<?xml version='1.0' encoding='utf-8'?>
<chapter num="03" heading="Discharge Limitations" title_num="26" subtitle_num="08">
  <regulation prefix="Regulation" num=".01" heading="Effluent Limitations.">
    <paragraph num="A.">
      <text>Prohibited Discharges. The following discharges to the waters of this State are prohibited:</text>
      <paragraph num="(1)">
        <text>The discharge of any wastes or waste waters regardless of volume unless:</text>
        <paragraph num="(a)">
          <text>Authorized by a discharge permit, or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Subject to control or modification required by a schedule of compliance established by this State;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>The discharge of any pollutant in toxic amounts including:</text>
        <paragraph num="(a)">
          <text>Substances which accumulate to toxic amounts during the expected life of organisms in the surface water, or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Substances which produce deleterious behavioral effects on the organisms;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>The discharge of any radiological, chemical, or biological warfare agent;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>The discharge of any high level radioactive waste;</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Any discharge which would substantially impair anchorage and navigation;</text>
      </paragraph>
      <paragraph num="(6)">
        <text>Any discharge to which the Administrator of the Environmental Protection Agency has objected in writing under the Federal Act;</text>
      </paragraph>
      <paragraph num="(7)">
        <text>Any discharge which is in conflict with a plan approved by this State;</text>
      </paragraph>
      <paragraph num="(8)">
        <text>The discharge of sewage from vessels while moored, berthed, or docked in waters of this State except through a federally and State-approved marine sanitation device;</text>
      </paragraph>
      <paragraph num="(9)">
        <text>The discharge of sewage or other wastes from vessels to the waters of Deep Creek Lake in Garrett County, Maryland; and</text>
      </paragraph>
      <paragraph num="(10)">
        <text>The discharge of sewage from vessels to the waters of this State, designated as restricted zones. These zones shall be designated:</text>
        <paragraph num="(a)">
          <text>Wherever greater environmental protection and enhancement is required, and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>According to the procedures outlined in the Federal Act.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>The following areas of the waters of the State are designated as no discharge zones, where the discharge of sewage from marine sanitation devices located on vessels is prohibited:</text>
      <paragraph num="(1)">
        <text>The Herring Bay no discharge zone which encompasses all tidal waters of Herring Bay and its tributaries westerly of a line beginning at a point at or near Holland Point defined by Lat. 38°43'34.9" N., Long 76°31'37.3" W., then running approximately 352° (true) to a point at or near Crab Pile A defined by Lat. 38°46'33.0" N., Long. 76°32'10.1" W., then running approximately 354° (true) to a point at or near the north shore of Parker Creek defined by Lat. 38°46'39.1" N., Long. 76°32'10.8" W.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The Northern Coastal Bays no discharge zone which encompasses all the tidal waters of Ocean City Inlet, Sinepuxent Bay, Isle of Wight Bay, Assawoman Bay, and their tributaries, upstream (West) of a line beginning at a point at or near the east end of the north Ocean City Inlet jetty, defined by Lat. 38°19'27.0" N., Long. 75° 05' 5.5" W., then running approximately 248° (true) to a point at or near the east end of the south Ocean City Inlet jetty, defined by Lat. 38°19'20.7" N., Long. 75°05'24.8" W., and north of a line across the north end of Sinepuxent Bay beginning at a point at or near the southeast entrance of the Ocean City commercial fish harbor (Swordfish Basin) defined by Lat. 38°19'37.0" N., Long. 75°06'6.0" W., then running approximately 110° (true) to a point at or near the shore at the northwest tip of Assateague Island defined by Lat. 38°19'32.0" N., Long. 75°05'49.0" W., and south of the Maryland-Delaware line beginning at a point at or near the east side of Assawoman Bay defined by Lat. 38°27'4.5" N., Long. 75°04'11.2" W., then running approximately 270° (true) to a point at or near the west side of Assawoman Bay defined by Lat. 38°27'4.4" N., Long. 75°05'09.3" W.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The Chester River no discharge zone, which encompasses all the tidal waters of the Chester River and its tributaries. The delineation will begin at 39°08'54.48? N., 76°16'37.11" W. and extend down to 39°02'23.56" N., 76°18'8.89" W. From there it will continue east throughout any navigable waters, including all tributaries and bays. Included within this zone are Lankford Bay, Corsica River, Southeast Creek, and many smaller tributaries.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>The waters of Anne Arundel County in 13 enumerated rivers, coves, and embayments as described in the following table:</text>
      </paragraph>
      <paragraph num="(5)">
        <text>The provisions in §B(4) of this regulation are effective for all vessels on July 1, 2022, with the exception of United States Coast Guard Inspected Passenger Vessels as defined in 46 CFR Chapter I , Subchapter T, Small Passenger Vessels (Under 100 Gross Tons), for which this regulation will become effective on July 1, 2025.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Controlled Discharges.</text>
      <paragraph num="(1)">
        <text>Discharge Permitted. The discharge of waters, wastes, or wastewaters to the waters of this State is permitted if:</text>
        <paragraph num="(a)">
          <text>The discharge does not contravene the surface water quality standards established by this State to protect legitimate beneficial water uses;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The discharge complies with the discharge permit requirements for:</text>
          <paragraph num="(i)">
            <text>Effluent limitations,</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Schedules of compliance, and</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>The use of the best available technology;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(c)">
          <text>The discharge is authorized by a discharge permit subject to conditions and restrictions imposed in the permit; or</text>
        </paragraph>
        <paragraph num="(d)">
          <text>The discharge is:</text>
          <paragraph num="(i)">
            <text>Dredge spoil resulting from an effluent returning to the waters of this State from an approved dredge spoils disposal area,</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Material excavated from the sediments underlying surface waters and placed in another part of the water, or</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Material placed in suspension in the water as part of a dredging or construction project authorized by the Department.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Best Available Technology.</text>
        <paragraph num="(a)">
          <text>Before establishing effluent limitations for any point source, the Department shall give careful consideration to necessary and practicable effluent limitations to achieve compliance with surface water quality standards (COMAR 26.08.02.01—.08) or ground water quality standards (COMAR 26.08.02.09). This consideration shall include:</text>
          <paragraph num="(i)">
            <text>Information provided as part of the discharge permit application;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Information available from discharge permit monitoring reports; and</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Any other information provided by the applicant or required by the Department.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Best available technology shall be required as the minimum for all permitted discharges. If it is determined that compliance with the established water quality standards will not be achieved through BAT, additional treatment shall be:</text>
          <paragraph num="(i)">
