  <regulation prefix="Regulation" num=".01" heading="Purpose and Administrative Responsibilities.">
    <paragraph num="A.">
      <text>Purpose. This chapter establishes the standards and procedures applicable to the construction, abandonment and maintenance of wells in Maryland.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Pre-emption of Local Authority. In accordance with Environment Article, §9-1304, Annotated Code of Maryland, the regulations of this chapter are the only procedures and standards applicable to construction of wells.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".02" heading="Definitions.">
    <paragraph num="A.">
      <text>In this chapter, the following terms have the meanings indicated.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Terms Defined.</text>
      <paragraph num="(1)">
        <text>“Abandonment” means to discontinue the use of a well permanently.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>“Annular space” means the space between casings or between the casing and borehole.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>“Approving Authority” means the Secretary of the Environment or the Secretary’s designee.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>“Aquifer” means a formation, group of formations, or part of a formation that contains sufficient saturated permeable material to yield significant quantities of water to a well.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Bedrock.</text>
        <paragraph num="(a)">
          <text>“Bedrock” means solid rock that underlies gravel, soil, or other superficial material.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>“Bedrock” also means in absolute terms material that a 6-inch auger, equipped with carbide cutting teeth, penetrates at a rate of less than 1 inch in 3 minutes.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(6)">
        <text>“Bentonite” means a colloidal clay, composed of at least 85 percent sodium montmorillonite.</text>
      </paragraph>
      <paragraph num="(7)">
        <text>“Bored well” means any excavation made using power driven equipment where the drill consists of a continuous spiral of metal solid or hollow stem auger or bucket attached to a shaft and where the excavated material is brought to the ground surface by upward movement along the surface of the spiral or removed by lifting the spiral or bucket.</text>
      </paragraph>
      <paragraph num="(8)">
        <text>“Borehole” means a hole drilled or bored into the earth, into which casing, screen, liners, grout, gravel pack and other physical objects that may be installed to construct a well. The generalized term includes the excavations for dug, driven, and jetted wells.</text>
      </paragraph>
      <paragraph num="(9)">
        <text>“Casing” means any metal, plastic or other pipe installed from the surface to either the bedrock or screened aquifer in the borehole.</text>
      </paragraph>
      <paragraph num="(10)">
        <text>“Cathodic protection well” means a well constructed to minimize the electrolytic corrosion of metallic equipment that comes in contact with the ground.</text>
      </paragraph>
      <paragraph num="(11)">
        <text>“Cluster” means a group of wells that are constructed for the same use on the same property.</text>
      </paragraph>
      <paragraph num="(12)">
        <text>“Confined aquifer” means an aquifer that is bounded above and below by beds of distinctly lower permeability than that of the aquifer itself and contains ground water under pressure greater than that of the atmosphere. This term is synonymous with the term “artesian aquifer”.</text>
      </paragraph>
      <paragraph num="(13)">
        <text>“Confining layer” means a body of impermeable or of distinctly less permeable material stratigraphically adjacent to one or more aquifers.</text>
      </paragraph>
      <paragraph num="(14)">
        <text>“Department” means the Department of the Environment.</text>
      </paragraph>
      <paragraph num="(15)">
        <text>“Development” means the process whereby a well is pumped, surged, bailed, airlifted, swabbed, or jetted to remove any material that may be blocking the well screen or fractures within the borehole.</text>
      </paragraph>
      <paragraph num="(16)">
        <text>“Disinfection” means the inactivation or removal of those agents that may cause infection.</text>
      </paragraph>
      <paragraph num="(17)">
        <text>“Domestic well” means a well used to supply potable water to one or more dwellings.</text>
      </paragraph>
      <paragraph num="(18)">
        <text>“Driven well” means any well in which the casing is manually or mechanically driven into the ground with little or no material excavated during well construction.</text>
      </paragraph>
      <paragraph num="(19)">
        <text>“Dug well” means any well made using only hand tools.</text>
      </paragraph>
      <paragraph num="(20)">
        <text>“Emergency condition” means:</text>
        <paragraph num="(a)">
          <text>The lack of water poses an immediate and significant danger to the health and welfare of persons, livestock, domestic fowl, or crops; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The Approving Authority has determined that other exceptional circumstances exist.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(21)">
        <text>“Geothermal well” means a well used to transfer heat to or from the ground or ground water.</text>
      </paragraph>
      <paragraph num="(22)">
        <text>“Grout” or “grouting material” means a stable, impervious bonding material that is reasonably free of shrinkage and is capable of providing a watertight seal in the annular space throughout the depth required.</text>
      </paragraph>
      <paragraph num="(23)">
        <text>“Hydrofracturing” means a method of developing or reworking an existing well whereby water is pumped down the borehole under pressure in an attempt to increase the well's yield.</text>
      </paragraph>
      <paragraph num="(24)">
        <text>“Industrial well” means a well used to supply water to an industrial or commercial facility for use in processing, washing, or manufacturing of goods and services.</text>
      </paragraph>
      <paragraph num="(25)">
        <text>“Injection well” means any hole made in the ground to inject fluids into any underground formation from which ground water may be produced.</text>
      </paragraph>
      <paragraph num="(26)">
        <text>“Irrigation well” means a well that is used for watering crops other than residential lawns and gardens.</text>
      </paragraph>
      <paragraph num="(27)">
        <text>“Jetted well” means any well made using water under pressure as a means of drilling or penetrating the ground.</text>
      </paragraph>
      <paragraph num="(28)">
        <text>“Jetted-driven well” means a jetted well where the diameter of the excavation is less than the diameter of the well casing used and the well casing is driven into the excavation.</text>
      </paragraph>
      <paragraph num="(29)">
        <text>“Liner” means a pipe that is installed inside a completed and cased well or borehole to:</text>
        <paragraph num="(a)">
          <text>Protect the integrity of the borehole;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Seal off zones of undesirable quality;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Repair compromised casing or;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Repair compromised screens.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(30)">
        <text>“Monitoring well” means a permanent well used for:</text>
        <paragraph num="(a)">
          <text>Determining the water table;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Determining the potentiometric surface of an aquifer;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Obtaining a ground water sample; or</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Ground water withdrawal for remediation purposes.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(31)">
        <text>“Non-potable well” means a well that is not used or intended to be used as a drinking water supply.</text>
      </paragraph>
      <paragraph num="(32)">
        <text>“Person” means the federal government, the State, any county, municipal corporation, or other political subdivision of the State, or any of their units, an individual, receiver, trustee, guardian, executor, administrator, fiduciary, or representative of any kind, or any partnership, firm, association, public or private corporation, or any other entity.</text>
      </paragraph>
      <paragraph num="(33)">
        <text>“Piezometer” means a nonpumping well of a temporary nature to measure water tables.</text>
      </paragraph>
      <paragraph num="(34)">
        <text>“Pitless adapter” means a device designed for attachment to the exterior of a well casing and equipped with lateral connections designed for the attachment of pipes leading from the well for purposes of conducting water to a distribution system and allowing extension of well casing above grade.</text>
      </paragraph>
      <paragraph num="(35)">
        <text>“Pitless unit” means a device designed to replace a section of casing with lateral connections designed for the attachment of pipes leading from the well for the purposes of conducting water to a distribution system and allowing extension of well casing above grade.</text>
      </paragraph>
      <paragraph num="(36)">
        <text>“Pollution” means any contamination or other alteration of the physical, chemical, or biological properties of any waters of the State, including a change in temperature, taste, color, turbidity, or odor of the waters, or the discharge or deposit of any organic matter, harmful organism, or liquid, gaseous, solid, radioactive, or other substance into any waters of this State that will render the waters harmful or detrimental to:</text>
        <paragraph num="(a)">
          <text>Public health, safety, or welfare;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Domestic commercial, industrial, agricultural, recreational, or other legitimate beneficial uses;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Livestock, wild animals, or birds; or</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Fish or other aquatic life.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(37)">
        <text>“Potable water” means water that is free from impurities in amounts sufficient to cause disease or harmful physiological effects and that conforms with the maximum contaminant levels as adopted by the United States Environmental Protection Agency and listed in 40 CFR §141, Subpart G as amended.</text>
      </paragraph>
      <paragraph num="(38)">
        <text>“Public well” means a well that is used to supply water to a public water system as defined in COMAR 26.04.01.</text>
      </paragraph>
      <paragraph num="(39)">
        <text>“Replacement well” means a well that is to replace any existing water supply.</text>
      </paragraph>
      <paragraph num="(40)">
        <text>Reworking.</text>
        <paragraph num="(a)">
          <text>“Reworking” means the rehabilitation or modification of a well.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>“Reworking” includes but is not limited to:</text>
          <paragraph num="(i)">
            <text>Removing and replacing well screen;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Placing a new screen in a well;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Placing liner pipe in a well; and</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Redevelopment of a well.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(c)">
          <text>“Reworking” does not include:</text>
          <paragraph num="(i)">
            <text>Increasing the diameter of a well; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Deepening of a well.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(41)">
        <text>“Standby well” means a water supply well that is a backup to the primarily used water supply well which meets the construction and potability standards of this chapter.</text>
      </paragraph>
      <paragraph num="(42)">
        <text>“Test well” means a well used for the purpose of exploring for ground water for a water supply and used to determine aquifer properties.</text>
      </paragraph>
      <paragraph num="(43)">
        <text>“Unconfined aquifer” means an aquifer that is not bounded above by a bed of distinctly lower permeability than that of the aquifer itself and contains ground water under pressure approximately equal to that of the atmosphere. This term is synonymous with the term “water table aquifer”.</text>
      </paragraph>
      <paragraph num="(44)">
        <text>“Variance” means a deviation from the requirements of these regulations granted by the Department according to the provisions of Regulation .37.</text>
      </paragraph>
      <paragraph num="(45)">
        <text>“Water supply well” means every type of well, except monitoring and closed loop geothermal wells.</text>
      </paragraph>
      <paragraph num="(46)">
        <text>“Well” means a hole made in the ground:</text>
        <paragraph num="(a)">
          <text>To explore for ground water;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>To obtain or monitor ground water;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>To inject water into any underground formation from which ground water may be produced; or</text>
        </paragraph>
        <paragraph num="(d)">
          <text>To transfer heat to or from the ground or ground water, if the hole:</text>
          <paragraph num="(i)">
            <text>Extends more than 20 feet below the surface of the ground; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Is not a well for obtaining geothermal resources under Environment Article, §5-601, Annotated Code of Maryland.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".03" heading="Application for a Well Construction Permit.">
    <paragraph num="A.">
      <text>An application for a well construction permit shall be made on the forms provided by the Approving Authority.</text>
    </paragraph>
    <paragraph num="B.">
      <text>A separate application shall be made for each well, except that a single application may be made for a cluster of wells under one of the following conditions:</text>
      <paragraph num="(1)">
        <text>The cluster is for closed loop geothermal or dewatering wells and the maximum number of wells drilled per application is 20; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The cluster is for piezometers used in spill control investigations and other groundwater investigations required by the Department.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>If piezometers are converted to permanent monitoring wells, a tag must be obtained for each one.</text>
    </paragraph>
    <paragraph num="D.">
      <text>An application shall be legible and complete. An illegible or incomplete application may be returned to the applicant with a statement of the reason for rejection.</text>
    </paragraph>
    <paragraph num="E.">
      <text>An application for a well construction permit shall be submitted to the Approving Authority for review, except for:</text>
      <paragraph num="(1)">
        <text>An application for a test well for a public water supply system or a public well, which shall be submitted to the Department through the Approving Authority; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>An application for a water supply well for use on a dairy farm, which shall be submitted to the Approving Authority who shall submit to the Maryland Department of Health for review prior to issuance.</text>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>An application for an injection well shall be submitted to the Department through the Approving Authority.</text>
    </paragraph>
    <paragraph num="G.">
      <text>An application for dewatering wells shall be made to the Approving Authority if:</text>
      <paragraph num="(1)">
        <text>The wells will be deeper than 30 feet;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The well will be in use for greater than 30 days; or</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The well will contain pumping equipment.</text>
      </paragraph>
    </paragraph>
    <paragraph num="H.">
      <text>An application for a cluster of wells shall include a drawing indicating the location of each proposed well on the property.</text>
