<?xml version='1.0' encoding='utf-8'?>
<chapter num="17" heading="Shop-Fabricated Aboveground Storage Tanks" title_num="26" subtitle_num="10">
  <regulation prefix="Regulation" num=".01" heading="Scope.">
    <paragraph num="A.">
      <text>This chapter applies to an owner, an operator, and a person in charge of an AST system with a shop-fabricated AST that is used or may be used to store oil at an oil storage facility or oil handling facility.</text>
    </paragraph>
    <paragraph num="B.">
      <text>An owner, an operator, and a person in charge of an AST system subject to the requirements in this chapter shall meet all applicable requirements under COMAR 26.10.01 for an oil storage facility or oil handling facility.</text>
    </paragraph>
    <paragraph num="C.">
      <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST used for storing asphalt only is exempt from the following requirements of this chapter:</text>
      <paragraph num="(1)">
        <text>Unless otherwise directed by the Department, the secondary containment requirements in Regulation .07 of this chapter;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The spill and overfill prevention requirements in Regulation .08 of this chapter;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The release detection requirements in Regulation .09 of this chapter; and</text>
      </paragraph>
      <paragraph num="(4)">
        <text>The emergency venting requirement in Regulation .11B of this chapter if the AST system has a capacity greater than 12,000 gallons and is not located in:</text>
        <paragraph num="(a)">
          <text>A secondary containment dike with another AST system storing a Class I liquid or Class II liquid; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The drainage path of another AST system storing a Class I liquid or Class II liquid.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".02" heading="Definitions.">
    <paragraph num="A.">
      <text>In this chapter:</text>
      <paragraph num="(1)">
        <text>A term in §B of this regulation has the meaning indicated; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A term not defined in §B of this regulation has:</text>
        <paragraph num="(a)">
          <text>The meaning given to the term in a relevant statute or COMAR 26.10.01 or 26.10.02; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>If not defined in a relevant statute or COMAR 26.10.01 or 26.10.02, the meaning attributed by common use.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Terms Defined.</text>
      <paragraph num="(1)">
        <text>“AST” has the meaning stated in COMAR 26.10.01.02B.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>“AST system” has the meaning stated in COMAR 26.10.01.02B.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>“Certified inspector” includes one of the following individuals certified to perform an inspection on a shop-fabricated AST:</text>
        <paragraph num="(a)">
          <text>An authorized inspector, as defined in COMAR 26.10.18.02B, with an adjunct certification, as specified in STI/SPFA SP001 “Standard for the Inspection of Aboveground Storage Tanks”; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A certified AST tank system inspector, as specified in STI/SPFA SP001 “Standard for the Inspection of Aboveground Storage Tanks”.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>“Double-walled AST” means an AST that:</text>
        <paragraph num="(a)">
          <text>Is manufactured as a storage tank within a storage tank; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Has an interstitial space between the primary storage tank and secondary storage tank walls that allows for:</text>
          <paragraph num="(i)">
            <text>Tightness testing of both storage tank walls; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Monitoring of the interstitial space for a release from the primary storage tank.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>“Elevated AST” means an AST that is not in direct contact with soil by either:</text>
        <paragraph num="(a)">
          <text>Being raised above the surface of the ground or bottom of a vault using supports designed to secure and support the AST from collapse when containing oil; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Resting on a surface material that does not allow moisture penetration or corrosion, such as concrete or steel.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(6)">
        <text>“Existing” means the installation or construction of an AST, an AST system, or a secondary containment dike was complete before June 13, 2022.</text>
      </paragraph>
      <paragraph num="(7)">
        <text>“External inspection” means a formal inspection of an AST conducted by a certified inspector in accordance with STI/SPFA SP001 “Standard for the Inspection of Aboveground Storage Tanks” to assess the condition of the AST to determine its suitability for continued service without entry into the AST interior.</text>
      </paragraph>
      <paragraph num="(8)">
        <text>“Formal inspection” means a documented external inspection or internal inspection of an AST conducted by a certified inspector in accordance with STI/SPFA SP001 “Standard for the Inspection of Aboveground Storage Tanks”.</text>
      </paragraph>
      <paragraph num="(9)">
        <text>Internal Inspection.</text>
        <paragraph num="(a)">
          <text>“Internal inspection” means a formal inspection of an AST conducted by a certified inspector in accordance with STI/SPFA SP001 “Standard for the Inspection of Aboveground Storage Tanks” to assess the internal and external condition of the AST to determine its suitability for continued service.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>“Internal inspection” includes the requirements of an external inspection in STI/SPFA SP001 “Standard for the Inspection of Aboveground Storage Tanks”.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(10)">
        <text>Interstitial Space.</text>
        <paragraph num="(a)">
          <text>“Interstitial space” means:</text>
          <paragraph num="(i)">
            <text>The space in a double-walled AST between the primary and secondary storage tank walls; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>The space in a double-bottom AST that provides an open or closed void to allow monitoring for a release between two storage tank bottoms.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>“Interstitial space” includes an interstice and an annular space.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(11)">
        <text>“Maximum working level” means the liquid level of a shop-fabricated AST that should not be exceeded during normal filling procedures and is below the activation level of any overfill prevention equipment.</text>
      </paragraph>
      <paragraph num="(12)">
        <text>“New” means the installation or construction of an AST, an AST system, or a secondary containment dike was complete on or after June 13, 2022.</text>
      </paragraph>
      <paragraph num="(13)">
        <text>Out-of-Service.</text>
        <paragraph num="(a)">
          <text>“Out-of-service” means an AST system in which the owner, the operator, and the person in charge of the AST system has:</text>
          <paragraph num="(i)">
            <text>Emptied the AST system of all oil and sludge; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Designated the AST system as out-of-service in accordance with Regulation .13 of this chapter.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>“Out-of-service” includes a change-in-service in which an AST system is emptied of all oil and sludge in order to store a non-oil product.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(14)">
        <text>“Overfill” means an occurrence when an AST is filled beyond the overfill level and may result in a spill, release, or discharge of oil.</text>
      </paragraph>
      <paragraph num="(15)">
        <text>“Overfill level” means the maximum design capacity of a shop-fabricated AST as determined by the AST manufacturer.</text>
      </paragraph>
      <paragraph num="(16)">
        <text>“Repair” means work necessary to maintain or restore an AST system to a safe operating condition using industry approved standards.</text>
      </paragraph>
      <paragraph num="(17)">
        <text>Secondary Containment Dike.</text>
        <paragraph num="(a)">
          <text>“Secondary containment dike” means a secondary containment system that confines a spill, release, or discharge of oil from an AST or piping within the secondary containment system.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>“Secondary containment dike” includes diking and a dike.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(18)">
        <text>“Secured area” means an area of an oil storage facility or oil handling facility where the owner, the operator, and the person in charge of the facility protects oil storage operations and oil handling operations from unauthorized access by:</text>
        <paragraph num="(a)">
          <text>Providing appropriate security around an AST system, including fencing;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Marking an AST system with the fire hazard category for the type of product stored;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Posting “No Trespassing” signs; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Providing an adequate security lighting system to:</text>
