<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".05" citation="COMAR 26.03.02.05" title_num="26" subtitle_num="03" chapter_num="02" heading="Storm Drains.">
  <paragraph num="A.">
    <text>Plans, profiles, and details for storm drains may be prepared on separate drawings or on the same drawings used for sanitary sewers.</text>
  </paragraph>
  <paragraph num="B.">
    <text>All calculations leading to the locations of inlets and the sizes and slopes of storm drains shall be submitted with the plans or previous to the plans. This is to include:</text>
    <paragraph num="(1)">
      <text>The intensity of rainfall to be considered;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Its frequency of occurrence;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>The coefficients of runoff;</text>
    </paragraph>
    <paragraph num="(4)">
      <text>The inlet time;</text>
    </paragraph>
    <paragraph num="(5)">
      <text>The summation of calculated flows at various progressive distances along the drains;</text>
    </paragraph>
    <paragraph num="(6)">
      <text>The spacing and types of inlets;</text>
    </paragraph>
    <paragraph num="(7)">
      <text>The hydraulic calculations leading to the selection of pipe sizes and slopes; and</text>
    </paragraph>
    <paragraph num="(8)">
      <text>Details of manholes, inlets, headwalls, and appurtenances.</text>
    </paragraph>
  </paragraph>
</regulation>