            <text>Required; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Based on waste load allocation.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Nutrient Control. This State recognizes that certain surface waters of this State are eutrophic or are approaching eutrophic conditions. All discharges to these surface waters shall be treated as necessary to reduce eutrophic effects. This State shall require that wastewaters containing nutrients which cause or contribute to eutrophication be:</text>
        <paragraph num="(a)">
          <text>Given advanced waste treatment before discharge;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Disposed of by spray irrigation on land; or</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Disposed of by other practicable procedures which will avoid direct discharge to surface waters.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>Use of Material Balance.</text>
        <paragraph num="(a)">
          <text>The Department may require that the operator of the facility involved conduct a material balance with the accuracy and precision necessary to account for environmentally significant losses of material in any instance when:</text>
          <paragraph num="(i)">
            <text>Pollution of the waters of this State is likely to occur as a result of discharge or loss of toxic substances; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>The Department determines the need for materials control to prevent water pollution.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>If a material balance is required, the Department shall review and approve:</text>
          <paragraph num="(i)">
            <text>The procedure to be used;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>The frequency of the determinations;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>The units of measurements;</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>The methods of calculations, management, and record; and</text>
          </paragraph>
          <paragraph num="(v)">
            <text>Any other specific requirements considered necessary.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(c)">
          <text>Information developed by the operator of a facility as a consequence of making a material balance shall be made available to the Department of the Environment on demand.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".02" heading="Use of Toxic Substances for Aquatic Life Management Purposes.">
    <paragraph num="A.">
      <text>Scope. Any person who adds toxic substances to the waters of this State for aquatic life management purposes shall be governed by this regulation.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Restrictions on Use.</text>
      <paragraph num="(1)">
        <text>Toxic substances may not be applied to, discharged to, or deposited in the waters of this State in any way unless:</text>
        <paragraph num="(a)">
          <text>The application, discharge, or deposit meets all of the requirements imposed by this regulation; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Approval is given in accordance with this regulation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>The mixing, handling, or transfer of toxic substances or the washing of or cleaning operations for toxic substance containers or equipment may not result in any way in:</text>
        <paragraph num="(a)">
          <text>Application to the waters of this State;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Discharge to the waters of this State;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Deposition in the waters of this State.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Wastes and wastewaters from the washing of toxic substance containers or equipment may not be discharged to or permitted to flow into:</text>
        <paragraph num="(a)">
          <text>Subsurface drainage or disposal systems;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Municipal sanitary sewerage systems; or</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Storm water drainage systems.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>The toxic substances used shall be adequately controlled and sufficiently selective so as not to adversely affect:</text>
        <paragraph num="(a)">
          <text>Desirable species of aquatic life in the designated areas to be treated; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Any aquatic life outside the designated area to be treated.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Procedure for Obtaining Approval.</text>
      <paragraph num="(1)">
        <text>Permits for the use of toxic substances in the waters of this State shall be requested from the Department at least 30 days before the initiation of every aquatic life management project employing the application, discharge, or deposit of toxic substances.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Application for permit shall include the following information for each project:</text>
        <paragraph num="(a)">
          <text>The purpose of the project;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A description and maps or drawings of the area involved;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>A description of the watershed upstream and downstream from the project, or the tidal area around the project;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>A description of the toxic substance to be used;</text>
        </paragraph>
        <paragraph num="(e)">
          <text>A description of the method of application;</text>
        </paragraph>
        <paragraph num="(f)">
          <text>Name, title, and address of the person in charge of the project;</text>
        </paragraph>
        <paragraph num="(g)">
          <text>A description of safeguards to be used;</text>
        </paragraph>
        <paragraph num="(h)">
          <text>The approximate dates of the project operation;</text>
        </paragraph>
        <paragraph num="(i)">
          <text>A statement outlining methods to be used in the cleanup of the area following the application, discharge, or deposit of the toxic substances; and</text>
        </paragraph>
        <paragraph num="(j)">
          <text>Any other information the Department of the Environment requires for the proper evaluation of the project.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>The Department of the Environment may authorize the Chairman of the Soil Conservation District, or his designee approved by the Department to issue an emergency permit for use of toxic substances for aquatic life management purposes. These emergency permits shall only be issued in accordance with the following guidelines:</text>
        <paragraph num="(a)">
          <text>An emergency permit shall only be issued when, in the opinion of the Soil Conservation District (SCD) representative, a situation exists which requires rapid or immediate attention to prevent:</text>
          <paragraph num="(i)">
            <text>Degradation of water quality; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Development of a situation requiring more extensive treatment at a later date.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Emergency permits shall:</text>
          <paragraph num="(i)">
            <text>Be restricted to a maximum of two applications of a toxic substance; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Only authorize use of copper sulfate, cutrine or diquat, unless specific written authorization is received from the Department.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(c)">
          <text>An emergency permit form provided by the Department shall be used for issuance of emergency permits. A copy of the executed permit shall then be forwarded to the Department.</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Emergency permits may only be issued during the time period from May 1 to September 30.</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Emergency permits may not be issued if the pond or body of water is tributary to a public water supply, or tributary to shellfish waters.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>A person who discharges toxic substances to waters of the State is not required to obtain a permit under this regulation if the person is covered under a discharge permit issued under COMAR 26.08.01—.04 that incorporates the requirements of §§B and C(1) and (2) of this regulation.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".03" heading="Water Quality Impact Assessment for Thermal Discharges.">
    <paragraph num="A.">