          <paragraph num="(i)">
            <text>Prevent acts of vandalism; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Assist in the detection of spills, releases, and discharges.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(19)">
        <text>“Shop-fabricated AST” means a welded carbon steel or stainless steel AST fabricated in a manufacturing facility, or an AST not otherwise identified as field-erected.</text>
      </paragraph>
      <paragraph num="(20)">
        <text>“Vault” means an enclosure that:</text>
        <paragraph num="(a)">
          <text>May be located above or below grade;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Consists of four walls, a floor, and a top for the purpose of containing an AST;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Allows for the inspection, repair, or maintenance of the vault and an AST; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Is not intended to be occupied by an individual for an extended period of time.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(21)">
        <text>“Vaulted AST” means an AST enclosed within a vault.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".03" heading="General Requirements.">
    <paragraph num="A.">
      <text>An owner, an operator, and a person in charge of a new or relocated AST system with a shop-fabricated AST shall ensure the new or relocated AST system meets the requirements of this chapter.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Unless otherwise specified in this chapter, an owner, an operator, and a person in charge of an existing AST system with a shop-fabricated AST shall ensure the existing AST system meets the requirements of this chapter not later than:</text>
      <paragraph num="(1)">
        <text>2 years after June 13, 2022; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Another time period approved by the Department.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall comply with the following permit, license, or approval requirements, when applicable:</text>
      <paragraph num="(1)">
        <text>Obtain an Individual Oil Operations Permit or comply with the General Oil Operations Permit conditions, in accordance with COMAR 26.10.01.09;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Obtain a State discharge permit or National Pollution Discharge Elimination System permit, in accordance with COMAR 26.08.04;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Obtain an Oil Transfer License, in accordance with COMAR 26.10.01.08;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Obtain an Air Quality Permit to Construct, in accordance with COMAR 26.11.02;</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Obtain a State Air Quality Permit to Operate, in accordance with COMAR 26.11.02; and</text>
      </paragraph>
      <paragraph num="(6)">
        <text>Comply with any other applicable federal, State, or local government permit, license, or approval requirements.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Notwithstanding the compliance schedule in §B of this regulation, an owner, an operator, and a person in charge of an AST system shall register and maintain up-to-date registration of the AST system with the Department in accordance with the procedures and schedule in COMAR 26.10.01.10.</text>
    </paragraph>
    <paragraph num="E.">
      <text>Wetlands and Waterways. An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall:</text>
      <paragraph num="(1)">
        <text>Prior to installing a new or replacement AST system or secondary containment dike, obtain any applicable wetland and waterways authorization stated in COMAR 26.10.01.04E; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>If installing the AST system in a location subject to flooding, protect the shop-fabricated AST from flotation by anchoring the storage tank in accordance with NFPA 30A “Code for Motor Fuel Dispensing Facilities and Repair Garages”.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".04" heading="Performance Standards for Vaulted Shop-Fabricated ASTs.">
    <text>An owner, an operator, and a person in charge of an AST system that installs a shop-fabricated AST in a vault shall:</text>
    <paragraph num="A.">
      <text>Construct a UL listed vault;</text>
    </paragraph>
    <paragraph num="B.">
      <text>Ensure the vault and the vaulted AST comply with the design, construction, installation, and operation requirements of:</text>
      <paragraph num="(1)">
        <text>This regulation;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>NFPA 30 “Flammable and Combustible Liquids Code”;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>If the vaulted AST is used as part of a motor fuel dispensing facility, NFPA 30A “Code for Motor Fuel Dispensing Facilities and Repair Garages”; and</text>
      </paragraph>
      <paragraph num="(4)">
        <text>NFPA 70 “National Electrical Code” for all electrical wiring;</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Ensure the vaulted AST is:</text>
      <paragraph num="(1)">
        <text>UL listed for aboveground use and for the type of product being stored;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Completely enclosed in the vault; and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Not partially or entirely covered by backfill;</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Provide venting for the vault and the vaulted AST according to the following requirements:</text>
      <paragraph num="(1)">
        <text>If the AST stores a Class I liquid, vent the vault in accordance with NFPA 30 “Flammable and Combustible Liquids Code”;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Terminate a normal vent for the vaulted AST:</text>
        <paragraph num="(a)">
          <text>Outside of the vault;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>At least 12 feet above ground level; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>At least 5 feet from a building opening;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>A normal vent for the vaulted AST may not terminate in a location that allows vapors to be trapped by the eaves of a building;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Ensure that an emergency vent for the vaulted AST is vapor-tight and allows for the venting of vapors inside of the vault; and</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Do not use a long-bolt manhole cover as an emergency vent for the vaulted AST;</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Install vapor and liquid detection systems in the vault that meet the following requirements:</text>
      <paragraph num="(1)">
        <text>The vapor detection system:</text>
        <paragraph num="(a)">
          <text>Is equipped with an on-site alarm that has a battery backup;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Has vapor detectors located not higher than 12 inches above the lowest point in the vault; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Is set to alarm when vapors reach or exceed 25 percent of the lower flammable limit of the oil stored;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>The liquid detection system is:</text>
        <paragraph num="(a)">
          <text>Set to alarm upon detection of a liquid; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Located in accordance with the liquid detection system manufacturer’s instructions; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>The vapor and liquid detection systems required under §E(1) and (2) of this regulation are designed so that if either system alarms, a signal alerts the owner, the operator, and the person in charge of the AST system:</text>
        <paragraph num="(a)">
          <text>At a constantly attended location where the vaulted AST is located; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>At another location that is continually monitored; and</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>Ensure the vaulted shop-fabricated AST complies with the spill and overfill prevention requirements in Regulation .08 of this chapter.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".05" heading="Performance Standards for AST Systems with a Shop-Fabricated AST.">
    <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall:</text>
    <paragraph num="A.">
      <text>Ensure the AST system is:</text>
      <paragraph num="(1)">
        <text>Properly selected for the oil storage application and type of oil stored; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Constructed to an industry standard, including a UL, STI or API standard;</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Ensure the foundation for a stationary shop-fabricated AST is:</text>
      <paragraph num="(1)">
        <text>Constructed to:</text>
        <paragraph num="(a)">
