nutrient removal or water quality improvements at ENR treatment levels or better;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Fifth for combined sewer overflow abatement projects, rehabilitation of existing sewers, and upgrading conveyance systems, including pumping stations.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Starting in FY 2018, priority for funding shall be:</text>
          <paragraph num="(a)">
            <text>First for ENR upgrades at wastewater treatment plants with a design capacity of 500,000 gallons per day or more that discharge to the Chesapeake Bay;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Second for the most cost-effective ENR upgrades at wastewater treatment plants with a design capacity of less than 500,000 gallons per day that discharge to the Chesapeake Bay, based on their project ranking in accordance with §C of this regulation;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Third for ENR upgrades at wastewater treatment plants that discharge into the Atlantic Coastal Bay or other waters of the State, based on their project ranking in accordance with §C of this regulation;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Fourth for future upgrades of wastewater facilities to achieve additional nutrient removal or water quality improvements at ENR treatment levels or better, based on their project ranking in accordance with §C of this regulation;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Fifth for purchase of nitrogen, phosphorus, and sediment load reductions in accordance with §F of this regulation;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Sixth for any of the following types of projects based on their project ranking in accordance with §C of this regulation:</text>
            <paragraph num="(i)">
              <text>Combined sewer overflow abatement, rehabilitation of existing sewers, and upgrading conveyance systems, including pumping stations;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Nitrogen reduction of onsite sewage disposal systems in accordance with Regulation .04 of this chapter;</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Stormwater projects by local governments who have implemented a system of charges; and</text>
            </paragraph>
            <paragraph num="(iv)">
              <text>Stormwater alternative compliance plans.</text>
            </paragraph>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Ranking System. The Department shall request and accept applications for financial assistance annually and prepare a project priority list that ranks individual projects according to the methodology developed by the Department based on the following factors:</text>
        <paragraph num="(1)">
          <text>Nutrient loads currently discharged and projected nutrient load reduction;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Cost-effectiveness in providing water quality or public health benefits;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Relative effectiveness of water quality benefit to the Chesapeake Bay or other body of water identified by the Department as impaired under Section 303(d) of the Clean Water Act;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>The existence of an Administrative or Civil Compliance Order or of a compliance schedule in a discharge permit;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Sustainability benefits such as water reuse, asset management, full cost pricing, energy conservation and smart growth;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Readiness to proceed to construction.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Funding Allocation. Each fiscal year, the total available grant funds, net of revenue needed for payment of debt service on outstanding bonds, operation and maintenance grants, and allowed operating expenses shall be allocated in priority order to construction ready projects in accordance with §§B and C of this regulation.</text>
      </paragraph>
      <paragraph num="E.">
        <text>Enhanced Nutrient Removal Operation and Maintenance Grants.</text>
        <paragraph num="(1)">
          <text>In fiscal year 2010 and thereafter, up to 10 percent of the fees collected annually in the Wastewater Fund shall be given to owners of wastewater treatment plants that are operating at or above the enhanced nutrient removal treatment level as grant awards to partially offset the cost of operation and maintenance.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The operation and maintenance grant for wastewater treatment plants operating at the enhanced nutrient removal treatment levels shall be at the base rate of $30,000 per year for every one million gallons per day design flow, not to exceed $300,000 per facility per year. Facilities with less than one million gallons per day design flow shall receive the base rate of $30,000 per year. This formula may be adjusted if there is a change in the Bay Restoration Fund statute, or if the amount appropriated in the budget is reduced.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The Department may offer a prorated amount of an operations and maintenance grant to correspond with the number of months that a wastewater treatment plant operated at the enhanced nutrient removal treatment level in the first year of project completion.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>The Department may offer additional operation and maintenance grants for facilities achieving above the enhanced nutrient removal treatment level based on the additional load reductions achieved.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>To qualify for the annual operation and maintenance grant, the following criteria shall be met:</text>
          <paragraph num="(a)">
            <text>The users of the wastewater treatment plant pay the Bay Restoration Fund fee;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The owner shall file an application with the Department on or before January 31 of each year, or by a date specified by the Department;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The owner shall demonstrate, by submitting performance data for the prior calendar year, that the plant was operated in a manner that optimized enhanced nutrient removal and used its best efforts to achieve equal to or less than 3 mg/l total nitrogen and equal to or less than 0.3 mg/l total phosphorus in wastewater effluent concentration;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>The owner shall provide data requested by the Department about the impact that a wastewater treatment plant that was upgraded to ENR has had on growth within the municipality or county that such a wastewater treatment plant is located as required by Environment Article, §9-1605.2, Annotated Code of Maryland.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="F.">