      <text>Purpose. This regulation specifies procedures for compliance with Maryland water quality standards for thermal discharges and describes the factors, criteria, and standards for the establishment of alternate thermal effluent limitations under the Federal Act, §316(a), in permits issued under the Environment Article, Title 9, Subtitle 3, Annotated Code of Maryland, and this chapter.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Definition. For purposes of this regulation only, “significant” means having a statistically measurable effect beyond the mixing zone.</text>
    </paragraph>
    <paragraph num="C.">
      <text>Control of Thermal Discharges.</text>
      <paragraph num="(1)">
        <text>The mixing zone for thermal discharges shall be 50 feet radially from the point of discharge.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The Department may establish a mixing zone of different size or shape on a case-by-case basis.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Thermal discharges shall be controlled so that the:</text>
        <paragraph num="(a)">
          <text>Temperature outside the applicable mixing zone meets the applicable water quality criteria specified in COMAR 26.08.02.03-3; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Discharges comply with the thermal mixing zone criteria in §D of this regulation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>Request for Alternate Thermal Effluent Limitations.</text>
        <paragraph num="(a)">
          <text>Dischargers who are unable to meet the requirements of either §C(3)(a) or (b) of this regulation may request alternate thermal effluent limitations as provided in §E of this regulation.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A new request for alternate thermal effluent limitations shall be made within 180 days of notification by the Department that the discharger's thermal discharge cannot assure protection of a balanced indigenous community of shellfish, fish, and wildlife in and on the body of water into which the discharge is made. This request shall include a completed demonstration or a study plan for a demonstration to show compliance with §E of this regulation.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>A request for renewal of alternate thermal effluent limitations shall be made at the same time that the application for the renewal of the existing State discharge permit is made. This request for the renewal of existing alternate thermal effluent limitations shall include a summary of the basis for granting the alternate thermal effluent limitations and subsequent data, if any, to show that the thermal discharge effluent limitations are more stringent than necessary to protect a balanced indigenous community of shellfish, fish, and wildlife in and on the body of water into which the discharge is made. In addition, the application shall provide any other pertinent information which the Department requests within 60 days after receipt of the permit application.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>Alternate effluent limitations are approved only for the term of a specific State discharge permit. When renewing that State discharge permit, the discharger shall be prepared to demonstrate that continuation of the alternate effluent limitations is appropriate.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Thermal Mixing Zone Criteria.</text>
      <paragraph num="(1)">
        <text>Requirements for Discharges to Tidal Waters.</text>
        <paragraph num="(a)">
          <text>The 24-hour average of the maximum radial dimension measured from the point of discharge to the boundary of the full capacity 2°C above ambient isotherm (measured during the critical periods) may not exceed 1/2 of the average ebb tidal excursion.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The 24-hour average full capacity 2°C above ambient thermal barrier (measured during the critical periods) may not exceed 50 percent of the accessible cross section of the receiving water body. Both cross sections shall be taken in the same plane.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The 24-hour average area of the bottom touched by waters heated 2°C or more above ambient at full capacity (measured during the critical periods) may not exceed 5 percent of the bottom beneath the average ebb tidal excursion multiplied by the width of the receiving water body.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Requirements for Discharges to Nontidal Waters.</text>
        <paragraph num="(a)">
          <text>The distance downstream from the point of discharge to the 24-hour average 2°C above ambient isotherm at full capacity may not exceed the distance traveled in 6 hours by the receiving stream. Both distances shall be measured during the critical periods.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The 24-hour average full capacity 2°C above ambient thermal barrier (measured during the critical periods) may not exceed 50 percent of the accessible cross section of the receiving body. Both cross sections shall be taken in the same plane.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The area of the bottom touched by waters heated 2°C or more above ambient at full capacity may not exceed 5 percent of the stream bottom passed over by the stream flowing for 6 hours. Both areas shall be measured during the critical periods.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Establishment of Alternate Effluent Limitations.</text>
      <paragraph num="(1)">
        <text>Thermal discharge effluent limitations or standards established in permits may be less stringent than those required by applicable standards and limitations if the discharger demonstrates to the satisfaction of the Department that the effluent limitations or standards are more stringent than necessary to assure the protection and propagation of a balanced, indigenous community of shellfish, fish, and wildlife in and on the body of water into which the discharge is made. This demonstration shall show that the alternate effluent limitation desired by the discharger, considering the cumulative impact of its thermal discharge together with all other significant impacts on the species affected, including impingement and entrainment impacts, will assure the protection and propagation of a balanced indigenous community of shellfish, fish, and wildlife in and on the body of water into which the discharge is to be made.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>In determining whether the protection and propagation of the affected species will be assured, the Department may consider any information contained or referenced in any applicable thermal water quality criteria and thermal water quality information published by the Environmental Protection Agency under the Federal Act, §304(a), or any other information considered relevant by the Department. The demonstration shall include evidence for the lack of the following factors:</text>
        <paragraph num="(a)">
          <text>A significant increase in abundance or distribution of any species considered to be nuisance species by the Department of the Environment;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A significant change in biological productivity;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>A significant elimination or impairment of economic and recreational resources; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>A significant reduction in the successful completion of the life cycle of representative important species (RIS).</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Existing dischargers may base their demonstration upon the absence of prior appreciable harm instead of predictive studies. Demonstrations shall show that:</text>
        <paragraph num="(a)">
          <text>Appreciable harm has not resulted from the thermal component of the discharge, taking into account the interaction of the thermal component with other pollutants and the additive effect of other thermal sources, to a balanced, indigenous community of shellfish, fish, and wildlife in and on the body of water into which the discharge has been made; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Despite the occurrence of the previous harm, the desired alternate effluent limitations, or appropriate modifications of them, will nevertheless assure the protection and propagation of a balanced, indigenous community of shellfish, fish, and wildlife in and on the body of water into which the discharge is made.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>In determining whether prior appreciable harm has occurred, the Department shall consider the length of time in which the applicant has been discharging and the nature of the discharge.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>If a discharger fails to demonstrate that existing facilities, or alternate effluent limitations together with all other impacts, will assure the protection and propagation of a balanced indigenous population of shellfish, fish, other aquatic life, or wildlife in and on the receiving water, then the discharger shall make changes in facility processes or operations, or both, sufficient to assure the protection and propagation of a balanced indigenous population of shellfish, fish, other aquatic life, or wildlife in and on the receiving water.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".04" heading="Representative Important Species.">
