<?xml version='1.0' encoding='utf-8'?>
<chapter num="07" heading="High Risk Oil Storage Facilities" title_num="26" subtitle_num="10">
  <regulation prefix="Regulation" num=".01" heading="Scope.">
    <paragraph num="A.">
      <text>Applicability.</text>
      <paragraph num="(1)">
        <text>The requirements of this chapter apply only to the following oil storage facilities:</text>
        <paragraph num="(a)">
          <text>An oil storage facility with a new or existing gasoline UST system located in a high risk groundwater use area (HRGUA) or well head protection area (WHPA); and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>An oil storage facility that meets the definition of a high risk underground oil storage facility under Regulation .07A of this chapter.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>In addition to the requirements of this chapter, an owner of a new or existing gasoline UST system and an owner of a high risk underground oil storage facility is subject to the requirements under COMAR 26.10.01—26.10.06, 26.10.08—26.10.12, and 26.10.16.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Variances.</text>
      <paragraph num="(1)">
        <text>The Department may grant an owner of a new or existing gasoline UST system or a high risk underground oil storage facility a variance from one or more requirements of this chapter if the owner demonstrates the UST system or oil storage facility is not a threat to groundwater.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>An owner applying for a variance provided under §B(1) of this regulation shall submit to the Department the following information:</text>
        <paragraph num="(a)">
          <text>A survey of groundwater use within a 1/2 mile radius of the oil storage facility;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A description of the construction materials used for the UST system;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>A description of the release detection methods used to protect groundwater;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>A description of operation and testing methods used to protect groundwater; and</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Any other information requested by the Department.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".02" heading="Definitions.">
    <paragraph num="A.">
      <text>In this chapter:</text>
      <paragraph num="(1)">
        <text>A term in §B of this regulation has the meaning indicated; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A term not defined in §B of this regulation has:</text>
        <paragraph num="(a)">
          <text>The meaning given to the term in a relevant statute or in COMAR 26.10.01 or 26.10.02; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>If not defined in a relevant statute or COMAR 26.10.01 or 26.10.02, the meaning attributed by common use.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Terms Defined.</text>
      <paragraph num="(1)">
        <text>“Existing gasoline UST system” means a UST system located in a HRGUA or WHPA:</text>
        <paragraph num="(a)">
          <text>Installed before:</text>
          <paragraph num="(i)">
            <text>January 26, 2005, if located in a HRGUA; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>January 1, 2010, if located in a WHPA;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Containing gasoline, including gasohol, that is used to fuel motor vehicles; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>That has a storage capacity greater than 2,000 gallons.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>“High risk groundwater use area” or “HRGUA” means an area with a new or existing gasoline UST system:</text>
        <paragraph num="(a)">
          <text>In which an individual water supply system, as defined in COMAR 26.04.03.01-1B, serves as the water supply for the new or existing gasoline UST system facility, an adjoining property of the new or existing gasoline UST system facility, or both; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Located in:</text>
          <paragraph num="(i)">
            <text>Baltimore, Carroll, Cecil, Frederick, or Harford County; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Anne Arundel, Baltimore, Carroll, Cecil, Frederick, or Harford County for the purpose of notifying a property owner of groundwater contamination in accordance with Environment Article, §4-411.2, Annotated Code of Maryland.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>“High risk underground oil storage facility” means an oil storage facility that meets the conditions defined in Regulation .07A of this chapter.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>“Levels of concern” means:</text>
        <paragraph num="(a)">
          <text>Benzene at (=) 5 parts per billion;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Toluene at (=) 1,000 parts per billion;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Ethylbenzene at (=) 700 parts per billion;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Total xylenes at (=) 10,000 parts per billion; and</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Methyl tertiary butyl ether (MTBE) at (=) 20 parts per billion.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>“Local government” means a county, municipal corporation, or sanitary district.</text>
      </paragraph>
      <paragraph num="(6)">
        <text>“New gasoline UST system” means a UST system, including a replacement UST system, located in a HRGUA or WHPA:</text>
        <paragraph num="(a)">
          <text>Installed on or after:</text>
          <paragraph num="(i)">
            <text>January 26, 2005, if located in a HRGUA; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>January 1, 2010, if located in a WHPA; and</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Containing gasoline, including gasohol, that is used to fuel motor vehicles.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(7)">
        <text>“Well” means a hole made in the ground to obtain or monitor groundwater.</text>
      </paragraph>
      <paragraph num="(8)">
        <text>“Well head protection area” or “WHPA” means an area in Baltimore, Carroll, Cecil, Frederick, or Harford County identified and regulated by a local government surrounding one or more wells serving a:</text>