        <text>Purchase of Nitrogen, Phosphorus, and Sediment Load Reductions.</text>
        <paragraph num="(1)">
          <text>Nitrogen, phosphorus, or sediment load reductions eligible for purchase shall meet the following criteria:</text>
          <paragraph num="(a)">
            <text>The environmental practices generating the purchased nitrogen, phosphorus, and sediment load reductions shall be located in Maryland;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The purchase of nitrogen, phosphorus, and sediment load reductions may not be from the agricultural sector or be permitted from environmental practices implemented on agricultural land as defined in COMAR 15.20.12.02;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The load reductions to be purchased pursuant to these regulations shall have been created on or after July 1, 2017; and</text>
          </paragraph>
          <paragraph num="(d)">
            <text>The load reductions purchased pursuant to these regulations may not be used for any other purpose.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Contracts for purchase of load reductions shall meet the following criteria:</text>
          <paragraph num="(a)">
            <text>The contracts executed by the Department for the purchase of nitrogen, phosphorus, and sediment load reductions may not exceed an annual obligation of $4,000,000 in FY 2018, $6,000,000 in FY 2019, $10,000,000 in FY 2020 and $10,000,000 in FY 2021, and may not exceed a cumulative expenditure of $30,000,000 over the term of the contracts;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The term of the contracts for the annual purchase of nitrogen, phosphorus, and sediment load reductions may not exceed the useful life of the environmental practice as determined by the Department;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The Department may not sign any new contracts for the annual purchase of nitrogen, phosphorus, and sediment load reductions after June 30, 2021; and</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Payment provisions will be defined in each purchasing contract and shall require documentation submitted by the seller reporting the nitrogen, phosphorus, or sediment load reduction resulting from a completed environmental practice.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>The Department shall use baseline loads and load reductions from baseline loads in developing a methodology for the purchase of nitrogen, phosphorus, and sediment load reductions.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>The purchasing baseline loads used to calculate the reduction of nitrogen, phosphorus, or sediment load reduction resulting from a proposed environmental practice are as follows:</text>
          <paragraph num="(a)">
            <text>The baseline for wastewater treatment plants that received a grant from the Bay Restoration Fund for ENR upgrade shall be the lesser of:</text>
            <paragraph num="(i)">
              <text>The annual load calculated based on a nitrogen concentration of 3.0 mg/l for nitrogen or a phosphorus concentration of 0.3 mg/l for phosphorus; or</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>The annual load for nitrogen or phosphorus, whichever is applicable, reported for the wastewater treatment plant for calendar year 2016;</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>The baseline for wastewater treatment plants that did not receive a grant from the Bay Restoration Fund shall be the lesser of:</text>
            <paragraph num="(i)">
              <text>The annual load calculated based on a nitrogen concentration of 18 mg/l for the nitrogen or a phosphorus concentration of 2 mg/l for the phosphorus, and the baselines may not to exceed the waste load allocation or concentrations assigned to the wastewater treatment plant by the discharge permit; or</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>The annual load for nitrogen or phosphorus, whichever is applicable, reported for the wastewater treatment plant for calendar year prior to a proposal submitted in response to a Request for Proposals issued by the Department pursuant to these regulations, and the baseline may not to exceed the waste load allocation or concentrations assigned to the wastewater treatment plant by the discharge permit;</text>
            </paragraph>
          </paragraph>
          <paragraph num="(c)">
            <text>The baseline per septic equivalent dwelling unit for nitrogen loading for a septic system that is connected to wastewater treatment plant on or after July 1, 2017, and did not receive State or federal financial assistance for the connection shall be:</text>
            <paragraph num="(i)">
              <text>For a septic system that has not been upgraded with the best available technology, 18.56 lbs/year for a system located within the critical areas, 11.60 lbs/year for a system located within 1,000 feet of surface water, and 6.96 lbs/year for all other system locations; and</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>For a septic system that has been upgraded with the best available technology, 9.28 lbs/year for a system located within the critical areas, 5.80 lbs/year for a system located within 1,000 feet of surface water, and 3.48 lbs/year for all other system locations;</text>
            </paragraph>
          </paragraph>
          <paragraph num="(d)">
            <text>The baseline for a permittee implementing stormwater best management practices and non-agricultural nonpoint source practices for nitrogen, phosphorus, or sediment reduction shall be the load reduction achieved after subtracting the load reductions the permittee is required to make under its municipal separate storm sewer system permit; or</text>
          </paragraph>
          <paragraph num="(e)">
            <text>The baseline for a person not regulated under municipal separate storm sewer system permit or property owner implementing stormwater best management practices or any other permissible nonpoint source practices for nitrogen, phosphorus, or sediment reduction shall be the existing conditions of the date a proposal is submitted for the purchase of a load reduction pursuant to these regulations, as determined by the Department consistent with appropriate assumptions and provisions of the Chesapeake Bay TMDL and the Chesapeake Bay Watershed Model, or other Chesapeake Bay Program models, provided that the reduction is not used by a regulated entity to meet the reductions required under its municipal separate storm sewer system permit.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(5)">