    <text>Representative important species (RIS) are those species selected by the applicant and approved by the Department that exhibit one or more of the following characteristics:</text>
    <paragraph num="A.">
      <text>Species that are sensitive to adverse harm from operations of the facility (for example, heat-sensitive species);</text>
    </paragraph>
    <paragraph num="B.">
      <text>Species that use the local area as spawning or nursery grounds, or both, including those species that migrate past the facility to spawn;</text>
    </paragraph>
    <paragraph num="C.">
      <text>Species of commercial or recreational value, or both;</text>
    </paragraph>
    <paragraph num="D.">
      <text>Species that are habitat formers and are critical to the functioning of the local ecosystem;</text>
    </paragraph>
    <paragraph num="E.">
      <text>Species that are important links in the local food web;</text>
    </paragraph>
    <paragraph num="F.">
      <text>Rare, threatened, or endangered species;</text>
    </paragraph>
    <paragraph num="G.">
      <text>Potential nuisance organisms likely to be enhanced by plant operations.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".05" heading="Cooling Water Intake Structures.">
    <paragraph num="A.">
      <text>The location, design, construction, and capacity of cooling water intake structures shall reflect the best technology available (BTA) for minimizing adverse environmental impact.</text>
    </paragraph>
    <paragraph num="B.">
      <text>The determination of BTA for minimizing adverse environmental impact shall consider the effect of:</text>
      <paragraph num="(1)">
        <text>Impingement loss as determined in §D of this regulation; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Entrainment loss as determined in §E of this regulation.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Unless otherwise directed by the Department, cooling water intake structures withdrawing less than 10,000,000 gallons per day from surface waters are excluded from the requirements of this regulation if the volume of water is less than 20 percent of the:</text>
      <paragraph num="(1)">
        <text>Design stream flow for nontidal waters; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Annual average net flow past the point of discharge which is available for dilution for tidal waters.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Determination of Impingement Loss.</text>
      <paragraph num="(1)">
        <text>The value of the impingement species destroyed by the intake structure shall be determined by estimating the number of each species destroyed and multiplying by the values listed in COMAR 08.02.09.01. These factors shall be weighted by multiplying by the following adjustment factor:</text>
        <paragraph num="(a)">
          <text>Recreational only ---------------------------------- 1.0;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Commercial and recreational -------------------- 1.0;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Commercial only ---------------------------------- 1.0;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Commercial, recreational, and forage ---------- 0.8;</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Commercial and forage --------------------------- 0.75;</text>
        </paragraph>
        <paragraph num="(f)">
          <text>Recreational and forage --------------------------- 0.75;</text>
        </paragraph>
        <paragraph num="(g)">
          <text>Forage ------------------------------------------   --- 0.75.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Dischargers shall install and operate functional modifications to mitigate impingement loss, provided that the additional cost of installation of modifications to intake structures and of operation modifications over a 5-year period does not exceed 5 times the estimated annual value of impingement loss. These approved modifications shall be defined as BTA under §B(1) of this regulation.</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Determination of Entrainment Loss.</text>
      <paragraph num="(1)">
        <text>Definition. For purposes of this regulation only, “significant” means having a statistically measurable effect beyond the mixing zone.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The discharger shall determine the extent of cooling water entrainment loss on a spawning or nursery area of consequence for RIS as defined in Regulation .04 of this chapter.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>If entrainment loss results in significant adverse environmental impact, the discharger shall install and operate functional modifications to mitigate entrainment loss. These approved modifications shall be defined as BTA under §B(2) of this regulation.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".06" heading="Chlorine Discharges.">
    <paragraph num="A.">
      <text>Biocide Residual Levels. Biocide residual levels shall be controlled in the effluents discharged to all surface waters of this State.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Use Designations III and III-P.</text>
      <paragraph num="(1)">
        <text>Except as provided in §B(2) of this regulation, the Department may not issue a permit allowing the use of chlorine or chlorine-containing compounds in the treatment of wastewaters discharging to Use III and Use III-P waters.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Chlorine or chlorine-containing compounds may be used in the treatment of wastewaters discharged to Use III and Use III-P waters if the treatment includes dechlorination to a level set by the Department, and if the sewage treatment facility:</text>
        <paragraph num="(a)">
          <text>Discharges an amount of treated sewage that is less than 1 percent of the 7-day, 10-year low flow of the receiving stream; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Was in existence on July 1, 1981, is owned or operated by a local subdivision, is required to convert from the use of chlorination to another system in order to be permitted under this regulation, and matching federal funds are not available to make the conversion.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>When an effluent discharged to a Use III or Use III-P water contains chlorine or chlorine-containing compounds which did not originate in the treatment of wastewater, the Department shall require dechlorination, where appropriate, to a level established under §D of this regulation.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>All Other Water Use Designations. A person may not discharge any chlorine or chlorine products into Use I, I-P, II, IV, or IV-P waters of this State in excess of the limits set forth below:</text>
      <paragraph num="(1)">
        <text>For steam electric power stations using once-through cooling water from plants with total rated generating capacity of 25 or more megawatts, the limit shall be 0.2 milligram/liter daily maximum of total residual chlorine as determined using the amperometric titration method;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>For steam electric power stations using once-through cooling water from plants with total rated generating capacity of less than 25 megawatts, the limit shall be 0.2 milligram/liter monthly average and 0.5 milligram/liter daily maximum of free available chlorine as determined using the amperometric titration method;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The limit for cooling tower blowdown from steam electric generating plants shall be 0.2 milligram/liter monthly average and 0.5 milligram/liter daily maximum of free available chlorine as determined using the amperometric titration method;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>For any other discharge category for which the EPA has published effluent limitation guidelines, the limit shall be the limits specified in the published guidelines;</text>