    </paragraph>
    <paragraph num="I.">
      <text>For a well permitted as part of a cluster that is proposed to be converted to a permanent monitoring well a separate application shall be made.</text>
    </paragraph>
    <paragraph num="J.">
      <text>The Approving Authority may request additional information deemed necessary to consider the application.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".04" heading="Review and Approval of an Application for a Well Construction Permit.">
    <paragraph num="A.">
      <text>Application Review and Approval.</text>
      <paragraph num="(1)">
        <text>The Approving Authority shall review the application for completeness and notify the applicant of any additional information needed.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The Approving Authority shall approve the application if:</text>
        <paragraph num="(a)">
          <text>The application is complete;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The proposed well meets the criteria of §B of this regulation;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The proposed source or sources of drilling water meets the requirements of this chapter;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>The Approving Authority has received the required well permit fee, if applicable; and</text>
        </paragraph>
        <paragraph num="(e)">
          <text>One of the following conditions regarding water appropriation or use permitting is met:</text>
          <paragraph num="(i)">
            <text>An application for an appropriation or use permit has been submitted, if required, in accordance with applicable State law and regulation; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>A notice of exemption, if required under Environment Article, §5-502, Annotated Code of Maryland, has been made with the Department.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>If it approves the application, the Approving Authority shall sign the application and issue a well construction permit.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>An application that has been disapproved by the Approving Authority shall be returned to the applicant with a statement of the reasons for disapproval.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Criteria for Approval.</text>
      <paragraph num="(1)">
        <text>A proposed well construction shall be in accordance with the applicable Master Water and Sewer Plan, promulgated in accordance with Environment Article, Title 9, Subtitle 5, Annotated Code of Maryland.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A proposed well location for a water supply or open loop geothermal well shall satisfy the following minimum horizontal distance requirements:</text>
        <paragraph num="(a)">
          <text>10 feet from a property line;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>15 feet from a road or dedicated right-of-way;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>30 feet from a building foundation;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>100 feet from identifiable sources of contamination and designated subsurface sewage disposal areas if the proposed well will utilize an unconfined aquifer as a water supply source;</text>
        </paragraph>
        <paragraph num="(e)">
          <text>50 feet from identifiable sources of contamination and designated subsurface sewage disposal areas if the proposed well will utilize a confined aquifer as a water supply source; and</text>
        </paragraph>
        <paragraph num="(f)">
          <text>Except as provided in §B(3) of this regulation, 50 feet from any sewage gravity or force main.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>If a force main is constructed of materials approved by the Department and has passed a leakage test in accordance with the recommended standards for sewage works, and, if required by the Approving Authority, concrete encasement of sewage force main joints have been emplaced within a 50-foot radius of the proposed well, then the distance from any force main may be 10 feet.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>A proposed well location for a closed loop geothermal well shall satisfy the following minimum distance requirements:</text>
        <paragraph num="(a)">
          <text>10 feet from a property line;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>15 feet from a road or dedicated right-of-way:</text>
        </paragraph>
        <paragraph num="(c)">
          <text>50 feet from potential sources of contamination: and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>50 feet from any gravity sewer line, except the distance of removal shall be at least 10 feet when the sewer is constructed of:</text>
          <paragraph num="(i)">
            <text>Cast iron pipe with either water-tight lead caulked joints or joints fitted with neoprene gaskets;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Solvent welded Scheduled 40 (or SDR equivalent) or better polyvinyl chloride (PVC) pipe; or</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Thermally welded high density polyethylene (HDPE) pipe.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>A water supply well may not be located within or under any building other than a separate structure constructed specifically for the housing of pumping equipment.</text>
      </paragraph>
      <paragraph num="(6)">
        <text>The Approving Authority may approve a monitoring or closed loop geothermal well location within a building, if unobstructed access to the well is provided.</text>
      </paragraph>
      <paragraph num="(7)">
        <text>All wells shall be located so as to be accessible for cleaning, treatment, repair, testing, inspection, and other requirements that may be necessary.</text>
      </paragraph>
      <paragraph num="(8)">
        <text>The location of a water supply well shall be in accordance with any conditions on well spacing that may be imposed by the Department through an appropriation or use permit.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Notwithstanding satisfaction of the criteria of this regulation, the Approving Authority, before approving a permit, shall determine the acceptability of a proposed well location with regard to all identifiable sources of contamination, topography, surface drainage, easements, and ground water conditions.</text>
    </paragraph>
    <paragraph num="D.">
      <text>Upon written request, deviation from the distance criteria may be permitted by the Approving Authority without a variance approved by the Department per Regulation .37 of this chapter for a domestic well constructed on an individual lot in those cases where the property owner has initiated or completed construction of the residential dwelling for that lot in compliance with all other State, county, or municipal laws and regulations. The request shall describe the need for a deviation and shall contain a statement signed by the owner confirming the basis for a deviation.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".05" heading="Issuance of Well Construction Permits.">
    <paragraph num="A.">
      <text>A well may not be constructed until the Approving Authority has issued a permit to drill the well, except as provided in Regulation .06 of this chapter.</text>
    </paragraph>
    <paragraph num="B.">
      <text>The Approving Authority may issue a well construction permit only to a person licensed by the State Board of Well Drillers as a master well driller.</text>
    </paragraph>
    <paragraph num="C.">
      <text>Except as provided in Regulation .06 of this chapter, the Approving Authority may issue a well construction permit after receipt and review of a completed application submitted in accordance with this chapter.</text>
    </paragraph>
    <paragraph num="D.">
      <text>The Approving Authority may impose special conditions on the permit that are necessary to protect the public health and environment.</text>
    </paragraph>
    <paragraph num="E.">
      <text>The Approving Authority shall issue a separate permit for each well, except that the Approving Authority may permit a well cluster under one permit.</text>
    </paragraph>
    <paragraph num="F.">
      <text>The permit, if necessary, authorizes the construction of a temporary well to supply drilling water for construction of the permitted well. The temporary well shall be sealed within 48 hours of completion of construction of the permitted well, in accordance with this chapter.</text>
    </paragraph>
    <paragraph num="G.">
      <text>Written Permit and Well Identification Tag.</text>
      <paragraph num="(1)">
        <text>Issuance of a well construction permit shall consist of a written permit and a durable well identification tag.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Written Permit.</text>
        <paragraph num="(a)">
          <text>The permit shall state pertinent information and requirements applicable to the approved well.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A permit shall be valid for a period of 12 months from the date of issuance by the Approving Authority.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Upon written request by the well driller, a permit may be extended in 6-month increments by the Approving Authority.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Well Identification Tag.</text>
        <paragraph num="(a)">
          <text>The well driller, immediately after grouting the well, shall permanently attach to the well the identification tag furnished by the Approving Authority.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The identification tag shall be permanently fastened to the well casing above the finished grade by means of a stainless steel band.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>For wells where a pitless adapter or pitless unit is not used, the identification tag shall be permanently attached or fastened to a concrete base where this base completely surrounds the casing.</text>
        </paragraph>
        <paragraph num="(d)">
          <text>For closed loop geothermal wells, the well identification tag shall be supplied to the owner.</text>
        </paragraph>
        <paragraph num="(e)">
          <text>If the identification tag is removed from the well during later work on the well, it shall be replaced in the proper position and manner by the person who removes it.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".06" heading="Emergency Procedure to Obtain a Well Construction Permit.">
    <paragraph num="A.">
      <text>The Approving Authority may permit emergency construction of wells for the conditions specified in Regulation .02B(20) of this chapter or for the following types of wells:</text>
      <paragraph num="(1)">
        <text>Monitoring wells at pollution spill sites to control the spread of the pollution as required by the Department; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Geothermal wells if a loss of heating or cooling poses a health threat or significant loss of goods or livestock.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>If an emergency condition occurs during normal business hours, the Approving Authority may grant an emergency permit in accordance with the following procedures:</text>
      <paragraph num="(1)">
        <text>The existence of an emergency condition shall be verified by the Approving Authority;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>If the emergency is verified to the satisfaction of the Approving Authority, the Approving Authority may issue a verbal emergency permit number to a master well driller;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The permit number shall be in the possession of the permittee during construction of the well, and shall constitute authorization to construct the well;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>The emergency permit shall become null and void if well construction is not started within 2 days after issuance of the emergency permit number; and</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Within 3 business days after the start of construction of the well, the master well driller shall submit to the Approving Authority a completed, written application, including the emergency permit number.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>If an emergency condition occurs during nonbusiness hours:</text>
      <paragraph num="(1)">
        <text>The master well driller shall attempt to contact the Approving Authority through the Approving Authority's nonbusiness-hours emergency telephone number;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>If the Approving Authority cannot be contacted, then the well may be constructed without receiving a verbal permit number provided that not later than the first business day following the start of well construction activity, an application is submitted to the Approving Authority; and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The Approving Authority shall verify the emergency condition before the issuance of a permit.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Any well constructed under an emergency condition shall be constructed in conformance with all applicable laws and regulations of the Approving Authority.</text>
    </paragraph>
    <paragraph num="E.">
      <text>If the new well location is found to be unacceptable by the Approving Authority, the well shall be sealed in accordance with this chapter.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".07" heading="Verbal Authorization to Construct a Well.">
    <paragraph num="A.">
      <text>The Approving Authority may grant verbal authorization to a master well driller to construct a well when:</text>
      <paragraph num="(1)">
        <text>The application has been submitted and approved by the Approving Authority; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The authorization is for an emergency well.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Verbal Authorization and Permit Number.</text>
      <paragraph num="(1)">
        <text>Verbal authorization shall be accompanied by the issuance of a well construction permit number.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Upon request by Approving Authority personnel, the well driller shall supply the well construction permit number for the well being drilled.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Verbal authorization may not be granted if the well is to provide water for a use requiring a permit to appropriate or use water, and this permit has not been obtained or is not valid.</text>
    </paragraph>
    <paragraph num="D.">
      <text>Any well constructed with verbal authorization shall be constructed in conformance with all applicable laws and the regulations of this chapter.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".08" heading="Transfer of Permit.">
    <paragraph num="A.">
      <text>A well construction permit may be transferred from the permittee to another master well driller provided:</text>
      <paragraph num="(1)">
        <text>The well has not been completed;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The permit has not expired;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The permittee obtains the Approving Authority's approval to transfer the permit; and</text>
      </paragraph>
      <paragraph num="(4)">
        <text>The transferee notifies the Approving Authority in writing of their intention to accept the permit.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>The transferee shall be responsible for complying with all laws and regulations applicable to the construction of the well.</text>
    </paragraph>
    <paragraph num="C.">
      <text>The transferee may not begin well construction before obtaining the permit and well tag from the permittee and receiving the approval of the transfer from the Approving Authority.</text>
    </paragraph>
    <paragraph num="D.">
      <text>The Approving Authority shall maintain a separate log of permit transfers.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".09" heading="Permit Invalidation.">
    <paragraph num="A.">
      <text>A permit is invalid if, prior to well completion, the Maryland Board of Well Drillers suspends or revokes the license of the master well driller permit holder.</text>
    </paragraph>
    <paragraph num="B.">
      <text>The Approving Authority may invalidate a permit after a finding that information submitted to support the application was inaccurate.</text>