          <text>Calculations to determine the total annual nitrogen, phosphorus, or sediment load reduction resulting from a proposed environmental practice shall be consistent with appropriate assumptions and provisions of the Chesapeake Bay TMDL and the Chesapeake Bay Watershed Model, or other Chesapeake Bay Program models and shall be based on the following:</text>
          <paragraph num="(a)">
            <text>For a wastewater treatment plant, the load reduction is the annual loading identified in the monthly discharge monitoring reports submitted to the Department by the permittee as required under the national pollution discharge elimination system permit or groundwater discharge permit, subtracted from the baseline loading;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>For septic system connections to wastewater treatment plants, the nitrogen reduction from each septic system is the average flow of 250 gallons per day per connected septic equivalent dwelling unit multiplied by the annual average nitrogen concentration at the wastewater treatment plant servicing the connections for the calendar year preceding the connection, subtracted from the baseline loading;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>For a septic system connection to wastewater treatment plants, the phosphorus reduction is zero lbs/year; or</text>
          </paragraph>
          <paragraph num="(d)">
            <text>For stormwater best management practices and non-agricultural non-point source practices, the load reduction is the loads generated after the implementation of the best management practice as determined by the Department consistent with appropriate assumptions and provisions of the Chesapeake Bay TMDL and the Chesapeake Bay Watershed Model, or other Chesapeake Bay Program models subtracted from the baseline loading.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(6)">
          <text>The gross nitrogen, phosphorus, and sediment reduction calculated in §F(5) of this regulation shall be converted to net delivered load reduction consistent with appropriate assumptions and provisions of the Chesapeake Bay TMDL and the Chesapeake Bay Watershed Model, or other Chesapeake Bay Program models, and the converted load is the maximum amount available for purchase.</text>
        </paragraph>
        <paragraph num="(7)">
          <text>The Department may not process any payment without being able to verify the reported reductions through the review of the supporting documentation provided by the seller, the review of other documents available to the Department, or on-site inspection, or combination of whichever is applicable.</text>
        </paragraph>
        <paragraph num="(8)">
          <text>The Department shall use a competitive process to select sellers for the purchase of nitrogen, phosphorus, or sediment load reduction, based on the following factors:</text>
          <paragraph num="(a)">
            <text>Cost — Lowest annual cost per pound for nitrogen and phosphorus load reduction, and lowest cost/ton for sediment load reduction with the cost of reduction for each pollutant evaluated and compared independently;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Materiality — Annual load reduction of at least 500 lbs of nitrogen or 100 lbs of phosphorus or 30 tons of sediment;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Sustainability — The environment practice is innovative and is able to produce nitrogen, phosphorus, or sediment load reductions, or combinations thereof, for extended periods of time or provide additional environmental benefits; and</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Additional benefits — The environmental practice provides additional benefits to water quality, habitat, watershed function, or social/community enhancement beyond nitrogen, phosphorus, and sediment reduction.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(9)">
          <text>Any load reductions purchased pursuant to this program and regulations shall be based on projects, practices, or activities initiated after the execution of a contract between the seller and the Department in response to the Request for Proposal issued by the Department.</text>
        </paragraph>
        <paragraph num="(10)">
          <text>Beginning July 1, 2018, the Department shall report each year to the Bay Restoration Fund Advisory Committee on the implementation of this program.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".04" heading="Onsite Sewage Disposal System Fund.">
      <paragraph num="A.">
        <text>Bay Restoration Fund fees deposited into the Onsite Sewage Disposal System Fund shall be used:</text>
        <paragraph num="(1)">
          <text>To provide grants or loans up to 100 percent for:</text>
          <paragraph num="(a)">
            <text>The cost to upgrade an existing onsite sewage disposal system with the best available technology for the removal of nitrogen;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The cost difference between a conventional onsite sewage disposal system and an onsite sewage disposal system that utilizes the best available technology for the removal of nitrogen;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The cost of replacing multiple onsite sewage disposal systems located in the same community with a new community sewerage system that is owned by a local government and that meets enhanced nutrient removal standards, and the cost may not exceed the sum of the cost difference between conventional onsite sewage disposal systems and new onsite sewage disposal systems that use the best available technology for removing nitrogen; and</text>
          </paragraph>
          <paragraph num="(d)">
