  <paragraph num="A.">
    <text>All wells shall be grouted in accordance with this regulation.</text>
  </paragraph>
  <paragraph num="B.">
    <text>Time Limits.</text>
    <paragraph num="(1)">
      <text>All wells shall be grouted as soon as possible but not later than 24 hours after the well casing has been set in place in Hydrogeological Area’s 1 &amp; 2.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>In Hydrogeological Area’s 3, 4 &amp; 5 all wells shall be grouted within 72 hours after the permanent casing has been set.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>After grouting is completed, there shall be a minimum curing time before drilling may be resumed of:</text>
      <paragraph num="(a)">
        <text>18 hours for Type I and Type II Portland cement; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>12 hours for Type III Portland cement.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="C.">
    <text>Grouting Materials.</text>
    <paragraph num="(1)">
      <text>Cement.</text>
      <paragraph num="(a)">
        <text>The annular space may be filled with neat Portland or quick-setting cement in a ratio of not over 6 gallons of water per 94-pound sack of cement.</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Bentonite may be added to the neat cement grout in an amount not to exceed 6 pounds per 94-pound sack of cement. If bentonite is added to the neat cement grout, then additional water may be added at the ratio of 1 gallon of water per 2 pounds of bentonite.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>Bentonite.</text>
      <paragraph num="(a)">
        <text>Bentonite with a minimum solids content of 20 percent may be used to fill the annular space in accordance with the following:</text>
        <paragraph num="(i)">
          <text>When mixed as a slurry, at 2 pounds bentonite per gallon of water; or</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>In chip or pellet form and if hydrated per the manufacturer specifications, when the annular space is less than 20 feet in depth.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(b)">
        <text>Bentonite may not be used for grouting where it will come into contact with ground water having a pH below 4.0 or a total dissolved solids content greater than 1,000 mg/l.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>Thermal Enhanced Bentonite Grout.</text>
      <paragraph num="(a)">
        <text>Bentonite slurry shall be mixed per manufacturer specifications.</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The sand-bentonite ratio may not be greater than 250 pounds of sand per 50 pounds of bentonite.</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Sand shall be “000” well gravel that meets the following:</text>
        <paragraph num="(i)">
          <text>95 percent silica sand;</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Have a uniformity coefficient not greater than 1.7; and</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>Have a particle size range of 0.60 mm to 0.15 mm.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="(4)">
      <text>Thermally Enhanced Cementatious Grout:</text>
      <paragraph num="(a)">
        <text>Shall be mixed per manufacturers specifications; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Have a permeability rating not less than 1 × 10&lt;sup&gt;¯7&lt;/sup&gt;.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(5)">
      <text>Cement alone or bentonite alone may be required as a special condition in a well construction permit for any well.</text>
    </paragraph>
    <paragraph num="(6)">
      <text>If rapid loss of grout material occurs during grout emplacement, coarse fill material may be used in the zone or zones in which the loss is occurring.</text>
    </paragraph>
    <paragraph num="(7)">
      <text>Other grouting materials or mixtures may be authorized as a special condition in a well construction permit for any well after review and approval by the Department.</text>
    </paragraph>
  </paragraph>
  <paragraph num="D.">
    <text>Standards for Grouting Unconfined Aquifer Wells in Hydrogeologic Areas 1 and 2. For wells screened in an unconfined aquifer under this section, the annular space shall be grouted to a depth of at least 20 feet.</text>
  </paragraph>
  <paragraph num="E.">
    <text>Standards for Grouting Confined Aquifer Wells in Hydrogeologic Area 2. Under this section:</text>
    <paragraph num="(1)">
      <text>The depth of grouting may not be less than 30 feet;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>The annular space above the screen and below the grout shall be completely filled with clay, drill cuttings, or sand before grouting operations begin;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>For two part (lapped) telescoped wells, the drilling fluid may be used as fill material in the annular space if the drill fluid has a weight greater than 11 pounds per gallon;</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Drilling fluid less than 11 pounds per gallon may not be used as an acceptable fill material;</text>
    </paragraph>
    <paragraph num="(5)">
      <text>For wells intended to have a yield greater than 5,000 gallons per day, the grout shall extend from a minimum of 5 feet into the confining bed, immediately above the aquifer being used, to the land surface; and</text>
    </paragraph>
    <paragraph num="(6)">
      <text>For wells intended to have a yield of less than 5,000 gallons per day, the grout shall extend from a minimum of 5 feet into the first confining bed, which is at least 5 feet thick, to the land surface.</text>
    </paragraph>
    <paragraph num="(7)">
      <text>Relative depths to confining layers are described in “MGS, Open File Report No. 12-02-20, Maryland Coastal Plain Aquifer Information System: Hydrogeologic Framework, 2013”, which is incorporated by reference.</text>
    </paragraph>
  </paragraph>
  <paragraph num="F.">
    <text>Standards for Grouting Wells in Hydrogeologic Areas 3, 4, and 5.</text>
    <paragraph num="(1)">
      <text>The annular space shall be grouted completely from the bottom of the casing to the land surface.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>The minimum depth of grout may not be less than 18 feet in Hydrogeologic Areas 3 and, and may not be less than 38 feet in Hydrogeologic Area 4 and 5.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>If caving conditions are experienced on wells with greater than 30 feet of casing, the annular space shall be grouted from the point where caving occurred or from a depth of 30 feet, whichever is greater, to the land surface.</text>
    </paragraph>
  </paragraph>
  <paragraph num="G.">
    <text>If the annular space cannot be grouted in accordance with these regulations, the well shall be abandoned and sealed in accordance with this chapter.</text>
  </paragraph>
  <paragraph num="H.">
    <text>Deviation from Grouting Standards.</text>
    <paragraph num="(1)">
      <text>Deviation from the grouting standards given in §§D, E, and F of this regulation may be approved by the Approving Authority for unusual conditions that prevent conformance with those standards.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>The deviation from the grouting standard shall be requested on a form provided by the Approving Authority. The request shall be submitted to the Approving Authority within 5 days after the well is completed. The Approving Authority shall reject or approve the request within 5 business days.</text>
    </paragraph>
  </paragraph>
  <paragraph num="I.">
    <text>Grout Height.</text>
    <paragraph num="(1)">
      <text>For wells where a pump is not to be installed, the final grout height shall be at ground grade.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>For wells where a pump is to be installed, the final grout height shall be immediately below the pitless adapter or pitless unit.</text>
    </paragraph>
  </paragraph>