          <text>Support the AST;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Prevent movement and uneven settlement of the foundation and the AST; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Provide positive drainage of water away from the foundation;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Capable of supporting the soil-bearing pressure of the AST and its contents; and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Designed by a qualified professional engineer using field and laboratory testing and analyses, if the AST system is located in an area subject to flooding;</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Install an elevated AST system, unless:</text>
      <paragraph num="(1)">
        <text>An alternate AST system is approved by the Department in writing; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The owner, the operator, and the person in charge of the alternate AST system installs, tests, and maintains a cathodic protection system in accordance with Regulation .10 of this chapter; and</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Test a new, repaired, or relocated AST system for tightness in accordance with NFPA 30 “Flammable and Combustible Liquids Code”:</text>
      <paragraph num="(1)">
        <text>Upon completing the installation or repair of the AST system; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Before placing the AST system in-service.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".06" heading="Performance Standards for Piping.">
    <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall:</text>
    <paragraph num="A.">
      <text>If installing or relocating a shop-fabricated AST on or after June 13, 2022, install piping that does not penetrate a secondary containment dike, unless otherwise approved by the Department;</text>
    </paragraph>
    <paragraph num="B.">
      <text>Ensure an existing shop-fabricated AST meets the following requirements:</text>
      <paragraph num="(1)">
        <text>For piping connected to an AST penetrating a secondary containment dike:</text>
        <paragraph num="(a)">
          <text>Obtain approval from the Department to leave the piping in place; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Properly abandon and replace the piping not later than 1 year after June 13, 2022 with piping that does not penetrate the secondary containment dike; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>For underground piping connected to an AST, ensure the piping complies with the underground piping requirements in §E of this regulation not later than 1 year after June 13, 2022;</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Ensure an aboveground piping system connected to a shop-fabricated AST is:</text>
      <paragraph num="(1)">
        <text>Constructed of carbon steel, alloy steel, or stainless steel piping;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Compatible with the type of oil transferred in the piping;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Designed and constructed in accordance with recognized industry standards;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Liquid tight;</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Properly supported by permanent bracing to prevent structural weaknesses; and</text>
      </paragraph>
      <paragraph num="(6)">
        <text>Protected against physical damage;</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Ensure a piping system installed aboveground or inside of a building is not constructed with:</text>
      <paragraph num="(1)">
        <text>Low melting point materials, such as aluminum, copper, or brass;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Materials that soften on fire exposure, such as plastics; or</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Non-ductile materials, such as cast iron;</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>If installing an underground piping system, comply with the following requirements:</text>
      <paragraph num="(1)">
        <text>Install the piping system, including containment sumps, in accordance with the performance standards in COMAR 26.10.03.02 and .03A(3);</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Installation of the piping system is performed in the continuous on-site presence and under the direction of a certified UST system technician, as required under COMAR 26.10.02.03D;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Test the piping system for tightness in accordance with COMAR 26.10.03.05 and 26.10.05.02D;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Test the containment sumps for tightness in accordance with COMAR 26.10.03.03A(3);</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Provide a method of leak detection in accordance with COMAR 26.10.05.02D;</text>
      </paragraph>
      <paragraph num="(6)">
        <text>Maintain the containment sumps clean and free of liquid; and</text>
      </paragraph>
      <paragraph num="(7)">
        <text>If a test for tightness conducted in accordance with §E(3) or (4) of this regulation results in a failed test result or a leak is found:</text>
        <paragraph num="(a)">
          <text>Report the failed test result to the Department within 2 hours in accordance with COMAR 26.10.08.01; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Follow the investigation and confirmation procedures in COMAR 26.10.08.03, including making repairs and retesting the piping system and containment sumps for tightness.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".07" heading="Secondary Containment.">
    <paragraph num="A.">
      <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall surround the AST system with a continuous secondary containment dike that meets the requirements of this regulation if:</text>
      <paragraph num="(1)">
        <text>The shop-fabricated AST is a single-walled AST with a capacity of 10,000 gallons or greater;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The shop-fabricated AST is a double-walled AST with a capacity of 10,000 gallons or greater, unless the double-walled shop-fabricated AST meets the conditions in §B of this regulation; or</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The Department determines that the AST system poses a water pollution hazard due to its size, nature, or location.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>An owner, an operator, and a person in charge of an AST system with a double-walled shop-fabricated AST is exempt from the requirement to install a secondary containment dike around the double-walled shop-fabricated AST provided the AST system:</text>
      <paragraph num="(1)">
        <text>Has overfill prevention equipment in accordance with Regulation .08 of this chapter;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Has a method of release detection in accordance with Regulation .09 of this chapter;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Is located within a secured area; and</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Meets one of the following conditions:</text>
        <paragraph num="(a)">
          <text>The AST system is part of a motor fuel dispensing facility, has a storage capacity not greater than 12,000 gallons, and stores a Class I liquid;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The AST system is part of a motor fuel dispensing facility, has a storage capacity not greater than 15,000 gallons, and stores a Class II liquid; or</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The AST system is not part of a motor fuel dispensing facility, has a storage capacity not greater than 20,000 gallons, and stores a Class II liquid or Class III liquid.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Compliance Schedule.</text>
      <paragraph num="(1)">
        <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST that has a new secondary containment dike shall meet the requirements in §§D—J of this regulation upon installation of the secondary containment dike.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Unless otherwise provided in this regulation, an owner, an operator, and a person in charge of an AST system with a shop-fabricated AST that has an existing secondary containment dike shall meet the requirements in §§D—J of this regulation not later than:</text>
        <paragraph num="(a)">
          <text>2 years after June 13, 2022; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Another time period approved by the Department.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST required under §A of this regulation to have a secondary containment dike shall ensure the secondary containment dike:</text>
      <paragraph num="(1)">
        <text>Can contain a spill, release, or discharge from an AST and connected piping within the secondary containment dike surrounding the AST until the spill, release, or discharge is detected and removed;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Is designed by a professional engineer;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Is approved by the Department;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Is designed with consideration given to the soil and groundwater conditions at the oil storage facility or oil handling facility;</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Prevents movement of oil into, near, or in an area likely to pollute waters of the State;</text>
      </paragraph>
      <paragraph num="(6)">
        <text>Provides safe ingress and egress for an individual;</text>
      </paragraph>
      <paragraph num="(7)">