    </paragraph>
    <paragraph num="C.">
      <text>The Approving Authority may invalidate a permit after a finding that information submitted to support the application is no longer applicable to the site.</text>
    </paragraph>
    <paragraph num="D.">
      <text>The Approving Authority shall notify the permittee that a permit has been invalidated.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".10" heading="Permittee's Responsibilities.">
    <paragraph num="A.">
      <text>The master well driller to whom a well construction permit is issued is responsible for construction of the well in accordance with the permit and applicable laws and regulations.</text>
    </paragraph>
    <paragraph num="B.">
      <text>All other persons working on a well or potable water supply system, including but not limited to a pump installer, a water-conditioner installer, an electrician, or a master plumber, also shall be responsible for their phase of the work and its conformance to applicable laws and regulations.</text>
    </paragraph>
    <paragraph num="C.">
      <text>Only the permittee, or his licensed employee or licensed agent, is authorized to construct the well.</text>
    </paragraph>
    <paragraph num="D.">
      <text>The permittee, or his licensed employee or licensed agent, shall be present on-site to supervise the work of constructing a well.</text>
    </paragraph>
    <paragraph num="E.">
      <text>Permit information shall be available on-site during construction of the well and made available upon request to the Approving Authority.</text>
    </paragraph>
    <paragraph num="F.">
      <text>The permittee, upon completion of the well, shall prepare, sign, and submit to the Approving Authority a legible well completion report. The requirements for well completion reports are set forth in Regulation .29 of this chapter.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".11" heading="Permits for Reworked and Deepened Wells.">
    <paragraph num="A.">
      <text>A well construction permit is not required if an existing well requires only reworking or repairing, and not deepening.</text>
    </paragraph>
    <paragraph num="B.">
      <text>If reworking the well includes hydrofracturing, the well driller shall submit a Hydrofracture of Well Report within 45 days after completion of the work as required in Regulation .28 of this chapter.</text>
    </paragraph>
    <paragraph num="C.">
      <text>If an existing well requires deepening, and the well identification number is verifiable by means of the well identification tag or prior permit, a well construction permit is not required except in areas of known water quality problems, however, upon completion, the well driller shall submit to the Approving Authority the well identification number and an updated completion report in accordance with the regulations of this chapter.</text>
    </paragraph>
    <paragraph num="D.">
      <text>If a well requires deepening and the well driller cannot provide the well identification number, the well driller shall apply for a well construction permit.</text>
    </paragraph>
    <paragraph num="E.">
      <text>If a well which is governed by a water appropriation and use permit requires deepening permission must be obtained from the Department.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".12" heading="Procedure for Authorizing Conversions of Test Wells.">
    <paragraph num="A.">
      <text>A permitted test well that is found to produce the required amount of water may be converted to a water supply well if:</text>
      <paragraph num="(1)">
        <text>It has been constructed in conformance with the regulations of this chapter for the use for which conversion is sought and COMAR 26.17.06;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Upon written request, the conversion is approved by the Approving Authority;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>For wells that are to supply water for a public water supply system, the request is approved by the Department; and</text>
      </paragraph>
      <paragraph num="(4)">
        <text>For wells that are to supply water for use on a dairy farm, the request is approved by the Maryland Department of Health.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>A test well may be converted to a monitoring well when requested in writing and approved by the Approving Authority.</text>
    </paragraph>
    <paragraph num="C.">
      <text>A test well may be converted to a standby well when requested in writing and approved by the Approving Authority.</text>
    </paragraph>
    <paragraph num="D.">
      <text>A test well shall be abandoned and sealed in accordance with this chapter within 180 days after completion unless a longer period of time is approved by the Approving Authority or the Approving Authority has approved its conversion to a water supply well, a monitoring well, or a geothermal well.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".13" heading="Relocation During Construction.">
    <paragraph num="A.">
      <text>If it is necessary to relocate a well under construction in order to obtain sufficient yield or potable water or because of a well construction problem, the well driller may relocate the well construction site under authority of the original permit if:</text>
      <paragraph num="(1)">
        <text>The new site meets the requirements of this chapter and the requirements of the Approving Authority; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The permittee provides a drawing of the new well location on the well completion report.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>If the new well location is found to not meet the requirements of this chapter the well shall be abandoned in accordance with this chapter.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".14" heading="Notification of Well Construction Activities.">
    <paragraph num="A.">
      <text>Water Supply Wells.</text>
      <paragraph num="(1)">
        <text>The permittee shall notify the Approving Authority on the business day prior to commencing well drilling activities to allow the Approving Authority the opportunity to inspect.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The Approving Authority may require that the permittee provide notice before commencing a yield test in Hydrogeologic Area 3.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The Approving Authority may require that the permittee provide notice before the installation of the pitless adapter or pitless unit.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>The Approving Authority may require that the permittee provide notification prior to commencing grouting activities to allow them the opportunity to inspect.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Nonpotable, Monitoring, and Geothermal Wells.</text>
      <paragraph num="(1)">
        <text>The Approving Authority may require the permittee give notice in advance of commencing well construction activities on monitoring wells and nonpotable wells.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The permittee shall notify the Approving Authority one business day prior to commencing well drilling activities of geothermal wells.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>A well driller shall notify a municipality if the well will be drilled inside the municipality's corporate boundary line or if the well will be drilled 1 mile or less outside the municipality's corporate boundary line.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".15" heading="Construction Standards — Hydrogeologic Areas.">
    <paragraph num="A.">
      <text>Geologic and hydrologic conditions in Maryland require varying well construction standards. For the purposes of this chapter, the State has been divided into five hydrogeologic areas. A map of the approximate hydrogeologic area boundaries is in Regulation .39 of this chapter.</text>
    </paragraph>
    <paragraph num="B.">
      <text>The Five Hydrogeologic  Areas.</text>
      <paragraph num="(1)">
        <text>Hydrogeologic Area 1. The area where the unconfined Quaternary aquifer of the Maryland Coastal Plain is of major importance; the area described in “United States Geological Survey (USGS) Professional Paper 822, Water Resources of the Delmarva Peninsula, 1973” and “Maryland Geological Survey (MGS), Report of Investigation No. 40, The Columbia Aquifer of the Eastern Shore of Maryland, Part 1 Hydrogeology, 1984”, which is incorporated by reference.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Hydrogeologic Area 2. The area where the confined aquifers of the Maryland Coastal Plain are of major importance as described in “MGS, Open File Report 72-02-1, A User's Guide for the Artesian Aquifers of the Maryland Coastal Plain, 1972”.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Hydrogeologic Area 3. The rocks of the Maryland Piedmont and Blue Ridge as described in “MGS, Report of Investigation 10, Ground Water Occurrence in the Maryland Piedmont, 1969”, and “MGS, Open File Report 69-02-1, Ground Water Aquifers and Mineral Commodities of Maryland, 1969”, exclusive of the carbonate rocks.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Hydrogeologic Area 4. The sedimentary rocks of the Maryland Appalachian Highlands and Valley and Ridge Provinces, exclusive of carbonate rocks, as described in the references listed in Hydrogeologic Area 3.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Hydrogeologic Area 5. The carbonate rocks as defined by the “Maryland Geological Survey, Geologic Map of Maryland”, Scale: 1:250,000 dated 1968.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".16" heading="Construction Standards — General.">
    <paragraph num="A.">
      <text>Sanitary Protection During Well Construction.</text>
      <paragraph num="(1)">
        <text>During well construction, the permittee shall protect against pollution of the well and any water-bearing geologic formations by any cause, including surface water drainage.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Whenever construction ceases before the well is grouted, the open annular space shall be covered by the permittee and the well shall be capped.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Water for Well Construction.</text>
      <paragraph num="(1)">
        <text>Only water from a source approved by the Approving Authority in accordance with this section may be used in the construction and development of a well.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Water used for construction of a well shall be taken from the best source available to the well driller.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The best source, in order of preference, shall be:</text>
        <paragraph num="(a)">
          <text>A public water supply system meeting the requirements of COMAR 26.04.01 for water quality;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Any other potable water supply;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>A nonpotable well;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>A temporary well, constructed specifically for the purposes of obtaining water for the construction of the well.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>Water used for the construction or development of a well shall:</text>
        <paragraph num="(a)">
          <text>Have a turbidity of not more than 25 standard units, except when the turbidity is due to the oxidation of dissolved iron or manganese;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Be transported, when necessary, in tank trucks used only for the purpose of transporting drilling or potable water;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Be treated with chlorine in amounts indicated in §B(5) of this regulation;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Have a color of not more than 25 standard units; and</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Contain no objectionable odor.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>Chlorine treatment required in §B(4)(c) of this regulation, shall be as follows:</text>
        <paragraph num="(a)">
          <text>For water from a public supply approved under COMAR 26.04.01, a chlorine compound shall be added to the water to produce a free chlorine residual of at least 1.0 mg/l when delivered at the drilling site;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>For water from any other potable water supply, the free chlorine residual of at least 3.0 mg/l in the water delivered at the drilling site;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Water from a nonpotable well shall be dosed with chlorine to produce a minimum free chlorine residual of 50 mg/l.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Screening in More Than One Aquifer Prohibited. A well may not be screened in more than one aquifer.</text>
    </paragraph>
    <paragraph num="D.">
      <text>Sealing-Off Strata. In order to preserve the quality of ground water, the Approving Authority may include a special condition in a well construction permit requiring that aquifers and other strata be sealed off.</text>
    </paragraph>
    <paragraph num="E.">
      <text>Well Development. All wells shall be developed according to the following requirements:</text>
      <paragraph num="(1)">
        <text>Well development means the process whereby a well is pumped, surged, bailed, airlifted, swabbed or jetted to remove any material that may be blocking the well screen or fractures within the borehole;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Development shall continue until formation cuttings, drilling fluids, and additives are removed from the well;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>For wells in Hydrogeologic Areas 1 and 2, well development shall remove the fine sand, silt, and clay from the water-bearing zone surrounding the well screen;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Any hydrofracturing shall be performed in accordance with Regulation .28 of this chapter; and</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Every well shall be developed in order to obtain the full yield of the well and a water quality that meets all of the following requirements:</text>
        <paragraph num="(a)">
          <text>Contains less than 5 milligrams sand or larger sized particles per liter of water, where particles with a diameter between 0.0625 and 2.0 mm are considered to be sand; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Has a turbidity of less than 10 NTU (nephelometric turbidity unit) as determined by methods designated in 40 CFR §141.74(a)(1), except if the turbidity is due to the oxidation of dissolved iron or manganese naturally occurring in the water.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".17" heading="Construction Standards — Casing.">
    <paragraph num="A.">
      <text>Well Casing.</text>
      <paragraph num="(1)">
        <text>Markings.</text>
        <paragraph num="(a)">
          <text>Except as provided in §A(1)(b) of this regulation, all casing shall be marked by the manufacturer sufficiently to allow identification of the casing.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Well casing for monitoring wells is exempt from displaying markings.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The well driller shall provide, upon request, sufficient information to allow identification of casing used for monitoring wells.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Plastic Well Casing.</text>
        <paragraph num="(a)">
          <text>Plastic well casing shall be polyvinyl chloride, PVC, manufactured to meet the standards of the American Society of Testing and Materials (ASTM) Standard F-480.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Plastic well casing shall be installed in accordance with the maximum depth limits specified:</text>
        </paragraph>
        <paragraph num="(c)">
          <text>In Hydrogeologic Areas 3, 4, and 5, plastic well casing may not be used for the main casing where caving conditions occur before casing placement.</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Plastic well casing 4 inches or less in diameter shall be a minimum of schedule 40.</text>
        </paragraph>
        <paragraph num="(e)">
          <text>All plastic well casing greater than 4 inches in diameter shall be a minimum of SDR 26.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Metal Well Casing.</text>
        <paragraph num="(a)">
