<regulation prefix="Regulation" num=".20" citation="COMAR 26.04.07.20" title_num="26" subtitle_num="04" chapter_num="07" heading="Sanitary Landfills — Industrial Landfills — Permit Requirements.">
  <paragraph num="A.">
    <text>Permit Application Requirements. When required to obtain a permit to construct or operate an industrial waste landfill, an applicant shall submit five copies of the following information:</text>
    <paragraph num="(1)">
      <text>A completed and signed application on a form provided by the Department.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>A comprehensive physical and chemical description of the waste materials to be disposed of in the landfill.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>A description, including flow diagrams, of the processes generating the wastes, including raw materials, intermediate by-products, final products, and waste streams.</text>
    </paragraph>
    <paragraph num="(4)">
      <text>A topographic map which is an accurate depiction of the site at the time the application is filed, prepared to a scale not smaller than 1 inch equals 200 feet, which depicts the property boundaries, on-site buildings and structures, and obvious surficial features, including but not limited to:</text>
      <paragraph num="(a)">
        <text>Springs and seeps;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Streams, whether intermittent or perennial;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Rock outcrops;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Sink holes;</text>
      </paragraph>
      <paragraph num="(e)">
        <text>Surface impoundments;</text>
      </paragraph>
      <paragraph num="(f)">
        <text>Wells;</text>
      </paragraph>
      <paragraph num="(g)">
        <text>100-year flood plain;</text>
      </paragraph>
      <paragraph num="(h)">
        <text>Forested or other vegetated areas; and</text>
      </paragraph>
      <paragraph num="(i)">
        <text>The location of any buried or overhead power transmission lines, utility pipelines, or storage tanks on the property.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(5)">
      <text>A discussion of the geologic formations directly underlying and in close proximity to the site.</text>
    </paragraph>
    <paragraph num="(6)">
      <text>A map or drawing depicting the final grades of the site after completion of landfilling activities.</text>
    </paragraph>
    <paragraph num="(7)">
      <text>A discussion of the projected future use of the landfilled area.</text>
    </paragraph>
    <paragraph num="(8)">
      <text>The volume and type of available cover material, if appropriate, for the material being landfilled.</text>
    </paragraph>
    <paragraph num="(9)">
      <text>Means of controlling access to the landfill.</text>
    </paragraph>
    <paragraph num="(10)">
      <text>Proposed operating procedures including:</text>
      <paragraph num="(a)">
        <text>Hours of operation;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Necessary equipment to handle wastes delivered to the site;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Contingency plans for fire or other emergencies; and</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Procedures to be followed upon delivery of wastes.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(11)">
      <text>Methods of controlling runoff or run-on to the site. Any erosion and sediment control provisions shall satisfy the requirements of Environment Article, Title 4, Subtitle 1, and COMAR 26.09.01.</text>
    </paragraph>
    <paragraph num="(12)">
      <text>Proposed methods of covering and stabilizing completed areas.</text>
    </paragraph>
    <paragraph num="(13)">
      <text>A description of the design features and systems intended to protect ground water from leachate which is generated by landfilled wastes.</text>
    </paragraph>
    <paragraph num="(14)">
      <text>If appropriate, a discussion as to how leachate will be collected, removed from the landfill, and ultimately disposed of.</text>
    </paragraph>
    <paragraph num="(15)">
      <text>Ground water elevation data from the area and a prediction of the maximum expected ground water elevation at the site of the landfill. An explanation shall be provided as to how the ground water elevation estimates were derived.</text>
    </paragraph>
    <paragraph num="(16)">
      <text>Geologic cross sections of the site in sufficient detail and orientation to clearly identify subsurface conditions.</text>
    </paragraph>
    <paragraph num="(17)">
      <text>Background ground water quality data for the following:</text>
      <paragraph num="(a)">
        <text>pH;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Alkalinity;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Hardness;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Chloride;</text>
      </paragraph>
      <paragraph num="(e)">
        <text>Specific conductance;</text>
      </paragraph>
      <paragraph num="(f)">
        <text>Nitrates;</text>
      </paragraph>
      <paragraph num="(g)">
        <text>Nickel;</text>
      </paragraph>
      <paragraph num="(h)">
        <text>Sulfates;</text>
      </paragraph>
      <paragraph num="(i)">
        <text>Copper;</text>
      </paragraph>
      <paragraph num="(j)">
        <text>Fluoride;</text>
      </paragraph>
      <paragraph num="(k)">
        <text>Arsenic;</text>
      </paragraph>
      <paragraph num="(l)">
        <text>Barium;</text>
      </paragraph>
      <paragraph num="(m)">
        <text>Cadmium;</text>
      </paragraph>
      <paragraph num="(n)">
        <text>Chromium;</text>
      </paragraph>
      <paragraph num="(o)">
        <text>Lead;</text>
      </paragraph>
      <paragraph num="(p)">
        <text>Zinc;</text>
      </paragraph>
      <paragraph num="(q)">
        <text>Chemical oxygen demand;</text>
      </paragraph>
      <paragraph num="(r)">
        <text>Mercury.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(18)">
      <text>For a particular industrial waste landfill, the Department may specify additional parameters for background ground water analysis.</text>
    </paragraph>
    <paragraph num="(19)">
      <text>Test boring logs, well completion reports, piezometric measurements, chemical or physical soil analyses, or both, and accompanying geotechnical analyses.</text>
    </paragraph>
    <paragraph num="(20)">
      <text>A preliminary conceptual design of the proposed landfill.</text>
    </paragraph>
    <paragraph num="(21)">
      <text>Other information required by the Department.</text>
    </paragraph>
  </paragraph>
  <paragraph num="B.">
    <text>Plan Review.</text>
    <paragraph num="(1)">
      <text>Following receipt of the specified number of copies of the required information, the Department shall forward one copy to the:</text>
      <paragraph num="(a)">
        <text>Chief executive officer or the governing body, or both, of the county or municipality in which the activity is proposed;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Local health official; and</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Local agency responsible for solid waste management.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>A person receiving a copy of the application and supporting information shall be requested to submit comments to the Department within 20 days of receipt of the application.</text>
    </paragraph>
  </paragraph>
  <paragraph num="C.">
    <text>Public Meeting. The Department reserves the right to conduct a public informational meeting which shall be advertised once per week for 2 successive weeks in a newspaper of general circulation in the affected area. Copies of the notice shall be distributed in the same manner as the application.</text>
  </paragraph>
  <paragraph num="D.">
    <text>Other Requirements.</text>
    <paragraph num="(1)">
      <text>Periodic Reports to Approving Authority. An annual written report shall be submitted to the Approving Authority concerning the status of the landfill. This report shall be submitted not later than 60 days following the date specified in the permit and shall at a minimum include the:</text>
      <paragraph num="(a)">
        <text>Quantity of solid waste received per month during each of the preceding 12 months. Quantities shall be given in tons and in-place cubic yards.</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Percentage of total capacity of the landfill used for emplacement of solid waste.</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Projected date at which the landfill will reach capacity, and the premises upon which this determination is made.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>The Department may require the permit holder to periodically collect and analyze ground and surface water samples at the permitted site and to report the results to the Department. The Department may furthermore specify the:</text>
      <paragraph num="(a)">
        <text>Number and location of the sampling points;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Frequency of the analyses;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Analytical procedures;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Materials to be monitored;</text>
      </paragraph>
      <paragraph num="(e)">
        <text>Frequency of reporting.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>The Approving Authority may impose other requirements considered necessary to protect the public health and the environment, or to prevent nuisance conditions.</text>
    </paragraph>
  </paragraph>
</regulation>