        <text>Prevents water accumulation at an AST foundation;</text>
      </paragraph>
      <paragraph num="(8)">
        <text>If the secondary containment dike surrounds two or more ASTs, is subdivided in accordance with NFPA 30 “Flammable and Combustible Liquids Code”;</text>
      </paragraph>
      <paragraph num="(9)">
        <text>If the secondary containment dike is exposed to precipitation, is designed and constructed to effectively hold 110 percent of the maximum capacity of the largest AST in the area enclosed by the secondary containment dike; and</text>
      </paragraph>
      <paragraph num="(10)">
        <text>Is constructed so that the secondary containment dike, upon testing, meets one of the following permeability criteria:</text>
        <paragraph num="(a)">
          <text>A permeability of less than 10-4 centimeters per second; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A product level drop rate of less than 1 centimeter per 3 hours.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Within 90 days of conducting a permeability test on a secondary containment dike or another time period approved by the Department, an owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall repair or replace a secondary containment dike that does not meet one of the permeability criteria listed in §D(10) of this regulation.</text>
    </paragraph>
    <paragraph num="F.">
      <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST that has an earthen secondary containment dike shall conduct permeability testing on the earthen secondary containment dike according to the following requirements:</text>
      <paragraph num="(1)">
        <text>For an existing earthen secondary containment dike that has not been previously tested for permeability, test the existing earthen secondary containment dike for permeability using an industry standard approved by the Department not later than 1 year after June 13, 2022;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Test a new earthen secondary containment dike for permeability using an industry standard approved by the Department upon completing the construction of the earthen secondary containment dike and prior to placing the AST in-service; and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Submit the results of the permeability testing to the Department not later than 60 days after the test.</text>
      </paragraph>
    </paragraph>
    <paragraph num="G.">
      <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST that has a secondary containment dike shall maintain written verification that the secondary containment dike meets the applicable requirements in §D—F of this regulation in accordance with Regulation .14 of this chapter.</text>
    </paragraph>
    <paragraph num="H.">
      <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST that has a secondary containment dike shall ensure a drain valve installed in the secondary containment dike is:</text>
      <paragraph num="(1)">
        <text>Not a flapper-type valve; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Except when being used to drain trapped water in accordance with §I of this regulation, kept completely closed and locked at all times.</text>
      </paragraph>
    </paragraph>
    <paragraph num="I.">
      <text>When draining trapped water from a secondary containment dike, an owner, an operator, and a person in charge of an AST system with a shop-fabricated AST that has the secondary containment dike shall:</text>
      <paragraph num="(1)">
        <text>Ensure the drainage leaving the secondary containment dike does not have any visible evidence of oil sheen;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Designate a representative to supervise, monitor, and document each drainage event from the secondary containment dike;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Keep a log that includes the following information for each secondary containment dike drainage event:</text>
        <paragraph num="(a)">
          <text>The name of the employee supervising, monitoring, and documenting the drainage;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The date of drainage event;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The time the drainage event started and ended;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>The estimated volume of water drained; and</text>
        </paragraph>
        <paragraph num="(e)">
          <text>A description of the water quality, such as the presence of an oil sheen; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>Maintain the log required by §I(3) of this regulation in accordance with Regulation .14 of this chapter.</text>
      </paragraph>
    </paragraph>
    <paragraph num="J.">
      <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST that has a secondary containment dike shall maintain the secondary containment dike clear and free of:</text>
      <paragraph num="(1)">
        <text>Vegetation; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Flammable and combustible materials, including oil.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".08" heading="Spill and Overfill Prevention.">
    <paragraph num="A.">
      <text>To prevent a spill, release, or discharge of oil due to an overfill of a shop-fabricated AST, an owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall:</text>
      <paragraph num="(1)">
        <text>Establish written procedures for filling the AST and maintain the procedures at the oil storage facility or oil handling facility;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Ensure the AST is:</text>
        <paragraph num="(a)">
          <text>Normally filled to a level that does not exceed the maximum working level of the AST; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Never filled to the overfill level of the AST; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>If required under NFPA 30 “Flammable and Combustible Liquids Code” or §G of this regulation, install, operate, inspect, maintain, and test overfill prevention equipment in accordance with:</text>
        <paragraph num="(a)">
          <text>The requirements of this regulation and Regulation .12 of this chapter;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>NFPA 30 “Flammable and Combustible Liquids Code”; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>PEI RP 600 “Recommended Practices for Overfill Prevention for Shop-Fabricated Aboveground Tanks”.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST may not use overfill prevention equipment:</text>
      <paragraph num="(1)">
        <text>To control AST filling operations at an oil storage facility or oil handling facility; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>That restricts or interferes with the functioning of the normal or emergency vent of the AST.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>In accordance with COMAR 26.10.08.04, an owner, an operator, and a person in charge of an AST system with a shop-fabricated AST and a responsible party shall:</text>
      <paragraph num="(1)">
        <text>Report and investigate a spill, release, or discharge from the AST system or an overfill; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Remediate the spill, release, or discharge or the overfill.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Delivery and Transfer Operations. An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall:</text>
      <paragraph num="(1)">
        <text>Confirm that the ullage available in the AST is greater than the volume of oil to be transferred to the AST before a delivery or transfer begins;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>During a delivery or transfer operation, ensure:</text>
        <paragraph num="(a)">
          <text>A spill, release, or discharge of oil does not occur due to overfilling the AST or spilling oil during the transfer; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The delivery or transfer operation is constantly monitored to prevent overfilling of the AST and spilling of oil;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Ensure the delivery or transfer operation is conducted in accordance with the requirements in COMAR 26.10.01.16—.18 and NFPA 385 “Standard for Tank Vehicles for Flammable and Combustible Liquids”; and</text>
      </paragraph>
      <paragraph num="(4)">
        <text>If the delivery is by truck tank or transport with a cargo tank capacity of 500 gallons or greater, confirm the company making an oil delivery or transfer holds a valid Individual Oil Operations Permit from the Department in accordance with COMAR 26.10.01.09.</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Liquid Level Measurements. An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall:</text>
      <paragraph num="(1)">
        <text>Gauge the liquid level and record the measurements in writing before filling the AST; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Maintain the records required under §E(1) of this regulation in accordance with Regulation .14 of this chapter.</text>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>Tank Gauge. An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall:</text>
      <paragraph num="(1)">
        <text>Equip the shop-fabricated AST with a tank gauge or other equivalent monitoring device that is:</text>
