# COMAR Title 26 — Department of the Environment

## Subtitle 03 — Water Supply, Sewerage, Solid Waste, and Pollution Control Planning and Funding

### Chapter 01 — Planning Water Supply and Sewerage Systems

#### Regulation .06 Flow Data.

*COMAR 26.03.01.06*

For each service area, flow data for all community and multi-use sewerage facilities will be presented according to either Table No. 15 for wastewater treatment plants or Table No. 15A for all principal collector sewers, interceptors, pumping stations, and associated force mains. Information presented previously in either Table No. 9 or Table No. 10 can be omitted from Table No. 15. In Table No. 15A, present data according to the flow pattern of existing sewerage system by starting with principal collector sewers and proceed to the treatment plant.

Table No. 3Projected Water Supply Demands and Planned Capacity
          
          
            Service Area
            Present 1975
            1980
            1990
            2000
          
          
            Population
            GPCD
            Capacity
            Population
            GPCD
            Capacity
            Population
            GPCD
            Capacity
            Population
            GPCD
            Capacity
          
        
        
          
            total
            served
            unserved
            (gals)
            demand
            planned
            total
            served
            unserved
            (gals)
            demand
            planned
            total
            served
            unserved
            (gals)
            demand
            planned
            total
            served
            unserved
            (gals)
            demand
            planned

——————

Table No. 4Inventory of Existing Community System Wells
          
          
            
            Well Nameor Number
            Aquifer
            CoordinateLocation
            DepthFeet
            DiameterInches
            Max. SafeYield
            PumpingCapacity
            WaterQuality
          
        
        
          
            Municipal (Public)
            
            
            
            
            
            
            
            
          
          
            Industrial
            
            
            
            
            
            
            
            
          
          
            Private Community/Institutional

——————

Table No. 5Inventory of Existing Impounded Supplies
          
          
            Owner
            CrestElevation(above sea level)
            SpillwayLength
            Total Length of Dam
            Height of Crest Above Stream Bed
            Flooded Area of Crest Elevation
            Length of Shore Line at Crest Elevation
            Water Overflowed Crest for First Time
            Capacity of Reservoir
            Safe Yield (MGD)
            Average Daily Withdrawal (MGD)
          
        
        
          
            Municipal (Public)
            
            
            
            
            
            
            
            
            
            
          
          
            Industrial
            
            
            
            
            
            
            
            
            
            
          
          
            Private Community/Institutional

——————

Table No. 6Inventory of Existing Water Treatment Facilities
          
          
            Owner
            Water Source
            Type Treatment
            Plant Coordinate Location
            Rated Plant Capacity (MGD)
            Average Production (MGD)
            Max Peak Flow(MGD)
            StorageCapacity(MGD)
            Planned Expansion MGD/Dates
            Method of Sludge Disposal
            Operating Agency
          
        
        
          
            Municipal (Public)
            
            
            
            
            
            
            
            
            
            
          
          
            Industrial
            
            
            
            
            
            
            
            
            
            
          
          
            Private Community*/Institutional

* If transfer to public ownership is recommended, indicate expected date.

——————

Table No. 8Immediate, 5 and 10 Year Priorities for Water Development
          
          
            
            Estimated Costs*
            Project StatusConstr. Start
          
          
            Fiscal YearandProject Number
            CountyPriorityAssigned
            CoordinateLocation
            Description
            Total
            Federaland/orState
            Local
            ImmediatePriorityProjects
            5 and 10 YearPeriod Projects
          
        
        
          
            ______Year

* Based on dollar values as of effective date of plan where applicable.

——————

Table No. 9Projected Sewerage Demands and Planned Capacity
          
          
            ServiceArea
            Present 1975
            1980
            1990
            2000
          
          
            Population
            GPCD
            Capacity
            Population
            GPCD
            Capacity
            Population
            GPCD
            Capacity
            Population
            GPCD
            Capacity
          
        
        
          
            total
            served
            unserved
            (gals)
            demand
            planned
            total
            served
            unserved
            (gals)
            demand
            planned
            total
            served
            unserved
            (gals)
            demand
            planned
            total
            served
            unserved
            (gals)
            demand
            planned