            <text>The cost of connecting a property using an onsite sewage disposal systems to an existing wastewater treatment plant that meets either enhanced nutrient removal or biological nutrient removal standards. This cost may not exceed the sum of the cost of onsite sewage disposal systems that include best available technology for removing nitrogen. This cost may include payment of principal, but not interest, of debt issued by a local government for such connection.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>To provide grants or loans up to 100 percent for the cost of repairing or replacing failing onsite sewage disposal systems with a system that uses the best available technology for the removal of nitrogen. This option is available only to low-income homeowners. The cost is the total cost of repair, replacement and upgrade including wastewater disposal drainfields, provided that funds are available after addressing the priorities listed in Regulation .04A(1)(a) and (b) of this chapter.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>For the Department’s operating expenses, including technical assistance, to administer the Bay Restoration Onsite Sewage Disposal System Fund not to exceed 8 percent of fees deposited into the Onsite Sewage Disposal System Fund.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>For expenses of a local public entity, not to exceed 10 percent of the fees deposited into the onsite sewage disposal system fund, to administer, enforce, and implement regulations adopted by the Department and delegated to the local public entity, for the reduction of nitrogen using best available technology at onsite sewage disposal systems.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Project Prioritization. Funding shall be based on the following order of priority:</text>
        <paragraph num="(1)">
          <text>Failing onsite sewage disposal systems in the Chesapeake and Atlantic Coastal Bays Critical Area, with best available technology for the removal of nitrogen;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Failing onsite sewage disposal systems outside the Chesapeake and Atlantic Coastal Bays Critical Area, with best available technology for the removal of nitrogen;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Nonconforming onsite sewage disposal systems in the Chesapeake and Atlantic Coastal Bays Critical Area, with best available technology for the removal of nitrogen;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Nonconforming onsite sewage disposal systems outside the Chesapeake and Atlantic Coastal Bays Critical Area, with best available technology for the removal of nitrogen;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Other onsite sewage disposal systems in the Chesapeake and Atlantic Coastal Bays Critical Area including new construction, with best available technology for the removal of nitrogen;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Other onsite sewage disposal systems outside the Chesapeake and Atlantic Coastal Bays Critical Area, including new construction, with best available technology for the removal of nitrogen.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Grant Awards. The Department shall request and accept applications for financial assistance annually and shall award grants based on the following factors:</text>
        <paragraph num="(1)">
          <text>Total number of septic systems within a county;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Number of septic systems within the Chesapeake Bay and Atlantic Coastal Bays Critical Area within a county;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Grant funding requested by the county or its authorized agent.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Income Based Grant Eligibility.</text>
        <paragraph num="(1)">
          <text>Homeowners with existing onsite sewage disposal systems or new onsite sewage disposal system construction may qualify for grant funding based on their income as follows:</text>
          <paragraph num="(a)">
            <text>Up to 100 percent of the approved cost for annual household income of $300,000 or less;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Up to 50 percent of the approved cost for annual household income above $300,000.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Not for profit entities with existing onsite sewage disposal systems or proposing new onsite sewage disposal system construction may qualify for up to 100 percent of the approved cost as grant funding.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Businesses with existing onsite sewage disposal systems or proposing a new onsite sewage disposal system construction can qualify for up to 50 percent of the approved cost as grant funding.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Small businesses, as defined by COMAR 21.01.02.01, with existing onsite sewage disposal systems or proposing a new onsite sewage disposal system construction can qualify for up to 75 percent of the approved cost as grant funding.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>The grant eligibility percentages in this section may be adjusted in the future based on higher or lower funding demands for the upgrade of onsite sewage disposal systems.</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Procedures for Review, Public Notice and Public Hearing for Projects Not Located in the Priority Funding Area.</text>
        <paragraph num="(1)">
          <text>Departmental Review. The applicant shall submit a complete application to include the following:</text>
          <paragraph num="(a)">
            <text>Information about the public health issues that the project addresses including a description of the current condition of the onsite sewage disposal system based on factors such as type of soil, lot size, water table, bacteria samples, and dye tests;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The anticipated mitigation that the project will provide to the identified public health issues;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Information regarding any potential new development resulting from the project;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Measures to be taken to mitigate the potential impacts of new growth resulting from the project;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Evidence that demonstrates the total net nitrogen reduction resulting from the project as well as any additional nitrogen loading that may result from potential new growth, including:</text>
            <paragraph num="(i)">
              <text>Methods used to calculate the total nitrogen reductions and additional nitrogen loading; and</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Assumptions relied upon to calculate the total nitrogen reductions and additional nitrogen loading; and</text>
            </paragraph>
          </paragraph>
          <paragraph num="(f)">