        <paragraph num="(a)">
          <text>Directly visible during a transfer operation;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Accurately measures the level or quantity of oil in the AST;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Independent of any overfill prevention equipment; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Maintained in working order;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Install and maintain the tank gauge or other equivalent monitoring device in accordance with the manufacture’s specifications; and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Inspect and calibrate the tank gauge or other equivalent monitoring device at least once per year.</text>
      </paragraph>
    </paragraph>
    <paragraph num="G.">
      <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST that has a storage capacity of 10,000 gallons or greater and is not located within a secondary containment dike shall install the following overfill prevention equipment on the AST system:</text>
      <paragraph num="(1)">
        <text>An overfill alarm that:</text>
        <paragraph num="(a)">
          <text>Has a test function to allow the operability of the device to be confirmed prior to each delivery or transfer of oil;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Consists of a visual alarm and an audible alarm that alerts an individual involved in the oil delivery or transfer operation; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Goes into alarm when the liquid level in the AST reaches 90 percent of the overfill level and upon failure or malfunction of the overfill device; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>An automatic shut-off device that:</text>
        <paragraph num="(a)">
          <text>Has a test function to allow the operability of the device to be confirmed prior to each delivery or transfer of oil;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Automatically shuts off the flow of oil into the AST when the liquid level reaches 95 percent of the overfill level; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Is equipped with a fail-safe mechanism that will trigger an alarm and shut off the flow of oil into the AST in the event of a device failure or malfunction.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="H.">
      <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST using overfill prevention equipment shall:</text>
      <paragraph num="(1)">
        <text>At least monthly, inspect and perform maintenance of overfill protection equipment in accordance with the manufacturer’s instructions; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>At least annually, perform functional testing of overfill protection equipment in accordance with the manufacturer’s instructions.</text>
      </paragraph>
    </paragraph>
    <paragraph num="I.">
      <text>Labeling. An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall:</text>
      <paragraph num="(1)">
        <text>Provide the following labeling on the AST system:</text>
        <paragraph num="(a)">
          <text>The storage capacity of the AST in gallons;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The type of oil stored or last stored in the AST prior to being placed out-of-service;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>A proper NFPA 704 “Standard System for the Identification of the Hazards of Materials for Emergency Response” placard; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>If the AST system was placed out-of-service in accordance with Regulation .13 of this chapter, the words “OUT-OF-SERVICE” or “EMPTY”; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Permanently and clearly mark the shop-fabricated AST with the information listed in §I(1) of this regulation on, not less than two sides of the AST and in locations that are highly visible to employees of an oil storage facility or oil handling facility, contractors, government representatives, and emergency response personnel.</text>
      </paragraph>
    </paragraph>
    <paragraph num="J.">
      <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall maintain records related to spill and overfill prevention measures required under this regulation in accordance with Regulation .14 of this chapter.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".09" heading="Release Detection.">
    <paragraph num="A.">
      <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall provide a method or combination of release detection methods that detect a spill, release, or discharge from the AST system through:</text>
      <paragraph num="(1)">
        <text>Visual inspections of the AST system in accordance with Regulation .12 of this chapter;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A continuous electronic release detection system; or</text>
      </paragraph>
      <paragraph num="(3)">
        <text>A continuous mechanical release detection system.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST using a continuous electronic or mechanical release detection system shall:</text>
      <paragraph num="(1)">
        <text>Install, calibrate, operate, and maintain the release detection system in accordance with the manufacturer’s instructions; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>At least annually:</text>
        <paragraph num="(a)">
          <text>Perform routine maintenance on the release detection system;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Check the release detection system for operability at scheduled service checks; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Per the manufacturer’s specifications, inspect, field-test, or calibrate the release detection system to verify that the selected release detection method is being maintained and operated properly to detect a spill, release, or discharge.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall monitor underground piping connected to the AST for spill, releases, and discharges in accordance with COMAR 26.10.05.02D.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".10" heading="Corrosion Protection.">
    <paragraph num="A.">
      <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST that has a capacity less than 10,000 gallons shall install an elevated AST so that the storage tank is not in direct contact with soil or another material that may allow moisture penetration or corrosion.</text>
    </paragraph>
    <paragraph num="B.">
      <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST that has a capacity of 10,000 gallons or greater, is not an elevated AST, and in direct contact with soil or another material that may allow moisture penetration or corrosion shall:</text>
      <paragraph num="(1)">
        <text>Provide one of the following cathodic protection systems:</text>
        <paragraph num="(a)">
          <text>An impressed current system;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A galvanic system; or</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Subject to the approval of the Department, an alternative method of corrosion protection that is:</text>
          <paragraph num="(i)">
            <text>Designed to prevent a spill, release, or discharge of oil or a threatened spill, release, or discharge of oil in a manner determined by the Department to be not less protective of human health and the environment than the methods in §B(1)(a) and (b) of this regulation; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Approved by a corrosion expert; and</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Provide a cathodic protection system that is:</text>
        <paragraph num="(a)">
          <text>Designed by a corrosion expert;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Designed and tested, at a minimum, in accordance with the following industry standards and recommended practices:</text>
          <paragraph num="(i)">
            <text>NACE SP0169-2013 “Control of External Corrosion on Underground or Submerged Metallic Piping Systems”;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>NACE SP0193-2016 “Application of Cathodic Protection to Control External Corrosion of Carbon Steel On-Grade Storage Tank Bottoms”;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>NACE TM0497-2018 “Measurement Techniques Related to Criteria for Cathodic Protection on Underground or Submerged Metallic Piping Systems”; and</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>API Recommended Practice 651 “Cathodic Protection of Aboveground Petroleum Storage Tanks”;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(c)">
          <text>Designed and installed to provide continuous corrosion protection to the external portion of the AST and other metal components of the AST system in contact with soil or other materials that may allow corrosion;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Installed with easily identifiable test stations, access points, or other methods to monitor the operation and functionality of the cathodic protection system; and</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Continuously operated and maintained for the in-service and out-of-service life of the AST system.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Impressed Current System. An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST system protected by an impressed current system shall:</text>
