<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".03" citation="COMAR 26.10.10.03" title_num="26" subtitle_num="10" chapter_num="10" heading="Assessing the Site at Closure or Change-in-Service.">
  <paragraph num="A.">
    <text>Before applying for an extension for temporary closure or completing a permanent closure or change-in-service of a UST system, an owner and an operator of a UST system shall:</text>
    <paragraph num="(1)">
      <text>Perform a site assessment to determine if there is evidence of a spill, release, or discharge where contamination would most likely be present; and</text>
    </paragraph>
    <paragraph num="(2)">
      <text>In selecting sample types, sample locations, and measurement methods consider:</text>
      <paragraph num="(a)">
        <text>The method of closure;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The nature of the stored regulated substance;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>The type of backfill;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>The depth to groundwater; and</text>
      </paragraph>
      <paragraph num="(e)">
        <text>Other factors appropriate for identifying the presence of a spill, release, or discharge.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="B.">
    <text>If contaminated soil, contaminated groundwater, free product, or vapor is discovered while performing the actions under §A of this regulation or by any other manner during a UST system closure or change-in-service activities, an owner, an operator, and a person in charge of a UST system shall:</text>
    <paragraph num="(1)">
      <text>Notify the Department within 2 hours of the discovery, as required in COMAR 26.10.08; and</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Begin performing the response and corrective actions required in COMAR 26.10.09.</text>
    </paragraph>
  </paragraph>
</regulation>