          <text>Metal well casing shall meet one of the following standards:</text>
          <paragraph num="(i)">
            <text>ASTM standard A-53 or A-589;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>American Petroleum Institute standard 5A or 5L; or</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>ASTM standard A-312, type 304 minimum, for stainless steel.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Metal well casing of 4 inches or less, nominal size, shall be schedule 40 or better.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Metal well casing greater than 4 inches, nominal size, shall have a minimum nominal wall thickness of 0.188 inches.</text>
        </paragraph>
        <paragraph num="(d)">
          <text>The Approving Authority may require that Schedule 40 or Standard Schedule metal well casing be used where there is corrosive water, soil, or geology.</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Metal casing shall be new, prime pipe, being free of pits or breaks.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>Casing material is not permitted which will cause the delivered water to be toxic or violate State or federal primary drinking water standards in effect at the time the well is constructed.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Other types and sizes of well casing may be approved by the Approving Authority for special applications, upon written request by the well driller.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Minimum Casing Length.</text>
      <paragraph num="(1)">
        <text>In Hydrogeologic Areas 1 and 2, the casing shall extend to the top of or into the aquifer used.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>In Hydrogeologic Areas 3, 4, and 5, the casing shall extend through the weathered zone and be seated a minimum of 2 feet into bedrock.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Less than 20 feet of casing may not be used in any area except as provided in Regulation .23 of this chapter.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>In Hydrogeologic Area 4, the minimum casing length is 40 feet.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Minimum Casing Diameter.</text>
      <paragraph num="(1)">
        <text>Potable water supply wells shall have a minimum main casing diameter of 4 inches in all hydrogeologic areas of the State.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>In Hydrogeologic Areas 1 and 2, for potable water supply wells, the 4-inch minimum main casing diameter shall extend to, whichever comes first:</text>
        <paragraph num="(a)">
          <text>A minimum of 250 feet; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The top of the aquifer used.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Criteria for Variance for Telescoping Casing.</text>
        <paragraph num="(a)">
          <text>The Approving Authority shall submit a report to the Department for approval prior to granting variances to §C(2) of this regulation for increasing or decreasing the minimum depth of the 4-inch minimum main casing diameter.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The report shall contain at a minimum the following information:</text>
          <paragraph num="(i)">
            <text>Area of county where variance is being considered;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Aquifer for which variance is being considered;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Discussion of current aquifer usage and predicted aquifer usage; and</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Proposed variance wording.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(c)">
          <text>The report shall be incorporated in the county Master Water and Sewer Plan prior to implementation.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Well Casing Joints.</text>
      <paragraph num="(1)">
        <text>Joints shall be watertight.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Joints for metal casing may be either electrically welded or threaded.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Joints for plastic well casing may be either threaded, solvent welded, or o-ring.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Screws or other mechanical devices may only be used to join PVC well liner:</text>
        <paragraph num="(i)">
          <text>For solvent welded joints used in liners;</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>With nonpenetrating stainless steel screws;</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>And per the recommendations of the pipe manufacturer to maintain their warranty.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Other Installation Requirements.</text>
      <paragraph num="(1)">
        <text>Liners shall meet the standards for well casing under §§A and D of this regulation.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Well casing may not be cut off or cut into below ground except to install a pitless unit.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Well casing shall extend at least 8 inches above the finished grade.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".18" heading="Construction Standards — Screen.">
    <paragraph num="A.">
      <text>Well Screens.</text>
      <paragraph num="(1)">
        <text>All wells that obtain water from aquifers in Hydrogeologic Areas 1 and 2 shall be equipped with a screen that shall adequately prevent the entrance of formation material into the well during use.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Well screens shall have sufficient structural strength to accomplish the purpose for which they are installed.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Well screen openings shall provide, so far as is practical, the maximum amount of open area, consistent with strength of screen material and sediment grain size of the water-bearing formation to permit maximum transmission without clogging.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Well screens, other than those made commercially, constructed by creating openings or slots in the casing, or liner, or both, by any mechanical contrivance are prohibited unless approved by the Approving Authority in a special permit condition.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>The well screen shall be provided with fittings necessary to seal the screen to the casing. If the screen diameter is smaller than the casing diameter, then extension of the screen blank section to at least 20 feet above the base of the main casing is required, or a packer or a reducer fitting shall be used.</text>
      </paragraph>
      <paragraph num="(6)">
        <text>A fitting shall be provided to close the bottom of the screen.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Gravel-Packed Wells.</text>
      <paragraph num="(1)">
        <text>Gravel, which is packed in the annular space, shall be water-washed, disinfected, and free from clay, silt, and organic material.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Gravel pack may not connect aquifers.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".19" heading="Construction Standards — Grouting.">
    <paragraph num="A.">
      <text>All wells shall be grouted in accordance with this regulation.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Time Limits.</text>
      <paragraph num="(1)">
        <text>All wells shall be grouted as soon as possible but not later than 24 hours after the well casing has been set in place in Hydrogeological Area’s 1 &amp; 2.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>In Hydrogeological Area’s 3, 4 &amp; 5 all wells shall be grouted within 72 hours after the permanent casing has been set.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>After grouting is completed, there shall be a minimum curing time before drilling may be resumed of:</text>
        <paragraph num="(a)">
          <text>18 hours for Type I and Type II Portland cement; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>12 hours for Type III Portland cement.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Grouting Materials.</text>
      <paragraph num="(1)">
        <text>Cement.</text>
        <paragraph num="(a)">
          <text>The annular space may be filled with neat Portland or quick-setting cement in a ratio of not over 6 gallons of water per 94-pound sack of cement.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Bentonite may be added to the neat cement grout in an amount not to exceed 6 pounds per 94-pound sack of cement. If bentonite is added to the neat cement grout, then additional water may be added at the ratio of 1 gallon of water per 2 pounds of bentonite.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Bentonite.</text>
        <paragraph num="(a)">
          <text>Bentonite with a minimum solids content of 20 percent may be used to fill the annular space in accordance with the following:</text>
          <paragraph num="(i)">
            <text>When mixed as a slurry, at 2 pounds bentonite per gallon of water; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>In chip or pellet form and if hydrated per the manufacturer specifications, when the annular space is less than 20 feet in depth.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Bentonite may not be used for grouting where it will come into contact with ground water having a pH below 4.0 or a total dissolved solids content greater than 1,000 mg/l.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Thermal Enhanced Bentonite Grout.</text>
        <paragraph num="(a)">
          <text>Bentonite slurry shall be mixed per manufacturer specifications.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The sand-bentonite ratio may not be greater than 250 pounds of sand per 50 pounds of bentonite.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Sand shall be “000” well gravel that meets the following:</text>
          <paragraph num="(i)">
            <text>95 percent silica sand;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Have a uniformity coefficient not greater than 1.7; and</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Have a particle size range of 0.60 mm to 0.15 mm.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>Thermally Enhanced Cementatious Grout:</text>
        <paragraph num="(a)">
          <text>Shall be mixed per manufacturers specifications; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Have a permeability rating not less than 1 × 10&lt;sup&gt;¯7&lt;/sup&gt;.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>Cement alone or bentonite alone may be required as a special condition in a well construction permit for any well.</text>
      </paragraph>
      <paragraph num="(6)">
        <text>If rapid loss of grout material occurs during grout emplacement, coarse fill material may be used in the zone or zones in which the loss is occurring.</text>
      </paragraph>
      <paragraph num="(7)">
        <text>Other grouting materials or mixtures may be authorized as a special condition in a well construction permit for any well after review and approval by the Department.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Standards for Grouting Unconfined Aquifer Wells in Hydrogeologic Areas 1 and 2. For wells screened in an unconfined aquifer under this section, the annular space shall be grouted to a depth of at least 20 feet.</text>
    </paragraph>
    <paragraph num="E.">
      <text>Standards for Grouting Confined Aquifer Wells in Hydrogeologic Area 2. Under this section:</text>
      <paragraph num="(1)">
        <text>The depth of grouting may not be less than 30 feet;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The annular space above the screen and below the grout shall be completely filled with clay, drill cuttings, or sand before grouting operations begin;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>For two part (lapped) telescoped wells, the drilling fluid may be used as fill material in the annular space if the drill fluid has a weight greater than 11 pounds per gallon;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Drilling fluid less than 11 pounds per gallon may not be used as an acceptable fill material;</text>
      </paragraph>
      <paragraph num="(5)">
        <text>For wells intended to have a yield greater than 5,000 gallons per day, the grout shall extend from a minimum of 5 feet into the confining bed, immediately above the aquifer being used, to the land surface; and</text>
      </paragraph>
      <paragraph num="(6)">
        <text>For wells intended to have a yield of less than 5,000 gallons per day, the grout shall extend from a minimum of 5 feet into the first confining bed, which is at least 5 feet thick, to the land surface.</text>
      </paragraph>
      <paragraph num="(7)">
        <text>Relative depths to confining layers are described in “MGS, Open File Report No. 12-02-20, Maryland Coastal Plain Aquifer Information System: Hydrogeologic Framework, 2013”, which is incorporated by reference.</text>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>Standards for Grouting Wells in Hydrogeologic Areas 3, 4, and 5.</text>
      <paragraph num="(1)">
        <text>The annular space shall be grouted completely from the bottom of the casing to the land surface.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The minimum depth of grout may not be less than 18 feet in Hydrogeologic Areas 3 and, and may not be less than 38 feet in Hydrogeologic Area 4 and 5.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>If caving conditions are experienced on wells with greater than 30 feet of casing, the annular space shall be grouted from the point where caving occurred or from a depth of 30 feet, whichever is greater, to the land surface.</text>
      </paragraph>
    </paragraph>
    <paragraph num="G.">
      <text>If the annular space cannot be grouted in accordance with these regulations, the well shall be abandoned and sealed in accordance with this chapter.</text>
    </paragraph>
    <paragraph num="H.">
      <text>Deviation from Grouting Standards.</text>
      <paragraph num="(1)">
        <text>Deviation from the grouting standards given in §§D, E, and F of this regulation may be approved by the Approving Authority for unusual conditions that prevent conformance with those standards.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The deviation from the grouting standard shall be requested on a form provided by the Approving Authority. The request shall be submitted to the Approving Authority within 5 days after the well is completed. The Approving Authority shall reject or approve the request within 5 business days.</text>
      </paragraph>
    </paragraph>
    <paragraph num="I.">
      <text>Grout Height.</text>
      <paragraph num="(1)">
        <text>For wells where a pump is not to be installed, the final grout height shall be at ground grade.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>For wells where a pump is to be installed, the final grout height shall be immediately below the pitless adapter or pitless unit.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".20" heading="Construction Standards — Methods of Grouting.">
    <paragraph num="A.">
      <text>All grout shall be emplaced in one continuous operation upward from the bottom of the casing or depth specified in these regulations.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Pouring, dumping, or shoveling of grout slurries into the annular space or well bore are prohibited.</text>
    </paragraph>
    <paragraph num="C.">
      <text>The drilling fluids in the annular space shall be thinned before grouting to a density less than that of the intended grout density.</text>
    </paragraph>
    <paragraph num="D.">
      <text>Grout shall be emplaced so that it completely displaces the fluid in the annular space from the bottom of the interval being grouted to the ground surface.</text>
    </paragraph>
    <paragraph num="E.">
      <text>The following are approved methods of grouting when performed in accordance with the conditions specified:</text>
      <paragraph num="(1)">
        <text>Grout Pipe Outside of Casing (Tremie Pipe).</text>
        <paragraph num="(a)">
          <text>The annular space shall be a minimum of 1½ inches.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>All grout shall be placed by pumping through the grout pipe.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The entire interval to be grouted shall be open and without obstructions; washing or jetting with water is recommended for cleaning the borehole and may serve to remove obstructions caused by caving which otherwise would prevent a proper grout.</text>