      <paragraph num="(1)">
        <text>Install, operate, maintain, inspect, and test the impressed current system in accordance with the requirements of this section;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Ensure the impressed current source is not de-energized at any time except to perform service work on the AST system;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Ensure the impressed current source is equipped with a continuously operating meter that displays the voltage, amperage, and operating (run) time;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>At least once every 60 days:</text>
        <paragraph num="(a)">
          <text>Inspect the impressed current system to ensure the cathodic protection system is functioning properly by:</text>
          <paragraph num="(i)">
            <text>Verifying the power source to the impressed current system is on; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Recording the voltage, amperage, and operating time; and</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Record and maintain the inspection results in accordance with Regulation .14 of this chapter;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>At least annually:</text>
        <paragraph num="(a)">
          <text>Have a cathodic protection tester inspect and test:</text>
          <paragraph num="(i)">
            <text>The impressed current system for electrical shorts, ground connections, meter accuracy, and circuit resistance; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>The condition of the impressed current system’s isolating devices, continuity bonds, and insulators; and</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Record and maintain the results of the inspection and test in accordance with Regulation .14 of this chapter;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(6)">
        <text>Have a corrosion expert inspect the impressed current system in accordance with an industry standard or recommended practice listed in §B(2) of this regulation:</text>
        <paragraph num="(a)">
          <text>When the impressed current system is 5 years of age; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Every 5 years thereafter;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(7)">
        <text>Provide a complete report for an inspection performed pursuant to §C(6) of this regulation to the Department and maintain a copy of the report in accordance with Regulation .14 of this chapter;</text>
      </paragraph>
      <paragraph num="(8)">
        <text>Except as provided in §C(9) of this regulation, if the protection provided by an impressed current system is determined to be inadequate to properly protect the AST system:</text>
        <paragraph num="(a)">
          <text>Employ a corrosion expert to determine the cause of the inadequacy within 30 days of the discovery; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Either:</text>
          <paragraph num="(i)">
            <text>Complete repairs of the impressed current system within 60 days of the discovery or on a schedule approved by the Department; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>If repairs cannot return the impressed current system to adequate performance, replace the impressed current system within 120 days of the discovery or on a schedule approved by the Department; and</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(9)">
        <text>If an impressed current system determined to be inadequate to provide proper protection to the AST system cannot be repaired or replaced in accordance with §C(8) of this regulation:</text>
        <paragraph num="(a)">
          <text>Empty all oil in contact with the portion of the AST system inadequately protected by the impressed current system; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Place the AST system out-of-service in accordance with Regulation .13 of this chapter.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Galvanic System. An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST system protected by a galvanic system shall:</text>
      <paragraph num="(1)">
        <text>Install, operate, maintain, inspect, and test the galvanic system in accordance with the requirements of this section;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Comply with the following inspection and test requirements:</text>
        <paragraph num="(a)">
          <text>A cathodic protection tester shall inspect and test the galvanic system in accordance with an industry standard or recommended practice listed in §B(2) of this regulation:</text>
          <paragraph num="(i)">
            <text>Within 6 months of installing the galvanic system; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>At least annually thereafter;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>A cathodic protection tester conducting an annual inspection shall make and record a sufficient number of AST-to-soil and underground piping-to-soil potential measurements to determine if the AST system is completely protected in accordance with an industry standard or recommended practice listed in §B(2) of this regulation; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Maintain records of the AST-to-soil and underground piping-to-soil potential measurements in accordance with Regulation .14 of this chapter;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Except as provided under §D(4) of this regulation, if the protection provided by a galvanic system is determined to be inadequate to properly protect the AST system:</text>
        <paragraph num="(a)">
          <text>Employ a corrosion expert to determine the cause of the inadequacy within 30 days of the discovery; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Either:</text>
          <paragraph num="(i)">
            <text>Complete repairs of the galvanic system within 60 days of the discovery or on a schedule approved by the Department; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>If repairs cannot return the galvanic system to adequate performance, replace the galvanic system within 120 days of the discovery or on a schedule approved by the Department; and</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>If a galvanic system determined to be inadequate to provide proper protection to the AST system cannot be repaired or replaced in accordance with §D(3) of this regulation:</text>
        <paragraph num="(a)">
          <text>Empty all oil in contact with the portion of the AST system inadequately protected by the galvanic system; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Place the AST system out-of-service in accordance with Regulation .13 of this chapter.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".11" heading="Normal and Emergency Venting.">
    <paragraph num="A.">
      <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall ensure the normal venting for the shop-fabricated AST meets the following requirements:</text>
      <paragraph num="(1)">
        <text>Design and construct the normal venting in accordance with one of the following industry standards:</text>
        <paragraph num="(a)">
          <text>UL 142 “Standard for Safety, Steel Aboveground Tanks for Flammable and Combustible Liquids”; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>API Standard 2000 “Venting Atmospheric and Low-pressure Storage Tanks”;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>The normal venting requirements for ASTs listed in NFPA 30 “Flammable and Combustible Liquids Code”; and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Vent an atmospheric pressure AST to prevent the development of vacuum or pressure above a 1.0 psi (6.9 kPa) maximum operating pressure.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall ensure the emergency venting for the shop-fabricated AST meets the following requirements:</text>
      <paragraph num="(1)">
        <text>Design and construct emergency venting in accordance with one of the following industry standards:</text>
        <paragraph num="(a)">
          <text>UL 142 “Standard for Safety, Steel Aboveground Tanks for Flammable and Combustible Liquids”; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>API Standard 2000 “Venting Atmospheric and Low-pressure Storage Tanks”; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Emergency venting meets the requirements in NFPA 30 “Flammable and Combustible Liquids Code”.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".12" heading="Inspection Requirements for an AST System.">
    <paragraph num="A.">
      <text>Periodic Visual Inspections.</text>
      <paragraph num="(1)">
        <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall conduct periodic visual inspections in accordance with:</text>
        <paragraph num="(a)">
          <text>The inspection procedures under §A(2) or (3) of this regulation; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The recordkeeping requirements under §A(4) and (5) of this regulation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST may meet the visual inspections requirement in §A(1) of this regulation by, at a minimum:</text>
        <paragraph num="(a)">
          <text>Inspecting for the following conditions monthly:</text>
          <paragraph num="(i)">