      </paragraph>
      <paragraph num="(5)">
        <text>For all other dischargers, including sewage treatment works, the limit shall be the nondetectable level.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Nondetectable Level. The nondetectable level shall be less than 0.1 milligram/liter as determined using either the DPD titrimetric or colorimetric method or an alternative method approved by the Department.</text>
    </paragraph>
    <paragraph num="E.">
      <text>Natural Constituents. The Department may make an exception to the requirements of this regulation if the chlorine or chlorine products are natural constituents of the intake water.</text>
    </paragraph>
    <paragraph num="F.">
      <text>Dechlorination. Dechlorination may be accomplished by:</text>
      <paragraph num="(1)">
        <text>Chemical addition;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Absorption onto activated carbon;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Control of discharge rates or holding of the effluent so that chlorine residuals are reduced to the nondetectable level; or</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Any other method approved in advance by the Department.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".07" heading="Control of the Discharge of Toxic Substances to Surface Waters.">
    <paragraph num="A.">
      <text>General.</text>
      <paragraph num="(1)">
        <text>The Department shall adopt toxic substance criteria for any substance that the Department determines could reasonably be expected to interfere with designated uses.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>If a discharge of a toxic substance not identified in COMAR 26.08.02 occurs, the Department may:</text>
        <paragraph num="(a)">
          <text>Adopt a water quality criterion for the toxic substance in accordance with the emergency regulation procedure under State Government Article, Annotated Code of Maryland;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Ban the discharge of the toxic substance under the general authorities in Environment Article, Title 9, Annotated Code of Maryland;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Modify any existing discharge permit to include a limitation for the toxic substance, or deny any new discharge permit until the Department determines the effect of the discharge;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Require biomonitoring and chemical testing by any discharger to demonstrate the impact of a toxic substance in the surface water; or</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Take any other action permitted by applicable law.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Compliance with permit limits based on toxic substance criteria shall be determined through application of a standard method accepted by the Department for the measurement of the toxic substance.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Effluent Limitation Modification for Toxic Substances.</text>
      <paragraph num="(1)">
        <text>The Department may, upon written application from the applicant for a discharge permit, grant a temporary modification from one or more effluent limitations based on water quality criteria for toxic substances.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A temporary modification may be granted for a period up to 3 years.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>In order to receive any temporary modification of a water quality based effluent limit, an applicant shall identify and employ all reasonable alternatives to reduce or eliminate toxicity in the discharge, including process changes, materials substitution, improved operation and maintenance, recycling, and pollution prevention activities.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>At the time of application for a temporary modification, the applicant shall provide to the Department all the necessary supporting data and information. If the Department needs additional information, the applicant shall bear the burden of generating that information.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>An application for a temporary modification shall identify the specific effluent limitation in the NPDES permit for which a temporary modification is sought, and shall demonstrate that at least one of the following factors is met:</text>
        <paragraph num="(a)">
          <text>Naturally occurring pollutant concentrations prevent the attainment of the use;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Natural, ephemeral, intermittent, or low flow conditions or water levels prevent the attainment of the use, unless these conditions may be compensated for by the discharge of sufficient volume of effluent discharges without violating State water conservation requirements to enable uses to be met;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Human-caused conditions or sources of pollution prevent the attainment of the use and cannot be remedied, or would cause more environmental damage to correct than to leave in place;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Dams, diversions, or other types of hydrologic modifications preclude the attainment of the use, and it is not feasible to restore the water body to its original condition or to operate these modifications in a way that would result in the attainment of the use;</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Physical conditions related to the natural features of the water body, such as the lack of proper substrate, cover, flow, depth, pools, riffles, and similar conditions unrelated to water quality, preclude attainment of aquatic life protection uses; or</text>
        </paragraph>
        <paragraph num="(f)">
          <text>Controls more stringent than those required by §§301(b) and 306 of the Federal Act would result in substantial and widespread economic and social impact.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(6)">
        <text>A temporary modification may be renewed for one or more periods up to 3 years each, upon written application and demonstration that the applicant meets the requirements for a temporary modification at the time of renewal.</text>
      </paragraph>
      <paragraph num="(7)">
        <text>Opportunity for public participation shall be provided in accordance with the NPDES permitting process as described in COMAR 26.08.04.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Criteria for Toxic Substances. The criteria for toxic substances in ambient water are found in COMAR 26.08.02.03—.03-3.</text>
    </paragraph>
    <paragraph num="D.">
      <text>Applicability to Dischargers.</text>
      <paragraph num="(1)">
        <text>Dischargers Required to Conduct Monitoring for Toxic Substances. The Department shall require any permittee who has a discharge that falls into one of the following categories to perform biological or chemical monitoring for toxic substances:</text>
        <paragraph num="(a)">
          <text>A POTW with a pretreatment program established in accordance with COMAR 26.08.08;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>An industrial discharger or POTW treatment plant with a wastewater flow greater than or equal to 1,000,000 gallons per day;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>A discharger whose discharge has demonstrated actual or potential toxicity; or</text>
        </paragraph>
        <paragraph num="(d)">
          <text>A discharger whose discharge the Department has reason to believe may cause toxicity as determined by an evaluation of manufacturing processes, indirect discharges, treatment processes, effluent or receiving water data, or other relevant information.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>NPDES Permit Monitoring Requirements.</text>
        <paragraph num="(a)">
          <text>A discharger identified in §D(1) of this regulation shall have requirements for toxic substance monitoring included in its permit at the time of permit issuance or reissuance.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Modifications to these requirements may be allowed on a case-by-case basis if the:</text>
          <paragraph num="(i)">
            <text>Specific conditions of the discharge suggest that a full scale toxics monitoring program is not necessary; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Characteristics of the receiving water indicate that a full scale toxics monitoring program is not needed.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(c)">