        </paragraph>
        <paragraph num="(d)">
          <text>The grout pipe shall extend from the surface to the bottom of the interval to be grouted.</text>
        </paragraph>
        <paragraph num="(e)">
          <text>The grout pipe may remain extended to the bottom of the interval during and after grouting, or it may be raised slowly as the grout is placed provided that the discharge end of the grout pipe remains submerged in the emplaced grout at all times until grouting is completed.</text>
        </paragraph>
        <paragraph num="(f)">
          <text>In the event of interruption in the grouting operations, the bottom of the grout pipe shall be raised above the grout level and should not be resubmerged until the air and water have been displaced from the grout pipe.</text>
        </paragraph>
        <paragraph num="(g)">
          <text>Grouting Depths of 20 feet or Less. Grout may be placed by a grout pipe inserted only 10 feet into the annular space, provided that:</text>
          <paragraph num="(i)">
            <text>The entire interval to be grouted is clearly visible from the surface and is dry; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>An annular space larger than the minimum 1½ inches may be required to assure visibility from the surface.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Grout Pipe — Inside Casing.</text>
        <paragraph num="(a)">
          <text>The bottom of the casing is fitted with a cementing shoe or float shoe and the casing is placed in the borehole a short distance off the bottom;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The grout pipe is placed in the casing a short distance from the float shoe or is mechanically attached to the float shoe; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Grout is pumped through the grout pipe until grout appears at the land surface.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Grouting with Bentonite Chips or Pellets. A well may be grouted using bentonite chips or pellets under the following conditions:</text>
        <paragraph num="(a)">
          <text>The grouting depth is 20 feet or less;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The annular space is open and free of obstruction;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The annular space is at least 1½ inches;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>The drilling fluid, if present, is thinned to a viscosity of less than 30 seconds and the weight is less than 9 pounds per gallon;</text>
        </paragraph>
        <paragraph num="(e)">
          <text>The bentonite chips or pellets may be poured down the annular space; and</text>
        </paragraph>
        <paragraph num="(f)">
          <text>The annular space is continuously measured to assure proper filling without bridging.</text>
        </paragraph>
        <paragraph num="(g)">
          <text>If bridging occurs and the annular space cannot be completely filled then:</text>
          <paragraph num="(i)">
            <text>The annular space shall be jetted to remove the bentonite; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>The well shall be abandoned and sealed in accordance with this chapter.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>The Approving Authority may approve other grouting methods not specifically identified by this regulation.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".21" heading="Construction Standards — Upper Terminal of Well.">
    <paragraph num="A.">
      <text>Except as provided for in this regulation, the following construction techniques for upper terminals for potable water supply wells are prohibited:</text>
      <paragraph num="(1)">
        <text>Use of buried well seals, or other devices, including a buried “sanitary well seal” to cap wells below ground surface and provide access for electrical cable or water pipes; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>All pits, including frost pits, which are holes or depressions in the ground surrounding casings, in which all pumping and other equipment subject to freezing is emplaced.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>All wells shall be extended at least 8 inches above final grade.</text>
    </paragraph>
    <paragraph num="C.">
      <text>In areas where flooding is likely to occur, including 100-year flood plains and coastal areas, the casing shall terminate at least 24 inches above finished ground surface or pump house floor.</text>
    </paragraph>
    <paragraph num="D.">
      <text>Pitless Adapters or Pitless Units Required.</text>
      <paragraph num="(1)">
        <text>Pitless adapters or pitless units shall be installed on all water supply wells except:</text>
        <paragraph num="(a)">
          <text>Wells enclosed in an above-grade pump house;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Wells for a public water supply if enclosed in a below-grade pump house or water treatment facility that conforms to regulations of the Department concerning public water supply system design; or</text>
        </paragraph>
        <paragraph num="(c)">
          <text>For suction lift systems where the well casing is 2 inches in diameter or less and used as a suction line a standard plumbing tee may be used as a pitless adapter.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>All pitless adapters and pitless units shall:</text>
        <paragraph num="(a)">
          <text>Be of a type approved by the National Sanitation Foundation International;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Meet the standards of the Water Systems Council; or</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Be approved by the Approving Authority.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Exemptions. Irrigation wells with a terminal 2 feet above grade and fitted with a ventless sanitary well cap are not required to have a pitless adapter or pitless unit installed.</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Proper Installation of Pitless Adapters or Pitless Units.</text>
      <paragraph num="(1)">
        <text>The well casing or pitless adaptor or pitless unit shall be located at least 8 inches above the finished ground surface or pump house floor if located inside of a building.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Connections of the Pitless Adapter or Pitless Unit.</text>
        <paragraph num="(a)">
          <text>Connections of the pitless adaptor or pitless unit to the well casing and the lateral connections from it shall be watertight.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A metal-cutting hole saw shall be used to construct the pitless adapter hole in the casing.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Cutting the pitless adapter hole in the casing by using an acetylene torch is not permitted.</text>
        </paragraph>
        <paragraph num="(d)">
          <text>All burrs resulting from the cutting operation shall be removed.</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Both outside and inside surfaces of that portion of casing surrounding the pitless adapter hole shall be made smooth.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>A pitless adapter or pitless unit shall be installed in conformance with the depth of water service pipe requirements of the applicable State or county plumbing code.</text>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>Well Caps.</text>
      <paragraph num="(1)">
        <text>All wells shall be capped with one of the following:</text>
        <paragraph num="(a)">
          <text>A watertight, screened vented cap;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A watertight cap; or</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The base of a pump motor, provided that, to prevent the entrance of vermin and debris:</text>
          <paragraph num="(i)">
            <text>The motor mount provides a watertight seal; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>If venting is required, the vent is screened.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>All well caps shall:</text>
        <paragraph num="(a)">
          <text>Meet one of the following requirements:</text>
          <paragraph num="(i)">
            <text>Comply with the standards of the National Sanitation Foundation International or the Water Systems Council; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Be a type approved by the Approving Authority; and</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>If screws, nuts, and bolts are used in them they must be stainless steel.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>The electrical conduit access shall be plugged if the pump is not installed.</text>
      </paragraph>
    </paragraph>
    <paragraph num="G.">
      <text>In areas where flooding is likely to occur, including 100-year flood plains and coastal areas, wells shall be fitted with flood resistant caps.</text>
    </paragraph>
    <paragraph num="H.">
      <text>Flowing Artesian Wells.</text>
      <paragraph num="(1)">
        <text>All wells, including a flowing artesian well, may not be allowed to run water to waste.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A flowing artesian well shall be fitted with a watertight cap or be fitted with a valve to stop the flow of water.</text>
      </paragraph>
    </paragraph>
    <paragraph num="I.">
      <text>Access Port for Water Level Measurement. The Department, through a special condition in a Water Appropriation and Use Permit, may require that any well be equipped with an access port for water level measurements.</text>
    </paragraph>
    <paragraph num="J.">
      <text>For irrigation wells where the pumping equipment is installed and removed every season the well shall be capped as follows:</text>
      <paragraph num="(1)">
        <text>A sanitary well seal may be used when the pumping equipment is installed; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A watertight or screen-vented cap shall be used when the pumping equipment is not installed.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".22" heading="Construction Standards — Pumping Equipment.">
    <paragraph num="A.">
      <text>The selection and installation of the pumping equipment shall conform to COMAR 09.20, or the local plumbing code, whichever is more stringent.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Electrical connections for pumping equipment shall conform to the National Electrical Code, or to the local electrical code, whichever is more stringent.</text>
    </paragraph>
    <paragraph num="C.">
      <text>If a safety rope is used it:</text>
      <paragraph num="(1)">
        <text>Shall be secured in the interior of the well; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>May not penetrate the well casing or cap.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>If an electrical conduit is present at the well terminal, it shall:</text>
      <paragraph num="(1)">
        <text>Be secured to the well cap so as to prevent the entrance of vermin and debris;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Be plugged at the interior opening with caulk or other suitable material to provide a water-resistant and insect-resistant seal; and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Extend at least 18 inches below the finished grade.</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Upon completion of pump installation, the person installing the pumping equipment shall disinfect the well, pump, and water supply system in accordance with this chapter.</text>
    </paragraph>
    <paragraph num="F.">
      <text>In areas of the State where the plumbing code does not specify pump installation requirements, then the pumping equipment shall be installed in accordance with the manufacturer's recommendations.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".23" heading="Construction Standards and Special Requirements for Specific Types of Wells.">
    <paragraph num="A.">
      <text>The following special requirements for specific types of wells based on the intended use of the well are as follows:</text>
      <paragraph num="(1)">
        <text>Irrigation Wells.</text>
        <paragraph num="(a)">
          <text>Wells in unconfined aquifers in Hydrogeologic Areas 1 and 2 used solely for irrigation shall have an annular space grouted to a minimum depth of 20 feet below land surface.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>All other irrigation wells shall meet the grouting requirements of Regulation .19 of this chapter.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Monitoring Wells.</text>
        <paragraph num="(a)">
          <text>The well driller shall submit to the Approving Authority the construction specifications that are proposed for a monitoring well as an attachment to the permit application.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The Approving Authority may approve, as a special condition of a permit, special construction standards for wells installed for the purpose of monitoring ground water.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>If the Approving Authority does not approve special construction standards, then well construction shall comply with the provisions of this chapter.</text>
        </paragraph>
        <paragraph num="(d)">
          <text>For an at-grade or below-grade well terminal, the well terminal shall be water tight and enclosed in a well vault.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Injection Wells.</text>
        <paragraph num="(a)">
          <text>The well driller for an injection well shall submit to the Approving Authority the construction specifications that are proposed as an attachment to the permit application.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The Approving Authority may not issue a permit to construct an injection well unless a State Discharge Permit has been issued by the Department.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>Geothermal Wells — Closed Loop.</text>
        <paragraph num="(a)">
          <text>The pipe material, jointing, pressure testing, and anti-freeze solutions for a closed loop geothermal well shall conform to the standards of COMAR 09.15.05.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The anti-freeze solution shall be environmentally safe.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The borehole of a closed-loop geothermal well shall be grouted from the bottom of the borehole to the ground surface.</text>
        </paragraph>
        <paragraph num="(d)">
          <text>The upper terminal of a closed-loop geothermal well may terminate below grade if:</text>
          <paragraph num="(i)">
            <text>The well location is marked by a metal plate so that the location can be found by a metal detector; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>The manifold and horizontal lines are marked with detection tape.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(e)">
          <text>When the closed-loop geothermal well is terminated below grade, the well tag shall be attached to the flow center.</text>
        </paragraph>
        <paragraph num="(f)">
          <text>If using copper as an exchange medium a maintenance agreement must be recorded in the County land records.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>Cathodic Protection Wells.</text>
        <paragraph num="(a)">
          <text>The borehole of a cathodic protection well shall be grouted from the bottom of the borehole to the ground surface.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The well driller shall submit to the Approving Authority the construction specifications that are proposed for a cathodic protection well as an attachment to the permit application.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(6)">
        <text>Dewatering Wells.  The annular space of a dewatering shall be grouted to a depth of 5 feet below the static water level.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>The following specific construction standards for specific wells, based on construction method, are as follows:</text>
      <paragraph num="(1)">
        <text>Driven Wells.</text>
        <paragraph num="(a)">
