<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".20" citation="COMAR 26.04.08.20" title_num="26" subtitle_num="04" chapter_num="08" heading="Cost Estimate for Closure.">
  <paragraph num="A.">
    <text>For each scrap tire facility, where a closure plan is required, an estimate shall be made of the costs for the transfer of the scrap tires to an authorized scrap tire facility or to the marketplace, and for the removal of all solid waste to a permitted solid waste acceptance facility, for the maximum amount of these materials that exist on the site at any time.</text>
  </paragraph>
  <paragraph num="B.">
    <text>The estimate shall be done according to a work sheet developed by the Department and shall include the following:</text>
    <paragraph num="(1)">
      <text>Identification of and mileage to an authorized scrap tire facility or marketplace;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Number of vehicle trips required to remove all scrap tires and solid waste from the facility;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Cost per load to transport;</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Cost to load;</text>
    </paragraph>
    <paragraph num="(5)">
      <text>Cost to deposit scrap tires at an authorized facility or marketplace and solid waste residuals at a permitted solid waste acceptance facility;</text>
    </paragraph>
    <paragraph num="(6)">
      <text>Cost to secure the site and restrict public access;</text>
    </paragraph>
    <paragraph num="(7)">
      <text>Administrative costs; and</text>
    </paragraph>
    <paragraph num="(8)">
      <text>Total closure cost estimate.</text>
    </paragraph>
  </paragraph>
</regulation>