            <text>Signs of spills, releases, or discharges from any portion of the AST system;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Water in the secondary containment dike and AST or, if a double-walled AST, the primary storage tank and interstice;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>The condition of the secondary containment dike, including drain valves;</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Signs of shell distortion;</text>
          </paragraph>
          <paragraph num="(v)">
            <text>Signs of settlement;</text>
          </paragraph>
          <paragraph num="(vi)">
            <text>Signs of corrosion;</text>
          </paragraph>
          <paragraph num="(vii)">
            <text>The condition of the AST foundation or supports;</text>
          </paragraph>
          <paragraph num="(viii)">
            <text>The condition of the exterior coating of the AST system;</text>
          </paragraph>
          <paragraph num="(ix)">
            <text>The condition of seams, rivets, and nozzle connections;</text>
          </paragraph>
          <paragraph num="(x)">
            <text>The condition of valves, pumps, piping, and other appurtenances directly connected to the AST;</text>
          </paragraph>
          <paragraph num="(xi)">
            <text>The condition of the tank gauge or an equivalent monitoring device;</text>
          </paragraph>
          <paragraph num="(xii)">
            <text>The condition of release detection systems; and</text>
          </paragraph>
          <paragraph num="(xiii)">
            <text>The condition of overfill protection equipment;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Inspecting containment sumps associated with an underground piping system monthly by:</text>
          <paragraph num="(i)">
            <text>Checking for evidence of a spill, release or discharge; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Removing any liquid or debris; and</text>
          </paragraph>
        </paragraph>
        <paragraph num="(c)">
          <text>Removing any water found during the monthly inspection from the secondary containment dike and AST or, if a double-walled AST, the primary storage tank and interstice.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST may meet the periodic visual inspections requirement in §A(1) of this regulation by conducting periodic AST inspections in accordance with STI/SPFA SP001 “Standard for the Inspection of Aboveground Storage Tanks”.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall maintain the following records related to periodic visual inspections:</text>
        <paragraph num="(a)">
          <text>If the AST system was inspected in accordance with §A(2) of this regulation, a written log or electronic record that includes:</text>
          <paragraph num="(i)">
            <text>The date of the inspection;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>The name and title of the individual performing the inspection;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>A description of each deficiency found;</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>The name and title of the individual notified of the deficiencies found; and</text>
          </paragraph>
          <paragraph num="(v)">
            <text>A record of how and when the deficiencies were corrected; and</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>If the AST system was inspected in accordance with §A(3) of this regulation, the completed monthly and annual inspection checklists in STI/SPFA SP001 “Standard for the Inspection of Aboveground Storage Tanks”.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall maintain the records required in §A(4) of this regulation in accordance with Regulation .14 of this chapter.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall conduct corrosion protection system inspections in accordance with Regulation .10 of this chapter.</text>
    </paragraph>
    <paragraph num="C.">
      <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall:</text>
      <paragraph num="(1)">
        <text>Inspect and clean normal and emergency vents for the shop-fabricated AST annually; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Maintain records of the vent inspection and cleaning required in §C(1) of this regulation in accordance with Regulation .14 of this chapter.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Formal Inspections and Leak Testing. In accordance with the procedures in STI/SPFA SP001 “Standard for the Inspection of Aboveground Storage Tanks”, an owner, an operator, and a person in charge of an oil storage facility or oil handling facility operating under an Individual Oil Operations Permit required under COMAR 26.10.01.09A shall:</text>
      <paragraph num="(1)">
        <text>As described in Section 5.0 of STI/SPFA SP001 “Standard for the Inspection of Aboveground Storage Tanks”, determine the formal inspection and leak testing schedule by the shop-fabricated AST size and category;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Have a certified inspector conduct formal external inspections and formal internal inspections on a shop-fabricated AST;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Have properly trained personnel conduct leak tests on a shop-fabricated AST in conjunction with a certified inspector conducting formal inspections on the shop-fabricated AST; and</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Comply with the formal inspection report requirements under §E of this regulation.</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Formal Inspection Report.</text>
      <paragraph num="(1)">
        <text>The certified inspector that conducts a formal external inspection or formal internal inspection of a shop-fabricated AST in accordance with §D of this regulation shall complete a final report for the formal inspection that, at a minimum:</text>
        <paragraph num="(a)">
          <text>Includes field data, measurements, pictures, drawings, tables, and an inspection summary;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Identifies unacceptable conditions and recommends corrective actions;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Determines the suitability of the AST for continued service per Section 10.0 of STI/SPFA SP001 “Standard for the Inspection of Aboveground Storage Tanks”;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Includes the date of the next scheduled formal external inspection or formal internal inspection; and</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Includes the name and STI SP001 certification number of the certified inspector.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>An owner, an operator, and a person in charge of an oil storage facility described in §D of this regulation shall:</text>
        <paragraph num="(a)">
          <text>Include the leak test results and supporting data in the final report for a shop-fabricated AST required under §E(1) of this regulation; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Maintain the final reports completed for each formal inspection and leak test conducted on a shop-fabricated AST in accordance with Regulation .14 of this chapter.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".13" heading="Out-of-Service and Permanent Closure.">
    <paragraph num="A.">
      <text>The requirements of this regulation apply to an owner, an operator, and a person in charge of an AST system with a shop-fabricated AST required under COMAR 26.10.01.10 to register the AST system with the Department.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Out-of-Service. An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall complete each of the following steps to place the AST system out-of-service:</text>
      <paragraph num="(1)">
        <text>Remove all oil from the AST system;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Isolate all piping connected to the AST;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Remove all waste materials from the AST system, including storage tank-bottom sludge, and dispose of these materials in compliance with applicable federal, State, and local laws;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Purge all petroleum vapors and maintain the AST system vapor free;</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Secure the AST system to prevent unauthorized entrance or tampering;</text>
      </paragraph>
      <paragraph num="(6)">
        <text>Protect the AST system from flotation;</text>
      </paragraph>
      <paragraph num="(7)">
        <text>Continue the operation and maintenance of corrosion protection on the AST system in accordance with Regulation .10 of this chapter;</text>
      </paragraph>
      <paragraph num="(8)">
        <text>Lock the fill port;</text>
      </paragraph>
      <paragraph num="(9)">
        <text>Label the AST using lettering at least 3 inches high, in a readily visible location on the AST, with the following information:</text>
        <paragraph num="(a)">
          <text>Date the AST was placed out-of-service;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Name of product last stored; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The words “OUT-OF-SERVICE” or “EMPTY”; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(10)">