          <text>Driven wells may not be used for a potable water supply.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>In a driven well an oversize hole for grout, at least 4 inches greater in diameter than the casing, shall be constructed to a depth of at least 10 feet, and the annular space between this hole and the casing shall be grouted to land surface.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The upper terminal of a driven well and pitless adapter or pitless unit installation shall be in accordance with this chapter.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Bored, Augered, and Dug Wells Cased with Concrete Pipe.</text>
        <paragraph num="(a)">
          <text>Bored, augered, and dug wells shall have a borehole with a minimum diameter of 6 inches larger than the outside diameter of the casing.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The annular space shall be filled with grout to a depth of at least 30 feet below land surface, unless otherwise approved by the Approving Authority.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The annular space below the grout shall be filled with a sand or gravel pack.</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Joints in the concrete casing shall be sealed with an impervious seal, such as cement and o-rings, to a depth of at least 20 feet.</text>
        </paragraph>
        <paragraph num="(e)">
          <text>The casing shall extend to a depth of at least 2 feet below the lowest seasonal water table.</text>
        </paragraph>
        <paragraph num="(f)">
          <text>The minimum depth of the casing shall be 20 feet.</text>
        </paragraph>
        <paragraph num="(g)">
          <text>The well shall be protected with either:</text>
          <paragraph num="(i)">
            <text>A precast, overlapping, steel-reinforced concrete cover; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>A metal cover at least 3/16 of an inch thick and fitted with a watertight gasket; and</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Be at least 8 inches above grade.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Jetted and Jetted-Driven Wells.</text>
        <paragraph num="(a)">
          <text>Jetted and jetted-driven wells shall be grouted to a minimum depth of 20 feet. This will necessitate construction of an oversize hole for grout to this depth.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Jetted and jetted-driven wells may not be used for potable water supplies.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>Horizontal Wells. The well driller shall submit plans with the Application for a Permit to Drill that provide details on how the horizontal well is to be constructed and identify the materials to be used.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".24" heading="Disinfection of Wells and Water Supply Systems.">
    <paragraph num="A.">
      <text>Upon completion of well construction activities, the permittee shall disinfect a water supply well in accordance with this regulation.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Whenever any work is done on the well after disinfection of the well by the well driller, the person doing the work shall be responsible for disinfection of the well and water supply system in accordance with this regulation.</text>
    </paragraph>
    <paragraph num="C.">
      <text>Material. Tablets or dry granular material may not be used as the only chlorination material. The materials, which may be used for disinfection, are:</text>
      <paragraph num="(1)">
        <text>Calcium hypochlorite,</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Sodium dichloro-triazine dehydrate; or</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Sodium hypochlorite.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Standard Disinfection Procedure.</text>
      <paragraph num="(1)">
        <text>The chlorine shall be placed in the well in quantities that will produce a concentration of at least 100 mg/l chlorine. The amount required to obtain this concentration will depend on the casing diameter and the amount of water in the well.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The well shall be chlorinated using all of the following sequential steps:</text>
        <paragraph num="(a)">
          <text>Chlorine tablets or granular chlorine shall be dropped in the top of the well and allowed to settle to the bottom, or a prepared 10 gallon chlorine solution, with a chlorine concentration of at least 100 mg/l, but not more than 500 mg/l, shall be placed in the bottom of the well by pumping or gravity through a tremie pipe, drill rod, hose, or other approved method.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A chlorine solution of at least 10 gallons and producing a concentration of at least 100 mg/l, but not more than 500 mg/l, in the well shall be introduced (poured) into the top of the well. All surfaces above the static level shall be washed with this solution.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>After the solution has been placed in the well, the water shall be agitated to thoroughly disperse the solution. Agitation may be accomplished by turning the pump on and off, or if no pump is available, by using a bailer, a swab, a plunger, air, or other approved method.</text>
        </paragraph>
        <paragraph num="(d)">
          <text>If the well has been connected to the pressure tank and distribution system, a small amount of the chlorinated water shall then be pumped through the system to thoroughly disinfect the system.</text>
        </paragraph>
        <paragraph num="(e)">
          <text>The well shall be allowed to stand without further agitation for at least 12 hours.</text>
        </paragraph>
        <paragraph num="(f)">
          <text>If a residual of at least 5 mg/l chlorine remains in the water after 12 hours, the well shall then be pumped to waste until the odor and taste of chlorine is no longer detectable. If less than 5 mg/l free residual chlorine is found in the water after 12 hours, the disinfection procedure shall be repeated.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Chlorinated water and water pumped during the flushing of the well during the disinfection procedure may not be discharged:</text>
        <paragraph num="(a)">
          <text>To an on-site sewage disposal system; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Directly to surface waters of the State.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Disinfection Procedure for Wells That Do Not Respond to the Standard Procedure.</text>
      <paragraph num="(1)">
        <text>If, after testing, the well cannot meet the bacteriological standard of this chapter, it shall be chlorinated as in §D of this regulation.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>If the well remains unresponsive after repeating the standard disinfection procedure per this section, a volume of water chlorinated to a concentration of 100 mg/l and at least two times the volume of chlorinated, standing water in the well, but not less than 50 gallons, shall be introduced into the well in order to completely displace the volume of chlorinated, standing water and force it out into the water bearing formation.</text>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>If bacteriological contamination persists after repeated disinfection, the Approving Authority may require the well to be abandoned and sealed in accordance with this chapter.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".25" heading="Maintenance and Repair.">
    <paragraph num="A.">
      <text>All material used in the maintenance, replacement, or repair of any well shall meet the requirements for new installation.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Broken, punctured, or otherwise defective or unserviceable casing, screens, fixtures, seals, or any part of the wellhead shall be repaired and replaced, or the well shall be properly abandoned and sealed.</text>
    </paragraph>
    <paragraph num="C.">
      <text>Any work performed on a water supply well with a well cap not meeting the standards of this chapter, shall also include the installation of a well cap meeting the standards of this chapter.</text>
    </paragraph>
    <paragraph num="D.">
      <text>Extension of the well casing for an above-grade terminal shall be completed in the following manner:</text>
      <paragraph num="(1)">
        <text>Install a pitless unit;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>If plastic casing is existing, then solvent weld additional plastic casing;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>If metal casing is existing, then thread or weld additional metal casing;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>A mechanical compression coupling; or</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Install a pipe coupling that is approved by the Approving Authority.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".26" heading="Minimum Yield and Yield Testing for Domestic Water Supply Wells.">
    <paragraph num="A.">
      <text>A domestic well or double well combination shall produce a minimum yield of 1 gallon per minute for 6 hours.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Replacement wells servicing an existing dwelling are exempt from the minimum yield requirement of 1 gallon per minute.</text>
    </paragraph>
    <paragraph num="C.">
      <text>The Approving Authority may require a mandatory yield test in any hydrogeologic area of the State for any well, if it is determined that a yield test is necessary to assure an adequate water supply.</text>
    </paragraph>
    <paragraph num="D.">
      <text>The County Water and Sewer Plan shall delineate those areas where a mandatory yield test is required for water supply wells in Hydrogeologic Areas 1, 2, 4, and 5.</text>
    </paragraph>
    <paragraph num="E.">
      <text>Each domestic well in Hydrogeologic Area 3 shall be tested for yield in accordance with §G of this regulation unless the requirement has been waived pursuant to §F of this regulation.</text>
    </paragraph>
    <paragraph num="F.">
      <text>The County Water and Sewer Plan shall delineate those areas in Hydrogeologic Area 3 where the mandatory yield test is waived.</text>
    </paragraph>
    <paragraph num="G.">
      <text>Yield Test Procedures.</text>
      <paragraph num="(1)">
        <text>Except as provided in §F of this regulation, all domestic wells drilled in Hydrogeologic Area 3 shall be yield tested as provided below:</text>
        <paragraph num="(a)">
          <text>On the yield test report form, the permittee shall note pertinent data related to the yield test, including but not limited to:</text>
          <paragraph num="(i)">
            <text>Static water level;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Measured depth of well;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Whether the well has been hydrofractured;</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Estimated well yield prior to hydrofracturing;</text>
          </paragraph>
          <paragraph num="(v)">
            <text>Depth of test pump in well;</text>
          </paragraph>
          <paragraph num="(vi)">
            <text>Name of the person performing the test;</text>
          </paragraph>
          <paragraph num="(vii)">
            <text>License number of person performing test; and</text>
          </paragraph>
          <paragraph num="(viii)">
            <text>Well construction permit number;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>The pump and related equipment shall be placed in the well;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Pumping shall begin at a rate of withdrawal greater than 8 gallons per minute until the water level drops to a point close to the pump;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>If the water level drops to near the pump, the pumping rate shall be adjusted so that the water level remains constant;</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Measure and record the flow rate of water discharged and water level at 15 minute intervals throughout the test; and</text>
        </paragraph>
        <paragraph num="(f)">
          <text>Discharge water at least 50 feet from the well and any on-site sewage disposal system.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>A single interruption of pumping of up to 15 minutes due to equipment failure or other unusual circumstances is permitted, but the amount of down time shall be made up by additional pumping at the end of the test.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The criteria for approval shall be a minimum yield of one gallon per minute for 6 hours continuous pumpring after the well has been pumped out as provided in §G(1)(c) of this regulation.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>The pump test may be terminated early and the well yield shall be considered adequate if a well:</text>
        <paragraph num="(a)">
          <text>Cannot be pumped out after 3 hours pumping as provided in §G(1)(c) of this regulation; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Yields 4 gallons per minute or greater for 3 hours continuous pumping, after the well has been pumped out as provided in §G(1)(c) of this regulation.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="H.">
      <text>The Approving Authority may permit two wells to be connected to meet the minimum yield requirement if:</text>
      <paragraph num="(1)">
        <text>A written request is submitted to the Approving Authority for each installation;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The wells to be connected are tested in accordance with the yield test procedures of this chapter;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Each well demonstrates a yield of at least 0.5 gallons per minute during the yield test; and</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Both wells are tested for yield at the same time.</text>
      </paragraph>
    </paragraph>
    <paragraph num="I.">
      <text>The yield test data shall be submitted to the Approving Authority for review.</text>
    </paragraph>
    <paragraph num="J.">
      <text>Domestic Water Supply System Standard.</text>
      <paragraph num="(1)">
        <text>The water supply system shall produce not less than 500 gallons of water in a 2-hour period, at least once each day.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>If the sustained yield of the well is not capable of meeting the total water supply standard, sufficient storage shall be provided.</text>
      </paragraph>
    </paragraph>
    <paragraph num="K.">
      <text>Well Storage.</text>
      <paragraph num="(1)">
        <text>If well storage is selected, the amount of storage required is calculated by subtracting the well's yield over a 2-hour period from 500 gallons.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A quantity of water in storage is equal to the number of feet below the static water level and 10 feet from the bottom of the well, multiplied times 1.5 gallons per foot for a 6-inch well or 0.65 gallons per foot for a 4-inch well.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".27" heading="Yield Test for Nondomestic Wells.">
    <text>The Department may require a yield test for a nondomestic well as part of the data collection requirements associated with an application for a Water Appropriation and Use Permit.</text>
  </regulation>
  <regulation prefix="Regulation" num=".28" heading="Hydrofracture of Wells.">
    <paragraph num="A.">
      <text>The Approving Authority shall be notified at least 2 business days in advance of commencing hydrofracturing work on an existing well.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Hydrofracturing may not be conducted on any well not constructed according to the requirements of this chapter without approval from the Approving Authority.</text>
    </paragraph>
    <paragraph num="C.">
      <text>Hydrofracturing may not be conducted in Hydrogeologic Area 5 without written permission from the Approving Authority.</text>
    </paragraph>
    <paragraph num="D.">
      <text>Hydrofracturing may be performed only by qualified professionals who possess a Maryland well driller's license or who are working as a subcontractor and under the direct supervision of a licensed Maryland well driller.</text>
    </paragraph>
    <paragraph num="E.">
      <text>Hydrofracturing a well within 100 feet of another water supply well requires written approval of the Approving Authority.</text>
    </paragraph>
    <paragraph num="F.">
      <text>The well to be hydrofractured shall be at least 50 feet from any other potable water supply well.</text>