        <paragraph num="(a)">
          <text>Community water system, as defined by COMAR 26.04.01.01B; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Public water system, as defined by COMAR 26.04.01.01B.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".03" heading="New Gasoline UST System.">
    <text>An owner of a new gasoline UST system, except for a new gasoline UST system in a HRGUA located in Anne Arundel County, shall:</text>
    <paragraph num="A.">
      <text>Comply with the following release prevention and detection requirements for a newly installed UST system:</text>
      <paragraph num="(1)">
        <text>If installing Stage II vapor recovery piping, install the Stage II vapor recovery piping in accordance with COMAR 26.10.03.02;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Install and utilize an interstitial release detection system for the UST system piping approved by the National Work Group on Leak Detection Evaluations;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>If the UST system has a storage capacity of greater than 2,000 gallons or there are multiple USTs installed in a shared excavation zone:</text>
        <paragraph num="(a)">
          <text>Install four monitoring pipes in accordance with the specifications in COMAR 26.10.03.04B, with one monitoring pipe located in each corner of the excavation zone; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>In conjunction with the monitoring pipes required under §A(3)(a) of this regulation, install a piping system that is designed to allow for active ventilation of the excavation zone; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>Select and, upon receipt of Department approval, install one of the following systems to detect a spill, release, or discharge of gasoline liquid and vapors from the UST system:</text>
        <paragraph num="(a)">
          <text>A minimum of three monitoring wells that are:</text>
          <paragraph num="(i)">
            <text>Constructed in accordance with COMAR 26.04.04 and Department specifications;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Located outside of the excavation zone;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>In locations that will allow for the determination of groundwater flow; and</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Placed in areas that are most likely to detect a spill, release, or discharge from the UST system;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>A pressure control system that:</text>
          <paragraph num="(i)">
            <text>Is continuously operated;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Continuously monitors storage tank pressure;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Maintains storage tank pressure at an average negative pressure; and</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Prevents the release of gasoline vapors to the environment;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(c)">
          <text>If the UST system excavation zone meets the conditions of §A(3) of this regulation by either having a storage capacity of greater than 2,000 gallons or multiple USTs installed in a shared excavation zone, a soil vapor extraction system that is:</text>
          <paragraph num="(i)">
            <text>Connected to the monitoring pipes and piping system required under §A(3) of this regulation; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Operated continuously to maintain active ventilation of the excavation zone; or</text>
          </paragraph>
        </paragraph>
        <paragraph num="(d)">
          <text>An alternative method that will detect a spill, release, or discharge of gasoline liquid and vapors from the UST system;</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Within 30 days of installing a UST system, and annually thereafter:</text>
      <paragraph num="(1)">
        <text>Sample each site supply well and groundwater monitoring well located at the oil storage facility using a method approved by the Department; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Analyze each collected water sample in accordance with Regulation .05 of this chapter;</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Within 60 days after conducting a sample collection in accordance with §B of this regulation, submit the following documents to the Department:</text>
      <paragraph num="(a)">
        <text>A complete laboratory report that includes a copy of the laboratory sample acceptance form, sample chain-of-custody, and laboratory analytical results; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>A site map identifying each site supply well and groundwater monitoring well located at the oil storage facility; and</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Upon completing the installation, replacement, repair, or upgrade of a UST system and before placing the UST system in operation:</text>
      <paragraph num="(1)">
        <text>Test all primary piping that does not contain liquid gasoline, tank top fittings, Stage II piping, riser pipes, and vent piping using a helium pressure test, or other test approved by the Department, in accordance with procedures prescribed by the Department;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>If leaks or deficiencies are found during the testing, make necessary repairs in accordance with COMAR 26.10.04.04; and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Upon completion of a repair, retest the UST system in accordance with §D(1) of this regulation to ensure the UST system does not leak.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".04" heading="Existing Gasoline UST System.">
    <paragraph num="A.">
      <text>An owner of an existing gasoline UST system in a HRGUA, except for an existing gasoline UST system located in Anne Arundel County, shall:</text>
      <paragraph num="(1)">
        <text>Not later than July 25, 2005, implement the following release detection methods:</text>
        <paragraph num="(a)">
          <text>Sample each site supply well and any existing groundwater monitoring wells located on the oil storage facility;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Install a minimum of three groundwater monitoring wells that are:</text>