          <text>Data submitted under any previous toxic substance monitoring program may be used to satisfy these requirements if the data is indicative of the current process and treatment conditions.</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Any toxic substance monitoring, including test protocols, shall be approved by the Department before initiation of the testing. All data generated shall be within the quality assurance and quality control specifications of the test protocol.</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Measurements below the minimum level may be reported as BML (below minimum level).</text>
        </paragraph>
        <paragraph num="(f)">
          <text>If the Department determines through the monitoring described in §D(1) of this regulation, that a discharge causes or has the potential to cause the discharge of toxic substances or an impact on surface waters, the Department may modify the discharge permit to require the discharger to collect data to verify or rule out the existence of an impact from a toxic substance.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Technology-Based Whole Effluent Toxicity Testing Requirements.</text>
      <paragraph num="(1)">
        <text>Purpose. Acute and chronic biotoxicity testing of effluents is used by the Department to assess the potential for acute and chronic toxicity in wastewater discharges.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Permittee Responsibility. A finding of no toxicity in the effluent does not relieve the permittee from the obligation to provide best available treatment technology or to comply with water quality standards for conventional and toxic substances.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Testing Required. The Department shall require biotoxicity testing in all new or renewed discharge permits for permittees identified in §D of this regulation.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Acute Whole Effluent Toxicity.</text>
        <paragraph num="(a)">
          <text>For the purpose of this subsection, an effluent is acutely toxic when the LC50 value resulting from the first 48 hours of a valid acute or chronic toxicity test is less than or equal to 100 percent effluent. LC50 means the effluent concentration at which 50 percent of the organisms die or are immobilized during the test.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Each test shall be conducted using at least two species, one vertebrate and one invertebrate, as specified by the Department. Each test shall be conducted in accordance with the procedures specified by the Department.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Unless otherwise specified in an existing permit, if the results for the first 48 hours of any two consecutive valid acute or chronic toxicity tests conducted within any 12-month period show acute toxicity under §E(4)(a) of this regulation, the permittee shall repeat the test within 30 days to confirm the finding of acute toxicity.</text>
        </paragraph>
        <paragraph num="(d)">
          <text>One toxicity test shall be differentiated from another by the date on which the effluent was sampled, not by the number of species tested.</text>
        </paragraph>
        <paragraph num="(e)">
          <text>If acute toxicity is confirmed, the permittee shall:</text>
          <paragraph num="(i)">
            <text>Eliminate the source of toxicity through operational changes; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Perform a toxicity reduction evaluation as specified within a defined compliance schedule.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(f)">
          <text>If the permittee repeats toxicity testing under §E(4)(c) of this regulation and the results for the first 48 hours of the repeat test do not show acute toxicity, the Department will require the permittee to repeat toxicity testing as specified in the permit.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>De Minimus Discharges. For categories, other than those identified in §D(1) of this regulation, of similar discharges that individually or cumulatively will have a de minimus impact on water quality, the Department may permit testing of representative discharges instead of requiring each permittee to test its effluent for whole effluent toxicity. In these circumstances, the Department shall impose conditions on the permittees relieved of the burden of whole effluent toxicity testing, to ensure that their effluents remain similar to those of the tested permittees.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".08" heading="Remining.">
    <paragraph num="A.">
      <text>Purpose. This regulation establishes the criteria under which the Department shall determine:</text>
      <paragraph num="(1)">
        <text>That an application for a coal remining NPDES permit has the potential to improve water quality as required under §301 of the Federal Water Pollution Control Act (33 U.S.C. §1311);</text>
      </paragraph>
      <paragraph num="(2)">
        <text>If an applicant for an NPDES permit to discharge pollutants from coal remining qualifies for a variance from the State water quality standards; and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The appropriate effluent limitations for pH, iron, and manganese and other requirements in any NPDES permit issued for coal remining at a specific site.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Application for NPDES Coal Remining Permit.</text>
      <paragraph num="(1)">
        <text>Application Requirements. The applicant shall comply with all permit application requirements as set forth in COMAR 26.08.04.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Required Documentation. The applicant shall:</text>
        <paragraph num="(a)">
          <text>Submit documentation from the Bureau of Mines that the proposed coal remining operation will be located on a remined area;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Certify that the proposed coal remining operation will be confined to the remined area;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Submit the application for a remining permit from the Bureau of Mines;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Describe the hydrologic balance for the proposed coal remining operation, including results of a detailed water quality and quantity monitoring program conducted in accordance with §B(4) of this regulation;</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Submit plans, cross sections, and schematic drawings describing the techniques for handling acid-forming materials to reduce the discharge of acidity, iron, and manganese;</text>
        </paragraph>
        <paragraph num="(f)">
          <text>Submit a description and an explanation of the range of abatement levels that probably can be achieved, costs, and each step proposed to reduce the discharge of acidity, iron, and manganese;</text>
        </paragraph>
        <paragraph num="(g)">
          <text>Submit a description of the spoil-handling practices necessary to reduce the discharge of acidity, iron, and manganese;</text>
        </paragraph>
        <paragraph num="(h)">
          <text>Submit a detailed topographic map of the proposed coal remining operation, including the locations of the preexisting and proposed discharges; and</text>
        </paragraph>
        <paragraph num="(i)">
          <text>Continue the water quality and quantity monitoring program described in §B(4) of this regulation on a quarterly basis, and submit the results to the Department on a quarterly basis until the Department makes a final permit decision.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>When any of the information required in §B(2)(d)—(h) of this regulation is contained in the information included as part of §B(2)(c), the applicant does not need to provide separate documentation.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Baseline Sampling Data.</text>
        <paragraph num="(a)">