    </paragraph>
    <paragraph num="G.">
      <text>Hydrofracturing a water supply well or test well within 500 feet of a landfill or area of known ground water contamination requires the Approving Authority's written approval.</text>
    </paragraph>
    <paragraph num="H.">
      <text>The well to be hydrofractured shall be at least 100 feet from any potential source of contamination.</text>
    </paragraph>
    <paragraph num="I.">
      <text>Water used for hydrofracturing shall:</text>
      <paragraph num="(1)">
        <text>Meet the requirements of Regulation .16B(3)(a) and(b) of this chapter; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Be from a source approved by the Approving Authority.</text>
      </paragraph>
    </paragraph>
    <paragraph num="J.">
      <text>New well construction may require deepening to meet the minimum system yield requirements of Regulation .26J of this chapter if there is a drop in static water level as a result of hydrofracturing.</text>
    </paragraph>
    <paragraph num="K.">
      <text>After hydrofracture, the total volume of water introduced into the well shall be removed prior to conducting test for yield in accordance with the procedures outlined in Regulation .26G of this chapter.</text>
    </paragraph>
    <paragraph num="L.">
      <text>Hydrofracture of Well Report.</text>
      <paragraph num="(1)">
        <text>The well driller shall file a Hydrofracture of Well Report to the Approving Authority within 45 days after hydrofracturing the well.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Yield test data shall be submitted with the Hydrofracture of Well Report for both new wells and existing wells.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".29" heading="Well Completion Reports.">
    <paragraph num="A.">
      <text>The permittee is responsible for submitting, on a form provided by the Approving Authority, a well completion report.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Submission.</text>
      <paragraph num="(1)">
        <text>The well completion report shall be submitted to the Approving Authority by the premittee not later than 45 days after construction or deepening of the well has been completed or after construction activity on an unsuccessful well, or dry hole, has been terminated.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Well construction activity shall be considered complete for the purpose of this regulation when the permittee:</text>
        <paragraph num="(a)">
          <text>Does not install the pump and the well is grouted; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Installs the pump before expiration of the permit and the well is ready for use.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Information Required.</text>
      <paragraph num="(1)">
        <text>The permittee shall provide all information required in the well completion report form in accordance with Environment Article, §9-1308, Annotated Code of Maryland.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>For a well cluster, a drawing of the well locations shall be submitted with the well completion report for each well.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>If geophysical logs were generated, then the driller shall submit two copies of the log.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".30" heading="Approval of Well for Use as Potable Water Supply.">
    <paragraph num="A.">
      <text>When Certificate of Potability Required.</text>
      <paragraph num="(1)">
        <text>A person may not put into service a well or water supply system that may be used for human consumption unless the Approving Authority has first issued a Certificate of Potability for the well.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>This section does not apply to any well that is not used as a potable water supply.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>If a well is later converted from a nonpotable water supply well to a potable water supply well, the well shall:</text>
        <paragraph num="(a)">
          <text>Meet the requirements of §B of this regulation; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Be approved by the Approving Authority.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>Before a standby well can be used as a potable water source, the owner shall obtain a Certificate of Potability for the well.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Certificate of Potability. The Approving Authority may issue a Certificate of Potability if a well meets the following criteria:</text>
      <paragraph num="(1)">
        <text>The well has been constructed in accordance with this chapter;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The well has been constructed in accordance with any permit special condition;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The well meets the yield requirements of this chapter;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>The well completion report has been submitted in accordance with Regulation 29 of this chapter;</text>
      </paragraph>
      <paragraph num="(5)">
        <text>The well identification tag is affixed to the well; and</text>
      </paragraph>
      <paragraph num="(6)">
        <text>The well meets the requirements, as applicable, for a public water supply system under §C of this regulation or a nonpublic potable water supply system under §D of this regulation.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>A well for a public water supply system shall:</text>
      <paragraph num="(1)">
        <text>Be approved by the Department; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Meet the requirements of COMAR 26.04.01.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>A well for a nonpublic potable water supply system, upon sampling and testing by the Approving Authority, shall meet the following limits:</text>
      <paragraph num="(1)">
        <text>Bacteriological, which means that:</text>
        <paragraph num="(a)">
          <text>The well water has tested negative for the presence of coliform bacteria for two consecutive samples collected at least 24 hours apart; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The water samples were analyzed following procedures approved for use in accordance with COMAR 26.08.05; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Chemical and physical, which means that:</text>
        <paragraph num="(a)">
          <text>A well water sample meets the maximum contaminant limits of COMAR 26.04.01 for Nitrate-nitrogen; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A well water sample meets the turbidity standards as specified under Regulation .16E of this chapter.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Additional analyses of the water may be required by the Approving Authority if it has reason to believe that constituents may be present in amounts that may be adverse to human health.</text>
    </paragraph>
    <paragraph num="F.">
      <text>Potable water contaminant standards for nonpublic potable water supply systems shall be the maximum contaminant levels for potable water adopted by the US EPA and listed in 40 CFR §141 Subpart G as amended.</text>
    </paragraph>
    <paragraph num="G.">
      <text>Issuance of Interim Certificate of Potability.</text>
      <paragraph num="(1)">
        <text>The Approving Authority may issue an Interim Certificate of Potability if the well meets the following:</text>
        <paragraph num="(a)">
          <text>The most recent bacteriological sample from the well has tested negative for the presence of coliform bacteria; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The water sample from the well meets the chemical and physical water quality standards of §§D(1) and (2), and F of this regulation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>A water system may be put into service with an Interim Certificate of Potability.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The subsequent water sample shall be collected within 6 months of the date of the first water sample and if this water sample is negative for coliform bacteria, a Certificate of Potability may be issued for the water system.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>The Approving Authority may impose special conditions on an Interim Certificate of Potability.</text>
      </paragraph>
    </paragraph>
    <paragraph num="H.">
      <text>Wells Failing to Meet Requirements for Certificate of Potability.</text>
      <paragraph num="(1)">
        <text>The Approving Authority may grant additional time for a well failing Certificate of Potability requirements to be brought into compliance with this chapter.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Except for those wells granted a permanent deviation in accordance with §J of this regulation, wells that cannot be brought into compliance with this chapter shall be abandoned and sealed.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>If, in the opinion of the Approving Authority, the results of the analysis required in this regulation indicate that constituents are present in amounts that may be adverse to human health or safety, a Certificate of Potability may not be issued.</text>
      </paragraph>
    </paragraph>
    <paragraph num="I.">
      <text>Special Conditions. The Approving Authority may impose special conditions on a Certificate of Potability.</text>
    </paragraph>
    <paragraph num="J.">
      <text>Granting of Permanent Deviation.</text>
      <paragraph num="(1)">
        <text>The Approving Authority, as a special condition, may grant a permanent deviation to the Certificate of Potability to install an adequate:</text>
        <paragraph num="(a)">
          <text>Water disinfection device;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Nitrate removal device;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Naturally occurring radionuclide removal device; or</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Water treatment device for any naturally occurring inorganic contaminant that exceeds the standards set in §D of this regulation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>All water treatment devices approved as a special condition in a Certificate of Potability shall be approved only under the following conditions:</text>
        <paragraph num="(a)">
          <text>The well has been carefully evaluated to determine that there are no physical defects and the well was constructed in accordance with this chapter; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A public water supply is not available.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>A water treatment device approved as a special condition in a Certificate of Potability for water disinfection shall be approved only if:</text>
        <paragraph num="(a)">
          <text>The well has not responded to the disinfection procedures described in Regulation .24 of this chapter; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>In Hydrogeologic Areas 1, 2, 3, and 4, fecal coliform contamination is not present.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>In Hydrogeologic Area 5, the Approving Authority may grant a permanent deviation for fecal coliform provided the following treatment is provided:</text>
        <paragraph num="(a)">
          <text>1 micron absolute filtration;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Chlorination; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Ultraviolet radiation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>If a permanent deviation is granted an attachment to the property deed shall be made that reflects the need for treatment, prior to the issuance of the Certificate of Potability.</text>
      </paragraph>
      <paragraph num="(6)">
        <text>A water treatment device for nitrate removal may be approved as a special condition in a Certificate of Potability. The approval requires that a source of water having less than the maximum contaminant level for nitrate as set in 26.04.01 is not available less than 600 feet beneath the surface of the ground.</text>
      </paragraph>
      <paragraph num="(7)">
        <text>A water treatment device for arsenic removal may be approved as a special condition in a Certificate of Potability. The approval requires that a source of water having less than the maximum contaminant level for arsenic as set forth in COMAR 26.04.01 is not available less than 600 feet beneath the surface of the ground.</text>
      </paragraph>
      <paragraph num="(8)">
        <text>A water treatment device approved as a special condition in a Certificate of Potability for naturally occurring radionuclide removal shall be approved only if a radionuclide free aquifer is not available less than 600 feet beneath the surface of the ground.</text>
      </paragraph>
      <paragraph num="(9)">
        <text>Any water treatment device approved as a special condition in a Certificate of Potability shall be capable of removing the targeted contaminant to levels below the standards set forth in §D of this regulation.</text>
      </paragraph>
      <paragraph num="(10)">
        <text>The Approving Authority may require submittal of a continuing service contract for the water treatment device prior to granting the permanent deviation.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".31" heading="Tests by a Maryland Certified Water Laboratory.">
    <paragraph num="A.">
      <text>At the option of the Approving Authority, the results of water quality tests performed by a Maryland certified water laboratory may be substituted for results obtained by the Approving Authority from a State-operated laboratory.</text>
    </paragraph>
    <paragraph num="B.">
      <text>The Maryland certified water laboratory shall certify that the sample was obtained and transported in accordance with COMAR 26.08.05.</text>
    </paragraph>
    <paragraph num="C.">
      <text>All tests taken by a Maryland certified water laboratory for an initial Certificate of Potability shall be submitted to the Approving Authority by the well owner prior to issuance of the Certificate of Potability.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".32" heading="Release of Information on Test Results.">
    <paragraph num="A.">
      <text>The Approving Authority shall maintain files of test results and shall release copies of these results, upon request, to the person who requested the tests and to persons for whose benefit the tests were performed.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Copies of the Certificate of Potability shall be released to all subsequent owners of the property or their agents upon request.</text>
    </paragraph>
    <paragraph num="C.">
      <text>The Approving Authority shall provide, with each well sample result, the address and telephone number of the office where an interpretation of the test results may be obtained.</text>
    </paragraph>
    <paragraph num="D.">
      <text>When the Approving Authority believes the sample, due to the collection and analysis date, is no longer representative of the condition of the well, the Approving Authority shall include this information along with the sample results.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".33" heading="Well Owners' Responsibilities.">
    <paragraph num="A.">
      <text>Every well shall be maintained in a condition to conserve and protect the ground water resource.</text>
    </paragraph>
    <paragraph num="B.">
      <text>After the well is completed, the well owner is responsible for maintaining the upper terminal of the well as specified in this chapter.</text>
    </paragraph>
    <paragraph num="C.">
      <text>The owner of a flowing artesian well shall maintain the upper terminal of the well to prevent the wasting of water as provided in this chapter.</text>
    </paragraph>
    <paragraph num="D.">
      <text>After the well is completed, the well owner shall maintain the access port in a manner that prevents the entrance of water, dust, insects, or other foreign material and permits ready access for water level measurements.</text>
    </paragraph>
    <paragraph num="E.">
      <text>After the well is completed, the well owner is responsible for maintaining the identification tag attached to the well.</text>
    </paragraph>
    <paragraph num="F.">
      <text>Whenever work is done on the well, the work shall be done in accordance with this chapter.</text>
    </paragraph>
    <paragraph num="G.">
