  <paragraph num="A.">
    <text>Preliminary Work Before Sealing a Well.</text>
    <paragraph num="(1)">
      <text>The well shall be investigated to determine:</text>
      <paragraph num="(a)">
        <text>Its present condition;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The details of its construction; and</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Whether there are any obstructions that will interfere with the process of filling and sealing.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>If there are any obstructions, they shall be removed, if possible, by cleaning the hole or redrilling.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Liners shall be removed prior to sealing or an alternate sealing plan must be approved by the Approving Authority.</text>
    </paragraph>
  </paragraph>
  <paragraph num="B.">
    <text>Filling and Sealing Wells.</text>
    <paragraph num="(1)">
      <text>In all hydrogeologic areas of the State, the annular space of cased wells shall be sealed.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Wells in an unconfined aquifer in Hydrogeologic Areas 1 and 2 shall be sealed by either of the following procedures:</text>
      <paragraph num="(a)">
        <text>If the well casing is not removed, fill the well with sealing material; or</text>
      </paragraph>
      <paragraph num="(b)">
        <text>If the well casing is removed, fill the entire length of the borehole with sealing material.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>Wells in a confined aquifer in Hydrogeologic Area 2 shall be filled and sealed by either of the following procedures:</text>
      <paragraph num="(a)">
        <text>If the casing has been removed, the well shall be filled the entire depth with sealing material; or</text>
      </paragraph>
      <paragraph num="(b)">
        <text>If the casing has not been removed:</text>
        <paragraph num="(i)">
          <text>Consideration shall be given to perforating or ripping the casing opposite the confining layers; and</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>The well shall be filled with sealing material.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="(4)">
      <text>Unconfined wells less than 2-inch diameter shall be sealed only with neat Portland cement.</text>
    </paragraph>
    <paragraph num="(5)">
      <text>Wells in Hydrogeologic Areas 3, 4, and 5 Filling and Sealing Procedures.</text>
      <paragraph num="(a)">
        <text>Fill material shall extend from the bottom of the well to within 20 feet of the casing bottom, except for filling materials used in unsuccessful wells under Regulation .35C(2) of this chapter.</text>
      </paragraph>
      <paragraph num="(b)">
        <text>If rapid loss of sealing material into the rock occurs during emplacement, coarse fill material may be used to fill voids.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="C.">
    <text>Placement of Material. The following standards shall be met in placing filling or sealing materials:</text>
    <paragraph num="(1)">
      <text>The well shall be sealed with the appropriate material emplaced from the top of the fill material;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>When neat Portland cement, concrete, or bentonite slurry is used, it shall be placed in one continuous operation utilizing a pipe extended to the bottom of the interval to be sealed except as noted in §D of this regulation;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Bentonite chips or pellets:</text>
      <paragraph num="(a)">
        <text>Shall be used in such a way as to prevent bridging, but if bridging occurs, the well shall be drilled out;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>May not be used for casing diameters smaller than 2 inches; and</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Shall follow the specific product manufacturer’s instructions for their use.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="D.">
    <text>Special Procedures for Filling and Sealing Certain Wells.</text>
    <paragraph num="(1)">
      <text>A dug well shall be filled and sealed by the following procedure:</text>
      <paragraph num="(a)">
        <text>Placing fill material in the well to a level approximately 5 feet below the land surface;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Placing a 2-feet thick layer of concrete above the fill; and</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Filling the remainder of the well to the ground surface.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>A monitoring well shall be sealed by the following procedure:</text>
      <paragraph num="(a)">
        <text>For monitoring wells less than 50 feet in depth:</text>
        <paragraph num="(i)">
          <text>Ripping or removing the casing; and</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Filling the well with sealing material; or</text>
        </paragraph>
      </paragraph>
      <paragraph num="(b)">
        <text>For monitoring wells greater than 50 feet in depth follow the procedures specified in §B of this regulation.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>A geothermal well shall be sealed by;</text>
      <paragraph num="(a)">
        <text>Removing all fluids from the tubing; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Filling the tubing and any open portion of the borehole with grout.</text>
      </paragraph>
    </paragraph>
  </paragraph>