<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".20" citation="COMAR 26.04.04.20" title_num="26" subtitle_num="04" chapter_num="04" heading="Construction Standards — Methods of Grouting.">
  <paragraph num="A.">
    <text>All grout shall be emplaced in one continuous operation upward from the bottom of the casing or depth specified in these regulations.</text>
  </paragraph>
  <paragraph num="B.">
    <text>Pouring, dumping, or shoveling of grout slurries into the annular space or well bore are prohibited.</text>
  </paragraph>
  <paragraph num="C.">
    <text>The drilling fluids in the annular space shall be thinned before grouting to a density less than that of the intended grout density.</text>
  </paragraph>
  <paragraph num="D.">
    <text>Grout shall be emplaced so that it completely displaces the fluid in the annular space from the bottom of the interval being grouted to the ground surface.</text>
  </paragraph>
  <paragraph num="E.">
    <text>The following are approved methods of grouting when performed in accordance with the conditions specified:</text>
    <paragraph num="(1)">
      <text>Grout Pipe Outside of Casing (Tremie Pipe).</text>
      <paragraph num="(a)">
        <text>The annular space shall be a minimum of 1½ inches.</text>
      </paragraph>
      <paragraph num="(b)">
        <text>All grout shall be placed by pumping through the grout pipe.</text>
      </paragraph>
      <paragraph num="(c)">
        <text>The entire interval to be grouted shall be open and without obstructions; washing or jetting with water is recommended for cleaning the borehole and may serve to remove obstructions caused by caving which otherwise would prevent a proper grout.</text>
      </paragraph>
      <paragraph num="(d)">
        <text>The grout pipe shall extend from the surface to the bottom of the interval to be grouted.</text>
      </paragraph>
      <paragraph num="(e)">
        <text>The grout pipe may remain extended to the bottom of the interval during and after grouting, or it may be raised slowly as the grout is placed provided that the discharge end of the grout pipe remains submerged in the emplaced grout at all times until grouting is completed.</text>
      </paragraph>
      <paragraph num="(f)">
        <text>In the event of interruption in the grouting operations, the bottom of the grout pipe shall be raised above the grout level and should not be resubmerged until the air and water have been displaced from the grout pipe.</text>
      </paragraph>
      <paragraph num="(g)">
        <text>Grouting Depths of 20 feet or Less. Grout may be placed by a grout pipe inserted only 10 feet into the annular space, provided that:</text>
        <paragraph num="(i)">
          <text>The entire interval to be grouted is clearly visible from the surface and is dry; and</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>An annular space larger than the minimum 1½ inches may be required to assure visibility from the surface.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>Grout Pipe — Inside Casing.</text>
      <paragraph num="(a)">
        <text>The bottom of the casing is fitted with a cementing shoe or float shoe and the casing is placed in the borehole a short distance off the bottom;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The grout pipe is placed in the casing a short distance from the float shoe or is mechanically attached to the float shoe; and</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Grout is pumped through the grout pipe until grout appears at the land surface.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>Grouting with Bentonite Chips or Pellets. A well may be grouted using bentonite chips or pellets under the following conditions:</text>
      <paragraph num="(a)">
        <text>The grouting depth is 20 feet or less;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The annular space is open and free of obstruction;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>The annular space is at least 1½ inches;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>The drilling fluid, if present, is thinned to a viscosity of less than 30 seconds and the weight is less than 9 pounds per gallon;</text>
      </paragraph>
      <paragraph num="(e)">
        <text>The bentonite chips or pellets may be poured down the annular space; and</text>
      </paragraph>
      <paragraph num="(f)">
        <text>The annular space is continuously measured to assure proper filling without bridging.</text>
      </paragraph>
      <paragraph num="(g)">
        <text>If bridging occurs and the annular space cannot be completely filled then:</text>
        <paragraph num="(i)">
          <text>The annular space shall be jetted to remove the bentonite; or</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>The well shall be abandoned and sealed in accordance with this chapter.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="(4)">
      <text>The Approving Authority may approve other grouting methods not specifically identified by this regulation.</text>
    </paragraph>
  </paragraph>
</regulation>