<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".05" citation="COMAR 26.10.18.05" title_num="26" subtitle_num="10" chapter_num="18" heading="Performance Standards for Piping.">
  <text>An owner, an operator, and a person in charge of an AST system with a field-erected AST shall:</text>
  <paragraph num="A.">
    <text>If installing or relocating a field-erected AST on or after June 13, 2022, install piping that does not penetrate a secondary containment dike, unless otherwise approved by the Department;</text>
  </paragraph>
  <paragraph num="B.">
    <text>Ensure an existing field-erected AST meets the following requirements:</text>
    <paragraph num="(1)">
      <text>For piping connected to an AST penetrating a secondary containment dike:</text>
      <paragraph num="(a)">
        <text>Obtain approval of the Department to leave the piping in place; or</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Properly abandon and replace the piping not later than 1 year after June 13, 2022 with piping that does not penetrate the secondary containment dike; and</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>For underground piping connected to an AST, ensure the piping complies with the underground piping requirements in §E of this regulation not later than 1 year after June 13, 2022;</text>
    </paragraph>
  </paragraph>
  <paragraph num="C.">
    <text>Ensure an aboveground piping system connected to a field-erected AST is:</text>
    <paragraph num="(1)">
      <text>Constructed of carbon steel, alloy steel, or stainless steel piping;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Compatible with the type of oil being transferred;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Designed and constructed in accordance with industry recognized standards;</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Liquid tight;</text>
    </paragraph>
    <paragraph num="(5)">
      <text>Properly supported by permanent bracing to prevent structural weaknesses; and</text>
    </paragraph>
    <paragraph num="(6)">
      <text>Protected against physical damage;</text>
    </paragraph>
  </paragraph>
  <paragraph num="D.">
    <text>Ensure a piping system installed aboveground or inside of a building is not constructed with:</text>
    <paragraph num="(1)">
      <text>Low melting point materials, such as aluminum, copper, or brass;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Materials that soften on fire exposure, such as plastics; or</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Non-ductile materials, such as cast iron; and</text>
    </paragraph>
  </paragraph>
  <paragraph num="E.">
    <text>If installing an underground piping system, comply with the following requirements:</text>
    <paragraph num="(1)">
      <text>Install the piping system, including containment sumps, in accordance with the performance standards in COMAR 26.10.03.02 and .03A(3);</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Installation of the piping system is performed in the continuous on-site presence and under the direction of a certified UST system technician, as required under COMAR 26.10.02.03D;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Test the piping system for tightness in accordance with COMAR 26.10.03.05 and 26.10.05.02D;</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Test the containment sumps for tightness in accordance with COMAR 26.10.03.03A(3);</text>
    </paragraph>
    <paragraph num="(5)">
      <text>Provide a method of leak detection in accordance with COMAR 26.10.05.02D;</text>
    </paragraph>
    <paragraph num="(6)">
      <text>Maintain the containment sumps clean and free of liquid; and</text>
    </paragraph>
    <paragraph num="(7)">
      <text>If a test for tightness conducted in accordance with §E(3) or (4) of this regulation results in a failed test result or a leak is found:</text>
      <paragraph num="(a)">
        <text>Report the failed test result to the Department within 2 hours in accordance with COMAR 26.10.08.01; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Follow the investigation and confirmation procedures in 26.10.08.03, including making repairs and retesting the piping system and containment sumps for tightness.</text>
      </paragraph>
    </paragraph>
  </paragraph>
</regulation>