<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".28" citation="COMAR 26.04.04.28" title_num="26" subtitle_num="04" chapter_num="04" heading="Hydrofracture of Wells.">
  <paragraph num="A.">
    <text>The Approving Authority shall be notified at least 2 business days in advance of commencing hydrofracturing work on an existing well.</text>
  </paragraph>
  <paragraph num="B.">
    <text>Hydrofracturing may not be conducted on any well not constructed according to the requirements of this chapter without approval from the Approving Authority.</text>
  </paragraph>
  <paragraph num="C.">
    <text>Hydrofracturing may not be conducted in Hydrogeologic Area 5 without written permission from the Approving Authority.</text>
  </paragraph>
  <paragraph num="D.">
    <text>Hydrofracturing may be performed only by qualified professionals who possess a Maryland well driller's license or who are working as a subcontractor and under the direct supervision of a licensed Maryland well driller.</text>
  </paragraph>
  <paragraph num="E.">
    <text>Hydrofracturing a well within 100 feet of another water supply well requires written approval of the Approving Authority.</text>
  </paragraph>
  <paragraph num="F.">
    <text>The well to be hydrofractured shall be at least 50 feet from any other potable water supply well.</text>
  </paragraph>
  <paragraph num="G.">
    <text>Hydrofracturing a water supply well or test well within 500 feet of a landfill or area of known ground water contamination requires the Approving Authority's written approval.</text>
  </paragraph>
  <paragraph num="H.">
    <text>The well to be hydrofractured shall be at least 100 feet from any potential source of contamination.</text>
  </paragraph>
  <paragraph num="I.">
    <text>Water used for hydrofracturing shall:</text>
    <paragraph num="(1)">
      <text>Meet the requirements of Regulation .16B(3)(a) and(b) of this chapter; or</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Be from a source approved by the Approving Authority.</text>
    </paragraph>
  </paragraph>
  <paragraph num="J.">
    <text>New well construction may require deepening to meet the minimum system yield requirements of Regulation .26J of this chapter if there is a drop in static water level as a result of hydrofracturing.</text>
  </paragraph>
  <paragraph num="K.">
    <text>After hydrofracture, the total volume of water introduced into the well shall be removed prior to conducting test for yield in accordance with the procedures outlined in Regulation .26G of this chapter.</text>
  </paragraph>
  <paragraph num="L.">
    <text>Hydrofracture of Well Report.</text>
    <paragraph num="(1)">
      <text>The well driller shall file a Hydrofracture of Well Report to the Approving Authority within 45 days after hydrofracturing the well.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Yield test data shall be submitted with the Hydrofracture of Well Report for both new wells and existing wells.</text>
    </paragraph>
  </paragraph>
</regulation>