          <paragraph num="(i)">
            <text>Constructed in accordance with COMAR 26.04.04 and Department specifications;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Outside of the excavation zone;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>In locations that will allow for the determination of groundwater flow; and</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Placed in areas that are most likely to detect a spill, release, or discharge from the UST system;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(c)">
          <text>Sample each groundwater monitoring well installed pursuant to §A(1)(b) of this regulation; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Analyze each water sample collected pursuant to §A(1)(a) and (c) of this regulation in accordance with Regulation .05 of this chapter;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>On an annual basis, collect and analyze water samples from each site supply well and groundwater monitoring well in accordance with §A(1)(a), (c) and (d) of this regulation;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Within 60 days after conducting a sample collection pursuant to §A(1) or (2) of this regulation, submit the following documents to the Department:</text>
        <paragraph num="(a)">
          <text>A complete laboratory report that includes a copy of the laboratory sample acceptance form, sample chain-of-custody, and laboratory analytical results; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A site map identifying each site supply well and groundwater monitoring well located on the oil storage facility; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>Except for a UST system with Stage II piping decommissioned using a method approved by the Department, not later than January 26, 2006, and on a 24-month basis thereafter, test the UST system in accordance with the following procedures:</text>
        <paragraph num="(a)">
          <text>Test all primary piping that does not contain liquid gasoline, tank top fittings, Stage II piping, riser pipes, and vent piping using a helium pressure test, or other test approved by the Department, in accordance with procedures prescribed by the Department;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>If leaks or deficiencies are found during the testing, make necessary repairs in accordance with COMAR 26.10.04.04; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Upon completion of a repair, retest the UST system in accordance with §A(4)(a) of this regulation to ensure the UST system does not leak.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>An owner of an existing gasoline UST system in a WHPA shall:</text>
      <paragraph num="(1)">
        <text>Not later than January 1, 2010, implement the following release detection methods:</text>
        <paragraph num="(a)">
          <text>Sample any existing groundwater monitoring well, and if present, site supply well located on the oil storage facility;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Install a minimum of three groundwater monitoring wells that are:</text>
          <paragraph num="(i)">
            <text>Constructed in accordance with COMAR 26.04.04 and Department specifications;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Outside of the excavation zone;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>In locations that will allow for the determination of groundwater flow; and</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Placed in areas that are most likely to detect a spill, release, or discharge from the UST system;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(c)">
          <text>Sample each groundwater monitoring well installed pursuant to §B(1)(b) of this regulation; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Analyze each water sample collected pursuant to §B(1)(a) and (c) of this regulation in accordance with Regulation .05 of this chapter;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>On an annual basis, collect and analyze water samples from each groundwater monitoring well, and if present, site supply well in accordance with §B(1)(a), (c) and (d) of this regulation;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Within 60 days after conducting a sample collection pursuant to §B(1) or (2) of this regulation, submit the following documents to the Department:</text>
        <paragraph num="(a)">
          <text>A complete laboratory report that includes a copy of the laboratory sample acceptance form, sample chain-of-custody, and laboratory analytical results; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A site map identifying each groundwater monitoring well, and if present, site supply well located on the oil storage facility; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>Except for a UST system with Stage II piping decommissioned using a method approved by the Department, not later than January 1, 2010, and on a 24-month basis thereafter test the UST system in accordance with the following procedures:</text>
        <paragraph num="(a)">
          <text>Test all primary piping that does not contain liquid gasoline, tank top fittings, Stage II piping, riser pipes, and vent piping using a helium pressure test, or other test approved by the Department, in accordance with procedures prescribed by the Department;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>If leaks or deficiencies are found during the testing, make necessary repairs in accordance with COMAR 26.10.04.04; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Upon completion of a repair, retest the UST system in accordance with §B(4)(a) of this regulation to ensure the UST system does not leak.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".05" heading="Analytical Testing Methods — New or Existing Gasoline UST Systems.">
    <text>An owner of a new or existing gasoline UST system shall conduct an analysis for full suite volatile organic compounds, including naphthalene and fuel oxygenates, for each water sample collected from:</text>
    <paragraph num="A.">
      <text>A groundwater monitoring well in accordance with USEPA Test Method 8260 or another method approved by the Department; and</text>
    </paragraph>
    <paragraph num="B.">