      <text>The well owner shall disclose all special conditions written into an Interim Certificate of Potability or Certificate of Potability to any purchaser of the property served by a well before entering into a contract of sale or lease.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".34" heading="Well Abandonment and Sealing Standards — General.">
    <paragraph num="A.">
      <text>Any well shall be considered abandoned when:</text>
      <paragraph num="(1)">
        <text>The well is in such a state of disrepair that continued use for its intended purpose is impracticable;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The well has been permanently disconnected from any water supply system or irrigation system; or</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The well is unsuccessful, that is, it does not meet the requirements of this chapter.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>All wells constructed prior to April 1, 1969 that are not in use shall be abandoned.</text>
    </paragraph>
    <paragraph num="C.">
      <text>An abandoned well shall be filled and sealed in accordance with this regulation.</text>
    </paragraph>
    <paragraph num="D.">
      <text>The Approving Authority may require a well owner to abandon and seal a well if it:</text>
      <paragraph num="(1)">
        <text>Is causing or is a potential source of pollution of waters of the State;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Is producing water that is polluted;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Does not have an Interim Certificate of Potability, if required; or</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Is no longer needed for its intended purpose.</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Well sealing shall:</text>
      <paragraph num="(1)">
        <text>Restore as nearly as possible those subsurface conditions that existed before the well was constructed, taking into account changes, if any, that have occurred since the time of construction; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Provide better protection against aquifer communication through the borehole.</text>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>An abandoned well shall be sealed in such a way that:</text>
      <paragraph num="(1)">
        <text>If it is a cased well:</text>
        <paragraph num="(a)">
          <text>The annular space is sealed so that it will not act as a channel for the interchange of waters; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The interior of the well casing is sealed so that it will not act as a channel for the interchange of waters;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>If it is an uncased well bore, it will not act as a channel for the interchange of waters; and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>It will not present a hazard to the safety and well-being of humans or animals.</text>
      </paragraph>
    </paragraph>
    <paragraph num="G.">
      <text>Any abandoned well shall be sealed only:</text>
      <paragraph num="(1)">
        <text>By a well driller licensed by the Maryland State Board of Well Drillers; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Under the supervision of a representative of the Approving Authority.</text>
      </paragraph>
    </paragraph>
    <paragraph num="H.">
      <text>Abandonment and Sealing Notification. For wells designed to be used at a rate of more than 10,000 gallons per day, a licensed well driller shall:</text>
      <paragraph num="(1)">
        <text>Provide written notification to the Approving Authority that identifies the well to be sealed and an outline of the work to be done;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Identify whether the well casing is to be perforated or ripped; and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Provide 24-hour notification to the Approving Authority before the commencement of sealing operations.</text>
      </paragraph>
    </paragraph>
    <paragraph num="I.">
      <text>Abandonment and Sealing Approval.</text>
      <paragraph num="(1)">
        <text>When the Approving Authority has reason to believe that the sealing of a well necessitates close supervision, it may require:</text>
        <paragraph num="(a)">
          <text>The submission of sealing plans and specifications for approval before sealing operations are initiated; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>24 hours’ notice before the commencement of sealing operations.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>The Approving Authority may approve of a well sealing procedure not identified in Regulation .36 of this chapter, provided the sealing procedure complies with Regulation .36D of this chapter.</text>
      </paragraph>
    </paragraph>
    <paragraph num="J.">
      <text>Reports on the Abandonment and Sealing of Wells.</text>
      <paragraph num="(1)">
        <text>When a well is abandoned and sealed, the person sealing it shall submit a completed Water Well Abandonment Sealing Report on the form provided by the Approving Authority.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>This report shall be submitted not later than 45 days after abandonment and sealing of the well or test hole.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".35" heading="Well Sealing Materials.">
    <paragraph num="A.">
      <text>The following sealing materials are acceptable to seal a well:</text>
      <paragraph num="(1)">
        <text>Concrete when mixed at five 94-pound sacks of Portland cement per yard of concrete;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Neat Portland cement grout when mixed in accordance with Regulation .19 of this chapter;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>A mixture of five 94-pound sacks of Portland cement and 1 cubic yard sand;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Bentonite, if used:</text>
        <paragraph num="(a)">
          <text>As a slurry mixed at 2 pounds per gallon of water; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>In chip or pellet form; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>Combinations of these materials.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Drilling fluid may not to be used to seal a well.</text>
    </paragraph>
    <paragraph num="C.">
      <text>Fill Materials.</text>
      <paragraph num="(1)">
        <text>Clay, silt, sand, gravel, crushed stone, mixtures of these materials, and sealing materials may be used as a filler in sealing a well.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>In the sealing of an unsuccessful well in Hydrogeologic Areas 3, 4, and 5, the drill cuttings may be used as fill material.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Material containing organic matter may not be used.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>The Approving Authority may require that fill material be disinfected.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".36" heading="Well Sealing Procedures.">
    <paragraph num="A.">
      <text>Preliminary Work Before Sealing a Well.</text>
      <paragraph num="(1)">
        <text>The well shall be investigated to determine:</text>
        <paragraph num="(a)">
          <text>Its present condition;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The details of its construction; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Whether there are any obstructions that will interfere with the process of filling and sealing.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>If there are any obstructions, they shall be removed, if possible, by cleaning the hole or redrilling.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Liners shall be removed prior to sealing or an alternate sealing plan must be approved by the Approving Authority.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Filling and Sealing Wells.</text>
      <paragraph num="(1)">
        <text>In all hydrogeologic areas of the State, the annular space of cased wells shall be sealed.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Wells in an unconfined aquifer in Hydrogeologic Areas 1 and 2 shall be sealed by either of the following procedures:</text>
        <paragraph num="(a)">
          <text>If the well casing is not removed, fill the well with sealing material; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>If the well casing is removed, fill the entire length of the borehole with sealing material.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Wells in a confined aquifer in Hydrogeologic Area 2 shall be filled and sealed by either of the following procedures:</text>
        <paragraph num="(a)">
          <text>If the casing has been removed, the well shall be filled the entire depth with sealing material; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>If the casing has not been removed:</text>
          <paragraph num="(i)">
            <text>Consideration shall be given to perforating or ripping the casing opposite the confining layers; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>The well shall be filled with sealing material.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>Unconfined wells less than 2-inch diameter shall be sealed only with neat Portland cement.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Wells in Hydrogeologic Areas 3, 4, and 5 Filling and Sealing Procedures.</text>
        <paragraph num="(a)">
          <text>Fill material shall extend from the bottom of the well to within 20 feet of the casing bottom, except for filling materials used in unsuccessful wells under Regulation .35C(2) of this chapter.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>If rapid loss of sealing material into the rock occurs during emplacement, coarse fill material may be used to fill voids.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Placement of Material. The following standards shall be met in placing filling or sealing materials:</text>
      <paragraph num="(1)">
        <text>The well shall be sealed with the appropriate material emplaced from the top of the fill material;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>When neat Portland cement, concrete, or bentonite slurry is used, it shall be placed in one continuous operation utilizing a pipe extended to the bottom of the interval to be sealed except as noted in §D of this regulation;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Bentonite chips or pellets:</text>
        <paragraph num="(a)">
          <text>Shall be used in such a way as to prevent bridging, but if bridging occurs, the well shall be drilled out;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>May not be used for casing diameters smaller than 2 inches; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Shall follow the specific product manufacturer’s instructions for their use.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Special Procedures for Filling and Sealing Certain Wells.</text>
      <paragraph num="(1)">
        <text>A dug well shall be filled and sealed by the following procedure:</text>
        <paragraph num="(a)">
          <text>Placing fill material in the well to a level approximately 5 feet below the land surface;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Placing a 2-feet thick layer of concrete above the fill; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Filling the remainder of the well to the ground surface.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>A monitoring well shall be sealed by the following procedure:</text>
        <paragraph num="(a)">
          <text>For monitoring wells less than 50 feet in depth:</text>
          <paragraph num="(i)">
            <text>Ripping or removing the casing; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Filling the well with sealing material; or</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>For monitoring wells greater than 50 feet in depth follow the procedures specified in §B of this regulation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>A geothermal well shall be sealed by;</text>
        <paragraph num="(a)">
          <text>Removing all fluids from the tubing; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Filling the tubing and any open portion of the borehole with grout.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".37" heading="Variances.">
    <text>Upon the recommendation of the Approving Authority and the approval of the Department, variances to the distance requirements of the regulations of this chapter for all wells and the construction standards for replacement wells may be granted, provided that the public health and the environment are protected.</text>
  </regulation>
  <regulation prefix="Regulation" num=".38" heading="Enforcement and Appeal.">
    <paragraph num="A.">
      <text>If the Approving Authority determines that there has been a violation of this chapter or of any permit or permit special condition, the Approving Authority shall:</text>
      <paragraph num="(1)">
        <text>Serve upon the alleged violator a written complaint specifying the nature and extent of the violation, items to be corrected, and time limits for correction; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Notify the well owner of the violation.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>If a person violating a requirement of this chapter cannot correct the violation, the Approving Authority may require abandonment and sealing of the well.</text>
    </paragraph>
    <paragraph num="C.">
      <text>A person aggrieved by a final decision of the Approving Authority in a contested case has the right to have the decision reviewed in accordance with the provisions of the Administrative Procedure Act and other applicable statutes and regulations. All appeals shall be filed with the Director, Water Management Administration, within 30 days after notification of the final decision by the Approving Authority.</text>
    </paragraph>
    <paragraph num="D.">
      <text>A person who violates any provision of this chapter is guilty of a misdemeanor and upon conviction is subject to the provisions under Environment Article, §9-1311, Annotated Code of Maryland.</text>
    </paragraph>
    <paragraph num="E.">
      <text>A person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this chapter is guilty of a misdemeanor and upon conviction is subject to the provisions under Environment Article, §9-1311, Annotated Code of Maryland.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".39" heading="Map of Maryland Showing Hydrogeologic Areas." />
  <annotations>
    <annotation type="Authority">Environment Article, §§9-1305 and 9-1305.1, Annotated Code of Maryland</annotation>
    <annotation type="History" subtype="Administrative History">Effective date: November 28, 1980 (7:24 Md. R. 2257)</annotation>
    <annotation type="History" subtype="Administrative History">Regulations .02J and .07B, C, D, G, J, and N amended effective March 1, 1982 (9:4 Md. R. 331)</annotation>
    <annotation type="History" subtype="Administrative History">Regulations .07Q and .09D adopted effective August 31, 1981 (8:17 Md. R. 1420)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .09C and D amended as an emergency provision effective May 26, 1983 (10:12 Md. R. 1070), emergency status expired September 26, 1983</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .09C and D amended and E adopted effective December 5, 1983 (10:24 Md. R. 2189)</annotation>
    <annotation type="History" subtype="Administrative History">Map recodified as Regulation .13</annotation>
    <annotation type="History" subtype="Administrative History">Chapter recodified from COMAR 10.17.13 to COMAR 26.04.04</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .07D amended as an emergency provision effective November 5, 2007 (34:26 Md. R. 2260); emergency status expired May 3, 2008</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .09B amended effective September 2, 2002 (29:17 Md. R. 1382)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .09B-1, F, and G adopted effective November 25, 1991 (18:23 Md. R. 2493)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .12D amended effective October 26, 1992 (19:21 Md. R. 1894)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .12F amended effective November 25, 1991 (18:23 Md. R. 2493)</annotation>
    <annotation type="History" subtype="Administrative History">Regulations .01—.13 repealed and new Regulations .01—.39 adopted effective January 19, 2015 (42:01 Md. R. 19)</annotation>
  </annotations>