            <text>Language amending the Water and Sewer Plan in draft or final form to identify the problem area and provide proof of available sewer service capacity, including identity of all necessary service agreements, proposed service area boundary changes, and any text and data changes needed to document new sewerage services.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Notice of Application and Public Hearing. Upon receiving an application for funding, the Department shall coordinate with the Maryland Department of Planning prior to granting preliminary approval and shall:</text>
          <paragraph num="(a)">
            <text>Provide a 30-day public notice on its website homepage summarizing:</text>
            <paragraph num="(i)">
              <text>The public health issues being addressed by the project;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>New in-fill growth resulting from the project;</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Mitigation measures to lessen the impact of new growth that could result from the project;</text>
            </paragraph>
            <paragraph num="(iv)">
              <text>Net nitrogen reductions resulting from the project that shall consider the impact of additional nitrogen loading from potential new growth; and</text>
            </paragraph>
            <paragraph num="(v)">
              <text>A deadline for receiving written comments;</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>Provide a copy of the public notice to any interested party that has requested such notice; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Provide an opportunity for a public hearing, if requested within 30 days of the public notice.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>If a public hearing is held regarding an application:</text>
          <paragraph num="(a)">
            <text>The applicant shall attend the hearing and present information concerning the application;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Written comments shall be accepted if they are received by the Department on or before the deadline specified by the Department; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Oral comments may be made at the public hearing.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>Determination of Preliminary Approval. The Department shall, in coordination with the Maryland Department of Planning, make its determination of preliminary approval:</text>
          <paragraph num="(a)">
            <text>Based on the information received with the application, along with any written comments received or any oral public comments received at the hearing that raise issues of law or material facts regarding an application for funding, but only if the issues are pertinent to purposes of the onsite sewage disposal system fund; or</text>
          </paragraph>
          <paragraph num="(b)">
            <text>If no public hearing is requested, based on the information received with the application and from written comments that raise issues of law or material facts regarding an application for funding, but only if the issues are pertinent to purposes of the onsite sewage disposal system fund.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(5)">
          <text>Funding Approval. Upon granting an applicant preliminary approval for funding, the Department shall submit the application for a Priority Funding Area exception to the Smart Growth Coordinating Committee or to such body as may be designated by the State to consider applications for Priority Funding Area exceptions, for final approval or disapproval. The Smart Growth Coordinating Committee shall formally notify the Department of its decision.</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Grant Conditions: Upon final approval of a priority funding area exception by the Smart Growth Coordinating Committee or such other body as may be designated by the State to consider applications for Priority Funding Area exceptions, the Department shall notify the applicant of the approval and shall enter into a grant agreement with the applicant that shall include terms and conditions of such final approval, including:</text>
          <paragraph num="(a)">
            <text>A denial of access for any future connections not included in the project’s proposed service area;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Limits on potential new developments that could result from the project;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>A requirement to amend the county water and sewer plan;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Provisions to ensure that the funding for the project will not unduly impede access to funding for upgrading other individual onsite sewage disposal systems within the jurisdiction; and</text>
          </paragraph>
          <paragraph num="(e)">
            <text>A certification from the county’s environmental health director that the project is consistent with a public health area of concern and shall be subsequently added to the county’s water and sewer plan.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </regulation>
    <annotations>
      <annotation type="Authority">Environment Article, §9-1605.2, Annotated Code of Maryland;Chs. 80 and 379, Acts of 2014; Chs. 124 and 153, Acts of 2015</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: February 3, 2014 (40:2 Md. R. 92)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .01A amended effective June 23, 2014 (41:12 Md. R. 669)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .02B amended effective April 9, 2018 (45:7 Md. R. 346); June 18, 2018 (45:12 Md. R. 619)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .03 amended effective June 23, 2014 (41:12 Md. R. 669); March 28, 2016 (43:6 Md. R. 412)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .03A amended effective June 18, 2018 (45:12 Md. R. 619)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .03A, B amended effective April 9, 2018 (45:7 Md. R. 346)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .03E amended effective May 17, 2021 (48:10 Md. R. 401)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .03F adopted effective April 9, 2018 (45:7 Md. R. 346)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .04A amended effective January 23, 2015 (42:1 Md. R. 19)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .04A, C amended effective June 23, 2014 (41:12 Md. R. 669)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .04D adopted effective January 23, 2015 (42:1 Md. R. 19)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .04D amended effective April 8, 2019 (46:7 Md. R. 371)</annotation>
    </annotations>
  </chapter>
</subtitle>