      <text>A site supply well in accordance with USEPA Test Method 524.2 or another method approved by the Department.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".06" heading="Detection of Levels of Concern.">
    <text>If the concentration of benzene, toluene, ethylbenzene, total xylenes, or MTBE is detected at equal to or greater than the levels of concern defined in Regulation .02B of this chapter in a groundwater sample collected and analyzed in accordance with Regulations .03—.05 of this chapter, an owner of a new or existing gasoline UST system shall:</text>
    <paragraph num="A.">
      <text>Within 24 hours of receiving an analytical laboratory report that shows the detection, report the sampling results to the Department;</text>
    </paragraph>
    <paragraph num="B.">
      <text>Within 48 hours of receiving an analytical laboratory report that shows the detection, initiate an investigation both on-site and off-site of the oil storage facility in accordance with COMAR 26.10.08.02—.04; and</text>
    </paragraph>
    <paragraph num="C.">
      <text>In accordance with COMAR 26.10.09.07, develop a corrective action plan under the direction of the Department.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".07" heading="High Risk Underground Oil Storage Facility.">
    <paragraph num="A.">
      <text>Defining a High Risk Underground Oil Storage Facility.</text>
      <paragraph num="(1)">
        <text>An oil storage facility is defined as a high risk underground oil storage facility under this chapter if the facility has:</text>
        <paragraph num="(a)">
          <text>An underground storage capacity that includes:</text>
          <paragraph num="(i)">
            <text>One or more UST systems constructed with a single-walled UST or single-walled product piping; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>A total underground oil storage capacity of 80,000 gallons or greater, not including underground oil storage capacity used to store heating oil for onsite consumptive use; or</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>As determined by a throughput review conducted in accordance with §A(2) of this regulation, a combined monthly oil throughput for all products stored in UST systems of:</text>
          <paragraph num="(i)">
            <text>750,000 gallons or more when averaged over a rolling 12-month period; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>1,000,000 gallons or more in any single month.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Throughput Review Procedures.</text>
        <paragraph num="(a)">
          <text>To determine if an underground oil storage facility meets the definition of a high risk underground oil storage facility on a throughput basis, an owner of an underground oil storage facility shall have a throughput review performed in accordance with §A(2)(b) of this regulation:</text>
          <paragraph num="(i)">
            <text>At least once every three years during a certified inspection of a UST system required under COMAR 26.10.03.10; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>If directed by the Department to perform a throughput review.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Using a form provided by the Department, a certified UST system inspector or a person in charge of an underground oil storage facility performing a throughput review shall determine the combined monthly oil throughput for all products by evaluating inventory records that document:</text>
          <paragraph num="(i)">
            <text>The average combined monthly oil throughput for all products over the preceding 12 months; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>The highest combined monthly oil throughput for all products in the preceding 12 months.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(c)">
          <text>An owner of an underground oil storage facility shall submit to the Department the throughput review:</text>
          <paragraph num="(i)">
            <text>As part of the inspection report required under COMAR 26.10.03.10D if the throughput review was performed during a certified inspection of a UST system; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>As directed by the Department.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>An owner of a high risk underground oil storage facility may demonstrate that the oil storage facility no longer meets the definition of a high risk underground oil storage facility by submitting documentation, such as an updated throughput review, to the Department that proves the oil storage facility no longer meets the conditions under §A(1) of this regulation.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Upon review of documentation provided to the Department pursuant to §A(3) of this regulation, the Department may determine:</text>
        <paragraph num="(a)">
          <text>The oil storage facility no longer meets the definition of a high risk underground oil storage facility; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The owner of the oil storage facility is no longer required to comply with the requirements of this regulation.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Compliance with Monitoring Methods. An owner of a high risk underground oil storage facility shall:</text>
      <paragraph num="(1)">
        <text>Select, and upon receipt of Department approval, implement one of the following monitoring methods:</text>
        <paragraph num="(a)">
          <text>Groundwater monitoring method specified under §C of this regulation;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Enhanced testing method specified under §D of this regulation; or</text>
        </paragraph>
        <paragraph num="(c)">
          <text>An alternative monitoring method specified under §E of this regulation; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Begin implementing the monitoring method in accordance with the following schedule:</text>
        <paragraph num="(a)">
          <text>Within 6 months of June 13, 2022, if the facility meets the size and construction conditions of §A(1)(a) of this regulation;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Within 6 months of determining that the facility meets the throughput conditions of §A(1)(b) of this regulation; or</text>
