  <paragraph num="A.">
    <text>When a UST system is temporarily closed, an owner and an operator of a UST system shall:</text>
    <paragraph num="(1)">
      <text>If a metal UST system, continue operation and maintenance of corrosion protection in accordance with COMAR 26.10.04.02;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Except as provided in §B(3) of this regulation, maintain a method of release detection in accordance with COMAR 26.10.05 and, if the UST system has a field-constructed tank or is an airport hydrant system, COMAR 26.10.12;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>If a spill, release, or discharge is suspected or confirmed, comply with the reporting, investigation, and corrective action requirements in COMAR 26.10.08 and 26.10.09;</text>
    </paragraph>
    <paragraph num="(4)">
      <text>In accordance with COMAR 26.10.03.09, amend the registration for the UST system not later than 30 days following the temporary closure of the UST system; and</text>
    </paragraph>
    <paragraph num="(5)">
      <text>If a motor fuel, bulk oil storage, used oil, or hazardous substance UST system, perform the UST system inspections required in COMAR 26.10.03.10.</text>
    </paragraph>
  </paragraph>
  <paragraph num="B.">
    <text>When a UST system is temporarily closed and the storage tank system is emptied by having all materials removed using commonly employed practices so that not more than 1 inch of residue or 0.3 percent by weight of the total capacity of the UST remain in the UST system, an owner and an operator of a UST system is not required to perform:</text>
    <paragraph num="(1)">
      <text>Operation and maintenance testing and inspections of spill and overfill prevention equipment, as required by COMAR 26.10.03.03;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Periodic operation and maintenance walkthrough inspections, as required by COMAR 26.10.04.03; and</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Operation and maintenance testing and inspections of release detection equipment, as required by COMAR 26.10.05.</text>
    </paragraph>
  </paragraph>
  <paragraph num="C.">
    <text>When a UST system is temporarily closed for 3 months or more, an owner and an operator of a UST system shall:</text>
    <paragraph num="(1)">
      <text>Leave the vent line open and functioning; and</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Cap and secure all other lines, pumps, manways, and ancillary equipment.</text>
    </paragraph>
  </paragraph>
  <paragraph num="D.">
    <text>When a UST system does not meet the performance standards for new UST systems in COMAR 26.10.03.01 or the upgrading requirements in COMAR 26.10.03.08, except for the requirements of COMAR 26.10.03.08F, and the UST system has been temporarily closed for more than 6 months, an owner and an operator of a UST system shall:</text>
    <paragraph num="(1)">
      <text>Permanently close the UST system in accordance with Regulations .02—.05 of this chapter; or</text>
    </paragraph>
    <paragraph num="(2)">
      <text>If the Department grants an extension, permanently close the UST system within the time period established by the Department and in accordance with Regulations .02—.05 of this chapter.</text>
    </paragraph>
  </paragraph>
  <paragraph num="E.">
    <text>When a UST system meets the performance standards for new UST systems in COMAR 26.10.03.01 or the upgrading requirements in COMAR 26.10.03.08, and the UST system has been temporarily closed for more than 1 year, an owner and an operator of a UST system shall:</text>
    <paragraph num="(1)">
      <text>Permanently close the UST system in accordance with Regulations .02—.05 of this chapter; or</text>
    </paragraph>
    <paragraph num="(2)">
      <text>If the Department grants an extension, permanently close the UST system within the time period established by the Department and in accordance with Regulations .02—.05 of this chapter.</text>
    </paragraph>
  </paragraph>
  <paragraph num="F.">
    <text>An owner and an operator of a temporarily closed UST system required to permanently close the UST system under §D or E of this regulation may apply to the Department for an extension to the required time period for completing the permanent closure by:</text>
    <paragraph num="(1)">
      <text>Completing a site assessment in accordance with the procedures in Regulation .03 of this chapter; and</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Submitting a written site assessment report to the Department that includes, at a minimum, the following information:</text>
      <paragraph num="(a)">
        <text>The location of the UST system on the property;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The date the site assessment was performed;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>A summary of any field test and the laboratory analytical results;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>The name of the contractors who performed the work; and</text>
      </paragraph>
      <paragraph num="(e)">
        <text>All analytical data and laboratory reports.</text>
      </paragraph>
    </paragraph>
  </paragraph>