——————

Table No. 10Inventory of Existing Water Treatment Facilities
          
          
            Owner
            Type Treatment
            Plant Coordinate Location
            Occupied Acres
            Vacant Acres
            Point of Discharge*
            Max Site CapacitySecondary
            Max. Site Capacity (MGD) Advanced
            Existing (MGD) Capacity
            Flows (MGD)Average Peak
            Planned or Expected Abandonment Date of Interim MGD Date
            Operating Agency
          
        
        
          
            Municipal (Public)
            
            
            
            
            
            
            
            
            
            
            
          
          
            Industrial
            
            
            
            
            
            
            
            
            
            
            
          
          
            Private Community**/Institutional

** If transfer to public ownership is recommended, indicate expected date.

——————

Table No. 11Problem Areas Inventory —  Individual and Community
          
        
        
          
            
              Service Area
            
            
              ProblemDescription
            
            
              Location
            
            
              Population
            
            
              Acres
            
            
              Treatment Capacity
            
            
              Treatment Demand
            
            
              PlannedCorrectionDate if Known

——————

Table No. 12Water Quality Problem Due to Storm Drainage Outfalls and to Non-point Sources
          
        
        
          
            
              Service Area
            
            
              Problem Description
            
            
              Location
            
            
              Reach Affected

——————

Table No. 13Immediate 5 and 10 Year Priorities for Sewerage Development
          
        
        
          
            
            
            
            
            
            Costs**
            
            
            Projected Schedule***
          
          
            Fiscal Year and Project Number
            County PriorityAssigned
            Coordinate* Location
            Description Total
            PL 660 Eligibility
            Other Federal Local
            Preliminary Plans
            Financial Plans
            Start Construction
            Complete Construction
          
          
            _____Year
            
            
            
            
            
            
            
            
            
          
          
            _____Year

* Where applicable for both treatment facility and point of discharge location.

** Based on real dollar values.

*** Month and year—for the last 5 years the “Construction Schedule Column” and need not be filled in.

Table No. 14Water and Sewerage Map Symbols

Table No. 15Flow DataWastewater Treatment Plants
          
        
        
          
            Design Parameters
            
            Flow
            Development Occupancy Units (1)
          
          
            Name or Service Area
            Hydraulic (mgd)
            Organic(ppm)
            Avg. Day*(mgd)
            Max. Day& (Date**)
            Existing*
            Anticipated***BPI
            PWA
          
          
            
            BOD
            SS
            
            UC
            NUC
            
          
          
            Example:
            
            
            
            
            
            
            117 R
            7 R
            830 R
          
          
            Clear Water
            3.5
            200
            200
            3.0
            5.5(3-17-76)
            6,500
            7 C
            none
            none

* Per Effective Date of Plan (7-1-76)

** During Previous Fiscal Year

*** List Residential (R) Separately from Commercial (C) and Industrial(i)

BPI—Building Permits Issued Per Effective Date of Plan

UC—Building Permits Issued Per Effective Date of Plan for Units under Construction

NUC—Building Permits Issued Per Effective Date of Plan for Units not under Construction

PWA—Building Permits for Unexpired Public Works Agreements Per Effective Date of Plan

(1) — Includes Industrial, Commercial and Residential Units

——————

Table No. 15AFlow DataCollector Sewers, Inceptors, Pumping Stations and Force Mains
          
          
            Name or SewerType Designation
            Sewer
            CapabilityPumping Station
            Force Main
          
        
        
          
            
            Diam.(Inches)
            Flow,Avg.Day*
            mgdDesign
            Number of Pumps
            Capacity of Each Pump(mgd)
            Normal PumpingCapacity (mgd)
            Avg. Day Pumpage* (mgd)
            Max. DayPumpageand Mgd(date)**
            Diam. (inches)
            Design FLow (mgd)
          
          
            Example:Collector
            12
            0.5
            1.0
            
            
            
            
            
            
            
          
          
            Clear Branch Interceptor
            18
            3.5
            5.0
            
            
            
            
            
            
            
          
          
            Severn RunP.S. and
            
            
            
            2
            3.6
            3.6
            2.5
            3.0(3-1-76)
            
            
          
          
            F.M.
            
            
            
            
            
            
            
            
            24
            8.0
          
          
            Clear WaterSTP
            
            (See Table No. 15)

* Per Effective Date of Plan (7-1-76)

** During Previous Fiscal Year