        <text>Notify the Department in writing 30 days before placing the AST system out-of-service.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Return to In-Service. An owner, an operator, and a person in charge of an out-of-service AST system with a shop-fabricated AST shall complete each of the following steps prior to placing the AST system in-service:</text>
      <paragraph num="(1)">
        <text>If a formal inspection and leak test was due to occur while the AST system was out-of-service, conduct a formal inspection and leak test of the AST system in accordance with Regulation .12 of this chapter;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Test all connected piping and appurtenances to ensure a spill, release, or discharge will not occur;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Maintain a copy of all corrosion protection system and formal inspection and testing reports, including the findings of inspections and tests and repairs performed, and provide a copy to the Department upon request; and</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Notify the Department in writing 30 days before placing the AST system in-service.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Permanent Closure. An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall permanently close the AST system in accordance with the following requirements:</text>
      <paragraph num="(1)">
        <text>At least 30 days before beginning the permanent closure of the AST system:</text>
        <paragraph num="(a)">
          <text>Notify the Department in writing of the planned AST system permanent closure; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Submit to the Department for approval a proposed sampling plan for a site assessment to determine if there is evidence of a spill, release, or discharge where contamination is most likely to be present, which includes the sampling of, at a minimum, the following areas of the AST site:</text>
          <paragraph num="(i)">
            <text>Within and immediately outside of the secondary containment dike, if present;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Within the footprint of the removed AST; and</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Beneath underground piping associated with the removed AST;</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Place the AST system out-of-service in accordance with §B of this regulation;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Comply with PEI RP 1700 “Recommended Practices for the Closure of Underground Storage Tank and Shop-Fabricated Aboveground Storage Tank Systems”;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Disconnect and remove all aboveground piping associated with the AST system;</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Disconnect and remove all underground piping associated with the AST system:</text>
        <paragraph num="(a)">
          <text>Under the continuous on-site presence and direction of a certified UST system technician or remover; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>In accordance with the UST system permanent closure procedures in COMAR 26.10.10.02D;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(6)">
        <text>Remove the AST and associated piping from the site; and</text>
      </paragraph>
      <paragraph num="(7)">
        <text>Within 45 days of completing the permanent closure and approved site assessment, submit a closure report to the Department detailing:</text>
        <paragraph num="(a)">
          <text>The AST closure activities; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The results of the sampling event, including a map identifying sample locations, laboratory results, summary of findings, and conclusions.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Change-in-Service. An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST placing the AST system out-of-service in order to store a non-oil product in the AST system shall:</text>
      <paragraph num="(1)">
        <text>Notify the Department in writing at least 30 days before placing the AST system out-of-service; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Place the AST system out-of-service in accordance with the requirements of the Department.</text>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>Upon completing an out-of-service activity specified §§B—E of this regulation, an owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall:</text>
      <paragraph num="(1)">
        <text>Within 30 days, amend the AST system registration with the Department in accordance with COMAR 26.10.01.10; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>If the oil storage facility or oil handling facility is required under COMAR 26.10.01.09 to be operated under an Individual Oil Operation Permit, submit a request to modify the Individual Oil Operations Permit in accordance with COMAR 26.10.01.12.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".14" heading="Recordkeeping.">
    <text>An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall:</text>
    <paragraph num="A.">
      <text>Maintain the records required under this chapter at the oil storage facility or oil handling facility, or another a readily accessible location;</text>
    </paragraph>
    <paragraph num="B.">
      <text>Provide the records to the Department upon request;</text>
    </paragraph>
    <paragraph num="C.">
      <text>Retain the following records for a minimum of 5 years:</text>
      <paragraph num="(1)">
        <text>Records of periodic visual inspections conducted in accordance with Regulation .12A of this chapter;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Records of annual normal and emergency vent inspections and cleaning conducted in accordance with Regulation .12C of this chapter;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Inventory control records;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Overfill prevention equipment testing records;</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Release detection records;</text>
      </paragraph>
      <paragraph num="(6)">
        <text>Secondary containment dike drainage logs;</text>
      </paragraph>
      <paragraph num="(7)">
        <text>Tank gauging device calibration records; and</text>
      </paragraph>
      <paragraph num="(8)">
        <text>Testing records for aboveground and underground piping; and</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Retain the following AST system records for the operational life of an AST system and for at least 5 years after an AST system was permanently closed in accordance with Regulation .13 of this chapter:</text>
      <paragraph num="(1)">
        <text>Construction records, including records of:</text>
        <paragraph num="(a)">
          <text>The AST name plate information;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The original as-built specifications and drawings and any modifications made to the AST system during the operational life of the AST system;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Applicable manufacturer’s documentation for ancillary equipment;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Tests conducted upon completing an installation or repair of an AST system component, including hydrostatic testing and pressure tightness testing;</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Material tests and analyses, including secondary containment dike permeability tests; and</text>
        </paragraph>
        <paragraph num="(f)">
          <text>The names of the companies performing construction activities and a description of the work performed;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Cathodic protection system inspections records for impressed current and galvanic systems, including records of:</text>
        <paragraph num="(a)">
          <text>Cathodic protection system design description;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Inspection findings and conclusions;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Recommendations; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Testing and repair records;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>A complete copy of each final report for a formal inspection;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Records of AST system repairs and alteration history, including names of companies completing repair work;</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Records of secondary containment dike testing and evaluation;</text>
      </paragraph>
      <paragraph num="(6)">
        <text>Records of spills, releases, and discharges and written reports of the occurrences required by COMAR 26.10.01.05E; and</text>
      </paragraph>
      <paragraph num="(7)">
        <text>A closure report for an AST system permanently closed in accordance with Regulation .13 of this chapter.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <annotations>
    <annotation type="Authority">Environment Article, §§4-401—4-403, 4-405, 4-406, 4-408, 4-410—4-412, 4-415-1—4-418, 4-501, and 4-502, Annotated Code of Maryland</annotation>
    <annotation type="History" subtype="Administrative History">Effective date: June 13, 2022 (49:12 Md. R. 642)</annotation>
  </annotations>
</chapter>