          <text>The baseline sampling data is derived by sampling and analysis of all preexisting discharges from the coal remining area and in-stream water quality upstream and downstream of the proposed coal remining site. The data shall be collected in a detailed water quality and quantity monitoring program which includes the requirements listed below and has been approved by the Department.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Sampling points should be established at convenient locations as near to the source as possible. Sampling points shall be established through an on-site visit by the Maryland Department of the Environment permit writer and the applicant. In the event of disagreement concerning the location of the sample site, the final decision shall be made by the Department.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>When flows from preexisting multiple effluent discharges converge at convenient sampling points, composite sampling and analysis may be appropriate.</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Each sample shall be measured for flow (million gallons/day) and analyzed for the best professional judgement (BPJ) parameters of acidity (milligrams/liter), iron (milligrams/liter) and manganese (milligrams/liter). Iron and manganese concentrations shall be in terms of total metal concentrations.</text>
        </paragraph>
        <paragraph num="(e)">
          <text>In addition to the BPJ parameters discussed above, the baseline sampling and analysis data shall include an analysis for parameters including pH, total suspended solids (milligrams/liter), alkalinity (milligrams/liter), specific conductance (millemhos/centimeter), and sulfates (milligrams/liter) for surface water.</text>
        </paragraph>
        <paragraph num="(f)">
          <text>Sampling shall occur, at a minimum, over a 12-month period, with samples being taken monthly at regular intervals (for example, every first Monday, or the 15th of each month) from both the effluent discharge and in-stream sampling sites. The 12 sampling and analysis events shall constitute the minimum baseline sampling data.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>Common Treatment Facilities.</text>
        <paragraph num="(a)">
          <text>If the applicant proposes to use common facilities to manage stormwater and remining flows, the applicant shall include in the applicant's application:</text>
          <paragraph num="(i)">
            <text>The location of each common facility;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>The source and volume of each discharge entering the common facility; and</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Any other information the Department may require.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>The applicant may not use a common facility to manage remining and stormwater flows without the written consent of the Department.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Issuance of NPDES Coal Remining Permit.</text>
      <paragraph num="(1)">
        <text>Prohibitions. The Department may not issue an NPDES permit for a coal remining activity unless:</text>
        <paragraph num="(a)">
          <text>The applicant has applied for a coal remining permit from the Bureau of Mines;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The coal remining operation is located on a site on which coal mining was conducted before August 3, 1977;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The applicant demonstrates to the satisfaction of the Department that the mining and reclamation procedures proposed for the site of the coal remining operation have the potential to improve water quality in the preexisting discharges based on a hydrologic reclamation plan and a probable hydrologic consequences statement;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>The Department determines, based on the proposed hydrologic reclamation plan, that the coal remining activity is not likely to cause discharges of pH, iron, or manganese which exceed the levels established as the baseline loading in the preexisting discharges at the site before the coal remining operation began; and</text>
        </paragraph>
        <paragraph num="(e)">
          <text>The information provided in the application is adequate for the Department to make an informed final permit decision.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Best Professional Judgement (BPJ) Limits for pH, Iron, and Manganese. When the Department issues an NPDES permit to discharge pollutants from a coal remining operation based upon the variance to State water quality standards described under COMAR 26.08.02, the water quality-based effluent limitations for pH, iron, and manganese shall be established on a case-by-case basis. Compliance with those effluent limitations constitutes compliance with those water quality criteria for pH, iron, and manganese set forth in COMAR 26.08.02.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Best Professional Judgement Limits (BPJ) Derivation. The modified effluent limits shall be derived through a BPJ methodology developed by the Department.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Permit Release Limit. This limit is derived by calculating the cumulative loading rate in tons/year of acidity, iron, and manganese from each concentration value and flow rate in the baseline data for the entire coal remining site. The cumulative loading rates for each parameter are summed and divided by the number of samples analyzed. This number is multiplied by 365 to establish the annual cumulative baseline loading rate for each parameter.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Monitoring.</text>
      <paragraph num="(1)">
        <text>Monitoring at the coal remining operation may be discontinued after the sampling required by §B(4) of this regulation is completed. The monitoring shall begin again, in accordance with the NPDES coal remining permit, upon initiation of remining operations.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>During the coal remining operation, monitoring of the parameters established in §B(4)(d) of this regulation shall be conducted at least quarterly for the ambient in-stream stations.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>During the coal remining operation, monitoring for all effluent discharges shall be conducted at least monthly for pH, iron, manganese, acidity, and total suspended solids.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>The permittee shall submit the compliance monitoring data to the Department at least quarterly in the manner and form required by the Department.</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Newly Discovered Discharges. An applicant with an existing coal remining operation seeking an NPDES permit modification from the Department under COMAR 26.08.04 to accommodate a newly discovered discharge shall demonstrate to the satisfaction of the Department that the applicant:</text>
      <paragraph num="(1)">
        <text>Discovered discharges within the proposed coal remining area after the applicant's NPDES permit was issued; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Has not caused or contributed to the discharges.</text>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>Final Monitoring.</text>
      <paragraph num="(1)">
        <text>Upon completion of the coal remining activity and before release from permit obligations, the permittee shall:</text>
        <paragraph num="(a)">
          <text>Demonstrate that the annual cumulative baseline loading set forth in the NPDES permit has not been exceeded, and that the water quality discharged from the site has been improved; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Compile the water quality information into a final report which shall analyze the data and document any changes in water quality in the stream.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>The demonstration required in §F(1)(a) of this regulation shall be based on 1 year of monthly sampling and analyses of untreated discharge collected in the second year following the completion of reclamation and revegetation, and shall be calculated in accordance with §C(4) of this regulation.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Failure to demonstrate that the water quality from the site has improved shall constitute a violation requiring corrective action.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".09" heading="Animal Feeding Operations.">
    <paragraph num="A.">
      <text>Animal Feeding Operation Size Categories.</text>
      <paragraph num="(1)">
        <text>A large, medium, or small AFO is an AFO housing the number of animals or with the total house capacity identified in the column labeled large, medium, or small, respectively, in Table 1.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The number of animals or, for dry manure chicken operations, house capacity shall be based on:</text>
        <paragraph num="(a)">