        </paragraph>
        <paragraph num="(c)">
          <text>On a schedule determined by the Department.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Groundwater Monitoring Method. An owner of a high risk underground oil storage facility choosing to implement the groundwater monitoring method shall:</text>
      <paragraph num="(1)">
        <text>Install a minimum of three groundwater monitoring wells:</text>
        <paragraph num="(a)">
          <text>That are constructed in accordance with the well construction requirements of COMAR 26.04.04 and Department specifications;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Outside of the excavation zone;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>In locations that will allow for the determination of groundwater flow; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>In areas that are most likely to detect a spill, release, or discharge from the UST system;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Within 60 days of installing the groundwater monitoring wells, and annually thereafter:</text>
        <paragraph num="(a)">
          <text>Sample each groundwater monitoring well and analyze collected samples:</text>
          <paragraph num="(i)">
            <text>For full suite volatile organic compounds, including naphthalene and fuel oxygenates, in accordance with USEPA Test Method 8260 or another method approved by the Department; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>For total petroleum hydrocarbons, including diesel and gasoline range organics, in accordance with USEPA Test Method 8015 or another method approved by the Department; and</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>If present at the high risk underground oil storage facility, sample each site supply well and analyze collected samples for full suite volatile organic compounds, including naphthalene and fuel oxygenates, in accordance with USEPA Test Method 524.2 or another method approved by the Department; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Within 60 days after conducting a sample collection required under §C(2) of this regulation, submit the following documents to the Department:</text>
        <paragraph num="(a)">
          <text>A complete laboratory report that includes a copy of the laboratory sample acceptance form, sample chain-of-custody, and laboratory analytical results; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A site map identifying each site supply well and groundwater monitoring well located at the oil storage facility.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Enhanced Testing Method.</text>
      <paragraph num="(1)">
        <text>This method may only be implemented by an owner of a high risk underground oil storage facility if all of the UST systems at the facility are installed with double-walled USTs and all of the piping systems are installed in accordance with COMAR 26.10.03.02A.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>An owner of a high risk underground oil storage facility choosing to implement the enhanced testing method shall:</text>
        <paragraph num="(a)">
          <text>Perform UST and piping release detection by interstitial monitoring and perform at least one additional method of UST release detection in accordance with COMAR 26.10.05;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Perform annual primary line precision tightness testing;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Perform annual piping interstice precision tightness testing;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Equip all containment sumps, except the vent riser containment sump, with sensors programmed for positive UST system dispensing and pumping shut down; and</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Every three years or at an alternative frequency under the direction of the Department, perform precision tightness testing of:</text>
          <paragraph num="(i)">
            <text>The UST in a manner that minimizes isolation of UST system components, such as the vent and vapor piping and risers, to the greatest extent possible; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>The UST interstice, except for a brine filled interstice.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Alternative Monitoring Method. Subject to Department approval, an owner of a high risk underground oil storage facility may implement an alternative monitoring method if the owner demonstrates the alternative method is designed to detect a spill, release, or discharge from the UST system in a manner that is not less protective of human health and the environment than a method described under §C or D of this regulation.</text>
    </paragraph>
    <paragraph num="F.">
      <text>If an owner of a high risk underground oil storage facility detects a spill, release, or discharge at the facility, the owner shall comply with the spill, release, or discharge reporting and corrective action requirements of COMAR 26.10.08 and 26.10.09.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".08" heading="Recordkeeping.">
    <text>An owner of a new or existing gasoline UST system and an owner of a high risk underground oil storage facility shall:</text>
    <paragraph num="A.">
      <text>Maintain records of all testing required by this chapter for one year at the oil storage facility and for five years at a location designated by the owner; and</text>
    </paragraph>
    <paragraph num="B.">
      <text>Make the records maintained pursuant to §A of this regulation available to the Department upon request or as required under this chapter.</text>
    </paragraph>
  </regulation>
  <annotations>
    <annotation type="Authority">Environment Article, §§4-401, 4-402, 4-405, 4-407—4-411.2, 4-415.1, 4-417, and 4-701 et seq., Annotated Code of Maryland</annotation>
    <annotation type="History" subtype="Administrative History">Effective date: February 4, 1991 (18:2 Md. R. 151)</annotation>
    <annotation type="History" subtype="Administrative History">Chapter revised effective November 4, 1996 (23:22 Md. R. 1498)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01 repealed and new Regulations .01—.08 adopted effective June 13, 2022 (49:12 Md. R. 642)</annotation>
  </annotations>
</chapter>