          <text>The total at the site; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>For adjacent sites involving any common ownership or operation, the combined total of all sites where the production, manure management, or storage operations are collectively owned or managed.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Table 1. Small, Medium, and Large AFO Size Categories.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Concentrated Animal Feeding Operations.</text>
      <paragraph num="(1)">
        <text>For AFOs that are defined or designated as CAFOs under the federal regulations, at 40 CFR 122.23, as amended, the requirements of the federal regulations applicable to concentrated animal feeding operations at 40 CFR Parts 122 and 412, as amended, are incorporated by reference with the following changes:</text>
        <paragraph num="(a)">
          <text>The terms “Director” and “State Director” mean the Secretary of the Environment or the Secretary of the Environment's designee;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The size threshold for defining a large dry manure chicken (other than laying hens) AFO is 125,000 chickens or a total house capacity of greater than or equal to 100,000 square feet;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>An AFO that is a large or medium CAFO under federal regulations is also subject to the permit requirements for a CAFO under Maryland regulations only if it discharges or proposes to discharge;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>An AFO that is a large CAFO under federal regulations that does not discharge or propose to discharge is subject to the requirements for a MAFO under the Maryland regulations.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>The Department may designate a small AFO as a CAFO after a site inspection, if:</text>
        <paragraph num="(a)">
          <text>Animal waste comes into contact with surface water; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Animals come into contact with surface water and the AFO is not using best management practices designed and approved by the soil conservation district (SCD) to limit animal access to surface water.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>A CAFO shall obtain permit coverage under the general discharge permit issued by the Department under COMAR 26.08.04.09N unless the Department, in its discretion, notifies the discharger that a separate discharge permit is required.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Maryland Animal Feeding Operations.</text>
      <paragraph num="(1)">
        <text>A MAFO shall obtain permit coverage under the general discharge permit issued by the Department under COMAR 26.08.04.09N, unless the Department, in its discretion, notifies the discharger that a separate discharge permit is required.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The Department may designate as a MAFO a small or medium AFO if the Department determines that the type or location of animal waste storage or animal access to surface water is likely to cause a discharge of pollutants to ground or surface waters of this State.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>A permitted MAFO upon closure of the facility shall maintain permit coverage until all animals and animal waste that were present while the operation was a MAFO are removed from the site.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>The deadline for a MAFO to submit an application for an individual permit or an NOI for a general discharge permit shall be in accordance with the schedules for NOIs specified in the general permit for AFOs issued under COMAR 26.08.04.09N.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Effluent Limitations for MAFOs.</text>
        <paragraph num="(a)">
          <text>MAFO permits shall at a minimum include requirements and schedules for development, submission to the Department, and implementation of a complete and current NMP and conservation plan.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The terms of the NMP shall be consistent with the terms of the conservation plan and, together with the conservation plan, shall:</text>
          <paragraph num="(i)">
            <text>Take into account all animal waste from the management of animals or their manure and associated waste nutrients; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Ensure that appropriate manure management measures are used to store, stockpile, and handle manure and animal waste to minimize the potential for nutrient loss or runoff.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(c)">
          <text>Except for storm water that comes into contact with animal waste that is land applied in accordance with a NMP, discharge of animal waste to surface waters of this State is prohibited.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(6)">
        <text>A facility's status as a MAFO does not require, and the permit authorization for a MAFO does not confer, NPDES discharge permit authorization under the Federal Act.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>The Department may require an AFO owned or operated outside of Maryland to obtain a discharge permit if all or a significant part of its operation, whether waste storage, waste application, or confinement of animals, is conducted in Maryland.</text>
    </paragraph>
    <paragraph num="E.">
      <text>An AFO, regardless of size, that utilizes a spray irrigation system for wastewater application shall be regulated under either a general or individual discharge permit.</text>
    </paragraph>
  </regulation>
  <annotations>
    <annotation type="Authority">Environment Article, §§9-313—9-316, 9-319, 9-320—9-325, and 9-328, Annotated Code of Maryland</annotation>
    <annotation type="History" subtype="Administrative History">Effective date: September 1, 1974 (1:1 Md. R. 33)</annotation>
    <annotation type="History" subtype="Administrative History">COMAR 10.50.01.05, .06, and .13 recodified to COMAR 26.08.03.01, .02, and .03, respectively</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01 amended effective November 5, 1984 (11:22 Md. R. 1899)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .02 amended effective November 5, 1984 (11:22 Md. R. 1899)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .02C amended effective May 18, 1979 (6:10 Md. R. 841)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .03 adopted effective May 19, 1978 (5:10 Md. R. 777)</annotation>
    <annotation type="History" subtype="Administrative History">Chapter revised effective June 27, 1988 (15:13 Md. R. 1556)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01 amended affective May 27, 2002 (29:10 Md. R. 827)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01A amended affective September 28, 2015 (42:19 Md. R. 1229)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01B amended affective April 16, 1990 (17:7 Md. R. 854); May 17, 2021 (48:10 Md. R. 402); May 30, 2022 (49:11 Md. R. 610)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .02 amended effective April 16, 1990 (17:7 Md. R. 854)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .02D adopted effective April 23, 2018 (45:8 Md. R. 422)</annotation>
    <annotation type="History" subtype="Administrative History">Regulations .03—.05 repealed and new Regulations .03—.05 adopted effective February 19, 1990 (17:3 Md. R. 301)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .03C amended affective July 5, 2004 (31:13 Md. R. 995)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .06 adopted effective May 1, 1989 (16:8 Md. R. 911)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .06 amended effective November 6, 1995 (22:22 Md. R. 1670)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .06B, C amended effective April 16, 1990 (17:7 Md. R. 854)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .06D amended effective March 25, 1996 (23:6 Md. R. 477)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .07 adopted effective April 16, 1990 (17:7 Md. R. 854)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .07 amended effective June 7, 1993 (20:11 Md. R. 917)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .08 adopted effective January 2, 1995 (21:26 Md. R. 2195)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .08 amended effective June 29, 1998 (25:13 Md. R. 996)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .09 adopted effective January 12, 2009 (36:1 Md. R. 24)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .09F repealed effective June 18, 2018 (45:12 Md. R. 619)</annotation>
  </annotations>
</chapter>